Loading...
HomeMy WebLinkAboutNCC221797_NOT Closeout Documents_20240426 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301 , Mooresville, NC 28115 (704) 663-1699 County: Union Project: PNG-Rone Creek Station Extension River basin: Catawba Person financially responsible: Piedmont Natural Gas - Randy Webb. Operation Project #: UNION-2022-049 Supervisor Address: 5601 Cannon Drive, Monroe, NC 281 10 1. Project Location: Waxhaw Highway, Waxhaw Pictures: No 2. Weather and soil conditions: Sunny, no activity Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no. check violations below: '. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Title: Inspection report: Sent Report Date given/sent: October 11, 2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitorinw or self-inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO l) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: - — -- --ht-tps://edocs.deq.ne.gov/Forms7NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have questions, contact me at Lily.Kay@ncdenr.gov or by phone at (704) 235-2137. Reported by: Lily Kay Others present: Date of inspection: October 10, 2023 Time arriving on site: 17:20 PM Time leaving site: 12:30 PI\I cc: