HomeMy WebLinkAboutSW6170501 - Parking Lot Expansion for Sandhills Utility Services (5)ea
x
xt. Flow
Project Limits
Area 4.28ac
1
IL
UAWti
f iLand Cover Type
IN
u -
,.• �„ "''
�nv
i
rfg • Eiji •ii-rn menial &r1 ices
ro•r n 111
19
4 t
Post -Development Land Cover
DA to SCM #3
_ Land Cover Type Area (SF) Area (ac) CN
SCM #3
Into SCM #1 and #2
Existing BUA 44,857 1 03 98
New BUA 12,379 0.28 98
DA to SCM #1 Open Space, good 11,931 0.27 39
Into SCM #3
Project Limits New BUA 28,217 0.65 98
• Area = 4.28ac Open Space, good 15,725 0.36 39
Untreated (Not Into SCM)
y; agq BUA 43,100 0.99 98
SCM #1 Open Space, good 30,427 0.70 39
Total 186,636 4.28 80
i
I %BUA= j 68.9%
�r
SCM #2
b
DA to SCM 412
,f
Post -Development Condition N
Sandhills Utility Site; Fort Bragg, NC
W E
° 20 40 B° 120 160`Feet s Draper Aden Associates
Engint-vi-h g • Stave.ying • En> l�r�nnkerr�ul Services