Loading...
HomeMy WebLinkAboutAddington Crossing Subdivision - HydroCAD Report WS1 RBP-1 BP-1 BP-2 BP-2 BP-4 Basin T DET1 Det 1 DET2 Det-2 DET3 Det 3 DR-1 DR-1 DR-2 DR-2 Ex-1 Ex WS #1 Ex-2 Ex-2 Ex-HH Ex HH Ex-PR (new Subcat) P-1 Det Pond 1 P-2 Det Pond 2 P-3 Det Pond 3 CP1 CP1 CP3 CulvertXCP1 XCP1 Routing Diagram for USI Revision WS1_Detention R Prepared by Cardno, Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcat Reach Pond Link USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 2HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pipe Listing (all nodes) Line# Node Number In-Invert (feet) Out-Invert (feet) Length (feet) Slope (ft/ft) n Diam/Width (inches) Height (inches) Inside-Fill (inches) 1 BP-1 0.00 0.00 492.0 0.0103 0.013 36.0 0.0 0.0 2 DET1 0.00 0.00 138.0 0.0057 0.013 24.0 0.0 0.0 3 DET2 0.00 0.00 944.0 0.0200 0.013 24.0 0.0 0.0 4 DET3 0.00 0.00 586.0 0.0100 0.013 24.0 0.0 0.0 5 P-1 610.83 610.58 45.2 0.0055 0.013 24.0 0.0 0.0 6 P-2 589.83 589.33 43.8 0.0114 0.013 36.0 0.0 0.0 7 P-3 581.83 581.58 33.0 0.0076 0.013 30.0 0.0 0.0 Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 3HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-1: BP-1 Runoff = 26.58 cfs @ 12.27 hrs, Volume= 115,438 cf, Depth= 2.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 10.308 70 Woods, Good, HSG C 2.590 58 Meadow, non-grazed, HSG B 2.820 68 1 acre lots, 20% imp, HSG B 15.718 68 Weighted Average 15.154 96.41% Pervious Area 0.564 3.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.7 199 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Bot.W=1.00' D=1.00' Z= 3.0 '/' Top.W=7.00' n= 0.035 0.9 492 0.0103 9.58 67.69 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.2 82 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 3.8 1,965 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.1 3,654 Total Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 4HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcatchment BP-1: BP-1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=15.718 ac Runoff Volume=115,438 cf Runoff Depth=2.02" Flow Length=3,654' Tc=30.1 min CN=68 26.58 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 5HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-2: BP-2 Runoff = 66.42 cfs @ 12.20 hrs, Volume= 267,721 cf, Depth= 1.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 18.072 70 Woods, Good, HSG C 26.981 58 Meadow, non-grazed, HSG B 45.053 63 Weighted Average 45.053 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total Subcatchment BP-2: BP-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=45.053 ac Runoff Volume=267,721 cf Runoff Depth=1.64" Flow Length=3,486' Tc=25.3 min CN=63 66.42 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 6HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-4: Basin T Runoff = 3.29 cfs @ 12.14 hrs, Volume= 11,732 cf, Depth= 1.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 109,957 58 Meadow, non-grazed, HSG B 109,957 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.9 150 0.0510 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.56" 6.0 1,003 0.0300 2.79 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 18.9 1,153 Total Subcatchment BP-4: Basin T Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)3 2 1 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=109,957 sf Runoff Volume=11,732 cf Runoff Depth=1.28" Flow Length=1,153' Tc=18.9 min CN=58 3.29 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 7HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET1: Det 1 Runoff = 14.39 cfs @ 11.98 hrs, Volume= 29,745 cf, Depth= 2.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description * 176,424 68 1 acre lots, 20% imp, HSG B 141,139 80.00% Pervious Area 35,285 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 50 0.1000 0.20 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 140 0.0167 2.08 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.4 138 0.0057 5.44 17.08 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 6.5 488 Total Subcatchment DET1: Det 1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=176,424 sf Runoff Volume=29,745 cf Runoff Depth=2.02" Flow Length=488' Tc=6.5 min CN=68 14.39 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 8HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET2: Det-2 Runoff = 36.26 cfs @ 12.02 hrs, Volume= 83,550 cf, Depth= 2.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 495,548 68 1 acre lots, 20% imp, HSG B 396,438 80.00% Pervious Area 99,110 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.5 80 0.2000 0.30 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 2.0 270 0.0200 2.28 Shallow Concentrated Flow, Swale Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 9.3 1,548 Total Subcatchment DET2: Det-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=495,548 sf Runoff Volume=83,550 cf Runoff Depth=2.02" Flow Length=1,548' Tc=9.3 min CN=68 36.26 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 9HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET3: Det 3 Runoff = 23.46 cfs @ 12.02 hrs, Volume= 56,519 cf, Depth= 2.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 228,009 79 1 acre lots, 20% imp, HSG C 182,407 80.00% Pervious Area 45,602 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 1.4 586 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 10.5 936 Total Subcatchment DET3: Det 3 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=228,009 sf Runoff Volume=56,519 cf Runoff Depth=2.97" Flow Length=936' Tc=10.5 min CN=79 23.46 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 10HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DR-1: DR-1 Runoff = 31.35 cfs @ 11.96 hrs, Volume= 62,093 cf, Depth= 2.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 250,493 79 1 acre lots, 20% imp, HSG C 200,394 80.00% Pervious Area 50,099 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR-1: DR-1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=250,493 sf Runoff Volume=62,093 cf Runoff Depth=2.97" Tc=5.0 min CN=79 31.35 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 11HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DR-2: DR-2 Runoff = 20.30 cfs @ 11.96 hrs, Volume= 40,204 cf, Depth= 2.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 162,192 79 1 acre lots, 20% imp, HSG C 129,754 80.00% Pervious Area 32,438 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR-2: DR-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=162,192 sf Runoff Volume=40,204 cf Runoff Depth=2.97" Tc=5.0 min CN=79 20.30 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 12HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-1: Ex WS #1 Runoff = 106.30 cfs @ 12.20 hrs, Volume= 424,141 cf, Depth= 1.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 1,448,958 70 Woods, Good, HSG C 1,524,134 58 Meadow, non-grazed, HSG B 2,973,092 64 Weighted Average 2,973,092 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total Subcatchment Ex-1: Ex WS #1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)115 110 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=2,973,092 sf Runoff Volume=424,141 cf Runoff Depth=1.71" Flow Length=3,486' Tc=25.3 min CN=64 106.30 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 13HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-2: Ex-2 Runoff = 19.08 cfs @ 12.26 hrs, Volume= 82,757 cf, Depth= 2.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 454,331 70 Woods, Good, HSG C 454,331 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Shallow Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.4 693 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Flow Bot.W=1.00' D=1.00' Z= 3.0 '/' Top.W=7.00' n= 0.035 Earth, dense weeds 3.6 1,844 0.0210 8.58 231.62 Channel Flow, Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.5 3,453 Total Subcatchment Ex-2: Ex-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=454,331 sf Runoff Volume=82,757 cf Runoff Depth=2.19" Flow Length=3,453' Tc=30.5 min CN=70 19.08 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 14HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-HH: Ex HH Runoff = 17.77 cfs @ 12.26 hrs, Volume= 77,837 cf, Depth= 2.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 427,324 70 Woods, Good, HSG C 427,324 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 1.8 474 0.0720 4.32 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 31.0 1,268 Total Subcatchment Ex-HH: Ex HH Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=427,324 sf Runoff Volume=77,837 cf Runoff Depth=2.19" Flow Length=1,268' Tc=31.0 min CN=70 17.77 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 15HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-PR: (new Subcat) Runoff = 7.61 cfs @ 11.90 hrs, Volume= 12,735 cf, Depth= 1.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 119,354 58 Meadow, non-grazed, HSG B 119,354 100.00% Pervious Area Subcatchment Ex-PR: (new Subcat) Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)8 7 6 5 4 3 2 1 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=119,354 sf Runoff Volume=12,735 cf Runoff Depth=1.28" Tc=0.0 min CN=58 7.61 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 16HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-1: Det Pond 1 Inflow Area = 176,424 sf, 20.00% Impervious, Inflow Depth = 2.02" for 10-Year event Inflow = 14.39 cfs @ 11.98 hrs, Volume= 29,745 cf Outflow = 9.83 cfs @ 12.05 hrs, Volume= 25,995 cf, Atten= 32%, Lag= 3.9 min Primary = 9.83 cfs @ 12.05 hrs, Volume= 25,995 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 615.76' @ 12.05 hrs Surf.Area= 5,478 sf Storage= 7,874 cf Plug-Flow detention time= 97.4 min calculated for 25,995 cf (87% of inflow) Center-of-Mass det. time= 35.7 min ( 883.4 - 847.7 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83'24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 610.83' / 610.58' S= 0.0055 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 614.93'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=9.82 cfs @ 12.05 hrs HW=615.76' (Free Discharge) 1=Culvert (Passes 9.82 cfs of 29.97 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 9.82 cfs @ 2.98 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=614.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 17HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-1: Det Pond 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=176,424 sf Peak Elev=615.76' Storage=7,874 cf 14.39 cfs 9.83 cfs9.83 cfs 0.00 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 18HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-2: Det Pond 2 Inflow Area = 495,548 sf, 20.00% Impervious, Inflow Depth = 2.02" for 10-Year event Inflow = 36.26 cfs @ 12.02 hrs, Volume= 83,550 cf Outflow = 31.97 cfs @ 12.06 hrs, Volume= 77,724 cf, Atten= 12%, Lag= 2.6 min Primary = 31.97 cfs @ 12.06 hrs, Volume= 77,724 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.01' @ 12.06 hrs Surf.Area= 9,300 sf Storage= 13,406 cf Plug-Flow detention time= 56.6 min calculated for 77,716 cf (93% of inflow) Center-of-Mass det. time= 19.1 min ( 869.4 - 850.3 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83'36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 589.83' / 589.33' S= 0.0114 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=31.94 cfs @ 12.06 hrs HW=595.01' (Free Discharge) 1=Culvert (Passes 31.94 cfs of 65.32 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 31.94 cfs @ 3.25 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 19HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-2: Det Pond 2 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=495,548 sf Peak Elev=595.01' Storage=13,406 cf 36.26 cfs 31.97 cfs31.97 cfs 0.00 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 20HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-3: Det Pond 3 Inflow Area = 228,009 sf, 20.00% Impervious, Inflow Depth = 2.97" for 10-Year event Inflow = 23.46 cfs @ 12.02 hrs, Volume= 56,519 cf Outflow = 18.88 cfs @ 12.08 hrs, Volume= 50,081 cf, Atten= 20%, Lag= 3.7 min Primary = 18.88 cfs @ 12.08 hrs, Volume= 50,081 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.55' @ 12.08 hrs Surf.Area= 10,463 sf Storage= 14,314 cf Plug-Flow detention time= 91.6 min calculated for 50,076 cf (89% of inflow) Center-of-Mass det. time= 35.2 min ( 859.0 - 823.8 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83'30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 581.83' / 581.58' S= 0.0076 '/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=18.86 cfs @ 12.08 hrs HW=586.55' (Free Discharge) 1=Culvert (Passes 18.86 cfs of 44.05 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 18.86 cfs @ 2.94 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 21HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-3: Det Pond 3 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=228,009 sf Peak Elev=586.55' Storage=14,314 cf 23.46 cfs 18.88 cfs18.88 cfs 0.00 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 22HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link CP1: CP1 Inflow Area = 3,959,851 sf, 7.25% Impervious, Inflow Depth = 1.94" for 10-Year event Inflow = 140.15 cfs @ 12.11 hrs, Volume= 639,256 cf Primary = 140.15 cfs @ 12.11 hrs, Volume= 639,256 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP1: CP1 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=3,959,851 sf 140.15 cfs140.15 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 23HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link CP3: Culvert Inflow Area = 3,569,650 sf, 5.86% Impervious, Inflow Depth = 1.85" for 10-Year event Inflow = 119.25 cfs @ 12.15 hrs, Volume= 548,970 cf Primary = 119.25 cfs @ 12.15 hrs, Volume= 548,970 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP3: Culvert Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=3,569,650 sf 119.25 cfs119.25 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 24HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link XCP1: XCP1 Inflow Area = 3,854,747 sf, 0.00% Impervious, Inflow Depth = 1.82" for 10-Year event Inflow = 142.07 cfs @ 12.22 hrs, Volume= 584,735 cf Primary = 142.07 cfs @ 12.22 hrs, Volume= 584,735 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP1: XCP1 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=3,854,747 sf 142.07 cfs142.07 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 25HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-1: BP-1 Runoff = 37.11 cfs @ 12.25 hrs, Volume= 158,349 cf, Depth= 2.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 10.308 70 Woods, Good, HSG C 2.590 58 Meadow, non-grazed, HSG B 2.820 68 1 acre lots, 20% imp, HSG B 15.718 68 Weighted Average 15.154 96.41% Pervious Area 0.564 3.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.7 199 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Bot.W=1.00' D=1.00' Z= 3.0 '/' Top.W=7.00' n= 0.035 0.9 492 0.0103 9.58 67.69 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.2 82 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 3.8 1,965 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.1 3,654 Total Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 26HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcatchment BP-1: BP-1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=15.718 ac Runoff Volume=158,349 cf Runoff Depth=2.78" Flow Length=3,654' Tc=30.1 min CN=68 37.11 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 27HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-2: BP-2 Runoff = 97.28 cfs @ 12.20 hrs, Volume= 378,973 cf, Depth= 2.32" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 18.072 70 Woods, Good, HSG C 26.981 58 Meadow, non-grazed, HSG B 45.053 63 Weighted Average 45.053 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total Subcatchment BP-2: BP-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=45.053 ac Runoff Volume=378,973 cf Runoff Depth=2.32" Flow Length=3,486' Tc=25.3 min CN=63 97.28 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 28HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-4: Basin T Runoff = 5.12 cfs @ 12.12 hrs, Volume= 17,251 cf, Depth= 1.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 109,957 58 Meadow, non-grazed, HSG B 109,957 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.9 150 0.0510 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.56" 6.0 1,003 0.0300 2.79 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 18.9 1,153 Total Subcatchment BP-4: Basin T Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)5 4 3 2 1 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=109,957 sf Runoff Volume=17,251 cf Runoff Depth=1.88" Flow Length=1,153' Tc=18.9 min CN=58 5.12 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 29HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET1: Det 1 Runoff = 19.78 cfs @ 11.98 hrs, Volume= 40,803 cf, Depth= 2.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description * 176,424 68 1 acre lots, 20% imp, HSG B 141,139 80.00% Pervious Area 35,285 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 50 0.1000 0.20 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 140 0.0167 2.08 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.4 138 0.0057 5.44 17.08 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 6.5 488 Total Subcatchment DET1: Det 1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=176,424 sf Runoff Volume=40,803 cf Runoff Depth=2.78" Flow Length=488' Tc=6.5 min CN=68 19.78 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 30HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET2: Det-2 Runoff = 49.97 cfs @ 12.01 hrs, Volume= 114,609 cf, Depth= 2.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 495,548 68 1 acre lots, 20% imp, HSG B 396,438 80.00% Pervious Area 99,110 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.5 80 0.2000 0.30 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 2.0 270 0.0200 2.28 Shallow Concentrated Flow, Swale Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 9.3 1,548 Total Subcatchment DET2: Det-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=495,548 sf Runoff Volume=114,609 cf Runoff Depth=2.78" Flow Length=1,548' Tc=9.3 min CN=68 49.97 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 31HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET3: Det 3 Runoff = 30.21 cfs @ 12.02 hrs, Volume= 73,319 cf, Depth= 3.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 228,009 79 1 acre lots, 20% imp, HSG C 182,407 80.00% Pervious Area 45,602 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 1.4 586 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 10.5 936 Total Subcatchment DET3: Det 3 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=228,009 sf Runoff Volume=73,319 cf Runoff Depth=3.86" Flow Length=936' Tc=10.5 min CN=79 30.21 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 32HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DR-1: DR-1 Runoff = 40.22 cfs @ 11.96 hrs, Volume= 80,549 cf, Depth= 3.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 250,493 79 1 acre lots, 20% imp, HSG C 200,394 80.00% Pervious Area 50,099 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR-1: DR-1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=250,493 sf Runoff Volume=80,549 cf Runoff Depth=3.86" Tc=5.0 min CN=79 40.22 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 33HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DR-2: DR-2 Runoff = 26.04 cfs @ 11.96 hrs, Volume= 52,155 cf, Depth= 3.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 162,192 79 1 acre lots, 20% imp, HSG C 129,754 80.00% Pervious Area 32,438 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR-2: DR-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=162,192 sf Runoff Volume=52,155 cf Runoff Depth=3.86" Tc=5.0 min CN=79 26.04 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 34HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-1: Ex WS #1 Runoff = 153.99 cfs @ 12.20 hrs, Volume= 596,369 cf, Depth= 2.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 1,448,958 70 Woods, Good, HSG C 1,524,134 58 Meadow, non-grazed, HSG B 2,973,092 64 Weighted Average 2,973,092 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total Subcatchment Ex-1: Ex WS #1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=2,973,092 sf Runoff Volume=596,369 cf Runoff Depth=2.41" Flow Length=3,486' Tc=25.3 min CN=64 153.99 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 35HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-2: Ex-2 Runoff = 26.28 cfs @ 12.24 hrs, Volume= 112,247 cf, Depth= 2.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 454,331 70 Woods, Good, HSG C 454,331 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Shallow Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.4 693 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Flow Bot.W=1.00' D=1.00' Z= 3.0 '/' Top.W=7.00' n= 0.035 Earth, dense weeds 3.6 1,844 0.0210 8.58 231.62 Channel Flow, Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.5 3,453 Total Subcatchment Ex-2: Ex-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=454,331 sf Runoff Volume=112,247 cf Runoff Depth=2.96" Flow Length=3,453' Tc=30.5 min CN=70 26.28 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 36HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-HH: Ex HH Runoff = 24.45 cfs @ 12.26 hrs, Volume= 105,575 cf, Depth= 2.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 427,324 70 Woods, Good, HSG C 427,324 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 1.8 474 0.0720 4.32 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 31.0 1,268 Total Subcatchment Ex-HH: Ex HH Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=427,324 sf Runoff Volume=105,575 cf Runoff Depth=2.96" Flow Length=1,268' Tc=31.0 min CN=70 24.45 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 37HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-PR: (new Subcat) Runoff = 11.40 cfs @ 11.90 hrs, Volume= 18,725 cf, Depth= 1.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 119,354 58 Meadow, non-grazed, HSG B 119,354 100.00% Pervious Area Subcatchment Ex-PR: (new Subcat) Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=119,354 sf Runoff Volume=18,725 cf Runoff Depth=1.88" Tc=0.0 min CN=58 11.40 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 38HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-1: Det Pond 1 Inflow Area = 176,424 sf, 20.00% Impervious, Inflow Depth = 2.78" for 25-Year event Inflow = 19.78 cfs @ 11.98 hrs, Volume= 40,803 cf Outflow = 15.45 cfs @ 12.03 hrs, Volume= 37,052 cf, Atten= 22%, Lag= 3.2 min Primary = 15.26 cfs @ 12.03 hrs, Volume= 37,029 cf Secondary = 0.19 cfs @ 12.03 hrs, Volume= 24 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 616.04' @ 12.03 hrs Surf.Area= 5,806 sf Storage= 9,462 cf Plug-Flow detention time= 76.0 min calculated for 37,052 cf (91% of inflow) Center-of-Mass det. time= 28.2 min ( 866.7 - 838.5 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83'24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 610.83' / 610.58' S= 0.0055 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 614.93'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=15.24 cfs @ 12.03 hrs HW=616.04' (Free Discharge) 1=Culvert (Passes 15.24 cfs of 31.02 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 15.24 cfs @ 3.44 fps) Secondary OutFlow Max=0.17 cfs @ 12.03 hrs HW=616.04' (Free Discharge) 3=Broad-Crested Rectangular Weir (Weir Controls 0.17 cfs @ 0.48 fps) Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 39HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-1: Det Pond 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=176,424 sf Peak Elev=616.04' Storage=9,462 cf 19.78 cfs 15.45 cfs 15.26 cfs 0.19 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 40HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-2: Det Pond 2 Inflow Area = 495,548 sf, 20.00% Impervious, Inflow Depth = 2.78" for 25-Year event Inflow = 49.97 cfs @ 12.01 hrs, Volume= 114,609 cf Outflow = 45.34 cfs @ 12.05 hrs, Volume= 108,782 cf, Atten= 9%, Lag= 2.3 min Primary = 45.34 cfs @ 12.05 hrs, Volume= 108,782 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.26' @ 12.05 hrs Surf.Area= 9,587 sf Storage= 15,719 cf Plug-Flow detention time= 44.2 min calculated for 108,782 cf (95% of inflow) Center-of-Mass det. time= 15.8 min ( 856.8 - 841.1 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83'36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 589.83' / 589.33' S= 0.0114 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=45.31 cfs @ 12.05 hrs HW=595.26' (Free Discharge) 1=Culvert (Passes 45.31 cfs of 67.46 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 45.31 cfs @ 3.56 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 41HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-2: Det Pond 2 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=495,548 sf Peak Elev=595.26' Storage=15,719 cf 49.97 cfs 45.34 cfs45.34 cfs 0.00 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 42HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-3: Det Pond 3 Inflow Area = 228,009 sf, 20.00% Impervious, Inflow Depth = 3.86" for 25-Year event Inflow = 30.21 cfs @ 12.02 hrs, Volume= 73,319 cf Outflow = 25.33 cfs @ 12.08 hrs, Volume= 66,881 cf, Atten= 16%, Lag= 3.4 min Primary = 25.33 cfs @ 12.08 hrs, Volume= 66,881 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.73' @ 12.08 hrs Surf.Area= 10,753 sf Storage= 16,160 cf Plug-Flow detention time= 77.4 min calculated for 66,881 cf (91% of inflow) Center-of-Mass det. time= 31.3 min ( 847.7 - 816.4 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83'30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 581.83' / 581.58' S= 0.0076 '/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=25.31 cfs @ 12.08 hrs HW=586.73' (Free Discharge) 1=Culvert (Passes 25.31 cfs of 45.14 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 25.31 cfs @ 3.24 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 43HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-3: Det Pond 3 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=228,009 sf Peak Elev=586.73' Storage=16,160 cf 30.21 cfs 25.33 cfs25.33 cfs 0.00 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 44HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link CP1: CP1 Inflow Area = 3,959,851 sf, 7.25% Impervious, Inflow Depth = 2.68" for 25-Year event Inflow = 199.15 cfs @ 12.09 hrs, Volume= 882,742 cf Primary = 199.15 cfs @ 12.09 hrs, Volume= 882,742 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP1: CP1 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=3,959,851 sf 199.15 cfs199.15 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 45HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link CP3: Culvert Inflow Area = 3,569,650 sf, 5.86% Impervious, Inflow Depth = 2.57" for 25-Year event Inflow = 170.78 cfs @ 12.14 hrs, Volume= 763,706 cf Primary = 170.78 cfs @ 12.14 hrs, Volume= 763,706 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP3: Culvert Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=3,569,650 sf 170.78 cfs170.78 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 46HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link XCP1: XCP1 Inflow Area = 3,854,747 sf, 0.00% Impervious, Inflow Depth = 2.53" for 25-Year event Inflow = 202.92 cfs @ 12.21 hrs, Volume= 814,192 cf Primary = 202.92 cfs @ 12.21 hrs, Volume= 814,192 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP1: XCP1 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=3,854,747 sf 202.92 cfs202.92 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 47HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-1: BP-1 Runoff = 46.12 cfs @ 12.24 hrs, Volume= 195,033 cf, Depth= 3.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 10.308 70 Woods, Good, HSG C 2.590 58 Meadow, non-grazed, HSG B 2.820 68 1 acre lots, 20% imp, HSG B 15.718 68 Weighted Average 15.154 96.41% Pervious Area 0.564 3.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.7 199 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Bot.W=1.00' D=1.00' Z= 3.0 '/' Top.W=7.00' n= 0.035 0.9 492 0.0103 9.58 67.69 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.2 82 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 3.8 1,965 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.1 3,654 Total Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 48HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcatchment BP-1: BP-1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=15.718 ac Runoff Volume=195,033 cf Runoff Depth=3.42" Flow Length=3,654' Tc=30.1 min CN=68 46.12 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 49HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-2: BP-2 Runoff = 123.94 cfs @ 12.20 hrs, Volume= 475,634 cf, Depth= 2.91" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 18.072 70 Woods, Good, HSG C 26.981 58 Meadow, non-grazed, HSG B 45.053 63 Weighted Average 45.053 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total Subcatchment BP-2: BP-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=45.053 ac Runoff Volume=475,634 cf Runoff Depth=2.91" Flow Length=3,486' Tc=25.3 min CN=63 123.94 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 50HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-4: Basin T Runoff = 6.74 cfs @ 12.12 hrs, Volume= 22,138 cf, Depth= 2.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 109,957 58 Meadow, non-grazed, HSG B 109,957 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.9 150 0.0510 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.56" 6.0 1,003 0.0300 2.79 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 18.9 1,153 Total Subcatchment BP-4: Basin T Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)7 6 5 4 3 2 1 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=109,957 sf Runoff Volume=22,138 cf Runoff Depth=2.42" Flow Length=1,153' Tc=18.9 min CN=58 6.74 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 51HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET1: Det 1 Runoff = 24.31 cfs @ 11.98 hrs, Volume= 50,255 cf, Depth= 3.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description * 176,424 68 1 acre lots, 20% imp, HSG B 141,139 80.00% Pervious Area 35,285 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 50 0.1000 0.20 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 140 0.0167 2.08 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.4 138 0.0057 5.44 17.08 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 6.5 488 Total Subcatchment DET1: Det 1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=176,424 sf Runoff Volume=50,255 cf Runoff Depth=3.42" Flow Length=488' Tc=6.5 min CN=68 24.31 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 52HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET2: Det-2 Runoff = 61.54 cfs @ 12.01 hrs, Volume= 141,159 cf, Depth= 3.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 495,548 68 1 acre lots, 20% imp, HSG B 396,438 80.00% Pervious Area 99,110 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.5 80 0.2000 0.30 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 2.0 270 0.0200 2.28 Shallow Concentrated Flow, Swale Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 9.3 1,548 Total Subcatchment DET2: Det-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=495,548 sf Runoff Volume=141,159 cf Runoff Depth=3.42" Flow Length=1,548' Tc=9.3 min CN=68 61.54 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 53HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET3: Det 3 Runoff = 35.73 cfs @ 12.02 hrs, Volume= 87,280 cf, Depth= 4.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 228,009 79 1 acre lots, 20% imp, HSG C 182,407 80.00% Pervious Area 45,602 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 1.4 586 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 10.5 936 Total Subcatchment DET3: Det 3 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=228,009 sf Runoff Volume=87,280 cf Runoff Depth=4.59" Flow Length=936' Tc=10.5 min CN=79 35.73 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 54HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DR-1: DR-1 Runoff = 47.46 cfs @ 11.96 hrs, Volume= 95,887 cf, Depth= 4.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 250,493 79 1 acre lots, 20% imp, HSG C 200,394 80.00% Pervious Area 50,099 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR-1: DR-1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=250,493 sf Runoff Volume=95,887 cf Runoff Depth=4.59" Tc=5.0 min CN=79 47.46 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 55HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DR-2: DR-2 Runoff = 30.73 cfs @ 11.96 hrs, Volume= 62,086 cf, Depth= 4.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 162,192 79 1 acre lots, 20% imp, HSG C 129,754 80.00% Pervious Area 32,438 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR-2: DR-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=162,192 sf Runoff Volume=62,086 cf Runoff Depth=4.59" Tc=5.0 min CN=79 30.73 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 56HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-1: Ex WS #1 Runoff = 195.05 cfs @ 12.20 hrs, Volume= 745,495 cf, Depth= 3.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 1,448,958 70 Woods, Good, HSG C 1,524,134 58 Meadow, non-grazed, HSG B 2,973,092 64 Weighted Average 2,973,092 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total Subcatchment Ex-1: Ex WS #1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=2,973,092 sf Runoff Volume=745,495 cf Runoff Depth=3.01" Flow Length=3,486' Tc=25.3 min CN=64 195.05 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 57HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-2: Ex-2 Runoff = 32.36 cfs @ 12.24 hrs, Volume= 137,310 cf, Depth= 3.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 454,331 70 Woods, Good, HSG C 454,331 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Shallow Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.4 693 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Flow Bot.W=1.00' D=1.00' Z= 3.0 '/' Top.W=7.00' n= 0.035 Earth, dense weeds 3.6 1,844 0.0210 8.58 231.62 Channel Flow, Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.5 3,453 Total Subcatchment Ex-2: Ex-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=454,331 sf Runoff Volume=137,310 cf Runoff Depth=3.63" Flow Length=3,453' Tc=30.5 min CN=70 32.36 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 58HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-HH: Ex HH Runoff = 30.09 cfs @ 12.26 hrs, Volume= 129,148 cf, Depth= 3.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 427,324 70 Woods, Good, HSG C 427,324 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 1.8 474 0.0720 4.32 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 31.0 1,268 Total Subcatchment Ex-HH: Ex HH Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=427,324 sf Runoff Volume=129,148 cf Runoff Depth=3.63" Flow Length=1,268' Tc=31.0 min CN=70 30.09 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 59HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-PR: (new Subcat) Runoff = 14.69 cfs @ 11.90 hrs, Volume= 24,030 cf, Depth= 2.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 119,354 58 Meadow, non-grazed, HSG B 119,354 100.00% Pervious Area Subcatchment Ex-PR: (new Subcat) Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=119,354 sf Runoff Volume=24,030 cf Runoff Depth=2.42" Tc=0.0 min CN=58 14.69 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 60HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-1: Det Pond 1 Inflow Area = 176,424 sf, 20.00% Impervious, Inflow Depth = 3.42" for 50-Year event Inflow = 24.31 cfs @ 11.98 hrs, Volume= 50,255 cf Outflow = 20.81 cfs @ 12.02 hrs, Volume= 46,505 cf, Atten= 14%, Lag= 2.5 min Primary = 18.62 cfs @ 12.02 hrs, Volume= 45,875 cf Secondary = 2.19 cfs @ 12.02 hrs, Volume= 630 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 616.20' @ 12.02 hrs Surf.Area= 5,980 sf Storage= 10,395 cf Plug-Flow detention time= 65.0 min calculated for 46,505 cf (93% of inflow) Center-of-Mass det. time= 24.9 min ( 857.4 - 832.5 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83'24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 610.83' / 610.58' S= 0.0055 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 614.93'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=18.61 cfs @ 12.02 hrs HW=616.19' (Free Discharge) 1=Culvert (Passes 18.61 cfs of 31.60 cfs potential flow) 2=Custom Weir/Orifice (Orifice Controls 18.61 cfs @ 3.72 fps) Secondary OutFlow Max=2.17 cfs @ 12.02 hrs HW=616.19' (Free Discharge) 3=Broad-Crested Rectangular Weir (Weir Controls 2.17 cfs @ 1.12 fps) Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 61HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-1: Det Pond 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=176,424 sf Peak Elev=616.20' Storage=10,395 cf 24.31 cfs 20.81 cfs 18.62 cfs 2.19 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 62HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-2: Det Pond 2 Inflow Area = 495,548 sf, 20.00% Impervious, Inflow Depth = 3.42" for 50-Year event Inflow = 61.54 cfs @ 12.01 hrs, Volume= 141,159 cf Outflow = 56.55 cfs @ 12.05 hrs, Volume= 135,333 cf, Atten= 8%, Lag= 2.1 min Primary = 56.55 cfs @ 12.05 hrs, Volume= 135,333 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.44' @ 12.05 hrs Surf.Area= 9,799 sf Storage= 17,474 cf Plug-Flow detention time= 37.9 min calculated for 135,318 cf (96% of inflow) Center-of-Mass det. time= 14.4 min ( 849.4 - 835.1 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83'36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 589.83' / 589.33' S= 0.0114 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=56.48 cfs @ 12.05 hrs HW=595.44' (Free Discharge) 1=Culvert (Passes 56.48 cfs of 68.99 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 56.48 cfs @ 3.79 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 63HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-2: Det Pond 2 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=495,548 sf Peak Elev=595.44' Storage=17,474 cf 61.54 cfs 56.55 cfs56.55 cfs 0.00 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 64HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-3: Det Pond 3 Inflow Area = 228,009 sf, 20.00% Impervious, Inflow Depth = 4.59" for 50-Year event Inflow = 35.73 cfs @ 12.02 hrs, Volume= 87,280 cf Outflow = 30.65 cfs @ 12.07 hrs, Volume= 80,842 cf, Atten= 14%, Lag= 3.2 min Primary = 30.65 cfs @ 12.07 hrs, Volume= 80,842 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.85' @ 12.07 hrs Surf.Area= 10,957 sf Storage= 17,489 cf Plug-Flow detention time= 69.5 min calculated for 80,842 cf (93% of inflow) Center-of-Mass det. time= 29.4 min ( 840.9 - 811.4 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83'30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 581.83' / 581.58' S= 0.0076 '/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=30.62 cfs @ 12.07 hrs HW=586.85' (Free Discharge) 1=Culvert (Passes 30.62 cfs of 45.89 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 30.62 cfs @ 3.33 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 65HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-3: Det Pond 3 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=228,009 sf Peak Elev=586.85' Storage=17,489 cf 35.73 cfs 30.65 cfs30.65 cfs 0.00 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 66HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link CP1: CP1 Inflow Area = 3,959,851 sf, 7.25% Impervious, Inflow Depth = 3.31" for 50-Year event Inflow = 249.95 cfs @ 12.05 hrs, Volume= 1,091,320 cf Primary = 249.95 cfs @ 12.05 hrs, Volume= 1,091,320 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP1: CP1 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)260 240 220 200 180 160 140 120 100 80 60 40 20 0 Inflow Area=3,959,851 sf 249.95 cfs249.95 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 67HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link CP3: Culvert Inflow Area = 3,569,650 sf, 5.86% Impervious, Inflow Depth = 3.19" for 50-Year event Inflow = 213.97 cfs @ 12.14 hrs, Volume= 948,391 cf Primary = 213.97 cfs @ 12.14 hrs, Volume= 948,391 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP3: Culvert Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=3,569,650 sf 213.97 cfs213.97 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 68HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link XCP1: XCP1 Inflow Area = 3,854,747 sf, 0.00% Impervious, Inflow Depth = 3.15" for 50-Year event Inflow = 255.38 cfs @ 12.20 hrs, Volume= 1,011,954 cf Primary = 255.38 cfs @ 12.20 hrs, Volume= 1,011,954 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP1: XCP1 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)280 260 240 220 200 180 160 140 120 100 80 60 40 20 0 Inflow Area=3,854,747 sf 255.38 cfs255.38 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 69HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-1: BP-1 Runoff = 55.85 cfs @ 12.24 hrs, Volume= 234,956 cf, Depth= 4.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (ac) CN Description 10.308 70 Woods, Good, HSG C 2.590 58 Meadow, non-grazed, HSG B 2.820 68 1 acre lots, 20% imp, HSG B 15.718 68 Weighted Average 15.154 96.41% Pervious Area 0.564 3.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.7 199 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Bot.W=1.00' D=1.00' Z= 3.0 '/' Top.W=7.00' n= 0.035 0.9 492 0.0103 9.58 67.69 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.2 82 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 3.8 1,965 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.1 3,654 Total Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 70HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcatchment BP-1: BP-1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=15.718 ac Runoff Volume=234,956 cf Runoff Depth=4.12" Flow Length=3,654' Tc=30.1 min CN=68 55.85 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 71HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-2: BP-2 Runoff = 153.13 cfs @ 12.20 hrs, Volume= 582,036 cf, Depth= 3.56" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (ac) CN Description 18.072 70 Woods, Good, HSG C 26.981 58 Meadow, non-grazed, HSG B 45.053 63 Weighted Average 45.053 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total Subcatchment BP-2: BP-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=45.053 ac Runoff Volume=582,036 cf Runoff Depth=3.56" Flow Length=3,486' Tc=25.3 min CN=63 153.13 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 72HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-4: Basin T Runoff = 8.53 cfs @ 12.12 hrs, Volume= 27,591 cf, Depth= 3.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 109,957 58 Meadow, non-grazed, HSG B 109,957 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.9 150 0.0510 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.56" 6.0 1,003 0.0300 2.79 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 18.9 1,153 Total Subcatchment BP-4: Basin T Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)9 8 7 6 5 4 3 2 1 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=109,957 sf Runoff Volume=27,591 cf Runoff Depth=3.01" Flow Length=1,153' Tc=18.9 min CN=58 8.53 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 73HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET1: Det 1 Runoff = 29.18 cfs @ 11.98 hrs, Volume= 60,542 cf, Depth= 4.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description * 176,424 68 1 acre lots, 20% imp, HSG B 141,139 80.00% Pervious Area 35,285 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 50 0.1000 0.20 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 140 0.0167 2.08 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.4 138 0.0057 5.44 17.08 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 6.5 488 Total Subcatchment DET1: Det 1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=176,424 sf Runoff Volume=60,542 cf Runoff Depth=4.12" Flow Length=488' Tc=6.5 min CN=68 29.18 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 74HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET2: Det-2 Runoff = 74.00 cfs @ 12.01 hrs, Volume= 170,054 cf, Depth= 4.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 495,548 68 1 acre lots, 20% imp, HSG B 396,438 80.00% Pervious Area 99,110 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.5 80 0.2000 0.30 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 2.0 270 0.0200 2.28 Shallow Concentrated Flow, Swale Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 9.3 1,548 Total Subcatchment DET2: Det-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=495,548 sf Runoff Volume=170,054 cf Runoff Depth=4.12" Flow Length=1,548' Tc=9.3 min CN=68 74.00 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 75HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET3: Det 3 Runoff = 41.54 cfs @ 12.02 hrs, Volume= 102,180 cf, Depth= 5.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 228,009 79 1 acre lots, 20% imp, HSG C 182,407 80.00% Pervious Area 45,602 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 1.4 586 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 10.5 936 Total Subcatchment DET3: Det 3 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=228,009 sf Runoff Volume=102,180 cf Runoff Depth=5.38" Flow Length=936' Tc=10.5 min CN=79 41.54 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 76HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DR-1: DR-1 Runoff = 55.08 cfs @ 11.96 hrs, Volume= 112,256 cf, Depth= 5.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 250,493 79 1 acre lots, 20% imp, HSG C 200,394 80.00% Pervious Area 50,099 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR-1: DR-1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=250,493 sf Runoff Volume=112,256 cf Runoff Depth=5.38" Tc=5.0 min CN=79 55.08 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 77HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DR-2: DR-2 Runoff = 35.66 cfs @ 11.96 hrs, Volume= 72,685 cf, Depth= 5.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 162,192 79 1 acre lots, 20% imp, HSG C 129,754 80.00% Pervious Area 32,438 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DR-2: DR-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=162,192 sf Runoff Volume=72,685 cf Runoff Depth=5.38" Tc=5.0 min CN=79 35.66 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 78HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-1: Ex WS #1 Runoff = 239.75 cfs @ 12.19 hrs, Volume= 909,251 cf, Depth= 3.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 1,448,958 70 Woods, Good, HSG C 1,524,134 58 Meadow, non-grazed, HSG B 2,973,092 64 Weighted Average 2,973,092 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 150 0.0350 0.17 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 6.1 1,162 0.0390 3.18 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 4.2 2,174 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 25.3 3,486 Total Subcatchment Ex-1: Ex WS #1 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)260 240 220 200 180 160 140 120 100 80 60 40 20 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=2,973,092 sf Runoff Volume=909,251 cf Runoff Depth=3.67" Flow Length=3,486' Tc=25.3 min CN=64 239.75 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 79HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-2: Ex-2 Runoff = 38.91 cfs @ 12.24 hrs, Volume= 164,476 cf, Depth= 4.34" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 454,331 70 Woods, Good, HSG C 454,331 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 150 0.0430 0.12 Sheet Flow, Shallow Woods: Light underbrush n= 0.400 P2= 3.56" 3.8 766 0.0430 3.34 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.4 693 0.0300 4.91 19.65 Trap/Vee/Rect Channel Flow, Channel Flow Bot.W=1.00' D=1.00' Z= 3.0 '/' Top.W=7.00' n= 0.035 Earth, dense weeds 3.6 1,844 0.0210 8.58 231.62 Channel Flow, Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.5 3,453 Total Subcatchment Ex-2: Ex-2 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=454,331 sf Runoff Volume=164,476 cf Runoff Depth=4.34" Flow Length=3,453' Tc=30.5 min CN=70 38.91 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 80HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-HH: Ex HH Runoff = 36.16 cfs @ 12.26 hrs, Volume= 154,699 cf, Depth= 4.34" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 427,324 70 Woods, Good, HSG C 427,324 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 1.8 474 0.0720 4.32 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 31.0 1,268 Total Subcatchment Ex-HH: Ex HH Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=427,324 sf Runoff Volume=154,699 cf Runoff Depth=4.34" Flow Length=1,268' Tc=31.0 min CN=70 36.16 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 81HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-PR: (new Subcat) Runoff = 18.32 cfs @ 11.90 hrs, Volume= 29,948 cf, Depth= 3.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 119,354 58 Meadow, non-grazed, HSG B 119,354 100.00% Pervious Area Subcatchment Ex-PR: (new Subcat) Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=119,354 sf Runoff Volume=29,948 cf Runoff Depth=3.01" Tc=0.0 min CN=58 18.32 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 82HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-1: Det Pond 1 Inflow Area = 176,424 sf, 20.00% Impervious, Inflow Depth = 4.12" for 100-Year event Inflow = 29.18 cfs @ 11.98 hrs, Volume= 60,542 cf Outflow = 25.87 cfs @ 12.02 hrs, Volume= 56,792 cf, Atten= 11%, Lag= 2.2 min Primary = 20.96 cfs @ 12.02 hrs, Volume= 54,964 cf Secondary = 4.91 cfs @ 12.02 hrs, Volume= 1,828 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 616.33' @ 12.02 hrs Surf.Area= 6,129 sf Storage= 11,218 cf Plug-Flow detention time= 57.0 min calculated for 56,792 cf (94% of inflow) Center-of-Mass det. time= 22.8 min ( 849.9 - 827.1 ) Volume Invert Avail.Storage Storage Description #1 614.00' 15,561 cf Bio Retention Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 614.00 3,548 0 0 615.00 4,590 4,069 4,069 616.00 5,765 5,178 9,247 617.00 6,864 6,315 15,561 Device Routing Invert Outlet Devices #1 Primary 610.83'24.0" Round Culvert L= 45.2' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 610.83' / 610.58' S= 0.0055 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 614.93'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.25 Width (feet) 4.00 4.00 #3 Secondary 616.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=20.94 cfs @ 12.02 hrs HW=616.33' (Free Discharge) 1=Culvert (Passes 20.94 cfs of 32.09 cfs potential flow) 2=Custom Weir/Orifice (Orifice Controls 20.94 cfs @ 4.19 fps) Secondary OutFlow Max=4.88 cfs @ 12.02 hrs HW=616.33' (Free Discharge) 3=Broad-Crested Rectangular Weir (Weir Controls 4.88 cfs @ 1.48 fps) Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 83HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-1: Det Pond 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=176,424 sf Peak Elev=616.33' Storage=11,218 cf 29.18 cfs 25.87 cfs 20.96 cfs 4.91 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 84HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-2: Det Pond 2 Inflow Area = 495,548 sf, 20.00% Impervious, Inflow Depth = 4.12" for 100-Year event Inflow = 74.00 cfs @ 12.01 hrs, Volume= 170,054 cf Outflow = 68.61 cfs @ 12.04 hrs, Volume= 164,228 cf, Atten= 7%, Lag= 2.0 min Primary = 68.61 cfs @ 12.04 hrs, Volume= 164,228 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 595.62' @ 12.04 hrs Surf.Area= 10,009 sf Storage= 19,253 cf Plug-Flow detention time= 33.3 min calculated for 164,228 cf (97% of inflow) Center-of-Mass det. time= 13.4 min ( 843.1 - 829.7 ) Volume Invert Avail.Storage Storage Description #1 593.00' 46,534 cf Bio Pond Two (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) 593.00 5,313 0.0 0 0 594.00 5,978 100.0 5,646 5,646 595.00 9,284 100.0 7,631 13,277 596.00 10,454 100.0 9,869 23,146 597.00 11,680 100.0 11,067 34,213 598.00 12,963 100.0 12,322 46,534 Device Routing Invert Outlet Devices #1 Primary 589.83'36.0" Round Culvert L= 43.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 589.83' / 589.33' S= 0.0114 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 594.03'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 10.00 10.00 12.00 12.00 #3 Secondary 597.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=68.51 cfs @ 12.04 hrs HW=595.62' (Free Discharge) 1=Culvert (Passes 68.51 cfs of 70.48 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 68.51 cfs @ 4.02 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=593.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 85HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-2: Det Pond 2 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=495,548 sf Peak Elev=595.62' Storage=19,253 cf 74.00 cfs 68.61 cfs68.61 cfs 0.00 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 86HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-3: Det Pond 3 Inflow Area = 228,009 sf, 20.00% Impervious, Inflow Depth = 5.38" for 100-Year event Inflow = 41.54 cfs @ 12.02 hrs, Volume= 102,180 cf Outflow = 36.36 cfs @ 12.07 hrs, Volume= 95,742 cf, Atten= 12%, Lag= 3.0 min Primary = 36.36 cfs @ 12.07 hrs, Volume= 95,742 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.96' @ 12.07 hrs Surf.Area= 11,146 sf Storage= 18,749 cf Plug-Flow detention time= 63.2 min calculated for 95,742 cf (94% of inflow) Center-of-Mass det. time= 28.0 min ( 834.9 - 807.0 ) Volume Invert Avail.Storage Storage Description #1 585.00' 31,098 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 585.00 8,010 0 0 586.00 9,541 8,776 8,776 587.00 11,206 10,374 19,149 588.00 12,692 11,949 31,098 Device Routing Invert Outlet Devices #1 Primary 581.83'30.0" Round Culvert L= 33.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 581.83' / 581.58' S= 0.0076 '/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 585.75'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 8.00 8.00 12.00 12.00 #3 Secondary 587.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=36.33 cfs @ 12.07 hrs HW=586.96' (Free Discharge) 1=Culvert (Passes 36.33 cfs of 46.58 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 36.33 cfs @ 3.44 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 87HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-3: Det Pond 3 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=228,009 sf Peak Elev=586.96' Storage=18,749 cf 41.54 cfs 36.36 cfs36.36 cfs 0.00 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 88HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link CP1: CP1 Inflow Area = 3,959,851 sf, 7.25% Impervious, Inflow Depth = 4.00" for 100-Year event Inflow = 305.36 cfs @ 12.05 hrs, Volume= 1,318,695 cf Primary = 305.36 cfs @ 12.05 hrs, Volume= 1,318,695 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP1: CP1 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)340 320 300 280 260 240 220 200 180 160 140 120 100 80 60 40 20 0 Inflow Area=3,959,851 sf 305.36 cfs305.36 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 89HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link CP3: Culvert Inflow Area = 3,569,650 sf, 5.86% Impervious, Inflow Depth = 3.87" for 100-Year event Inflow = 260.68 cfs @ 12.14 hrs, Volume= 1,150,268 cf Primary = 260.68 cfs @ 12.14 hrs, Volume= 1,150,268 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP3: Culvert Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)280 260 240 220 200 180 160 140 120 100 80 60 40 20 0 Inflow Area=3,569,650 sf 260.68 cfs260.68 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS1_Detention R Printed 8/15/2017Prepared by Cardno Page 90HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link XCP1: XCP1 Inflow Area = 3,854,747 sf, 0.00% Impervious, Inflow Depth = 3.82" for 100-Year event Inflow = 312.43 cfs @ 12.20 hrs, Volume= 1,228,426 cf Primary = 312.43 cfs @ 12.20 hrs, Volume= 1,228,426 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP1: XCP1 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)340 320 300 280 260 240 220 200 180 160 140 120 100 80 60 40 20 0 Inflow Area=3,854,747 sf 312.43 cfs312.43 cfs