Loading...
HomeMy WebLinkAboutSW6170804 - ABC StorageTO GEORGE M. ROSE, P.E. P.O. Box 53441 Fayetteville, NC 28305 (910) 977-5822 Fax (910) 485-5823 dCE44103 OCA 4G3GQ nM93m044Lad DATE f->_ Zi"' t I JOB NO. ATTENTION V'/gyp� �J�/ ��► RE: /yt°L i�S�IrO'�i WE ARE SENDING YOU VTTACHED ❑ UNDER SEPARATE COVER COPIES DATE NO. DESCRIPTION 1 veep"4-gRoli ?ate SDI 2 -&gK►VA-e�-tA6r4 ?V Vt Alfl'L l G •of4 4'e- G�(,t�ll`�P lcar► � A R>U. 046 THESE ARE TRANSMITTED as checked below: ❑ FOR APPROVAL ❑ APPROVED AS SUBMITTED ❑ FOR YOUR USE ❑ APPROVED AS NOTED AUG p EQUESTED p RETURNED FOR CORRECTIONS FOR REVIEW AND COMMENT ❑ ';*,1 WD t UUA „I`CY STOR 1WATER pERIAITTINC REMARKS COPY TO SIGNED: L�. DEMLR USE ONLY Date Received , F e Paid Permit Number 21i 7 , Applicable Ruleg: ❑ Coastal SW —1995 ❑ Coastal SW — 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): 2. Location of Project (street address): Io .me "I WRIT me City:Eastover County:Cumberland Zip:28312 3. Directions to project (from nearest major intersection): Dunn Road north from U.S. 301 to intersection with Middle Road. Site is on east side of Dunn Road at the Middle Road intersection. 4. Latitude:35° 05' 48" N Longitude: -78'47'00" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ❑Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires STAU--102 - Renewal Application Form b. If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 1.80 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b. If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI- http://12ortal.ncdenr.org/web/lr/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:ABC Storage LLC Signing Official & Title:Biju George b. Contact information for person listed in item 1a above: Street Address:5604 Shady Pine Court City:Hope Mills Mailing Address (if applicable): City: Phone: (910 ) 574-0278 Email:uttakundi@hotmail.com State:NC Zip:28348 State: Fax: Zip: c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/ Organization: Signing Official & b. Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): City: Phone: ( ) State: State: Fax: Zip: Zip: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:George M. Rose Signing Official & Title:Engineer, Agent for Owner b. Contact information for person listed in item 3a above: Mailing Address:P.O. Box 53441 City:Fayetteville Phone: (910 ) 977-5822 Email:grose9295@gmail.com 4. Local jurisdiction for building permits: State:NC Zip:28305 Fax: (910 ) 485-5823 Point of Contact:Connie Spell Phone #: (910 ) 229-3716 Form SWU-101 Version Oct. 31, 2013 Page 2 of 7 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Approximately 56% of the site will not be developd at this time. Approximately 80% of the remaining 44% of the project site drains to a proposed infiltration basin on the western property line. Approximately 20% of the remaining developed portion drains towards Dunn Road. Routnzg calculations will show that overall post - development flows are less than pre -development flows. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUDApproval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW —1995 ❑ Ph II — Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 4.18 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area': 4.18 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 35.2 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Form SWU-101 Version Oct. 31, 2013 Page 3 of 7 Basin-Informatiori _ Drains e Area _ Drainage Area Drainage Area _ Drains ge,Area Receiving Stream Name Reece Creek Stream Class * C Stream Index Number * 18-28-2 Total Drainage Area (sf) 181,899 On-site Drainage Area (sf) 181,899 Off-site Drainage Area (sf) 0 Proposed Impervious Area** (sf) 64,338 % Impervious Area** (total) 35.4 ' Im ,ervious** Surface Area - ` Drainage Area`_ Drainage Area Drainage Area(- Drainage_Area _ On-site Buildings/Lots (sf) 15,000 On-site Streets (sf) 0 On-site Parking (sf) 47,759 On-site Sidewalks (sf) 1,579 Other on-site (sf) 0 Future (sf) 0 Off-site (sf) 0 Existing BUA*** (sf) 0 Total (sf): 64,338 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq[ps/csu/classifications ** Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. ***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off-site impervious area listed above determined? Provide documentation. N/A Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. Ini 'al 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants `Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to ham://www.envhel�.org/pages/onesto�ex�ress.html//www.envhel�.org/pages/onesto�ex�ress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) Form SWU-101 Version Oct. 31, 2013 Page 4 of 7 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within Y2 mile of the site boundary, include the Y2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded _ structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) „ n 102 ^ _,, A copy of the most current property deed. Deed book: " W � I 1 Page No: For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. bi!p://www.secretaU.state.nc.us/Corporations/­CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state-stormwater- forms docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and .protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. Form SWU-101 Version Oct. 31, 2013 Page 5 of 7 VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:George M. Rose Consulting Firm: George M. Rose, P.E. Mailing Address:P.O. Box 53441 City:Fayetteville State:NC Zip:28305 Phone: (910 ) 977-5822 Fax: (910 ) 485-5823 Email:grose@nc.rr.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) _ f7 l J W 00 certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) IE31JU with (print or type name of organization listed in Contact Information, item 1a)- A&� 00 4L'Ci to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: P-// 721 I, a Notary Public for the State of ���©�� County of Cu ml3tvlan�l do hereby certify that Kul u Ge -orae personally appeared before me this 1701day of A LARus+ RO0 , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, ,��aea aoe re a e®r r rrrejej a,Q®�®��ER ® °O, iO00e� TA on ®�� •ten =G` SEAL My commission expires jw-1 1 a i adac) Form SWU-101 Version 06Aug2012 Page 6 of 7 X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a,'LC `��'{ �> certify that the information included on this permit application form is, to the oest of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H.1000 and any other applicable state stormwater requirements. Signature: �' ���"— ��� Date: I `P6'a Notary Public for the State of � Q C O� �" 0- County of cram 6,-r IAJJ do hereby certify that personally appeared before me this l-1`hday of AY4iw4 , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, 44484®4III VIFIIF,,, eb0`4° R ®. ®T A��`. m ®0 ® s r Jsse'y�B�1 s� � ND Ci®v osoeooeaoe °A�0l049m 90 IIta 8944 SEAL My commission expires SCS, d IQ, a6 as Form SW -101 Version 06Aug2012 Page 7 of 7 SUPPLEMENT -EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this project: Quantity Location(s) Infiltration System 1 3768 Dunn Road, Eastover, NC 28312 Bioretention Cell Wet Pond Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader -Filter Strip Disconnected Impervious Surface Treatment Swale Dry Pond Designer information for this project: Name and Title George M Rose, P E Organization - Biu Geor e Street address P O. Box 53441 City, State, Zip Fayetteville, NC 28305 Phone number(s): 910-977-5822 Email: grose9295@gmail.com Designer .' 0..%�/ Refresh Sheet (Click Button Below) �►s ��ip • SEAL svo • ,�,�.�,� 5 a S Signature of D ign e • • • m • o a °eso�Q '• NGINS ® �a�m`'` � Oes��04ft d•• e Date Applicant: Refresh Sheet (Click Button Below) Project Name: ABC Storage Address 3768 Dunn Road City / Town Eastover, NC 28312 fnoironnim Q�alrry Company: ABC Storage, LLC Contact: Biu Geor e Mailing Address: 5604 Shady Pine Court City, State, Zip- Hope Mills, NC 28348 Phone number(s). 910-574-0278 Email: I uttakundi@hotmall.com Certification Statement I certify, under penalty of law that this Supplement -EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and - that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. Cover Page 1 129 PM 8/18/2017 I Oaeration & Maintenance Aqreement I Project Name: Project Location: ABC Storage 3768 Dunn Road, Eastover, Cumberland County Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & co Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: ding O&M tables will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s). Location(s). Location(s): Location(s). Location(s): Location(s): Location(s). Location(s). be added automatically): 3768 Dunn Road, Eastover, NC 28312 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature: ls?i Biju George Q 'Member/Manager, ABC Storage 5604 Shady Pine Court AN TT-!� Hope Mills, NC 28348 910-574-0278 UENR-LAND uttakundi@hotmail.com STORMWAFE ED I� I,n,LITY R -MUTING Date- 2 1 I, Ck6s hx RQ mp6n a Notary Public for the State of r �_�p„ir�LLK,E„ County of r f^uytn�Ula,n� do hearby certify that personally appeared before me this day of "u Zol- and acknowledge the due execution of the Operations and Maintenance Agreement. Witness my hand and official seal, %%%-\AER D. Uc •e ®TRR�•% �UB0 My commission expires STORM -EZ 8/18/2017 Version 1.4 O&M Manual Page 1 of 2 i Infiltration System Maintenance Requirements j Important maintenance procedures: - The drainage area will be carefully managed to reduce The sediment load to The infiltration basin Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. - The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it shall be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County) Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a infiltration basin erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the sediment off-site. swale applicable). The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale (if applicable). control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated Search for the source of the sediment and remedy the problem if and reduced the depth to 75% possible. Remove the sediment and dispose of it in a location where it of the original design depth. will not cause impacts to streams or the BMP Erosion has occurred or riprap Provide additional erosion protection such as reinforced turf matting or is displaced. riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying The main treatment area A visible layer of sediment has Search for the source of the sediment and remedy the problem if accumulated. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than 5 Replace the top few inches of filter media and see if this corrects the days after a storm event. standing water problem. If so, revegetate immediately If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by wiping them with pesticide (do not growing in the main treatment spray). area. The embankment Shrubs or trees have started Remove shrubs or trees immediately. to grow on the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. RM -EZ outlet. ST Version u(Nrvi iwanuai 8/18/2 17 Page 2 of 2