Loading...
HomeMy WebLinkAboutNCG140426 DMR SW STORMWATER DISCHARGE OUTFALL (SDO) - Semi-Annual MONITORING FOR GENERAL PERMIT NO. NCG140000 Orig—State 0 Copy—State 0 Copy—Plant CERTIFICATE OF COVERAGE NO. wricignaffiaala SAMPLE COLLECTION YEAR: 2016 0 Copy-File FACILITY NAME: Chandler Concrete/Piedmont Inc. - Plant 117 SAMPLING PERIOD: ❑July-December ®January-June PERSON COLLECTING SAMPLES: RFCEIVED COUNTY Guilford CERTIFIED LABORATORY:Pace Analytical Lab#633 r PHONE NO. (336)378- 1008 AUG ® a%OPTIONAL INFO: ADD TO LISTSERVE?EYES NO EMAIL: _ CENTRAL ALESDISCHARGING TO CLASS: ESA HQW PNA ['Trout ®OtherWS-V; DWR SECTION NSW Part A:Stormwater Monitoring Requirements Date Sample In Tier 2 Collected pH TSS Event Total a Monthly #of Months in Outfall No. Duration Rainfall4 (mo/dd/yr OR (Standard Units) (mg/L) Monitoring? Tier 2 Sampling NO FLOW)1 (minutes) (in) (yin) - - 6-92 1002 '3 - - - - - - 1 NO FLOW - - N N/A 1 If"NO FLOW"or"NO DISCHARGE, Enter"NO FLOW"or"NO DISCHARGE"for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark,or outside the benchmark range(for pH),you must implement the Tier 1 or Tier 2 responses in the General Permit.Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I,except when discharging to ORW, HQW,Trout,and PNA waters where they are 50 mg/I. °For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge. Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1of2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using>55 gal of new motor oil/month—averaged over a calendar year. In Tier 2 pH TPH using method Total Suspended Event Total New Motor Oil #of Months Outfall Date Samplea Monthly (Standard 1664A SGT-HEM Solids Duration Rainfall Usage in Tier 2 No. Collected Monitoring? 2 (mo/dd/yr)1 Units) (mg/L) (mg/L) (minutes) (in) (gal/month) (y/n) Sampling 6-92 152 1002'3 - - - - - 1 NO FLOW Not Applicable -Avg. <55 Gal./Mo. _ . HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL(INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" &"No Discharge" reports)within 30 days of receipt of sample (or at end of monitoring period in case of"No Flow")to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly re ••nsible for gathe-ing the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that then-e�, ignific ' nalt' for submitting false information, including the possibility of fines nd imprisonment for knowing violations." 7 '772(Signature of Permittee) (fate) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2