Loading...
HomeMy WebLinkAboutSW3170603 - Larkin Subidivision Phase 6B (2)SUPPLEMENT -EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this protect Quantity Location(s) Infiltration System Bioretention Cell Wet Pond 4 Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader -Filter Strip Disconnected Impervious Surface Treatment Swale Dry Pond Designer information for this project: Applicant: Project Name: Larkin Golf Course Ph. 613 Address City / Town Statesville, NC Envlronmrn Quality Name and Title: Matthew Johnson (Civil Engineer II) Company: Dependable Development, Inc Organization: R. Joe Harris, Inc Contact: Jeff Reasner Street address: 127 Ben Casey Dr, Suite 101 Mailing Address 2649 Brekonridgs Dr, Suite 104 City, State, Zip: Fort Mill, SC 29708 City, State, Zip: Monroe, NC 28110 Phone number(s): (803) 802-1799 Phone number(s) (704) 238-1229 Email: m�ohnson@r�oeharris com Email treasner@truehomesusa.com Designer ®,®O11'11®®f�! Certification Statement (�v'ei�v I certify, under penalty of law. that this Supplement -EZ form and all supporting •� gSS % 7i„�= ►' /:s•; information were prepared under my direction or supervision; that the information In the form is, to the best of my knowledge `� L provided and belief, true, accurate, and complete; and n MA L ,• r Signature of D lgner - that the engineering plans, specifications, operation and maintenance e .• `® '�` agreements and other supporting information are consistent with • •` o� the information provided here. o re that there are significant es for a lse I am of i'�K %1*0 MSQ 7 s�7 s�i7 fines and imprisonmentlting information including the possibility forr knowing Date violations as well as a report being made to my professional board Cover Page 1 122 PM 5/22/2017 WET POND Larkin Golf Course Ph. 6B THE DRAINAGE AREA ^1 Drainage area number Break down of BUA in the drainage area (both new and existing). Total coastal wetlands area (sq ft) Parking / driveway (sq ft) 10281 sf Total surface water area (sq ft) FWet7f]— Sidewalk (sq ft) 3444 sf Total drainage area (sq ft) Roof (sq ft) 33915 sf BUA associated with existing development (sq ft) Roadway (sq ft) 19878 sf Proposed new BUA (sq ft) 67518 sf Other, please specify in the comment box below (sq ft) N/A Percent BUA of drainage area 48% Total BUA (sq ft) 67518 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify)* Design rainfall depth (in) 1 0 in Minimum volume required (cu ft) 5656 cf Design volume of SCM (cu ft) 5794 cf GENERAL MDC FROM 02H.1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? No #7 If applicable, with the SCM be cleaned out after construction Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mametenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H V)9 31 #9 Does the drainage easement comply with General MDC (9)9 Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)v #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? 'Yes #6 What is the method for dewatering the SCM for maintenances Drawdown Orifice #13 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 #1 Method used SAIDA, #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 5846 sf #6 Location of vegetated shelf @ Normal Pool #1 Volume of the main permanent pool (cubic feet) 10075 cf #6 Elevation of top of shelf (fmsl) l 766 ft #2 Average depth of the main pool (feet) 3 ft #6 Elevation of bottom of shelf (fmsl) 765 ft #2 Was the vegetated shelf included in the calculation of average depth? Yes #6 Slope of vegetated shelf (H V) ,6 1 #2 Elevation of the bottom of the permanent pool (fmsl) 761 ft #7 Diameter of drawdown orifice (inches) 18 in #2 Elevation of the top of the permanent pool (fmsl) 761 ft #7 Drawdown time for the temporary pool (hours) 57,hrs #2 Elevation of the top of the temporary pool (fmsl) 761 ft #7 Does the onfice drawdown from below the top surface of the permanent pools Yes #3 Depth provided for sediment storage (inches) 12 in #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm9 Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting Yes #9 Are fountains proposed? -No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path #9 If yes, is documentation provided per Wet Pond MDC (9)? #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 1661 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Centipede #5 Depth of forebay at entrance (inches) 48 in #11 Describe the planting plan for the vegetated shelf #5 Depth of forebay at exit (inches) #5 Does water flow out of the forebay in a non-erosive manner9 #5 Clean-out depth for forebay (inches) #5 Will the forebay be cleaned out when the depth is reduced to less than the above? Yes , 12 in Yes Plants are tube placed in rows, alternating species and to be spaced 4'• on center Plant,types are from the NCDEQ BMP, Manual approved species list ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond that you think is relevant to the review Wet Pond 1 132 PM 5/22/2017 WET POND Larkin Golf Course Ph. 6B THE DRAINAGE AREA Drainage area number Break down of BUA in the drainage area (both new and existing). 2 Total coastal wetlands area (sq ft) Parking / driveway (sq ft) 4392 sf Total surface water area (sq ft) M218236 Sidewalk (sq ft) 6239 sf Total drainage area (sq ft) Roof (sq ft) 24236sf BUA associated with existing development (sq fl) Roadway (sq ft) 10871 sf Proposed new BUA (sq ft) Other, please specify in the comment box below (sq ft) N/A Percent BUA of drainage area 21% Total BUA (sq ft) 45738 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify) IDesign rainfall depth (in) 10 in Minimum volume required (cu ft) 4346 cf Des gn volume of SCM (cu ft) 4474 cf GENERAL MDC FROM 02H.1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? No #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H V)? 31 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance?Drawdown WET POND MDC FROM 02H.1053 Orifice #13 Was the SCM designed by an NC licensed professional? Yes #1 Method used SAIDA #6 Width of the vegetated shelf (feet) 611 #1 Surface area of the main permanent pool (square feet) 4438 sf #6 Location of vegetated shelf @ Normal Pool #1 Volume of the main permanent pool (cubic feet) 7226 cf #6 Elevation of top of shelf (fmsl) 786 ft #2 Average depth of the main pool (feet) 3 ft #6 Elevation of bottom of shelf (fmsl) 785 ft #2 Was the vegetated shelf included in the calculation of average depth? Yes #6 Slope of vegetated shelf (H V) 61 #2 Elevation of the bottom of the permanent pool (fmsl) 781 ft #7 Diameter of drawdown orifice (inches) 15 in #2 Elevation of the top of the permanent pool (fmsl) 785 ft #7 Drawdown time for the temporary pool (hours) 59 hrs #2 Elevation of the top of the temporary pool (fmsl) 785 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? Yes #3 Depth provided for sediment storage (inches) 121n #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? as #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path #9 If yes, is documentation provided per Wet Pond MDC (9)? #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 1226 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Centipede #5 Depth of forebay at entrance (inches) 481n #11 Describe the planting plan for the vegetated shelf #5 Depth of forebay at exit (inches) 481n #5 Does water flow out of the forebay in a non-erosive manner? Yes #5 Clean-out depth for forebay (inches) 12 in #5 Will the forebay be cleaned out when the depth is reduced to less than the above? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond that you think is relevant to the review 1PIants are to be placed in rows, alternating species and spaced 4' on center Plant types to,be used are from the NCDEQ JBMP Manual approved species list Wet Pond 1 133 PM 5/22/2017 WET POND Larkin Golf Course Ph. 6B THE DRAINAGE AREA 3 Drainage area number Wet Pond #300 Break down of BUA in the drainage area (both new and existing) Total coastal wetlands area (sq ft) N/A Parking / driveway (sq ft) 7621 sf Total surface water area (sq ft) N/A Sidewalk (sq ft) 10378 sf Total drainage area (sq ft) 310583 sf Roof (sq ft) 70150 sf BUA associated with existing development (sq ft) 58876 sf Roadway (sq ft) 41660 sf Proposed new BUA (sq ft) 70933 sf Other, please specify in the comment box below (sq ft) Percent BUA of drainage area COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM 42% Total BUA (sq ft) 129809 sf Stormwater program(s) that apply (please specify) Design rainfall depth (in) 1 0 in GENERAL MDC FROM 02H.1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? No Minimum volume required (cu ft) Design volume of SCM (cu ft) #7 if applicable, with the SCM be cleaned out after construction 11020 cf 11127 cf Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mametenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H V)? 31 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Drawdown Orrfice #13 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 #1 Method used SAIDA #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 9828 sf #6 Location of vegetated shelf @ Normal Pool #1 Volume of the main permanent pool (cubic feet) 21616 cf #6 Elevation of top of shelf (fmsl) 770 ft #2 Average depth of the main pool (feet) 3 ft #6 Elevation of bottom of shelf (fmsl) 769 ft #2 Was the vegetated shelf included in the calculation of average depth? Yes #6 Slope of vegetated shelf (H V) 61 #2 Elevation of the bottom of the permanent pool (fmsl) 765 ft #7 Diameter of drawdown orifice (inches) 2 5 in #2 Elevation of the top of the permanent pool (fmsl) 769 ft #7 Drawdown time for the temporary pool (hours) 51 firs #2 Elevation of the top of the temporary pool (fmsl) 769 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? Yes #3 Depth provided for sediment storage (inches) 12 in #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path #9 If yes, is documentation provided per Wet Pond MDC (9)9 #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 3753 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Centipede #5 Depth of forebay at entrance (inches) 48 in #11 Describe the planting plan for the vegetated shelf #5 Depth of forebay at exit (inches) #5 Does water flow out of the forebay in a non-erosive manner? #5 Clean-out depth for forebay (inches) #5 Will the forebay be cleaned out when the depth is reduced to less than the above? ADDITIONAL INFORMATION 48 in Yes 12 in Yes Plants are to be placed in rows, alernating species and to be spaced 4' on center Plant types to be used are from the NCDEQ BMP Manual approved species list Please use this space to provide any additional information about this wet pond that you think is relevant to the review Wet Pond 1 133 PM 5/22/2017 WET POND Larkin Golf Course Ph. 6B THE DRAINAGE AREA 4 Drainage area number Wet Pond #400 Break down of BUA in the drainage area (both new and existing). Total coastal wetlands area (sq fl) N/A Parking I driveway (sq ft) 31612 sf Total surface water area (sq ft) N/A Sidewalk (sq ft) 25636 sf Total drainage area (sq ft) 559310 sf - Roof (sq ft) 159299 sf BUA associated with existing development (sq ft) _ 23463 sf Roadway (sq ft) 69307 sf Proposed new BUA (sq ft) 262291 sf Other, please specify in the comment box below (sq ft) Percent BUA of drainage area 51% Total BUA (sq ft) 285754 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify) Design rainfall depth (in) 1 0 in GENERAL MDC FROM 02H.1050 Mmimum volume required (cu ft) Design volume of SCM (cu ft) 23762 cf 23971 cf #1 Is the SCM sized to treat the SW from all surfaces at build -out? No #7 If applicable, with the SCM be cleaned out after construction Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H V)? 31 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Drawdown Orifice #13 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 #1 Method used SAIDA #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 19483 sf #6 Location of vegetated shelf @ Normal Pool _ #1 Volume of the main permanent pool (cubic feet) 49275 cf #6 Elevation of top of shelf (fmsl) 764 It #2 Average depth of the main pool (feet) 4 ft #6 Elevation of bottom of shelf (fmsl) 763 ft #2 Was the vegetated shelf included in the calculation of average depth? Yes #6 Slope of vegetated shelf (H V) 61 #2 Elevation of the bottom of the permanent pool (fmsl) 759 It #7 Diameter of drawdown orifice (inches) 3 8 in #2 Elevation of the top of the permanent pool (fmsl) 763 ft #7 Drawdown time for the temporary pool (hours) 50 hrs #2 Elevation of the top of the temporary pool (fmsl) 763 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? Yes #3 Depth provided for sediment storage (inches) 12 in #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path #9 If yes, is documentation provided per Wet Pond MDC (9)? #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 8191 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Centipede #5 Depth of forebay at entrance (inches) 481n #11 Describe the planting plan for the vegetated shelf #5 Depth of forebay at exit (inches) 481n #5 Does water flow out of the forebay in a non-erosive manner? Yes #5 Clean-out depth for forebay (inches) 12 in #5 Will the forebay be cleaned out when the depth is reduced to less than the above? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond that you think is relevant to the review Plants are to be placed in rows, alternating species and to be,spaced 4' on center Plant types to be used are from the NCDEQ BMP Manual approved species list Wet Pond 1 133 PM 5/22/2017 I Operation & Maintenance Agreement I Project Name: Project Location: Larkin Golf Course 66 136 Club House Dr, Statesville, NC 28667 Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & correspc Bioretention Cell Quantity. Dante: (01, 7 Dry Detention Basin Quantity. Iy Nod -lel On') ri'a Grassed Swale Quantity: 1 rop�sQ Green Roof Quantity, and Infiltration Basin Quantity, Infiltration Trench Quantity: Level Spreader/VFS Quantity, Permeable Pavement Quantity. Proprietary System Quantity, Rainwater Harvesting Quantity, Sand Filter Quantity, Stormwater Wetland Quantity, 5/25/2017 Wet Detention Basin Quantity, 4 Disconnected Impervious Area Present. I No User Defined BMP Present: No O&M tables will Location(s). Location(s). Location(s). Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): tie aaaea a I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party * Responsible Party: Title & Organization: Street address: City, state, zip - Phone number(s): Email: Michael Foss - Dependable Development, Inc. Operations Partner - Land Development 2649 Brekonridge Centre Drive, Suite 104 Monroe, NC 28110 980-313-3367 mfoess@truehomesusa.com Signature: Dante: (01, 7 M O a Notary Public for the State of Iy Nod -lel On') ri'a County of MM k(Ln&A! a do hearby certify that MIMLIp 1 rop�sQ personally appeared before me this 5 day of -3cA JJQ /,.261-7 and acknowledge the due execution of the eratio s and Maintenance Agreement . Witness my hand and official seal, L �a°,a o 6 �ssion TA9/. CU G N 0� D �'UB1.� ® 1D � d 28,20 ST �'® C9 s° 5/25/2017 Version 1.4 P®d��BBi1IAg3�1 O&M Manual Pagel of5 'Wet Detention Pond Maintenance Requirements I The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Important maintenance procedures: _ Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks) _ No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. _ Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. _ If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The inlet device The pipe is clogged. Unclog the pipe Dispose of the sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The forebay Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design depth for will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying STORM -EZ 5/25/2017 Version 1 4 O&M Manual Page 3 of 5 Wet Detention Pond Maintenance Requirements (Continued) The main treatment area Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design sediment will not cause impacts to streams or the BMP. storage depth. Algal growth covers over 50% Consult a professional to remove and control the algal growth. of the area. Cattails, phragmites or other Remove the plants by wiping them with pesticide (do not spray). invasive plants cover 50% of the basin surface. The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. STORM -EZ 5/25/2017 Version 1 4 O&M Manual Page 4 of 5 Wet Detention Pond Design Summary Wet Pond Diagram WET POND ID FOREBAY MAIN POND #100 Permanent Pool EI 765 Permanent Pool EI. 765 765.86 Temporary Pool El- Temporary Pool EI: 76586 Pretreatment other Clean Out Depth: Clean Out Depth: 4 4 No than forebay? Sediment Removal EI- 761 Sediment Removal EI: 761 760 Has Veg. Filter? Yes Bottom Elevation: Bottom Elevation: 760 WET POND ID FOREBAY MAIN POND #200 Permanent Pool EI. 785 Permanent Pool EI. 785 Temporary Pool El, 785.88 Temporary Pool EI: 785.88 Pretreatment other No Clean Out Depth: 4 Clean Out Depth: 4 than forebay? Sediment Removal EI. 781 Sediment Removal EI. 781 Has Veg Filter? Yes Bottom Elevation: 780 Bottom Elevation: 780 WET POND ID FOREBAY MAIN POND #300 Permanent Pool EI. 769 Permanent Pool El. 769 Temporary Pool El: 770.02 Temporary Pool EI: 77002 Pretreatment other No Clean Out Depth: 4 Clean Out Depth. 4 than forebay? Sediment Removal El- 765 Sediment Removal El: 765 Has Veg Filter? Yes Bottom Elevation: 764 Bottom Elevation- 764 WET POND ID FOREBAY MAIN POND #400 Permanent Pool EI. 763 Permanent Pool El. 763 Temporary Pool EI: 764.14 Temporary Pool EI: 76414 Pretreatment other No Clean Out Depth: 4 Clean Out Depth: 4 than forebay? Sediment Removal EI: 759 Sediment Removal EI. 759 Has Veg Filter? Yes Bottom Elevation: 758 Bottom Elevation: 758 STORM -EZ 5/25/2017 Version 1.4 O&M Manual Page 5 of 5