Loading...
HomeMy WebLinkAboutNCC221715_NOT Closeout Documents_20240430 SEDIMENTATION INSPECTION REPORT Town of Weddington 1924 Weddington Rd.Weddington,NC 28104 County: Union Project: Belle Mar River basin: Catawba Person financially responsible: Kent Olson(kent@olsondevelopment.com) Project#Weddington 2022-002 Address: 11121 Carmel Commons Blvd-Suite 360,Charlotte,NC 28226 Case# 1. Project location: Old Mill Road-Weddington NC Pictures:No: ❑Yes: ✓❑Video:❑Digital:❑ 2. Weather and soil conditions: Partly Cloudy/Wet Soil Conditions First inspection:Yes:❑No: ✓❑ 3. Is site currently under notice of violation? Yes:❑No:✓❑ 4. Is the site in compliance with S.P.C.A.and rules? Yes: No:❑ If no,check violations below: 5. Violations: ❑a. No approved plan,G.S. 113A-57(4)and 15A N.C.A.0 4B.0107(c) ❑g. Inadequate buffer zone,G.S. 113A-57(1) b. Failure to follow approved plan,G.S. 113A-57(5)E ❑h. Graded slopes and fills too steep, c. Failure to submit revised plan,G.S. 113A-54.1(b)and G.S. 113A-57(2)or 15A N.C.A.C.4B.0124(e) 15A N.C.A.C.4B.0118(a) ❑i.Unprotected exposed slopes, G.S. 113A-57(2) ❑d. Failure to provide adequate groundcover,G.S. 113A-57(3)and j. Failure to install and maintain measures, 15A N.C.A.C.4B.0107(b) 15A N.C.A.C.4B.0113 ❑k. Failure to self-inspect G.S. 113A-54.1(e)and ❑ e. Insufficient measures to retain sediment on site,G.S. 113A-57(3) 15A N.C.A.C.4B.0131 Elf Failure to take measures to protect property, 15A N.C.A.C.4B.0105 ❑1. Other(describe) 6. Potential NPDES Permit Violation under NCG 010000? Yes:❑No: ✓❑Not Applicable:❑If no,check violations below: r m. Failure to manage construction site pollutants,NCG 010000 Sec.II,B.1 n r. Failure to have approved plan and NPDES n. Failure to provide ground stabilization,NCG 010000 Sec.II,B.2 n permit on site,NCG 010000 Sec.III,3(d) -o. Failure to maintain rain gauge or record daily rainfall, I I s. Failure to install and maintain BMP's, — NCG 010000 Sec.II,B.1(a,b) NCG 010000 Sec.III,4 ❑p. Failure to meet self-inspection and reporting requirements, n t.Failure to operate and maintain control NCG 010000 Sec.II,B.1(c-i) measures,NCG 010000 Sec.IV, 1 nq. Failure to dewater sediment basin from surface, NCG 010000 Sec.II,B.4 nu.Bypass of stormwater control facilities, NCG 010000,Sec.IV,3 nv. Other(describe) . 7. Has sedimentation damage occurred since last inspection or at 1st inspection? Yesn If yes,where?(check all that apply) No:111 Lake/natural watercourse on the tract:❑Lake/natural watercourse off the tract:❑Other property:1-1 Description: Stormwater Discharge Outfall with sediment loss: Degree of damage: slight: ❑moderate:❑severe:❑ 8. Contact made with(name): Kent Olson(kent@olsondevelopment.com) Title:Financially Responsible Party Inspection report given: or sent: ✓❑to person financially responsible. Date given/sent: January 10,2024 9. Corrective actions needed: Report by:Steve Canter Others present: Date of inspection: January 8,2024 Time arriving on site: 12:30pm Time leaving site: 1:00pm cc: Page 1 of 3 Revised 01/27/2021 SEDIMENTATION INSPECTION REPORT Local Delegated E&SC Program Name Address County:Union Project: Belle Mar Project#Weddington 2022-002 9. Corrective actions needed(continued) nSubmit an adequate sedimentation and erosion control plan for approval,covering all areas disturbed or to be disturbed. Install all sedimentation and erosion control measures as shown on the approved plan. Submit a revised sedimentation and erosion control plan for approval for the following areas: Provide adequate permanent ground cover on all areas where development has been completed according to the time limits in the approved El plan,including the following areas: Install erosion and sediment control devices sufficient to retain sediment on the tract at the following areas: ri nInstall temporary sediment traps or basins and associated diversions as shown on the approved plan,including the following locations: Install adequate drop inlet protection as shown on the approved plan,including the following locations: Provide an adequate stream buffer zone of sufficient width to confine visible sedimentation within the 25%of the buffer nearer the land disturbance using natural or artificial means(minimum 25-foot width in Trout Waters)including the following areas: Reduce the angle of graded slopes to an angle on which vegetative ground cover may be established including the following locations: For disturbed areas less than one acre,provide adequate temporary or permanent ground cover on all graded slopes where rough or fine grading has been completed for 21 calendar days,including the following locations: riMaintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation da mage including the following locations Properly handle concrete to avoid contact with surface waters,wetlands or buffers and prevent discharge from site. El Relocate soil stockpiles at least 50 feet away from storm drain inlets or surface waters.❑ Provide adequate temporary or permanent ground cover on areas where land-disturbing activity has ceased in 7 or 14 days according to NCG 01000 permit conditions at the following areas: nProvide sediment basins with a drainage area of one acre or greater with a skimmer or flashboard riser. Inspect all erosion and sedimentation control measures and storm discharge outfalls at least weekly and within 24 hours of a rainfall event of 1 inch or greater and complete self-monitoring reports. Maintain a rain gauge in good working order and record daily rainfall amounts. 10.Comments: Revised 01/27/2021 SEDIMENTATION INSPECTION REPORT Local Delegated E&SC Program Name Steve Canter Address January 8, 2024 3 3 Report by: Date of inspection: Page of Check only one box, if closing out project. 111 Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is released and coverage under the NPDES General Stormwater Permit for Construction Activities is terminated. I I Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:deq.nc.gov/NCG01.Please note that this correspondence must be uploaded as part of completing the NOT process. Steve Canter January 8, 2024 3 3 Report by: Date of inspection: Page of Revised 01/27/2021