Loading...
HomeMy WebLinkAboutSW6230701_Supplement-EZ Form_20240430 SUPPLEMENT-EZ COVER PAGE LOAD SUPPLEMENT FORMS I PROJECT INFORMATION 1 Project Name Dunn Operations Center 2 Project Area(ac) 34.32 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 1.48 5 Is this project High or Low Density? Both High and Low Density 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 2 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 Storm Filter 24 Silva Cell 25 Bayfilter 26 Filterra LOAD SUPPLEMENT FORMS DESIGNER CERTIFICATION 27 Name and Title: Jeremy Wooster,PE,Technical Manager 28 Organization: McAdams 29 Street address: 621 Hillsborough St.Ste 500 30 City,State,Zip: Raleigh,NC 27603 31 Phone number(s): _ 919-361-5000 32 Email: wooster@mcadamsco.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here Desloner ,0 11II►!//1� NC••R / p /i/ 4 SEAL r: = ature esigner 048394 •. NGINE‘•�;��� 0/ 'IT K.woo\\• oti/zs/ y Seal Date DRAINAGE AREAS 1 Is this a high densityproiect? Yes 2 If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? Yes 4 If so.number of low density drainage areas 1 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 LD i 4 Type of SCM Wet Pond Wet Pond N/A 5 Total drainage area(sq ft) 1957821 sf 958,748 266.723 209,038 6 Onsite drainage area(sq ft) 958.680 191,901 137,136 7 Offsite drainage area(sq ft) 68 74.822 71,902 8 Total BUA in project(sq ft) 1029160 sf 820885 sf 182666 sf 25577 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) New BUA not on subdivided lots(subject to 10 permitting)(sf) 947430 sf 820817 sf 107844 sf 18737 sf 11 Offsite BUA(sq ft) 81730 sf 68 sf 74822 sf 6840 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) 754342 sf 651107 sf 103235 sf 18203 sf -Sidewalk(sq ft) 72702 sf 70702 sf 2000 sf 534 sf -Roof(sq ft) 101617 sf 99008 sf 2609 sf -Roadway(sq ft) -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on subdivided 13 lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots Lc ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 53% 86% 68% 12% 19 Design storm(inches) 1.0 in 1.0 in 1.0 in 20 Design volume of SCM(cu ft) 65556 cf 14811 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND 1 Drainage area number A B 2 Minimum required treatment volume(Cu ft) I 65556 d I 14811 cf GENERAL MDC FROM 02H.1050 31Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM(H:V)? 3:1 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes (10-year storm)? Is there an overflow or bypass for inflow volume in excess of the Yes Yes 8 design volume? 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with N/A N/A General MDC(10)? 14 is there an O&M Agreement that complies with General MDC(11)? Yes yes 15 Is there an O&M Plan that complies with General MDC(12)? yes yes 16 Does the SCM follow the device specific MDC? yes yes 17 Was the SCM designed by an NC licensed professional? yes yes yvET POND MDC FROM 02H.1053 18 Sizing method used SAIDA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth(bottom of sediment 210.00 221.00 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 210.50 222.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 215.00 226.00 23 Elevation of the permanent pool(fmsl) 215.50 227.00 24 Elevation of the top of the vegetated shelf(fills!) 215.50 227.00 25 Elevation of the temporary pool(fmsl) 217.75 227.75 26 Surface area of the main permanent pool(square feet) 22906 20722 27 Volume of the main permanent pool(cubic feet) 88969 cf 74598 cf 28 Average depth of the main pool(feet) 3.88 ft 3.60 ft 29 Average depth equation used Equation 2 Equation 2 30 If using equation 3,main pool perimeter(feet) 31 If using equation 3.width of submerged veg.shelf(feet) 32 Volume of Lhe forebay(cubic feet) 17603 cf 13651 cf 33 Is this 15-20%of the volume in the main pool? Yes Yes 34 Clean-out depth for forebay(inches) 6 in 12 in 35 Design volume of SCM(cu ft) 74034 cf 21077 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice,orifice diameter(inches) 3.50 in 2.75 in 38 If weir.weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 3.18 2.67 41 Are the inlet(s)and outlet located in a manner that avoids short- yes Yes circuiting? 42 Are berms or baffles provided to improve the flow path? No No 43 Depth of forebay at entrance(inches) 60 in 60 in 44 Depth of forebay at exit(inches) 40 in 40 in 45 Does water flow out of the forebay in a non-erosive manner? Yes Yes 46 Width of the vegetated shelf(feet) 6 ft 9 ft 47 Slope of vegetated shelf(H:V) 12:1 9:1 46 Does the orifice drawdown from below the top surface of the Yes Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes Yes yr,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that No No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment See Plans See Plans 54 Has a planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Species of turf will depend on when it is planted,see sheets C9.04 and C9.09 in the plans for more information.