Loading...
HomeMy WebLinkAboutSW6170601 - DaVita Rockfish (3)Stormwater Report RECEIVE,) JUN d 6 2017 ' NR` SAND 00ALITy STORMWATER pERNIJ; , TTJNG DaVita - Rockfish Project Location: Paraclete Drive, Hoke County, North Carolina Project #: 17-021 Designer: Triad Design Group, P.C. 4807-C Koger Blvd Greensboro, NC 27407 �N CARS. 09 ; May 25, 2017 triaddesigngroup ARCHITECTURES ENGINEERING I INTERIOR DESIGN 4807 - C Koger Boulevard, Greensboro, NC 27407 1 T - 336-216-8282 F-336-218-8010 I www.triad-designgroup.com STORMWATER NARRATIVE: PROJECT DESCRIPTION The proposed project is located on Paraclete Drive in Hoke County, NC. The site is on a newly established lot (Lot 4) in the Paraclete Real Estate Subdivision The new lot is located on the south side of Paraclete Drive approximately 930 feet east of the intersection of Paraclete Drive and Brock Road. The site is approximately 1.502 total acres with no existing built upon area on site. A total of 0.86 acres of BUA is proposed. Approximately 50% of the site is wooded with a combination of deciduous and evergreen trees. The proposed project will consist of a 9,060 sf, 1 story building along with drives and parking areas for the proposed facility. Grading for the proposed expansions will require the disturbance of approximately 1.50 acres with fills of approximately 1 to 2 feet to reach finished grades. The site is not expected to balance therefore will require the import of structural fill. The selected contractor will be required to import fill from a previously approved site or will be required to permit the site where the borrow material will originate from. It will be the responsibility of the contractor to permit the borrow site if the identified site has not been previously permitted. EXISTING SITE CONDITIONS The subject project is proposed on a 1.502 acre site in Hoke County NC. The project site is approximately 50% wooded with a combination of evergreens and hardwoods. The site crowns near the middle and slopes to the north and south. Grades range from 248 down to 243 msl. There are no streams, ponds, or wetlands located on the site. Public utilities (water and sewer) are available to the - site and are provided by Hoke County. ADJACENT AREAS The site is bordered by undeveloped land to the east and west, Paraclete Drive to the north, and Fayetteville Road to the south. SOILS The soils present within the project area are- FaB - Faceville Loamy Sand, 2 to 6 Percent Slopes, Group B NoA - Norfolk Loamy Sand, 0 to 2 Percent Slopes, Group A Ra - Rains Sandy Loam, 0 to 2 Percent Slopes, Group B STORMWATER CONSIDERATIONS The additional impervious area created by the proposed project will be treated for water quality and water quantity by a combination of StormFilters and dry detention ponds designed to meet the Hoke County and NCDEQ standards. Runoff from all built -upon areas will be conveyed to a StormFilter system where the first inch of runoff will be treated for water quality. Flows in excess of the design storm will bypass the system and flow into dry detention areas where the flows exiting the site will be reduced to pre - development levels. CONSTRUCTION SEQUENCE The site will be developed according to the construction sequence shown Sheet C2.2A of the plans and contained in this document. Some deviations from this sequence may be required due to local site conditions, or unanticipated problems. These changes will be coordinated through the engineer and NCDEQ inspections staff. All work must meet NCDEQ standards. A pre -construction meeting between the grading contractor and the NCDEQ inspection staff may be required. A copy of the grading permit and approved plans must be kept on the job site at all times. Additional pre -construction meetings with other interested parties may be required. CALCULATIONS All calculations necessary for the design of erosion and sediment control devices and Stormwater Control Measures (SCM) are in accordance with the NCDEQ erosion and sediment control manual, NCDEQ Stormwater manual, and NCDOT drainage manual. All hydrologic and hydraulic computations are included in the plans Treatment Volume Pond Area 1 Pond Area 2 Total Required 696 75 cf 1301.25 cf 1998.00 cf Provided 697 00 cf 1306.00 cf 2003.00 cf Predevelopment — 1.653 cfs 2.105 cfs 1yr 0 642 cfs 0.752 cfs 6 346 cfs 2yr 1 304 cfs 10yr 3.674 cfs 1 00y 8.317 cfs Post Development — Pond Area 1 Pond Area 2 Total 1 yr 1.216 cfs 2 312 cfs 3 528 cfs 2yr 1.536 cfs 2.851 cfs 4 387 cfs 10yr 2.409 cfs 4 323 cfs 6.732 cfs 1 00y 3.799 cfs 6 676 cfs 10 475 cfs Routed Flows Leaving Site — 1yr 0 227 cfs 0.372 cfs 0 599 cfs 2yr 0.310 cfs 0.479 cfs 0.789 cfs 10yr 0 455 cfs 1.653 cfs 2.105 cfs 1 00y 0.752 cfs 6 346 cfs 6 909 cfs Name DaVita Rockfish Location Paraclete Drive Drainage Area DA1, DA2, DA3 DA4 Existing BUA 0 Acres Existing Pervious Area 1 22 Acres Hydrologic Soils Group B CN 61 Tc 6.6 min apre 1 yr 0.642 cfs " 2yr 1.304 ds 10yr 3 674 cfs _ 1 00y 8 317 cfs - Date 5/24/2017 Revised Project # 14-046 Designed By MWJ Checked By 4807-C Koger Blvd Greensboro, NC 27407 336-218-8282'336-218-8010 Fax Site Su Site I 1.22 Acres I sed BUA0 78 Acres sed Pervious Area 0 44 Acres logic Soils Group B 84.66 5 min DA -1 DA -2 DA -3 DA4 1 yr "i° 3:528cisJ, 0 657 0 559 1 537 0 775 ted 2yr 4,387 cfs 0 816 072 1 876 0 975 10yr 6.731 1 247 1 161 2 802 1 521 1 00y 10.476 cfs. 1 935 1 864 4 288 2 389 1yr 2yr 10yr 1 00y 0 599 cfs 0 789 ds 2 105 cfs 6 909 ds triaddesigngroup ARCHrrECTURE I ENGINEERING I INTERIOR DESIGN 4807-C Koger Bou6vard Greensboro NC 27407 1 T-336.218.8282 F 3362188010 I wvnv triad designgroup cam STORMFILTER DESIGN INFORMATION CLl\.\ I // ® Determining Number of %O 'Cartridges for Volume-Based ENGINEERED SOLUTIONS Design in NC Design Engineer: �1 JDP Blue Cells =Input Date 3/27/2017 Black Cells = Calculation Site Information Project Name Project State Project Location Drainage Area, Ad Impervious Area, Ai Pervious Area, Ap % Impervious Runoff Coefficient, Rv Water Quality Volume Calculations Design storm rainfall depth, Rd Water quality volume, WQV Storage Component Calculations Capture 75% of WQV Pretreatment credit (estimated or calculated), %pre Mass loading calculations Mean Annual Rainfall, P Agency required % removal Percent Runoff Capture (% capture) Mean Annual Runoff,Vt Event Mean Concentration of Pollutant, EMC Annual Mass Load, Mtotal Filter System Filtration brand Cartridge height Cartridge Quantity Calculation Mass removed by pretreatment system, Mpre Mass load to filters after pretreatment, Mit Estimate the required filter efficiency, Etilter Mass to be captured by filters, Mutter Maximum Cartridge Flow rate, Qcan Mass load per cartridge, Mart (lbs) Number of Cartridges required, Nme, Maximum Treatment Capacity SUMMARY Davita Rockfish S North Carolina Raeford 0.31 ac 0.27 ac 0.04 86% 0.83 1.0 in 928.4 fe 696.3 fP 30% =0.05+0.9*(AVAd) =Ad* Rv* Rd* (43560/ 12) =0.75*WQV 46 in 85% 90% 38,435 ft'=P*Ad*Rv*(43560/12)*%capture 70.0 mg/I (Typically 60 - Residential/Office, 7D - Commercial, too -Industrial) 167.86 lbs =EMC*Vt*(28-3)*(0.000001)*(2-2046) StormFilter 27 in 50 lbs =Mtotal * %removal 117 lbs =Mtotal - Mpre 79% =1+(%removal - 1)/(1 - %pre) 92 lbs =Mpassl * Efilter 7.5 gpm =q * (7-5 ft2/cartrldge) 54 lbs =lookup mass load per cartridge 2 =ROUNDUP(Mfilter/Mcart,O) 0.03 =Nmass*(Qcart/449) Maximum Treatment Flow Rate, cfs 0.03 Cartridge Flow Rate, gpm 7.5 Number of Cartridges 2 Name. DaVita Rockfish Date 5/24/201 Revised Paraclete Drive Project # 17-021 Designed By MWJ Checked By 4807-C Koger Blvd Greensboro, NC 27407 336-218-8282 '336-218-8010 Fax Simple Method Volume Calculation Area= r DA -1 J 1 Rational C Values Impervious Surface C = 095 Lawn/Landscaped Area C = 035 Other Areas C = Rv = 005+09•la Rv = Runoff Coefficient la = Impervious Fraction SF C Composite Area Impervious Surface 6480 095 6156 Lawn/Landscape Area 628 035 2198 Other Areas 0 055 0 TOTAL 7108 63758 0163177227 ac 0 146368228 ac la = 0911648846 Rv = 0870483962 V= 3630'Rv'Rd'A 515.6166667 cf Rd = Design Rain Strom 1 00 1n A = Drainage Area 0 163177227 ac RunoffVolume 515.6166667 triaddesigngroup ARCHITECTURE I ENGINEERING IINTERIOR DESIGN 4807 - C Koger Boulevard, Greensboro, NC 27407 1 T- 336-218-8282 F - 336-218-8010 I www triad-deslgngroup corn Protect Name DaVita Rockfish Date 2/28/201 Revised Location Paraclete Drive Project # 17-021 Designed By MWJ Checked By Simple Method Volume Calculation V= 3630'RVRd'A 413 2333333 cf Rd = Design Rain Strom 1 00 in A = Drainage Area 0 146189164 ac Runoff Volume 413.2333333 triaddesigngroup ARCHITECTURE S ENGINEERING I INTERIOR DESIGN 4807- C Koger Boulevard, Greensboro, NG27407 I T -336-21B-8282 F-3362188010 I www triad designgroup corn 4W 4807-C Koger Blvd Greensboro, NC 27407 336-218-8282 '336-218-8010 Fax Area = l DA -2./ Rational C Values Impervious Surface C = 095 Lawn/Landscaped Area C = 035 Other Areas C = Rv = 005+09'la Rv = Runoff Coefficient la = Impervious Fraction SF C Composite Area Impervious Surface 5156 095 48982 Lawn/Landscape Area 1212 035 4242 Other Areas 0 055 0 TOTAL 6368 53224 0146189164 ac 0 122185491 ac la = 0809673367 Rv = 077870603 V= 3630'RVRd'A 413 2333333 cf Rd = Design Rain Strom 1 00 in A = Drainage Area 0 146189164 ac Runoff Volume 413.2333333 triaddesigngroup ARCHITECTURE S ENGINEERING I INTERIOR DESIGN 4807- C Koger Boulevard, Greensboro, NG27407 I T -336-21B-8282 F-3362188010 I www triad designgroup corn 4W 4807-C Koger Blvd Greensboro, NC 27407 336-218-8282 '336-218-8010 Fax C%oNTECH" ENGINEERED SOLUTIONS Fb N� Design Engineer: Date Site Information Project Name Project State Project Location Drainage Area, Ad Impervious Area, Ai Pervious Area, Ap % Impervious Runoff Coefficient, Rv Water Quality Volume Calculations Design storm rainfall depth, Rd Water quality volume, WQV Storage Component Calculations Capture 750/. of WQV Pretreatment credit (estimated or calculated), %pre Mass loading calculations Mean Annual Rainfall, P Agency required % removal Percent Runoff Capture (% capture) Mean Annual Runoff,Vt Event Mean Concentration of Pollutant, EMC Annual Mass Load, Mtotat Filter System Filtration brand Cartridge height Cartridge Quantity Calculation Mass removed by pretreatment system, Mp. Mass load to filters after pretreatment, Mp,.1 Estimate the required filter efficiency, Efilter Mass to be captured by filters, Mfilt,, Maximum Cartridge Flow rate, Or Mass load per cartridge, Mca,t (Ibs) Number of Cartridges required, Nmass Maximum Treatment Capacity SUMMARY Determining Number of Cartridges for Volume -Based Design in NC JDP 3/27/2017 Davita Rockfish N North Carolina Raeford 0.54 ac 0.50 ac 0.04 92% 0.88 Blue Cells = Input Black Cells = Calculation =0.05+0.9* (AVAd) 1.0 in 1735.31`0=Ad*Rv*Rd*(43560/12) 1301.5 fe =0.75*WQV 30% 46 in 85% 90% 71,842 It''=P*Ad*Rv*(43560/12)*%capture 70.0 mg/I (Typically 60 - Remdential/Office, 70 - Commamial, 100 - Industrial) 313.76 lbs =EMC*Vt*(28.3)*(0.000001)*(22046) StormFilter 27 in 94 lbs =Mtotal * %removal 220 lbs =Mtotal - Mpre 79% =1+(%removal - 1)/(1 - %pre) 173 lbs =Mpassl * Efilter 7.5 gpm =q * (7.5 ft2/cartddge) 54 lbs =lookup mass load per cartridge 4 =ROUNDUP(Mfilter/Mcart,O) 0.07 =Nmass*(Qcart/449) Maximum Treatment Flow Rate, cfs 0.07 Cartridge Flow Rate, gpm 7.: Number of Cartridges ©2008 CONTECH Stormwater Solutions contechstormwater.com 1of1 Name. DaVita Rockfish Date 2/28/201 Revised Paraclete Drive Project # 17-021 Designed By MJ Checked By Simple Method Volume Calculation Area Rational C Values Impervious Surface C = 095 Lawn/Landscaped Area C = 035 Other Areas C = Rv = 005+09'la Rv = Runoff Coefficient la = Impervious Fraction SF C Composite Area Impervious Surface 14632 095 139004 Lawn/Landscape Area 484 035 1694 Other Areas 0 055 0 TOTAL 15116 140698 0 347015611 ac 0 322998163 ac la = 0967980947 Rv = 0921182853 V= 3630•Rv'Rd'A 1160 383333 cf Rd = Design Rain Strom 1 00 in A = Drainage Area 0 347015611 ac Runoff Volume 1160.383333 triaddesigngroup ARCHITECTURE I ENGINEERING (INTERIOR DESIGN 4807 - C Koger Boulevard, Greensboro, NC 27407 1 T - 336.218 8282 F-336-218-8010 I www tread-destgngroup core W 4W 1111- 4807-C Koger Blvd Greensboro, NC 27407 336-218-8282'336-218-8010 Fax Project Name Location Par Drive DaVita Rockfish Area = -, DA -4 Rational C Values Impervious Surface C = 095 Lawn/Landscaped Area C = 035 Other Areas C = Rv = 005+09'la Rv = Runoff Coefficient la = Impervious Fraction SF C Impervious Surface 7198 Lawn/Landscape Area 1322 Other Areas 0 TOTAL 8520 0195592287 ac la = 0844835681 Rv = 0810352113 Volume V= 3630'Rv'Rd'A Rd = Design Rain Strom A = Drainage Area Runoff Volume Date 2/28/201 Revised Project # 17-021 Designed By MWJ Checked By Method Volume Calculation Composite Area 095 68381 035 4627 055 0 73008 0 167603306 ac 575 35 Gf 100 in 0.195592287 ac 575.35 triaddesigngroup ARCHITECTURE I ENGINEERING IINTERIOR DESIGN 41107 - C Koger Boulevard, Greensboro, NC 27407 1 T - 336-218-8282 F - 336.218-8010 1 www triad-designgroup corn W� >, 4807-C Koger Blvd Greensboro, NC 27407 336-218-8282 '336-218-8010 Fax Protect Name DaVita Rockfish Date 2/18/2015 Revised �� Location Paraclete Drive Project # 14-046 Designed By MWJ Checked By Drainage Area DA1, DA2, DA3 DA4 4807-C Koger Blvd Greensboro, NC 27407 336-218-8282'336-218-8010 Fax Underaroud Volumes Drainage Areas DA -1 WQV DA -2 WQV Design Volume WQV 75% Design Volume 24" Diamlater CMP Pipe 222 If 516 413 929 cf 696 75 cf Required 697 cf Provided DA -3 WQV 1160 DA -4 WQV 575 Design Volume WQV 1735 cf 75% Design Volume WQv 1301 25 cf 48" Dlamlater CMP Pipe 134 If 1306 cf Provided triaddesigngroup ARCHITECTURE I ENGINEERING IINTERIOR DESIGN 4807 - C Koger Boulevard, Greensboro, NC 27407 1 T 336-218 8282 F-336-218-8010 I www brad-designgroulacorn Hydraflow Table of Contents P\2017\DaVita-Rockfish17-021\-Civil\Calculations\DaVitaRockfish Contech gpw Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc. v11 Wednesday, 05/24/2017 WatershedModel Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, DA -1 HydrographReports................................................................................................................. Hydrograph No. 2, SCS Runoff, DA-2...................................................................................... 5 Hydrograph No. 3, SCS Runoff, DA-3...................................................................................... 6 Hydrograph No. 4, SCS Runoff, DA-4...................................................................................... 7 Hydrograph No. 5, SCS Runoff, Area to South Dry Pond ........................................................ 8 Hydrograph No. 6, SCS Runoff, Area to North Dry Pond ......................................................... 9 Hydrograph No. 7, SCS Runoff, Predevelopment.................................................................. 10 Hydrograph No. 8, Combine, DA -3-4 Combined.................................................................... 11 Hydrograph No. 9, Reservoir, Contech North UG.................................................................. 12 Pond Report - Contech System......................................................................................... 13 Hydrograph No. 10, Diversion1, Flow From Chambers......................................................... 14 Hydrograph No. 11, Diversion2, Wier Flow............................................................................ 15 Hydrograph No. 12, Combine, DA -1-2 Combined.................................................................. 16 Hydrograph No. 13, Reservoir, Contech South UG............................................................... 17 PondReport - Contech South............................................................................................ 18 Hydrograph No. 14, Diversion1, Flow From Chambers......................................................... 19 Hydrograph No. 15, Diversion2, Wier Flow............................................................................. 20 Hydrograph No. 16, Combine, Combined Flow To Dry Pond North ....................................... 21 Hydrograph No. 17, Reservoir, <no description>................................................................... 22 PondReport - North Dry Pond........................................................................................... 23 Hydrograph No. 18, Combine, Routed Flow From Pond ........................................................ 24 Hydrograph No. 19, Combine, Combined Flow To Dry Pond South ...................................... 25 _ Hydrograph No. 20, Reservoir, Dry Pond South.................................................................... 26 Pond Report - South Dry Pond.......................................................................................... 27 Hydrograph No. 21, Combine, Routed Flow Leaving South Pond ......................................... 28 Hydrograph No. 22, Combine, Total FLow Leaving Site ........................................................ 29 2 - Year SummaryReport....................................................................................................................... 30 HydrographReports................................................................................................................. 31 Hydrograph No. 1, SCS Runoff, DA-1.................................................................................... 31 HydrographNo. 2, SCS Runoff, DA-2.................................................................................... 32 HydrographNo. 3, SCS Runoff, DA-3.................................................................................... 33 Hydrograph No. 4, SCS Runoff, DA-4.................................................................................... 34 Hydrograph No. 5, SCS Runoff, Area to South Dry Pond ...................................................... 35 Hydrograph No. 6, SCS Runoff, Area to North Dry Pond ....................................................... 36 Hydrograph No. 7, SCS Runoff, Predevelopment.................................................................. 37 Hydrograph No. 8, Combine, DA -3-4 Combined.................................................................... 38 Hydrograph No. 9, Reservoir, Contech North UG.................................................................. 39 Hydrograph No. 10, Diversion1, Flow From Chambers......................................................... 40 Hydrograph No. 11, Diversion2, Wier Flow............................................................................ 41 Contents continued... P \2017\DaVita - Rockfish 17-021\- Civd\Calculations\DaVita Rockfish Contech.gpw Hydrograph No. 12, Combine, DA -1-2 Combined.................................................................. 42 Hydrograph No. 13, Reservoir, Contech South UG............................................................... 43 Hydrograph No. 14, Diversion1, Flow From Chambers......................................................... 44 Hydrograph No. 15, Diversion2, Wler Flow............................................................................ 45 Hydrograph No. 16, Combine, Combined Flow To Dry Pond North ....................................... 46 Hydrograph No. 17, Reservoir, <no description>................................................................... 47 Hydrograph No. 18, Combine, Routed Flow From Pond ........................................................ 48 Hydrograph No. 19, Combine, Combined Flow To Dry Pond South ...................................... 49 Hydrograph No. 20, Reservoir, Dry Pond South.................................................................... 50 Hydrograph No. 21, Combine, Routed Flow Leaving South Pond ......................................... 51 Hydrograph No. 22, Combine, Total FLow Leaving Site ........................................................ 52 10 - Year SummaryReport....................................................................................................................... 53 Hydrograph Reports................................................................................................................. 54 Hydrograph No. 1, SCS Runoff, DA-1.................................................................................... 54 Hydrograph No. 2, SCS Runoff, DA-2.................................................................................... 55 Hydrograph No. 3, SCS Runoff, DA-3.................................................................................... 56 Hydrograph No. 4, SCS Runoff, DA-4.................................................................................... 57 Hydrograph No. 5, SCS Runoff, Area to South Dry Pond ...................................................... 58 Hydrograph No. 6, SCS Runoff, Area to North Dry Pond ....................................................... 59 Hydrograph No. 7, SCS Runoff, Predevelopment.................................................................. 60 Hydrograph No. 8, Combine, DA -3-4 Combined.................................................................... 61 Hydrograph No. 9, Reservoir, Contech North UG.................................................................. 62 Hydrograph No. 10, Diversion1, Flow From Chambers......................................................... 63 Hydrograph No. 11, Diversion2, Wler Flow............................................................................ 64 Hydrograph No. 12, Combine, DA -1-2 Combined.................................................................. 65 Hydrograph No. 13, Reservoir, Contech South UG............................................................... 66 Hydrograph No. 14, Diversion1, Flow From Chambers......................................................... 67 Hydrograph No. 15, Diversion2, Wler Flow............................................................................ 68 Hydrograph No. 16, Combine, Combined Flow To Dry Pond North ....................................... 69 Hydrograph No. 17, Reservoir, <no description>................................................................... 70 Hydrograph No. 18, Combine, Routed Flow From Pond ........................................................ 71 Hydrograph No. 19, Combine, Combined Flow To Dry Pond South ...................................... 72 Hydrograph No. 20, Reservoir, Dry Pond South.................................................................... 73 Hydrograph No. 21, Combine, Routed Flow Leaving South Pond ......................................... 74 Hydrograph No. 22, Combine, Total FLow Leaving Site ........................................................ 75 100 - Year SummaryReport....................................................................................................................... 76 HydrographReports................................................................................................................. 77 Hydrograph No. 1, SCS Runoff, DA-1.................................................................................... 77 Hydrograph No. 2, SCS Runoff, DA-2.................................................................................... 78 Hydrograph No. 3, SCS Runoff, DA-3.................................................................................... 79 HydrographNo. 4, SCS Runoff, DA-4.................................................................................... 80 Hydrograph No. 5, SCS Runoff, Area to South Dry Pond ...................................................... 81 Hydrograph No. 6, SCS Runoff, Area to North Dry Pond ....................................................... 82 Hydrograph No. 7, SCS Runoff, Predevelopment.................................................................. 83 Hydrograph No. 8, Combine, DA -3-4 Combined.................................................................... 84 Hydrograph No. 9, Reservoir, Contech North UG.................................................................. 85 Contents continued... Hydrograph Hydrograph Hydrograph Hydrograph Hydrograph Hydrograph Hydrograph Hydrograph Hydrograph Hydrograph Hydrograph Hydrograph Hydrograph No No No No No No No No No No No No P \2017\DaVita - Rockfish 17-021\- CMACalculations\DaVita Rockfish Contech gpw 10, Diversion1, Flow From Chambers......................................................... 11, Diversion2, Wier Flow............................................................................ 12, Combine, DA -1-2 Combined.................................................................. 13, Reservoir, Contech South UG............................................................... 14, Diversion1, Flow From Chambers......................................................... 15, Diversion2, Wier Flow............................................................................ 16, Combine, Combined Flow To Dry Pond North ....................................... 17, Reservoir, <no description>................................................................... 18, Combine, Routed Flow From Pond ........................................................ 19, Combine, 20, Reservoir, 21, Combine, No. 22, Combine, Combined Flow To Dry Pond South ...................................... DryPond South.................................................................... Routed Flow Leaving South Pond ......................................... Total FLow Leaving Site ........................................................ 86 87 88 89 90 91 92 93 94 95 96 97 98 OFReport.................................................................................................................. 99 Watershed Model Schematic OV 22 Legend Hvd• Origin Descriation 1 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 1 SCS Runoff DA -1 2 SCS Runoff DA -2 3 SCS Runoff DA -3 4 SCS Runoff DA -4 5 SCS Runoff Area to South Dry Pond 6 SCS Runoff Area to North Dry Pond 7 SCS Runoff Predevelopment 8 Combine DA -3-4 Combined 9 Reservoir Contech North UG 10 Diversionl Flow From Chambers 11 Diversion2 Wier Flow 12 Combine DA -1-2 Combined 13 Reservoir Contech South UG 14 Diversion1 Flow From Chambers 15 Diversion2 Wier Flow 16 Combine Combined Flow To Dry Pond North 17 Reservoir <no description> 18 Combine Routed Flow From Pond 19 Combine Combined Flow To Dry Pond South 20 Reservoir Dry Pond South 21 Combine Routed Flow Leaving South Pond 22 Combine Total FLow Leaving Site Project: P:\2017\DaVita - Rockfish 17-021\- Civil\Calculations\DaVita Rockfish Contech 9 ednesday, 05 / 24 / 2017 Hydrograph Return Period Re Hydr~rhflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 1 SCS Runoff ------ 0 657 0 816 ------- ------- 1 247 ------- ------- 1 935 DA -1 2 SCS Runoff ------ 0 559 0.720 ------- ------- 1 161 ------- ------- 1 864 DA -2 3 SCS Runoff ------ 1 537 1.876 ------- ------- 2 802 ------- ------- 4 288 DA -3 4 SCS Runoff ------ 0 775 0 975 ------- ------- 1 521 ------- ------- 2 389 DA -4 5 SCS Runoff ------ 0 095 0 192 ------- ------- 0 542 ------- ------- 1 227 Area to South Dry Pond 6 SCS Runoff ------ 0 089 0 182 ------- ------- 0 512 ------- ------- 1 159 Area to North Dry Pond 7 SCS Runoff ------ 0 642 1 304 ------- ------- 3 674 ------- ------- 8 317 Predevelopment 8 Combine 3, 4, 2 312 2 851 ------- ------- 4 323 ------- ------- 6 676 DA -3-4 Combined 9 Reservoir 8 2 211 2 829 ------- ------- 4 293 ------- ------- 6 631 Contech North UG 10 Diversion1 9 0 072 0 073 ------- ------- 0 077 ------- ------- 0 077 Flow From Chambers 11 Diversion2 9 2 138 2 756 ------- 4.216 ------- ------- 6 555 Wier Flow 12 Combine 1, 2, 1 216 1 536 ------- ------- 2 409 ------- ------- 3 799 DA -1-2 Combined 13 Reservoir 12 1 210 1 528 ------- ------- 2 396 ------- ------- 3 780 Contech South UG 14 Diversion1 13 0 019 0 019 ------- ------- 0 020 ------- ------- 0 020 Flow From Chambers 15 Diversion2 13 1 192 1 510 ------- ------- 2 376 ------- ------- 3 760 Wier Flow 16 Combine 6, 11, 2 227 2 938 ------- ------- 4 728 ------- ------- 7 713 Combined Flow To Dry Pond North 17 Reservoir 16 0 302 0 408 ------- ------- 1 581 ------- ------- 6 269 <no description> 18 Combine 10,17 0 372 0 479 ------- ------- 1 653 ------- ------- 6 346 Routed Flow From Pond 19 Combine 5, 15, 1 282 1 702 ------- ------- 2 918 ------- ------- 4 981 Combined Flow To Dry Pond South 20 Reservoir 19 0.208 0 291 ------- ------- 0 437 ------- ------- 0 733 Dry Pond South 21 Combine 14,20 0 227 0 310 ------- ------- 0 455 ------- ------- 0 752 Routed Flow Leaving South Pond 22 Combine 18,21 0 599 0 789 ------- ------- 2 105 ------- ------- 6 909 Total FLow Leaving Site Proj. file: P-\2017\DaVita - Rockfish 17-021\- CivikCalculations\DaVita Rockfish �CWdddesj#ay, 05 / 24 / 2017 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3DO 2016 by Autodesk, Inc v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0 657 1 717 1,431 ------ ------ ------ DA -1 2 SCS Runoff 0 559 1 717 1,160 ------ ------ ------ DA -2 3 SCS Runoff 1 537 1 717 3,535 ------ ------ ------ DA -3 4 SCS Runoff 0 775 1 717 1,646 ------ ------ ------ DA -4 5 SCS Runoff 0 095 1 719 256 ------ ------ ------ Area to South Dry Pond 6 SCS Runoff 0 089 1 719 242 ------ ------ ------ Area to North Dry Pond 7 SCS Runoff 0 642 1 719 1,737 ------ ------ ------ Predevelopment 8 Combine 2 312 1 717 5,181 3, 4, ------ ------ DA -3-4 Combined 9 Reservoir 2 211 1 719 5,176 8 24587 1,710 Contech North UG 10 Diversionl 0 072 1 716 3,790 9 ------ ------ Flow From Chambers 11 Diversion2 2.138 1 719 1,386 9 ----- ------ Wier Flow 12 Combine 1 216 1 717 2,590 1, 2, ------ ------ DA -1-2 Combined 13 Reservoir 1 210 1 718 2,584 12 24620 631 Contech South UG 14 Diversionl 0 019 1 712 1,364 13 ------ ------ Flow From Chambers 15 Diversion2 1.192 1 718 1,220 13 ------ ------ Wier Flow 16 Combine 2 227 1 719 1,628 6, 11, ------ ------ Combined Flow To Dry Pond North 17 Reservoir 0.302 1 730 1,641 16 24468 900 <no description> 18 Combine 0 372 1 729 5,431 10,17 ------ ------ Routed Flow From Pond 19 Combine 1.282 1 718 1,477 5, 15, ------ ------ Combined Flow To Dry Pond South 20 Reservoir 0208 1 729 1,486 19 24541 712 Dry Pond South 21 Combine 0 227 1 729 2,851 14,20 ------ ------ Routed Flow Leaving South Pond 22 Combine 0 599 1 729 8,282 18,21 ------ ------ Total FLow Leaving Site P:\2017\DaVita - Rockfish 17-021\- Civil\Cal u[gfi ursl\®aVild:RloYbfish Contech. Wednesday, 05 / 24 / 2017 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 1 DA -1 Hydrograph type = SCS Runoff Peak discharge = 0.657 cfs Storm frequency = 1 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 1,431 cuft Drainage area = 0.160 ac Curve number = 94* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0 150 x 98) + (0 010 x 39)] / 0 160 Q (cfs) DA -1 Hyd. No. 1 -- 1 Year Q (cfs) 0.0 20 Hyd No. 1 40 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) 0.80 0.60 0.50 0.40 0.30 k 0.20 0.0 20 Hyd No. 1 40 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) 5 Hydr®graph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 1.00 Wednesday, 05 / 24 / 2017 Hyd. No. 2 DA -2 Hydrograph type = SCS Runoff Peak discharge = 0.559 cfs Storm frequency = 1 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 1,160 cuft Drainage area = 0.160 ac Curve number = 89* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0 120 x 98) + (0 040 x 61)] / 0 160 DA -2 Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 1.00 1.00 0.90 090 __ �...� .._...__._. .... � � .....� .__.._.�... ....._.__._ � 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 040 0.40 0.30 0.30 0.20 0.20 0.10 0.10 000 � � 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Hyd. No. 3 DA -3 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 0.350 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.04 in Storm duration = 24 hrs * Composite (Area/CN) = [(0 340 x 98) + (0 010 x 61)] / 0 350 Q (cfs 2.00 1.00 rTiTil 0.0 2.0 Hyd No. 3 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor DA -3 Hyd. No. 3 -- 1 Year I Wednesday, 05 / 24 / 2017 = 1.537 cfs = 11.95 hrs = 3,535 tuft = 97* = 0 ft = 5.00 min = Type II = 484 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Q (cfs) 2.00 1.00 20.0 Time (hrs) 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 05 / 24 / 2017 Hyd. No. 4 DA -4 Hydrograph type = SCS Runoff Peak discharge = 0.775 cfs Storm frequency = 1 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 1,646 cuft Drainage area = 0.200 ac Curve number = 92* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0 170 x 98) + (0 030 x 61)] / 0 200 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 010 000 0.0 2.0 4.0 6.0 Hyd No. 4 DA -4 Hyd. No 4 -- 1 Year Q (cfs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 5 Area to South Dry Pond Hydrograph type = SCS Runoff Peak discharge = 0.095 cfs Storm frequency = 1 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 256 cuft Drainage area = 0.180 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 009 0.08 0.07 _.�...__ .,.._ 006 0.05 0.04 0.03 0.02 0.01 0 00 ®1 no 0 2 4 6 8 Hyd No. 5 Area to South Dry Pond Hyd. No. 5 -- 1 Year Q (cfs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Hyd. No. 6 Time to peak Area to North Dry Pond Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 0.170 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.04 in Storm duration = 24 hrs 9 Wednesday, 05 / 24 / 2017 Peak discharge = 0.089 cfs Time to peak = 11.98 hrs Hyd. volume = 242 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Area to North Dry Pond Q (cfs) Hyd No. 6 -- 1 Year Q (cfs) 0.10 009 0.08 0.07 0.06 005 0.04 0.03 0.02 0.01 000 0.10 0.09 0.08 0.07 006 0.05 0.04 0.03 0.02 0.01 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 6 Time (hrs) 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 7 Predevelopment Hydrograph type = SCS Runoff Peak discharge = 0.642 cfs Storm frequency = 1 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 1,737 cuft Drainage area = 1.220 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.60 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Predevelopment Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 000 0 2 4 Hyd No. 7 Is OM 1.00 0.90 0.80 0.70 060 0.50 0.40 0.30 0.20 0.10 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 8 DA -3-4 Combined Hydrograph type = Combine Peak discharge = 2.312 cfs Storm frequency = 1 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 5,181 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 0.550 ac Q (cfs 3.00 2.00 1.00 rOViT.1 DA -3-4 Combined Hyd. No. 8 -- 1 Year 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Hyd No. 8 Hyd No. 3 Hyd No. 4 14.0 16.0 180 Q (cfs) 3.00 2.00 1.00 20.0 Time (hrs) 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 9 Contech North UG Hydrograph type = Reservoir Peak discharge = 2.211 cfs Storm frequency = 1 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 5,176 cuft Inflow hyd. No. = 8 - DA -3-4 Combined Max. Elevation = 245.87 ft Reservoir name = Contech System Max. Storage = 1,710 cuft Storage Indication method used Q (cfs 3.00 2.00 1.00 r.TIrI Contech North UG Hyd. No. 9 -- 1 Year _..._ .- �. m_ 0 3 6 9 12 15 18 21 24 27 Hyd No. 9 Hyd No. 8 ` _ � Total storage used = 1,710 cuft Q (cfs) 3.00 2.00 1.00 30 Time (hrs) Pond Report 13 Hydraflow Hydrographs Extension for AutoCAD@ Civil 3DO 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Pond No. 7 - Contech System 000 000 Crest Len (ft) Pond Data 000 000 000 UG Chambers -Invert elev = 242 65 ft, Rise x Span = 4 00 x 4 00 ft, Barrel Len = 42 00 ft, No Barrels = 3, Slope = 0 00%, Headers = Yes Stage / Storage Table 000 000 Crest EI. (ft) Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 000 24265 n/a 0 0 040 24305 n/a 103 103 080 24345 n/a 180 283 1.20 243.85 n/a 218 501 1 60 24425 n/a 241 742 200 24465 n/a 251 993 240 24505 n/a 251 1,244 280 24545 n/a 240 1,485 320 24585 n/a 218 1,703 360 24625 n/a 179 1,883 400 24665 n/a 103 1,986 [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 800 1.25 000 000 Crest Len (ft) = 4 00 000 000 000 Span (in) = 800 1 25 000 000 Crest EI. (ft) = 24557 000 000 000 No. Barrels = 1 1 0 0 Weir Coeff. = 333 333 333 333 Invert EI. (ft) = 24265 24265 000 000 Weir Type = Ciplti --- --- --- Length (ft) = 2400 000 000 000 Multi -Stage = No No No No Slope (%) = 1 00 000 0.00 n/a N -Value = 013 013 013 n/a Orifice Coeff. = 060 060 060 0.60 Exfil.(in/hr) = 0 000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 000 Note Culvert/Orifice outflows are analyzed under inlet (to) and outlet (cc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage (ft) Stage / Discharge Elev (ft) 5 00 400 300 200 1 00 0 00 247 65 24665 245.65 24465 24365 24265 000 200 400 600 800 1000 1200 1400 1600 Total Q Discharge (cfs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Hyd. No. 10 Flow From Chambers Hydrograph type = Diversion1 Storm frequency = 1 yrs Time interval = 1 min Inflow hydrograph = 9 - Contech North UG Diversion method = Pond - Contech System Peak discharge Time to peak Hyd. volume 2nd diverted hyd Pond structure Flow From Chambers 14 Wednesday, 05 / 24 / 2017 = 0.072 cfs = 11.93 hrs = 3,790 tuft =11 = Culy/Orf A Q (cfs) Hyd No. 10 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 30 Time (hrs) Hyd No. 10 -- Pond outlet Hyd No. 9 -- Inflow Hyd No. 11 -- 9 minus 10 15 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@) Civil 3DO 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 11 Wier Flow Hydrograph type = Diversion2 Peak discharge = 2.138 cfs Storm frequency = 1 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 1,386 cuft Inflow hydrograph = 9 - Contech North UG 2nd diverted hyd. = 10 Diversion method = Pond - Contech System Pond structure = Culy/Orf A Q (cfs) 3.00 2.00 1.00 FAMTil Wler Flow Hyd. No. 11 -- 1 Year 0 3 6 9 12 15 18 21 24 27 Hyd No. 11 -- Qin - Pond outlet ® Hyd No. 9 -- Inflow Hyd No. 10 Q (cfs) 3.00 2.00 1 00 30 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Hyd. No. 12 DA -1-2 Combined Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 1 min Inflow hyds. = 1, 2 Q (cfs 2.00 1 00 'dAT1l 16 Wednesday, 05 / 24 / 2017 Peak discharge = 1.216 cfs Time to peak = 11.95 hrs Hyd. volume = 2,590 cuft Contrib. drain. area = 0.320 ac DA -1-2 Combined Hyd. No. 12 -- 1 Year Q (cfs) 2.00 1.00 e 0.0 2.0 4.0 60 8.0 10.0 12.0 14.0 Hyd No. 12 ® Hyd No. 1 Hyd No. 2 16.0 18.0 20.0 22.0 - Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc. v11 Hyd. No. 13 Contech South UG Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 12 - DA -1-2 Combined Reservoir name = Contech South Storage Indication method used. Q (cfs) 2.00 1.00 e 3 Hyd No. 13 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Contech South UG Hyd. No. 13 -- 1 Year 6 9 12 - Hyd No. 12 17 Wednesday, 05 / 24 / 2017 = 1.210 cfs = 11.97 hrs = 2,584 tuft = 246.20 ft = 631 tuft 15 18 21 24 27 _- __j Total storage used = 631 cuft Q (cfs) 2.00 1.00 Had- 0.00 30 Time (hrs) Pond Report 18 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Pond No. 9 - Contech South Weir Structures Pond Data [A] UG Chambers -Invert elev = 244 55 ft, Rise x Span = 2 00 x 2 00 ft, Barrel Len = 109 00 ft, No Barrels = 2, Slope = 0 00%, Headers = Yes Stage / Storage Table [A] [B] Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 000 24455 n/a 0 0 020 244.75 n/a 37 37 040 244.95 n/a 65 102 060 24515 n/a 79 181 080 24535 n/a 87 268 1 00 24555 n/a 91 358 1 20 24575 n/a 91 449 140 24595 n/a 87 536 1 60 24615 n/a 79 614 1 80 24635 n/a 65 679 200 24655 n/a 37 716 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 800 075 000 0.00 Crest Len (ft) = 400 000 000 000 Span (in) = 800 075 000 000 Crest EI. (ft) = 24600 000 000 000 No. Barrels = 1 1 0 0 Weir Coeff. = 333 333 333 333 Invert El. (ft) = 24455 24455 0.00 000 Weir Type = Clpltl --- --- --- Length (ft) = 34.00 000 000 000 Multi -Stage = No No No No Slope (%) = 1 00 000 000 n/a N -Value = 013 013 013 n/a Orifice Coeff. = 060 060 0.60 060 Exfil.(in/hr) = 0 000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 000 Note Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage (ft) Stage / Discharge Elev (ft) 300 1 00 000 ' ' 000 1 00 Total Q 247 55 24655 24555 ' I I 1' 24455 200 300 400 500 600 Discharge (cfs) Hydrograph Report 19 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 05 / 24 / 2017 Hyd. No. 14 Flow From Chambers Hydrograph type = Diversion1 Peak discharge = 0.019 cfs Storm frequency = 1 yrs Time to peak = 11.87 hrs Time interval = 1 min Hyd. volume = 1,364 cuft Inflow hydrograph = 13 - Contech South UG 2nd diverted hyd. = 15 Diversion method = Pond - Contech South Pond structure = Culy/Orf A Q (cfs 2.00 1.00 Flow From Chambers Hyd. No. 14 -- 1 Year 0.00 0 3 6 9 Hyd No. 14 -- Pond outlet Q (cfs) 2.00 1.00 ffWITH 12 15 18 21 24 27 30 Time (hrs) Hyd No. 13 -- Inflow Hyd No. 15 -- 13 minus 14 Hydrograph Report 20 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 05 / 24 / 2017 Hyd. No. 15 Wier Flow Hydrograph type = Diversion2 Peak discharge = 1.192 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 1,220 cuft Inflow hydrograph = 13 - Contech South UG 2nd diverted hyd. = 14 Diversion method = Pond - Contech South Pond structure = Culy/Orf A Q (cfs) 2.00 1.00 Wier Flow Hyd. No. 15 -- 1 Year 0.00 0 3 6 9 12 15 18 21 24 27 Hyd No. 15 -- Qin - Pond outlet Hyd No. 13 -- Inflow Hyd No. 14 Q (cfs) 2.00 1.00 Mmd- 0.00 30 Time (hrs) Hydrograph Report 21 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 16 Combined Flow To Dry Pond North Hydrograph type = Combine Peak discharge = 2.227 cfs Storm frequency = 1 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 1,628 cuft Inflow hyds. = 6, 11 Contrib. drain. area = 0.170 ac Combined Flow To Dry Pond North Q (cfs) Hyd. No. 16 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 120 13.0 14.0 Time (hrs) Hyd No. 16 Hyd No. 6 Hyd No. 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 17 <no description> Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 16 - Combined Flow To Dry PcIVIdAiEftyation Reservoir name = North Dry Pond Max. Storage Storage Indication method used. Q (cfs) 3.00 2.00 1.00 <no description> Hyd. No. 17 -- 1 Year 22 Wednesday, 05 / 24 / 2017 = 0.302 cfs = 12.17 hrs = 1,641 cuft = 244.68 ft = 900 cuft 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Hyd No. 17 Hyd No. 16 t__..__ __ 1 Total storage used = 900 cult Q (cfs) 3.00 2.00 1.00 - 0.00 20.0 Time (hrs) Stage (ft) 300 200 1.00 0 00 Note Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (or) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge 000 1 00 200 3.00 400 500 600 700 Total Q Elev (ft) 24700 24600 245.00 1 24400 800 Discharge (cfs) 23 Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Pond No. 8 - North Dry Pond Pond Data Contours -User-defined contour areas Conic method used for volume calculation Begining Elevation = 244 00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 000 24400 912 0 0 1 00 24500 1,764 1,315 1,315 200 24600 2,640 2,187 3,502 300 24700 3,040 2,837 6,339 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 1200 400 0.00 000 Crest Len (ft) = 471 000 0.00 000 Span (in) = 1200 400 000 000 Crest EI. (ft) = 24575 000 000 000 No. Barrels = 1 1 0 0 Weir Coeff. = 333 3.33 333 333 Invert EI. (ft) = 24225 24400 000 0.00 Weir Type = 1 --- --- --- Length (ft) = 10.00 000 000 000 Multi -Stage = Yes No No No Slope (%) = 1 00 000 000 n/a N -Value = 013 013 013 n/a Orifice Coeff. = 060 060 060 060 Exfil.(in/hr) = 0 000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 000 Stage (ft) 300 200 1.00 0 00 Note Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (or) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge 000 1 00 200 3.00 400 500 600 700 Total Q Elev (ft) 24700 24600 245.00 1 24400 800 Discharge (cfs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Hyd. No. 18 Routed Flow From Pond Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 1 min Inflow hyds. = 10, 17 Q (cfs) 24 Wednesday, 05 / 24 / 2017 Peak discharge = 0.372 cfs Time to peak = 12.15 hrs Hyd. volume = 5,431 cuft Contrib. drain. area = 0.000 ac Routed Flow From Pond Hyd. No. 18 -- 1 Year Q (cfs) 0 3 Hyd No. 18 6 9 12 Hyd No. 10 15 18 Hyd No. 17 21 24 27 30 Time (hrs) 1 0 3 Hyd No. 18 6 9 12 Hyd No. 10 15 18 Hyd No. 17 21 24 27 30 Time (hrs) Hydrograph Report 25 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 19 Combined Flow To Dry Pond South Hydrograph type = Combine Peak discharge = 1.282 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 1,477 cuft Inflow hyds. = 5, 15 Contrib. drain. area = 0.180 ac Q (cfs 200 1.00 Combined Flow To Dry Pond South Hyd. No. 19 -- 1 Year 4.0 6.0 ® Hyd No. 5 8.0 100 - Hyd No. 15 12.0 14.0 Q (cfs) 2.00 1.00 16.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 20 Dry Pond South Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 19 - Combined Flow To Dry PcMd)S(EJdvation Reservoir name = South Dry Pond Max. Storage Storage Indication method used. Q (cfs) 2.00 1.00 0.00 0 2 4 Hyd No. 20 Dry Pond South Hyd. No. 20 -- 1 Year 26 Wednesday, 05 / 24 / 2017 = 0.208 cfs = 12.15 hrs = 1,486 tuft = 245.41 ft = 712 cuft 6 8 10 12 14 16 18 20 22 24 Hyd No. 19 L=--] Total storage used = 712 cuft Q (cfs) 2.00 1.00 0.00 26 Time (hrs) Pond Report 27 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Pond No. 10 - South Dry Pond Pond Data Contours -User-defined contour areas Conic method used for volume calculation Beglning Elevation = 245 00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 000 24500 1,124 0 0 1 00 24600 2,400 1,722 1,722 200 24700 2,884 2,638 4,360 250 24750 4,568 1,847 6,207 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 1200 400 000 000 Crest Len (ft) = 628 000 000 000 Span (in) = 1200 400 000 000 Crest EI. (ft) = 24700 000 000 000 No. Barrels = 1 1 0 0 Weir Coeff. = 333 333 333 333 Invert El. (ft) = 24430 24500 000 000 Weir Type = 1 --- --- --- Length (ft) = 2400 000 000 000 Multi -Stage = Yes No No No Slope (%) = 1 00 000 000 n/a N -Value = 013 013 013 n/a Orifice Coeff. = 060 060 060 060 Exfil.(in/hr) = 0 000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 000 Note Culvert/Orifice outflows are analyzed under Inlet (Ic) and outlet (oc) control Weir risers checked for orifice conditions (Ic) and submergence (s) Stage (ft) Stage / Discharge Elev (ft) 300 200 1 00 248.00 24700 24600 0 00 I ' ' ' ' ' 245 00 000 1 00 2.00 300 400 500 600 Total Q Discharge (cfs) 28 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@) Civil 3DO 2016 by Autodesk, Inc. v11 0.50 Wednesday, 05 / 24 / 2017 Hyd. No. 21 Routed Flow Leaving South Pond Hydrograph type = Combine Peak discharge = 0.227 cfs Storm frequency = 1 yrs Time to peak = 12.15 hrs Time interval = 1 min Hyd. volume = 2,851 cuft Inflow hyds. = 14, 20 Contrib. drain. area = 0.000 ac Routed Flow Leaving South Pond Q (cfs) Hyd. No. 21 -- 1 Year Q (cfs) 0.50 0.50 � 0.45 0.45 `W' _._..� .......__... _�.�..�.. 0.40 0.40 0.35 035 �. 0.30 0.30 025 0.25 _. 0.20 0.20 0.15 0.15 0.10 0.10 � � � 0.05 0.05 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 Time (hrs) Hyd No. 21 Hyd No. 14 Hyd No. 20 29 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 22 Total FLow Leaving Site Hydrograph type = Combine Peak discharge = 0.599 cfs Storm frequency = 1 yrs Time to peak = 12.15 hrs Time interval = 1 min Hyd. volume = 8,282 cuft Inflow hyds. = 18, 21 Contrib. drain. area = 0.000 ac Total FLow Leaving Site Q (cfs) Hyd. No. 22 -- 1 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 � � � 0.80 0.70 0.70 0.60 0.60 0.50 0.50 040 .��. .......�,.�.,. N.,�....___� __._ 0.40 0.30 �. 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 4 8 12 16 20 24 28 32 36 Time (hrs) Hyd No. 22 Hyd No. 18 Hyd No. 21 30 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 0 816 1 717 1,804 ------ ------ ------ DA -1 2 SCS Runoff 0 720 1 717 1,512 ------ ------ ------ DA -2 3 SCS Runoff 1 876 1 717 4,367 ------ ------ ------ DA -3 4 SCS Runoff 0 975 1 717 2,103 ------ ------ ------ DA -4 5 SCS Runoff 0.192 1 718 442 ------ ------ ------ Area to South Dry Pond 6 SCS Runoff 0 182 1 718 417 ------ ------ ------ Area to North Dry Pond 7 SCS Runoff 1 304 1 718 2,994 ------ ------ ------ Predevelopment 8 Combine 2 851 1 717 6,471 3, 4, ------ ------ DA -3-4 Combined 9 Reservoir 2 829 1 718 6,465 8 245 92 1,734 Contech North UG 10 Diversionl 0 073 1 718 4,166 9 ------ ------ Flow From Chambers 11 Diversion2 2 756 1 718 2,300 9 ------ ------ Wier Flow 12 Combine 1 536 1 717 3,315 1, 2, ------ ------ DA -1-2 Combined 13 Reservoir 1 528 1 718 3,309 12 24623 642 Contech South UG 14 Diversionl 0 019 1 718 1,459 13 ------ ------ Flow From Chambers 15 Diversion2 1510 1 718 1,851 13 ------ ------ Wier Flow 16 Combine 2 938 1 718 2,717 6, 11, ------ ------ Combined Flow To Dry Pond North 17 Reservoir 0 408 1 729 2,733 16 24511 1,558 <no description> 18 Combine 0 479 1 727 6,899 10,17 ------ ------ Routed Flow From Pond 19 Combine 1 702 1 718 2,293 5, 15, ------ ------ Combined Flow To Dry Pond South 20 Reservoir 0 291 1 728 2,303 19 24565 1,115 Dry Pond South 21 Combine 0 310 1 728 3,762 14,20 ------ ------ Routed Flow Leaving South Pond 22 Combine 0 789 1 728 10,660 18,21 ------ ------ Total FLow Leaving Site P:\2017\DaVita - Rockfish 17-021\- Civil\Cal uFAfihrri\1E?aVdd:F3b'dbfjsh Contech. Wednesday, 05 / 24 / 2017 Hydr®graph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Hyd. No. 1 Time to peak DA -1 Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.160 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.68 in Storm duration = 24 hrs * Composite (Area/CN) = [(0 150 x 98) + (0 010 x 39)] / 0 160 Q (cfs) 31 Wednesday, 05 / 24 / 2017 Peak discharge = 0.816 cfs Time to peak = 11.95 hrs Hyd. volume = 1,804 cuft Curve number = 94* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 DA -1 Hyd No. 1 -- 2 Year Q (cfs) 1 00 1.00 - � 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 ' 0.50 050 0.40 040 _ _.�. �W � � 0.30 0.30 0.20 0.20 0.10 0.10 00 2.0 Hyd No. 1 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) 32 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 2 OEM Hydrograph type = SCS Runoff Peak discharge = 0.720 cfs Storm frequency = 2 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 1,512 cuft Drainage area = 0.160 ac Curve number = 89* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0 120 x 98) + (0 040 x 61)] / 0 160 Q (cfs) Deo -2 Hyd. No. 2 -- 2 Year Q (cfs) 0.0 2.0 4.0 Hyd No. 2 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) I 0.0 2.0 4.0 Hyd No. 2 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v11 Hyd. No. 3 DA -3 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.350 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.68 in Storm duration = 24 hrs Composite (Area/CN) _ [(0 340 x 98) + (0.010 x 61)] / 0 350 Q (cfs) 2.00 1.00 0.00 ' 0.0 2.0 Hyd No. 3 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor DA -3 Hyd. No. 3 -- 2 Year 33 Wednesday, 05 / 24 / 2017 = 1.876 cfs = 11.95 hrs = 4,367 cuft = 97* = 0 ft = 5.00 min = Type II = 484 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Q (cfs) 2.00 1.00 — 0.00 20.0 Time (hrs) 34 Hydr®graph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 4 DA -4 Hydrograph type = SCS Runoff Peak discharge = 0.975 cfs Storm frequency = 2 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 2,103 cuft Drainage area = 0.200 ac Curve number = 92* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0 170 x 98) + (0 030 x 61)] / 0 200 Q (cfs) DA -4 Hyd. No. 4 -- 2 Year Q (cfs) 0.0 2.0 Hyd No. 4 40 6.0 8.0 10.0 12.0 14.0 160 18.0 20.0 Time (hrs) f. 1� mom now= 0.0 2.0 Hyd No. 4 40 6.0 8.0 10.0 12.0 14.0 160 18.0 20.0 Time (hrs) 35 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 5 Area to South Dry Pond Hydrograph type = SCS Runoff Peak discharge = 0.192 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 442 cuft Drainage area = 0.180 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 _._..... 0.30 025 0.20 015 0.10 0.05 0 00 0 2 4 Hyd No. 5 Area to South Dry Pond Hyd. No. 5 -- 2 Year Q (cfs) 36 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 6 Area to North Dry Pond Hydrograph type = SCS Runoff Peak discharge = 0.182 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 417 cuft Drainage area = 0.170 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 ..x__...... 0.30 0.25 ._.� 020 0.15 0.10 0.05 n nn 0 2 4 Hyd No. 6 Area to North Dry Pond Hyd No 6 -- 2 Year Q (cfs) 37 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 7 Predevelopment Hydrograph type = SCS Runoff Peak discharge = 1.304 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,994 cuft Drainage area = 1.220 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.60 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 200 1.00 000 ' 0 2 4 Hyd No. 7 Predevelopment Hyd. No. 7 -- 2 Year Q (cfs) 2.00 1.00 A .1 1 1 1 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) 38 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 8 DA -3-4 Combined Hydrograph type = Combine Peak discharge = 2.851 cfs Storm frequency = 2 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 6,471 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 0.550 ac Q (cfs) 3.00 2.00 1.00 DA -3-4 Combined Hyd. No. 8 -- 2 Year 0.00 ' 0.0 2.0 4.0 6.0 80 10.0 12.0 Hyd No. 8 Hyd No. 3 Hyd No. 4 14.0 16.0 18.0 Q (cfs) 3.00 2.00 1.00 UMB- 0.00 20.0 Time (hrs) 39 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 1 2017 Hyd. No. 9 Contech North UG Hydrograph type = Reservoir Peak discharge = 2.829 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 6,465 cuft Inflow hyd. No. = 8 - DA -3-4 Combined Max. Elevation = 245.92 ft Reservoir name = Contech System Max. Storage = 1,734 cuft Storage Indication method used. Q (cfs 3.00 2.00 1.00 rfiv,7.� Contech North UG Hyd. No. 9 -- 2 Year 0 3 6 9 12 15 18 21 24 27 Hyd No. 9 Hyd No. 8 i —i Total storage used = 1,734 cuft Q (cfs) 3.00 2.00 1.00 30 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Hyd. No. 10 Flow From Chambers Hydrograph type = Diversion1 Storm frequency = 2 yrs Time interval = 1 min Inflow hydrograph = 9 - Contech North UG Diversion method = Pond - Contech System Peak discharge Time to peak Hyd. volume 2nd diverted hyd Pond structure Flow From Chambers 40 Wednesday, 05 / 24 / 2017 = 0.073 cfs = 11.97 hrs = 4,166 cuft =11 = Culy/Orf A Q (cfs) Hyd. No. 10 -- 2 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 30 Time (hrs) Hyd No. 10 -- Pond outlet ® Hyd No. 9 -- Inflow Hyd No. 11 -- 9 minus 10 Hydrograph Report 41 Hydraflow Hydrographs Extension for AutoCAD@ Civil 31DO 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 11 Wier Flow Hydrograph type = Diversion2 Peak discharge = 2.756 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,300 cuft Inflow hydrograph = 9 - Contech North UG 2nd diverted hyd. = 10 Diversion method = Pond - Contech System Pond structure = Culy/Orf A Q (cfs) 3.00 2.00 1.00 Wier Flow Hyd. No. 11 -- 2 Year 0.00 0 3 6 9 12 15 18 21 24 27 Hyd No. 11 -- Qin - Pond outlet - Hyd No. 9 -- Inflow Hyd No. 10 Q (cfs) 3.00 2.00 1.00 =M+- 0.00 30 Time (hrs) 42 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 12 DA -1-2 Combined Hydrograph type = Combine Peak discharge = 1.536 cfs Storm frequency = 2 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 3,315 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 0.320 ac Q (cfs 200 1.00 GTiTiI DA -1-2 Combined Hyd. No. 12 -- 2 Year 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Hyd No. 12 Hyd No. 1 ® Hyd No. 2 140 160 18.0 Q (cfs) 2.00 1.00 20.0 Time (hrs) 43 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 13 Contech South UG Hydrograph type = Reservoir Peak discharge = 1.528 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 3,309 cuft Inflow hyd. No. = 12 - DA -1-2 Combined Max. Elevation = 246.23 ft Reservoir name = Contech South Max. Storage = 642 cuft Storage Indication method used. Q (cfs 2.00 1.00 �.I 0 2 4 Hyd No. 13 Contech South UG Hyd. No. 13 -- 2 Year 6 8 10 12 14 16 18 20 22 24 Hyd No. 12 i 1 Total storage used = 642 cuft Q (cfs) 2.00 1.00 26 Time (hrs) Hydrograph Report 44 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 14 Flow From Chambers Hydrograph type = Diversion1 Peak discharge = 0.019 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 1,459 cuft Inflow hydrograph = 13 - Contech South UG 2nd diverted hyd. = 15 Diversion method = Pond - Contech South Pond structure = Culy/Orf A Flow From Chambers Q (cfs) Hyd. No. 14 -- 2 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 14 -- Pond outlet Hyd No. 13 -- Inflow - Hyd No. 15 -- 13 minus 14 Hydrograph Report 45 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 15 Wler Flow Hydrograph type = Diversion2 Peak discharge = 1.510 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 1,851 cuft Inflow hydrograph = 13 - Contech South UG 2nd diverted hyd. = 14 Diversion method = Pond - Contech South Pond structure = Culy/Orf A Q (cfs) 2.00 1.00 Wier Flow Hyd. No. 15 -- 2 Year 0.00 0 2 4 6 8 10 12 14 16 Hyd No. 15 -- Qin - Pond outlet Hyd No. 13 -- Inflow 18 20 22 24 Hyd No. 14 Q (cfs) 2.00 1.00 MM- 0.00 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v11 Hyd. No. 16 Combined Flow To Dry Pond North Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 6, 11 Peak discharge Time to peak Hyd. volume Contrib. drain. area 46 Wednesday, 05 / 24 / 2017 = 2.938 cfs = 11.97 hrs = 2,717 cuft = 0.170 ac Combined Flow To Dry Pond North Q (cfs) Hyd. No. 16 -- 2 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 Time (hrs) Hyd No. 16 Hyd No. 6 Hyd No. 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Hyd. No. 17 <no description> Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 16 - Combined Flow To Dry PcMd)N&Kwation Reservoir name = North Dry Pond Max. Storage Storage Indication method used. Q (cfs) 3.00 2.00 1.00 <no description> Hyd. No. 17 -- 2 Year 47 Wednesday, 05 / 24 12017 = 0.408 cfs = 12.15 hrs = 2,733 tuft = 245.11 ft = 1,558 tuft 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 17 Hyd No. 16 ! — Total storage used = 1,558 cuft Q (cfs) 3.00 2.00 1.00 -- 0.00 22.0 Time (hrs) 48 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc. v11 Wednesday, 05 / 24 / 2017 Hyd. No. 18 MIEN Routed Flow From Pond Hydrograph type = Combine Peak discharge = 0.479 cfs Storm frequency = 2 yrs Time to peak = 12.12 hrs Time interval = 1 min Hyd. volume = 6,899 cuft Inflow hyds. = 10, 17 Contrib. drain. area = 0.000 ac Q (cfs) Routed Flow From Pond Hyd. No. 18 -- 2 Year Q (cfs) 0 3 6 Hyd No. 18 9 12 Hyd No. 10 15 18 21 Hyd No. 17 24 27 30 33 Time (hrs) MIEN iI �I I �M" hl� allSIMM 0 3 6 Hyd No. 18 9 12 Hyd No. 10 15 18 21 Hyd No. 17 24 27 30 33 Time (hrs) Hydrograph Report 49 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 19 Combined Flow To Dry Pond South Hydrograph type = Combine Peak discharge = 1.702 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,293 cuft Inflow hyds. = 5, 15 Contrib. drain. area = 0.180 ac Q (cfs 2.00 1.00 .�.II Combined Flow To Dry Pond South Hyd. No. 19 -- 2 Year 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Hyd No. 19 Hyd No. 5 Hyd No. 15 14.0 16.0 Q (cfs) 2.00 1.00 18.0 Time (hrs) 50 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 20 Dry Pond South Hydrograph type = Reservoir Peak discharge = 0.291 cfs Storm frequency = 2 yrs Time to peak = 12.13 hrs Time interval = 1 min Hyd. volume = 2,303 cuft Inflow hyd. No. = 19 - Combined Flow To Dry PcMd)SOOvation = 245.65 ft Reservoir name = South Dry Pond Max. Storage = 1,115 cuft Storage Indication method used. Q (cfs 2.00 1.00 rrre Dry Pond South Hyd. No. 20 -- 2 Year Q (cfs) 2.00 1.00 ffilliril 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 20 Hyd No. 19 l_-___ Total storage used = 1,115 cuft 51 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 21 Routed Flow Leaving South Pond Hydrograph type = Combine Peak discharge = 0.310 cfs Storm frequency = 2 yrs Time to peak = 12.13 hrs Time interval = 1 min Hyd. volume = 3,762 cuft Inflow hyds. = 14, 20 Contrib. drain. area = 0.000 ac Q (Cfs) Routed Flow Leaving South Pond Hyd. No. 21 -- 2 Year Q (cfs) 0 4 Hyd No. 21 8 12 16 Hyd No. 14 20 24 - Hyd No. 20 28 32 36 40 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Hyd. No. 22 Total FLow Leaving Site Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 18, 21 Q (cfs) 52 Wednesday, 05 / 24 / 2017 Peak discharge = 0.789 cfs Time to peak = 12.13 hrs Hyd. volume = 10,660 cuft Contrib. drain. area = 0.000 ac Total FLow Leaving Site Hyd. No. 22 -- 2 Year Q (cfs) 0 3 6 Hyd No. 22 9 12 15 Hyd No. 18 18 21 24 - Hyd No. 21 27 30 33 36 Time (hrs) ■ �m 0 3 6 Hyd No. 22 9 12 15 Hyd No. 18 18 21 24 - Hyd No. 21 27 30 33 36 Time (hrs) 53 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1 247 1 717 2,841 ------ ------ ------ DA -1 2 SCS Runoff 1 161 1 717 2,512 ------ ------ ------ DA -2 3 SCS Runoff 2 802 1 717 6,663 ------ ------ ------ DA -3 4 SCS Runoff 1.521 1 717 3,384 ------ ------ ------ DA -4 5 SCS Runoff 0 542 1 718 1,105 ------ ------ ------ Area to South Dry Pond 6 SCS Runoff 0.512 1 718 1,044 ------ ------ ------ Area to North Dry Pond 7 SCS Runoff 3 674 1 718 7,493 ------ ------ ------ Predevelopment 8 Combine 4 323 1 717 10,047 3, 4, ------ ------ DA -3-4 Combined 9 Reservoir 4 293 1 718 10,042 8 24604 1,786 Contech North UG 10 Diversionl 0 077 1 716 5,005 9 ------ ------ Flow From Chambers 11 Diversion2 4 216 1 718 5,037 9 ------ ------ Wier Flow 12 Combine 2.409 1 717 5,353 1, 2, ------ ------ DA -1-2 Combined 13 Reservoir 2 396 1 718 5,347 12 24632 668 Contech South UG 14 Diversionl 0 020 1 717 1,614 13 ------ ------ Flow From Chambers 15 Diversion2 2 376 1 718 3,732 13 ------ ------ Wier Flow 16 Combine 4 728 1 718 6,081 6, 11, ------ ------ Combined Flow To Dry Pond North 17 Reservoir 1 581 1 725 6,104 16 24591 3,307 <no description> 18 Combine 1 653 1 725 11,109 10, 17 ------ ------ Routed Flow From Pond 19 Combine 2 918 1 718 4,838 5, 15, ------ ------ Combined Flow To Dry Pond South 20 Reservoir 0 437 1 729 4,848 19 24625 2,374 Dry Pond South 21 Combine 0 455 1 729 6,463 14,20 ------ ------ Routed Flow Leaving South Pond 22 Combine 2 105 1 725 17,572 18,21 ------ ------ Total FLow Leaving Site P:\2017\DaVita - Rockfish 17-021\- Civil\Cal ulRr3tmy&RaViid:R&-Yb In Contech. Wednesday, 05 / 24 / 2017 54 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@) Civil 3DO 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 1 DA -1 Hydrograph type = SCS Runoff Peak discharge = 1.247 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 2,841 cuft Drainage area = 0.160 ac Curve number = 94* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) _ [(0 150 x 98) + (0 010 x 39)] / 0.160 DA -1 Q (cfs) Hyd No. 1 -- 10 Year Q (cfs) 2.00 2.00 I I 4 1.00 1.00 -- 0.00 LJ �—L 0.00 0.0 20 40 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 1 55 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 2 07_ Hydrograph type = SCS Runoff Peak discharge = 1.161 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 2,512 cuft Drainage area = 0.160 ac Curve number = 89* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = ((0 120 x 98) + (0 040 x 61)] / 0 160 i Q (cfs 2.00 1.00 .rrr>t 0.0 2.0 Hyd No. 2 DA -2 Hyd. No. 2 -- 10 Year 4.0 6.0 8.0 100 12.0 14.0 16.0 18.0 Q (cfs) 2.00 MIM 20.0 Time (hrs) 56 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 05 / 24 / 2017 Hyd. No. 3 DA -3 Hydrograph type = SCS Runoff Peak discharge = 2.802 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 6,663 cuft Drainage area = 0.350 ac Curve number = 97* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.340 x 98) + (0 010 x 61)] / 0 350 Q (cfs 3.00 2.00 1.00 WITH 0.0 2.0 Hyd No. 3 Dao -3 Hyd. No. 3 -- 10 Year 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Q (cfs) 3.00 2.00 1.00 20.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@) Civil 3DO 2016 by Autodesk, Inc. v11 Hyd. No. 4 DA -4 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.200 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.44 in Storm duration = 24 hrs " Composite (Area/CN) = [(0 170 x 98) + (0 030 x 61)] / 0.200 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor DA -4 Q (cfs) Hyd. No. 4 -- 10 Year L.uu 1.00 .rm 0.0 2.0 Hyd No. 4 57 Wednesday, 05 / 24 / 2017 = 1.521 cfs = 11.95 hrs = 3,384 tuft = 92* = 0 ft = 5.00 min = Type II = 484 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Q (cfs) 2.00 1.00 20.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Hyd. No. 5 Time to peak Area to South Dry Pond Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.180 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.44 in Storm duration = 24 hrs Q (cfs) 58 Wednesday, 05 / 24 / 2017 Peak discharge = 0.542 cfs Time to peak = 11.97 hrs Hyd. volume = 1,105 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Area to South Dry Pond Hyd. No. 5 -- 10 Year Q (cfs) A AA 0 2 4 Hyd No. 5 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) ME ■ ■ - - - - ------ ONE Emil NN 0 2 4 Hyd No. 5 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) 59 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 05 / 24 / 2017 Hyd. No. 6 Area to North Dry Pond Hydrograph type = SCS Runoff Peak discharge = 0.512 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 1,044 cuft Drainage area = 0.170 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) Area to North Dry Pond Hyd. No. 6 -- 10 Year Q (cfs) 1,00 I.VV 0.90 _ 0.90 .._...___..�� w _.�.._ _ .......�.� �....� .....�..�_ � .. 0.80 0.80 _.� 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 _.. ... .......� ._........... _ � �. .�.�......_ 0.10 0.10 0 00 0.00 0 2 4 Hyd No. 6 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v11 Hyd. No. 7 Time to peak Predevelopment Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 1.220 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.44 in Storm duration = 24 hrs Q (cfs) 60 Wednesday, 05 / 24 / 2017 Peak discharge = 3.674 cfs Time to peak = 11.97 hrs Hyd. volume = 7,493 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 6.60 min Distribution = Type II Shape factor = 484 Predevelopment Hyd. No. 7 -- 10 Year Q (cfs) 4.00 3.00 2.00 1.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 7 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v11 Hyd. No. 8 DA -3-4 Combined Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 1 min Inflow hyds. = 3, 4 61 Wednesday, 05 / 24 / 2017 Peak discharge = 4.323 cfs Time to peak = 11.95 hrs Hyd. volume = 10,047 cuft Contrib. drain. area = 0.550 ac DA -3-4 Combined Q (cfs) Hyd. No. 8 -- 10 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 00 20 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 8 Hyd No. 3 Hyd No. 4 62 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Wednesday, 05 1 24 / 2017 Hyd. No. 9 Contech North UG Hydrograph type = Reservoir Peak discharge = 4.293 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 10,042 cuft Inflow hyd. No. = 8 - DA -3-4 Combined Max. Elevation = 246.04 ft Reservoir name = Contech System Max. Storage = 1,786 cuft Storage Indication method used. Contech North UG Q (cfs) Hyd. No. 9 -- 10 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 30 Time (hrs) Hyd No. 9 Hyd No. 8 E Total storage used = 1,786 cuft 63 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 10 Flow From Chambers Hydrograph type = Diversion'! Peak discharge = 0.077 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 1 min Hyd. volume = 5,005 cuft Inflow hydrograph = 9 - Contech North UG 2nd diverted hyd. = 11 Diversion method = Pond - Contech System Pond structure = Culy/Orf A Flow From Chambers Q (cfs) Hyd. No. 10 -- 10 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 30 Time (hrs) Hyd No. 10 -- Pond outlet Hyd No. 9 -- Inflow - Hyd No. 11 -- 9 minus 10 64 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 11 Wier Flow Hydrograph type = Diversion2 Peak discharge = 4.216 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 5,037 cuft Inflow hydrograph = 9 - Contech North UG 2nd diverted hyd. = 10 Diversion method = Pond - Contech System Pond structure = Culy/Orf A Wier Flow Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 200 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 30 Time (hrs) Hyd No. 11 -- Qin - Pond outlet Hyd No. 9 -- Inflow Hyd No. 10 65 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 12 DA -1-2 Combined Hydrograph type = Combine Peak discharge = 2.409 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 5,353 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 0.320 ac Q (cfs 3.00 2.00 1 00 NV T>t DA -1-2 Combined Hyd. No. 12 -- 10 Year 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Hyd No. 12 Hyd No. 1 Hyd No. 2 14.0 16.0 18.0 Q (cfs) 300 2.00 1.00 20.0 Time (hrs) Hydrograph Report 66 Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc. v11 Wednesday, 05 / 24 / 2017 Hyd. No. 13 Contech South UG Hydrograph type = Reservoir Peak discharge = 2.396 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 5,347 cuft Inflow hyd. No. = 12 - DA -1-2 Combined Max. Elevation = 246.32 ft Reservoir name = Contech South Max. Storage = 668 cuft Storage Indication method used. Q (cfs 3.00 2.00 we MUM Contech South UG Hyd. No. 13 -- 10 Year 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Hyd No. 13 Hyd No. 12 - _ _ Total storage used = 668 cuft Q (cfs) 3.00 2.00 1.00 20.0 Time (hrs) Hydrograph Report 67 Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 14 Flow From Chambers Hydrograph type = Diversion'! Peak discharge = 0.020 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 1,614 cuft Inflow hydrograph = 13 - Contech South UG 2nd diverted hyd. = 15 Diversion method = Pond - Contech South Pond structure = Culy/Orf A Flow From Chambers Q (cfs) Hyd. No. 14 -- 10 Year Q (cfs) 300 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 14 -- Pond outlet ® Hyd No. 13 -- Inflow - Hyd No. 15 -- 13 minus 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Hyd. No. 15 Wler Flow Hydrograph type = Diversion2 Storm frequency = 10 yrs Time interval = 1 min Inflow hydrograph = 13 - Contech South UG Diversion method = Pond - Contech South Q (cfs) 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume 2nd diverted hyd. Pond structure Willer Flow Hyd No. 15 -- 10 Year Wednesday, 05 / 24 / 2017 = 2.376 cfs = 11.97 hrs = 3,732 tuft =14 = Culy/Orf A Q (cfs) 3.00 2.00 1.00 g 111 . 1 4.0 6.0 _..__ • No. w Pond o 8.0 10.0 12.0 ® Hyd No. 13 -- Inflow 14.0 16.0 Hyd No. 14 18.0 20.0 Time (hrs) Q (cfs) 5.00 4.00 3.00 -- 2.00 1.00 Combined Flow To Dry Pond North Hyd. No. 16 -- 10 Year 0.0 2.0 4.0 .0 • No. 6 8.0 10.0 ® Hyd No. 11 12.0 14.0 Q (cfs) 5.00 4.00 3.00 2.00 1.00 16.0 Time (hrs) 69 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 16 Combined Flow To Dry Pond North Hydrograph type = Combine Peak discharge = 4.728 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 6,081 cuft Inflow hyds. = 6, 11 Contrib. drain. area = 0.170 ac Q (cfs) 5.00 4.00 3.00 -- 2.00 1.00 Combined Flow To Dry Pond North Hyd. No. 16 -- 10 Year 0.0 2.0 4.0 .0 • No. 6 8.0 10.0 ® Hyd No. 11 12.0 14.0 Q (cfs) 5.00 4.00 3.00 2.00 1.00 16.0 Time (hrs) Hydrograph Report 70 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 17 <no description> Hydrograph type = Reservoir Peak discharge = 1.581 cfs Storm frequency = 10 yrs Time to peak = 12.08 hrs Time interval = 1 min Hyd. volume = 6,104 cuft Inflow hyd. No. = 16 - Combined Flow To Dry PcMd)NEfgyation = 245.91 ft Reservoir name = North Dry Pond Max. Storage = 3,307 cuft Storage Indication method used Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0.0 2.0 Hyd No. 17 <no description> Hyd. No. 17 -- 10 Year 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Hyd No. 16 �_ _ 1 Total storage used = 3,307 cuft Q (cfs) 5.00 i II 3.00 2.00 1.00 0.00 20.0 Time (hrs) Hydrograph Report 71 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 18 Routed Flow From Pond Hydrograph type = Combine Peak discharge = 1.653 cfs Storm frequency = 10 yrs Time to peak = 12.08 hrs Time interval = 1 min Hyd. volume = 11,109 tuft Inflow hyds. = 10, 17 Contrib. drain. area = 0.000 ac Q (cfs) 2.00 1.00 Routed Flow From Pond Hyd. No. 18 -- 10 Year 0 00 0 3 6 9 12 15 18 21 Hyd No. 18 Hyd No. 10 Hyd No. 17 24 27 30 Q (cfs) 2.00 1.00 --J- 0.00 33 Time (hrs) 72 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 05 / 24 / 2017 Hyd. No. 19 Combined Flow To Dry Pond South Hydrograph type = Combine Peak discharge = 2.918 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 4,838 cuft Inflow hyds. = 5, 15 Contrib. drain. area = 0.180 ac Q (cfs 3.00 i _ 2.00 I� I I I 1.00 0.0 2.0 . No. 19 Combined Flow To Dry Pond South Hyd. No. 19 -- 10 Year 4.0 6.0 Hyd No. 5 8.0 10.0 12.0 - Hyd No. 15 14.0 16.0 Q (cfs) 3.00 2.00 1.00 18.0 Time (hrs) 73 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 1 2017 Hyd. No. 20 Dry Pond South Hydrograph type = Reservoir Peak discharge = 0.437 cfs Storm frequency = 10 yrs Time to peak = 12.15 hrs Time interval = 1 min Hyd. volume = 4,848 cuft Inflow hyd. No. = 19 - Combined Flow To Dry PdW&SEitYvation = 246.25 ft Reservoir name = South Dry Pond Max. Storage = 2,374 tuft Storage Indication method used. Q (cfs) 3.00 2.00 1.00 rava� Dry Pond South Hyd. No. 20 -- 10 Year - - --------- - ------ Q (cfs) 3.00 2.00 1.00 1 11 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 20 Hyd No. 19 _ --1 Total storage used = 2,374 cuft 74 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 0.50 Wednesday, 05 / 24 12017 Hyd. No. 21 Routed Flow Leaving South Pond Hydrograph type = Combine Peak discharge = 0.455 cfs Storm frequency = 10 yrs Time to peak = 12.15 hrs Time interval = 1 min Hyd. volume = 6,463 cuft Inflow hyds. = 14, 20 Contrib. drain. area = 0.000 ac Routed Flog Leaving South Pond Q (cfs) Hyd. No. 21 -- 10 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 � 0.20 0.20 � � 0.15 � 0.15 0.10 0.10 0.05 0.05 0.00 .�.�........:............ �_. w ,__ �w � _ u..,� .,�,.,....N...... .. __. � _. �. �.. 0.00 0 4 8 12 16 20 24 28 32 36 40 Time (hrs) Hyd No. 21 Hyd No. 14 Hyd No. 20 75 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 22 Total FLow Leaving Site Hydrograph type = Combine Peak discharge = 2.105 cfs Storm frequency = 10 yrs Time to peak = 12.08 hrs Time interval = 1 min Hyd. volume = 17,572 cuft Inflow hyds. = 18, 21 Contrib. drain. area = 0.000 ac Q (cfs 3.00 2.00 1.00 raLT6I Total FLow Leaving Site Hyd. No. 22 -- 10 Year 0 3 6 9 12 15 18 21 Hyd No. 22 Hyd No. 18 Hyd No. 21 24 27 30 Q (cfs) 3.00 2.00 1.00 33 Time (hrs) Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1 935 1 717 4,528 ------ ------ ------ DA -1 2 SCS Runoff 1 864 1 717 4,170 ------ ------ ------ DA -2 3 SCS Runoff 4 288 1 717 10,377 ------ ------ ------ DA -3 4 SCS Runoff 2 389 1 717 5,481 ------ ------ ------ DA -4 5 SCS Runoff 1 227 1 718 2,466 ------ ------ ------ Area to South Dry Pond 6 SCS Runoff 1 159 1 718 2,329 ------ ------ ------ Area to North Dry Pond 7 SCS Runoff 8 317 1 718 16,713 ------ ------ ------ Predevelopment 8 Combine 6 676 1 717 15,858 3, 4, ------ ------ DA -3-4 Combined 9 Reservoir 6 631 1 718 15,853 8 246.20 1,857 Contech North UG 10 Diversion1 0 077 1 712 5,909 9 ------ ------ Flow From Chambers 11 Diversion2 6 555 1 718 9,943 9 ------ ------ Wier Flow 12 Combine 3 799 1 717 8,698 1, 2, ------ ------ DA -1-2 Combined 13 Reservoir 3 780 1 717 8,692 12 24643 694 Contech South UG 14 Diversion1 0 020 1 712 1,745 13 ------ ------ Flow From Chambers 15 Diversion2 3 760 1 717 6,947 13 ------ ------ Wier Flow 16 Combine 7 713 1 718 12,272 6, 11, ------ ------ Combined Flow To Dry Pond North 17 Reservoir 6.269 1 721 12,298 16 24627 4,282 <no description> 18 Combine 6 346 1 721 18,208 10,17 ------ ------ Routed Flow From Pond 19 Combine 4 981 1 718 9,413 5, 15, ------ ------ Combined Flow To Dry Pond South 20 Reservoir 0 733 1 729 9,421 19 24703 4,486 Dry Pond South 21 Combine 0 752 1 729 11,167 14,20 ------ ------ Routed Flow Leaving South Pond 22 Combine 6 909 1 721 29,374 18,21 ------ ------ Total FLow Leaving Site P:\2017\DaVlta - Rockfish 17-021\- Civil\Cal IluFAUb rA1RaVdd:RO&VsfllContech. Wednesday, 05 / 24 / 2017 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Hyd. No. 1 DA -1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 0.160 ac Basin Slope = 0.0% Tc method = User Total precip. = 8.28 in Storm duration = 24 hrs Composite (Area/CN) = [(0 150 x 98) + (0 010 x 39)] / 0.160 Q (cfs 2.00 1 00 (7711 0.0 2.0 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor DA -1 Hyd. No. 1 -- 100 Year I Wednesday, 05 / 24 / 2017 = 1.935 cfs = 11.95 hrs = 4,528 tuft = 94* = 0 ft = 5.00 min = Type II = 484 40 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Q (cfs) 2.00 1.00 20.0 Time (hrs) a Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 12017 Hyd. No. 2 BEIM Hydrograph type = SCS Runoff Peak discharge = 1.864 cfs Storm frequency = 100 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 4,170 cult Drainage area = 0.160 ac Curve number = 89* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(0 120 x 98) + (0 040 x 61)] / 0.160 Q (Cfs) 2.00 1.00 0.00 0.0 2.0 Hyd No. 2 DA -2 Hyd. No. 2 -- 100 Year 4.0 6.0 8.0 10.0 12.0 140 16.0 18.0 Q (cfs) 2.00 1.00 —1"- 0.00 20.0 Time (hrs) 79 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 31DO 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 3 DA-3 Hydrograph type Storm frequency Time interval = SCS Runoff = 100 yrs = 1 min Peak discharge Time to peak Hyd. volume = 4.288 cfs = 11.95 hrs = 10,377 cuft Drainage area = 0.350 ac Curve number = 97* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) _ [(0 340 x 98) + (0 010 x 61)] / 0 350 DA-3 Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.02.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 4 DA -4 Hydrograph type = SCS Runoff Peak discharge = 2.389 cfs Storm frequency = 100 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 5,481 cuft Drainage area = 0.200 ac Curve number = 92* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0 170 x 98) + (0 030 x 61)] / 0 200 Q (cfs 3.00 2.00 1.00 r.Ta>t 0.02.0 Hyd No. 4 DA -4 Hyd. No. 4 -- 100 Year 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Q (cfs) 3.00 2.00 1 00 20.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Hyd. No. 5 Area to South Dry Pond Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 0.180 ac Basin Slope = 0.0% Tc method = User Total precip. = 8.28 in Storm duration = 24 hrs Q (cfs 2.00 1 00 WITH 0 2 4 Hyd No. 5 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Area to South Dry Pond Hyd. No. 5 -- 100 Year 81 Wednesday, 05 / 24 / 2017 = 1.227 cfs = 11.97 hrs = 2,466 cuft = 61 = 0 ft = 5.00 min = Type II = 484 6 8 10 12 14 16 18 20 22 24 Q (cfs) 2.00 1.00 26 Time (hrs) Hydrograph Report 82 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 6 Area to North Dry Pond Hydrograph type = SCS Runoff Peak discharge = 1.159 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,329 cuft Drainage area = 0.170 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Area to North Dry Pond Q (cfs) Hyd. No. 6 -- 100 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 6 Time (hrs) 83 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 7 Predevelopment Hydrograph type Storm frequency Time interval = SCS Runoff = 100 yrs = 1 min Peak discharge Time to peak Hyd. volume = 8.317 cfs = 11.97 hrs = 16,713 cuft Drainage area = 1.220 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.60 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) Predevelopment Hyd. No. 7 -- 100 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 7 84 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 8 DA -3-4 Combined Hydrograph type = Combine Peak discharge = 6.676 cfs Storm frequency = 100 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 15,858 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 0.550 ac DA -3-4 Combined Q (cfs) Hyd. No 8 -- 100 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 200 1.00 1.00 0 00 0.00 00 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 8 Hyd No. 3 ® Hyd No. 4 85 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 9 Contech North UG Hydrograph type = Reservoir Peak discharge = 6.631 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 15,853 cuft Inflow hyd. No. = 8 - DA -3-4 Combined Max. Elevation = 246.20 ft Reservoir name = Contech System Max. Storage = 1,857 cuft Storage Indication method used. Contech North UG Q (cfs) Q (cfs) Hyd. No. 9 -- 100 Year 7.00 7.00 6.00 6.00 5.00 _.�,.... �..�..�. � _. ..M..._._ ..._..�. 5.00 4.00 4.00 3.00 3.00 2.00 _............._ ._.�___.. �... _�. � � 2.00 1.00 1.00 0.00 � __.._.,.._. � _ 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hrs) Hyd No. 9 Hyd No. 8 :__ _-_I Total storage used = 1,857 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 10 Flow From Chambers Hydrograph type = Diversion1 Peak discharge = 0.077 cfs Storm frequency = 100 yrs Time to peak = 11.87 hrs Time interval = 1 min Hyd. volume = 5,909 cuft Inflow hydrograph = 9 - Contech North UG 2nd diverted hyd. = 11 Diversion method = Pond - Contech System Pond structure = Culy/Orf A Flow From Chambers Q (cfs) Hyd. No. 10 -- 100 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 _ �.�.... . u..�.w...� __�_...w_ �..�.._..�.. _. 5.00 4.00 4.00 3.00 3.00 2.00 ..�.._..� �.._. _.�_,... � � ..... �.m. _.�.�....� ..�.....�.�.�.. 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hrs) Hyd No. 10 -- Pond outlet Hyd No. 9 -- Inflow - Hyd No. 11 -- 9 minus 10 87 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 11 Wier Flow Hydrograph type = Diversion2 Peak discharge = 6.555 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 9,943 cuft Inflow hydrograph = 9 - Contech North UG 2nd diverted hyd. = 10 Diversion method = Pond - Contech System Pond structure = Culy/Orf A Wler Flow Q (cfs) Hyd. No. 11 -- 100 Year Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0 00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hrs) Hyd No. 11 -- Qin - Pond outlet Hyd No. 9 -- Inflow Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 12 DA -1-2 Combined Hydrograph type = Combine Peak discharge = 3.799 cfs Storm frequency = 100 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 8,698 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 0.320 ac DA -1-2 Combined Q (cfs) Hyd. No. 12 -- 100 Year Q (cfs) 4.00 4.00 300 3.00 200 2.00 1.00 1 00 0.00 0.00 0.0 2.0 4.0 6.0 80 10.0 120 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 12 Hyd No. 1 Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Hyd. No. 13 Contech South UG Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 12 - DA -1-2 Combined Reservoir name = Contech South Storage Indication method used. Q (cfs) 4.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Contech South UG Hyd. No. 13 -- 100 Year 89 Wednesday, 05 / 24 / 2017 = 3.780 cfs = 11.95 hrs = 8,692 cuft = 246.43 ft = 694 cuft 0.00 l I I I I 1-- 0.02.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Hyd No. 13 Hyd No. 12 _I Total storage used = 694 cuft Q (cfs) 4.00 3.00 2.00 1.00 ---? 0.00 20.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Hyd. No. 14 Flow From Chambers Hydrograph type = Diversion1 Storm frequency = 100 yrs Time interval = 1 min Inflow hydrograph = 13 - Contech South UG Diversion method = Pond - Contech South Peak discharge Time to peak Hyd. volume 2nd diverted hyd Pond structure Flow From Chambers M Wednesday, 05 / 24 / 2017 = 0.020 cfs = 11.87 hrs = 1,745 cuft =15 = Culy/Orf A Q (cfs) Hyd No. 14 -- 100 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 00 2.0 40 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 14 -- Pond outlet Hyd No. 13 -- Inflow Hyd No. 15 -- 13 minus 14 Hydrograph Report 91 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 15 Wier Flow Hydrograph type = Diversion2 Peak discharge = 3.760 cfs Storm frequency = 100 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 6,947 cuft Inflow hydrograph = 13 - Contech South UG 2nd diverted hyd. = 14 Diversion method = Pond - Contech South Pond structure = Culy/Orf A Wier Flow Q (cfs) Hyd. No. 15 -- 100 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 L==LL 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 200 Time (hrs) Hyd No. 15 -- Qin - Pond outlet Hyd No. 13 -- Inflow Hyd No. 14 92 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 16 Combined Flow To Dry Pond North Hydrograph type = Combine Peak discharge = 7.713 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 12,272 cuft Inflow hyds. = 6, 11 Contrib. drain. area = 0.170 ac Q (cfs 8.00 6.00 4.00 M f171TA7 Combined Flow To Dry Pond North Hyd. No. 16 -- 100 Year 0.0 2.0 4.0 6.0 8.0 10.0 Hyd No. 16 Hyd No. 6 - Hyd No. 11 12.0 14.0 Q (cfs) 8.00 MIR 4.00 2.00 16.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc. v11 Hyd. No. 17 ono description> Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 16 - Combined Flow To Dry PcMd)NEVyation Reservoir name = North Dry Pond Max. Storage Storage Indication method used. Q (cfs) 8.00 .11 4.00 2.00 0.00 -1- 0.0 2.0 Hyd No. 17 <no description> Hyd. No. 17 -- 100 Year 93 Wednesday, 05 / 24 / 2017 = 6.269 cfs = 12.02 hrs = 12,298 cuft = 246.27 ft = 4,282 cuft 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Hyd No. 16 �_ - I Total storage used = 4,282 cuft Q (cfs) 8.00 4.00 2.00 0.00 18.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 18 Routed Flow From Pond Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 1 min Inflow hyds. = 10, 17 94 Wednesday, 05 / 24 / 2017 Peak discharge = 6.346 cfs Time to peak = 12.02 hrs Hyd. volume = 18,208 cuft Contrib. drain. area = 0.000 ac Routed Flow From Pond Q (cfs) Hyd. No. 18 -- 100 Year Q (cfs) 700 7.00 6.00 6.00 5.00 � � � � 5.00 400 �.._ ..... __. _._ ... ._�....__.. .. 4.00 300 3.00 2.00 2.00 1.00 1.00 0.00 � 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 18 Hyd No. 10 Hyd No. 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3DO 2016 by Autodesk, Inc. v11 Hyd. No. 19 Combined Flow To Dry Pond South Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 1 min Inflow hyds. = 5, 15 95 Wednesday, 05 / 24 / 2017 Peak discharge = 4.981 cfs Time to peak = 11.97 hrs Hyd. volume = 9,413 cuft Contrib. drain. area = 0.180 ac Combined Flow To Dry Pond South Q (cfs) Hyd. No. 19 -- 100 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.0 20 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hyd No. 19 Hyd No. 5 Hyd No. 15 96 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31D® 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 20 Dry Pond South Hydrograph type = Reservoir Peak discharge = 0.733 cfs Storm frequency = 100 yrs Time to peak = 12.15 hrs Time interval = 1 min Hyd. volume = 9,421 cuft Inflow hyd. No. = 19 - Combined Flow To Dry Pdb d)SEldvation = 247.03 ft Reservoir name = South Dry Pond Max. Storage = 4,486 cuft Storage Indication method used. Dry Pond South Q (cfs) Hyd. No. 20 -- 100 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 20 Hyd No. 19 ___ __ _=__1 Total storage used = 4,486 cult 97 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc v11 Wednesday, 05 / 24 / 2017 Hyd. No. 21 Routed Flow Leaving South Pond Hydrograph type = Combine Peak discharge = 0.752 cfs Storm frequency = 100 yrs Time to peak = 12.15 hrs Time interval = 1 min Hyd. volume = 11,167 cuft Inflow hyds. = 14, 20 Contrib. drain. area = 0.000 ac 0 4 Hyd No. 21 8 12 Hyd No. 14 16 20 24 Hyd No. 20 28 32 36 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc v11 7.00 Wednesday, 05 / 24 / 2017 Hyd. No. 22 Total Flow Leaving Site Hydrograph type = Combine Peak discharge = 6.909 cfs Storm frequency = 100 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 29,374 cuft Inflow hyds. = 18, 21 Contrib. drain. area = 0.000 ac Total Flow Leaving Site Q (cfs) Hyd. No. 22 -- 100 Year Q (cfs) 7.00 7.00 6.00 6.00 � 5.00 500 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 ...._.._._...._»_»... .�...__.�..w � 0.00 0 3 6 9 12 15 18 21 24 27 30 Time (hrs) Hyd No. 22 Hyd No. 18 Hyd No. 21 M O N 0t N (n O coN Cn O C a) N G U N E Cf) U) 0) E CO C O 4- U N a Q CO O O O O V) m m Z coN O m N O O r to — r- O O N N N N CD N N CDM O r O M co LL If) V h O _ M CD M _ N N If) 6 Cn O O O O Ct) C LO Cl) LO O— 00N d O lUA 000 O N to CO U N r CD O N N N CO CO N `- O N V O O N O Cl) O O r (D O '7 O 0^0 r U W O 00 r co O O M 00 Co tt r CD co Cn (0 C O O O O O O O O O C7 O COO (A N CC) A a O N O N N M M M 7 tS C; O O O O O O O O W M T r N O N M M CO M U T CM D CO O OCD O O I- C N M — r O O O O d 7 j� T N O O CD co co O Itl O CD 00 O O O O— O M d M N 0 O (DD r vi O O LL D c N 0 N N 2 N N N C N O CA co O N N r O A If) CO 00 O 00 N V r N N N O M Cl) V V V 7 0 CN 00 co m w N O r N N N M O M It V) C V Cl) CD O m N co w Ln V OM O n CO') CMD O C Cl) M N IT V M co CD m co Cl) �- O cocD M a' CA C7 CND coO O r � COD V V v r co V O F U-) (fl o 0 0 'oN � �- M In N(n (n US LO co E V O CD O C0 V C O (D II- U N E Cf) U) 0) E CO C O 4- U N a T O00 CO O O O O V) m m O coN O m N O O r to — r- O O N N N N CD N N CDM O r O M co If) V h O _ M CD M _ N If) 6 Cn O O O O Ct) d LO Cl) LO O— 00N O lUA 000 O N to CO = N r CD O N N N CO CO O `- t1) N V O Or O O Cl) r O C(DD N O '7 O N VO' CL •U V O Cl) O O O N N M Cl) M d M O N O O O O Or C7 O COO (A N CC) yam-. a O N O N N M M M i C; O O O O O O O O M 'C C r N O N M M CO M N T CM D CO O OCD O O I- d N M — r O O O O j� T N O O CD co co O Itl O Cl) M O O It 00 O M > M N N O Cl) Cl) vi O C 0 w o a U (n U U) S S > S 2 2 U N C N w CA co O N N r O O If) CO 00 O 00 N V r N N N O M Cl) V V V CN 00 co m N O r N N N M O M It V) �V N Ln •-- O CO') CMD N Cl) M O IT V LD Cn CD C7 t- V O N r- N (Mf) Oro r co V O Cf) U-) (fl (D CD Fto(D !')O O LO co LO co E V O CD O C0 V C O (D II- r 00 co 0 o t o 0 0 .a } r- N M LO N LO wa U N E Cf) U) 0) E CO C O 4- U N a T O00 co O O O O O O O r 'V' 00 O O O O r >+ CD O Cf) O O O O CD O CD (0 O CO O O O O co L tf9 _ 00 O M O O O O N N If) 6 Cn O O O O Ct) d = O r CD O O O O O O O `- t1) N V O O O O Cl) r CL •U A O Cl) O O Ln Il- O O O O O O O O O 00 d M O N O O O O N yam-. O O O O O O O O i C; O O O O O O O O T CM D CO O OCD O O I- N M — r O O O O j� O O O O O O O CD O Cl) O O O O O O O C o 7 O N (O r N M C O C 0 o a U (n U U) S S > S 2 2 U N