Loading...
HomeMy WebLinkAboutNCC231175_NOT Closeout Documents_20240430 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200 County: Durham Project: SW-40 S.Alston Ave Sidewalk River basin: Cape Fear Person financially responsible:City of Durham-Tasha N Johnson,Assistant Project#: DURHA-2023-004 Director-Public Works Address: 101 City Hall Plaza,Durham,NC 27701 1. Project Location: Alston Avenue,Durham Pictures: No 2. Weather and soil conditions: sunny,dry,workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): none Title: Inspection report: Sent Report Date given/sent: April 30,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Dylan Reinhardt Others present: Date of inspection: April 29,2024 Time arriving on site: 10:30 AM Time leaving site: 10:45 AM CC: