Loading...
HomeMy WebLinkAboutSW6231001_Stormwater Design Report_20240424 Bowman Lancaster N Parker Church Road Hoke County, North Carolina COORDINATE: 35°01 '20.14"N, 79°08'14.20"W Project No.: 2201 37-01-001 Stormwater Design Report Prepared By: Bowman NORTH CAROLINA 4006 Barrett Drive, Suite 104 Raleigh, NC 27609 ICAIIIo a • i SEAL : 051571 • PREPARED FOR: /i' �l 0 ?. /�'J lllfll 1111���\\\ Lancaster 1 HOA Inc. �� 1184 Fayetteville Road Carlo Pardo, PE Raeford, NC 28376 NC License No. 051571 George Blackwell 0: (919) 553-6570 (910) 777-7778 cpardo@bowman.com JANUARY 17, 2024 Lancaster -Storm water Design Report 1 Bowman NORTH CAROLINA TABLE OF CONTENTS Stormwater Management Narrative PAGE • Project Data 3 • Site History 3 • Project Description 4 • Land Disturbance and Impervious Area 4 • Watershed Protection Overlay 4 • Streams 4 • Floodplains 4 • Design Requirements 4 • Methodology 5 • Conclusion 5 Appendix A: Figures 7 • County Soil Survey • Topography Map • FEMA Flood Map No. 3710945600J • Hydrologic Unit Code (HUC) • Surface Water Classification Map • NOAA Point Precipitation Frequency Estimates • SHWT and Infiltration Rate Report • Pre-Development Drainage Basin Map • Post-Development Drainage Basin Map Appendix B: Infiltration Basin Calculations 8 • Design Supplement • CN Values • Time of Concentration Calculations • Infiltration Basin Design • Hydrographs • Stormwater Management Details • Spillway Design Lancaster -Stormwater Design Report 2 I P a g e Bowman NORTH CAROLINA STORMWATER MANAGEMENT NARRATIVE This report documents the hydrological and erosion control analysis performed by Bowman Consulting for the proposed Lancaster residential development in Hoke County, North Carolina. The report consists of a review of available hydrologic data, methods analysis, development of existing and proposed hydraulic models, and presentation of the impacts of the proposed development in the project. PROJECT DATA Table 1:Site Information Project Name Lancaster Parcel Identification 494560401059 Number (PIN) Parcel Address 471 N Parker Church Rd Previous Site Plan Case N/A Number Stormwater Regulatory N/A Basin River Basin Cape Fear Total Parcel Area 10.82+ acres Existing / Proposed EXISTING: 0.09 acres (4,117 SF) Impervious Area PROPOSED: 2.32 acres (100,880 SF) Area of Land Disturbance 2.10 acres TMDLs N/A Watershed Protection N/A Overlay SITE HISTORY The proposed site is located in Hoke County, North Carolina and is within an unincorporated area of McLauchlin Township. The site is along N Parker Church Road. The site is adjacent to single- family home subdivisions on the north and west, and undeveloped wooded space to the south and east. Soils located within the project site as defined by NRCS (National Resources Conservation Service) are described in Table 2. Lancaster -Storm water Design Report 3 I P a g e Bowman NORTH CAROLINA Table 2:Hydrologic Soil Groups Group Description WaB Wagram loamy sand, 0 to 6 percent slopes NoB Norfolk loamy sand, 2 to 6 percent slopes BaD Blaney loamy sand, 8 to 15 percent slopes BaB Blaney loamy sand, 2 to 8 percent slopes According to the Web Soil Survey, 65% of the subject site falls within the hydrologic soil group A and 35% of the site falls within hydrologic soil group C. Group A soils have a high infiltration rate when thoroughly wet and consist mostly of well drained sands or gravelly sands. Group C soils have a slow infiltration rate when thoroughly wet and are moderately fine textured or fine textured. PROJECT DESCRIPTION Lancaster 1 HOA Inc. is proposing to develop the +10.82 acre parcel with a new 16 lot residential development, as well as supporting infrastructure. LAND DISTURBANCE AND IMPERVIOUS AREA The project includes approximately 2.10 acres of land disturbance on the northern parcel. Approximately 2.32 acres (+ 100,880 SF) of impervious area is proposed for the lots, pavement, sidewalk, and mail kiosk. WATERSHED PROTECTION OVERLAY This site is not located in a watershed protection overlay. STREAMS There are no streams located on site. FLOODPLAINS The project is shown to be located in Zone 'X' per FEMA Panel 3710945600J located in Appendix A. Because the post-developed conditions will not result in a net increase in runoff from the site, no adverse downstream impacts are expected to occur. DESIGN REQUIREMENTS Stormwater design was based on the standards presented in the North Carolina Department of Environmental Quality (NC DEQ) Stormwater Design Manual. Lancaster -Stormwater Design Report 4 I P a g e Bowman NORTH CAROLINA The NC DEQ requires that post-development discharge rates for the site are not to exceed pre- development discharge rates for the one (1)-year and ten (10)-year twenty-four (24)-hour duration storm event. Stormwater quantity control will be provided by one new infiltration basin as part of the development. METHODOLOGY Hydrology and storm water modeling calculations were performed using the latest version of Hydraflow modeling software. Simulations were set up based on information provided within the North Carolina Department of Environmental Quality (NC DEQ) Stormwater Design Manual. The Soil Conservation Service (NRCS TR-55) hydrologic method was utilized for the estimation of stormwater runoff peak rates and the generation of hydrographs for the routing of stormwater flows. Input and results can be found summarized in tables throughout this report and in the appendices. CONCLUSION Stormwater design was based on the standards presented in the North Carolina Department of Environmental Quality (NC DEQ) Stormwater Design Manual. Peak Runoff Analysis • Pre-Development Conditions The site is currently residential with a few buildings and dirt driveways, but is primarily open and wooded space. The site is planned for residential development. For the purposes of SCM design, one drainage area was analyzed in this report with its own study point, composite runoff curve number and single point of analysis. SCM#1 Pre-Developed Area covers 9.55 acres (+416,055 SF) and directs water to the southeast corner of the site. Drainage Area #1 drains off-site and eventually to Puppy Creek. The characteristics for the pre- development condition are shown below and additional calculations such as can be found in Appendix B. A drainage map identifying the basin can also be found in Appendix B. Table 5:Pre-Development Drainage Area Summaries Area Composite Time of Basin ID [acres] Curve Concentration Number (CN) (Tc) [min.] SCM #1 Pre-Developed Area 9.55 60.4 22.3 • Post-Development Conditions The post-development condition contains one drainage area to the infiltration basin. Lancaster -Stormwater Design Report 5 I P a g e Bowman NORTH CAROLINA Drainage Area #1 consists of the proposed residential development area and some offsite area. The drainage area collects runoff with curb inlets, and drainage pipes that connect to the proposed infiltration basin SCM. The characteristics for the post-development drainage areas are shown below and calculations can be found in Appendix B. A drainage map identifying the area can be found in Appendix A. Table 6:Post Development Area Summaries Area Composite Time of Basin ID [acres] Curve Concentration Number (CN) (Tc) [min.] SCM #1 Post-Developed Area 9.04 73.2 5 • Comparison of Peak Discharges The pre- and post- development peak discharges are shown below. Full calculations and hydrographs can be found on Appendix B. Table 8: Total Site Downstream Impact-Normal Condition Pre-Dev. Post-Dev. w/o Detention Post-Dev. w/ Detention Peak Discharge Rate Peak Discharge Rate Peak Discharge Rate Storm Event (cfs) (cfs) (cfs) 1-yr 24-hr _ 2.112 13.62 _ 0.000 10-yr 24-hr 15.12 40.47 1.315 100-yr 24-hr 36.22 76.68 46.12 Lancaster -Storm water Design Report Wage Bowman NORTH CAROLINA APPENDIX A Figures County Soil Survey Topography Map FEMA Flood Map Hydrologic Unit Code (HUC) Surface Classification Map NOAA Point Precipitation Frequency Estimates SHWT and Infiltration Rates Report Pre-Development Drainage Basin Map Post-Development Drainage Basin Map Lancaster -Storm water Design Report 7 I P a g e Hydrologic Soil Group—Hoke County, North Carolina 8 F 669840 669920 670000 670080 670160 670240 670320 670400 670480 670560 35°1'28"N . 35°1'28"N - .1! • a .0 0 JT • 51 i*Nos 114. Pep) 8 - , \ ...........H1 . 11 r.. NoB - 4 I 'f ,ram — t �01 NE 541oR RD- wE nd ate thIlE -2,ca0 ° 35°1'12"N I 6� 35°1'12'N 669840 669920 670000 670080 670160 670240 670320 670400 670480 670560 3 3 b. Map Scale:1:3,530 if printed on A landscape(11"x 8.5")sheet. , N Meters 0 50 100 200 300 Feet 0 150 300 600 900 Map projection:Web Mercator Corner coordinates:WG584 Edge tics:UTM Zone 17N WOiS84 USDA Natural Resources Web Soil Survey 9/1/2023 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Hoke County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 C/D Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as .v B/D of the version date(s)listed below. • r C Soil Survey Area: Hoke County, North Carolina Survey Area Data: Version 20,Sep 8,2022 • • C/D Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Apr 23,2022—Apr Soil Rating Points 27,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 9/1/2023 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Hoke County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Blaney loamy sand,2 to C 7.6 22.4% 8 percent slopes BaD Blaney loamy sand,8 to C 7.3 21.5% 15 percent slopes JT Johnston loam ND 0.7 2.1% NoB Norfolk loamy sand,2 to A 3.4 10.0% 6 percent slopes WaB Wagram loamy sand,0 A 15.0 44.0% to 6 percent slopes Totals for Area of Interest 34.0 100.0% USDA Natural Resources Web Soil Survey 9/1/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Hoke County,North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 9/1/2023 Conservation Service National Cooperative Soil Survey Page 4 of 4 Y Liv, 1 e.., 7,;-• Z,'. ' .' '..'."2.1%‘-: :.-- ...e , Nicholson Creek - Nicholson Creek •-• - ' -• ‘. --- Nicholson Creek Clifdal. .. 1 iD . . . . . / 1... — ' - Johnsons Mill 1 .,.<1.-.) _ - . , If•,_--J-I'4 • , •-•. _ _.:__-r--. . a --;1 -,.., • ".., I . Nicholson Creek -i Nicholson Creek- - 7) - 'IN i cho I s on CreEk -t-- - Clifdal. ,... _ . _. .. 5-: ... -, ,-, •- • .. National Flood Hazard Layer FIRMette = FEMA Legend_ 79°8'25"W 35°1'36"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT r •11 041 �� \ Without Base Flood Elevation(BFE) '• • • I ` Zone A,V.A99 y '1 With BFE or Depth Zone AE,AO,AH,VE,AR Nc6 SPECIAL FLOOD _ - �- HAZARD AREAS Regulatory Floodway . ...-"(f\ \*N‘IN\ • _... • 0.2%Annual Chance Flood Hazard,Areas r11 r i ,.Fi� of 1%annual chance flood with average 0� �i 4.`7 depth less than one foot or with drainage I OA • • areas of less than one square mile zone x • , , i,,,►�/ � ' i y�� Future Conditions 1%Annual � ' , • , • \�'1, . Chance Flood Hazard zonex • • ', 4 ,r 4.0 " Area with Reduced Flood Risk due to j • '• 110. %. ��G OTHER AREAS OF Levee.See Notes.zonex f ' , r��et 1' Zone AE ` FLOOD HAZARD �� Area with Flood Risk due to Leveezone D • � C F� � '�, , ! , . \ NO SCREEN Area of Minimal Flood Hazard zonex l I / ' • \ t\ _ Effective LOMRs lL_ • ♦ t \ 1 } OTHER AREAS Area of Undetermined Flood Hazard Zone D I. 410 #r �• •_ , 0" .►tklik • Zone AE IS 1t GENERAL ----- Channel,Culvert,or Storm Sewer • I� • STRUCTURES I I I I I I I Levee,Dike,or Floodwall t • I. . d �` 1 O 20.2 Cross Sections with 1%Annual Chance HOKE COUNTY 1 t�•s Water Surface Elevation • _ i \ ' a - Coastal Transect • 4 ' -� _ s - Base Flood Elevation Line(BFE) 3 to 0397� AREA OF MINIMAL FLOOD HAZARD '� Limit of Study . Jurisdiction Boundary • ZOn X ' FLOOt1'���Y --- Coastal Transect Baseline • -f„ 3710945600J •• 37109466.. - F� OTHER - - Profile Baseline 01J• �� .y�..r.• . FEATURES � Hydrographic Feature eff iri . /17/2006 01 eff. 10/17/21)r i t, • - ail Digital Data Available N \\\. ArA.Pan � No Digital Data Available �,, .• •. 0 r •I y Unmapped '� 1104410°.— r' • yy ' ^�� The pin displayed on the map is an approximate A y. • ; �' 4.4. i �� .� point selected by the user and does not represent 111, • A .� i� • an authoritative property location. ♦rai �. This map complies with FEMA's standards for the use of �� • �• o. digital flood maps if it is not void as described below. �/}' • j • • j iv __► _ The basemap shown complies with FEMA's basemap • • • • . : • °if µ ` accuracy standards • a• •.J 41 • • The flood hazard information is derived directly from the • authoritative NFHL web services provided by FEMA.This map ` , . �• • i I •sr3 * r I' , • ` ,�2,0 was exported on 9/1/2023 at 2:39 PM and does not ` 1•' .• i. 6 reflect changes or amendments subsequent to this date and ♦_ y�. tit 11• time.The NFHL and effective information may change or , � •; 4 • �' r••, •I•�• ^• �� W'. • ♦ become superseded by new data over time. T11' 1• v - �' • This map image is void if the one or more of the following map : . * 1 • i - •, a, elements do not appear:basemap imagery,flood zone labels, # - _ t� • legend,scale bar,map creation date,community identifiers, • FIRM panel number,and FIRM effective date.Map images for ge Feet 1:6 79°7'48"W 35°1'7"N unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 '�0� regulatory purposes. Basemap Imagery Source:USGS National Map 2023 73 a 8 C. h11 Ct co (1 of 2) ► LO X 12-Digit HUC(Subwatershed) 12-Digit Name: Lower Puppy Creek Z 12-Digit Code: 030300040606 a i 10-Digit Name: Rockfish Creek vc co 10-Digit Code: 0303000406 0 8-Digit Code: 03030004 A River Basin: Cape Fear lie Dr a 12-Digit Area(ac): 11.636.32 o I ,� on 10 R4 Zoom to ns Tv illMir c`o co AO jt _ Id 0 al o o0 y �SSenro`Nec 0O, o i DEQ r,:, NC Surface Water Classifications NC Classifications Website Report an Issue �viP I,., y 1 QStream Details ( Lec:crd )( Layers )\ Pr nt ) a Oe 4 ®a O O 0GS ca'ralrot 01 g. f,ni -a Oi oi to F4 XQ- C2 I y _it Familyo a Surface Water Classifications: 6 ♦t N R gar `y''" ,� ; Surface Water Classifications: 0] X Facrs o �' e Stream Index: 18-31 -19 �� ir to Cx ��,a �o\`9 Stream Index: 18-31 19 0 Stream Name: Puppy Creek Stream Name: Puppy Creek o Description: From source to Rockfish Creek Description: From source to Rockfish Creek :, Classification. C p` Date of Class.: June 30, 1973 Classification: C '+e`•d'‘ Pk' What does this Class_mean? v _,v Date of Class.: June 30, 1973 F/ ,.0.,.v 1, River Basin: Cape Fear 0What does this Class. mean? View i a 7 Johnsons 3CZzon, t Mill -'-' River Basin: Cape Fear 7. t, Q ,0'3� L`. 9/1/23,2:37 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 vL Location name: Raeford,North Carolina,USA* '''' i X1 Latitude:35.022°, Longitude: -79.1365° V none „ .175,i Elevation:247 ft** 4' *source:ESRI Maps -.nu° **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 I 5 10 25 50 100 200 I 500 1000 5-min 0.436 0.514 0.600 0.664 0.741 0.796 0.849 0.899 0.960 1.01 (0.396-0.483) (0.467-0.570) (0.544-0.665) (0.601-0.734) (0.668-0.817) (0.716-0.877) (0.759-0.934) (0.800-0.988) (0.847-1.06) (0.883-1.11) 10-min 0.696 0.822 0.960 1.06 1.18 1.27 1.35 1.42 1.52 1.59 (0.632-0.771) (0.747-0.912) (0.872-1.06) (0.962-1.17) (1.06-1.30) (1.14-1.40) (1.21-1.48) (1.27-1.57) (1.34-1.67) (1.39-1.74) 15-min 0.870 1.03 1.22 1.34 1.50 I 1.61 1.70 1.80 1.91 1.99 (0.790-0.963) (0.939-1.15)I (1.10-1.35) (1.22-1.48) (1.35-1.65) (1.44-1.77) (1.52-1.88) (1.60-1.98) I (1.69-2.10) (1.74-2.19) 30-min 1.19 1.43 1.73 1.95 2.22 2.42 2.61 2.80 1 3.04 3.22 (1.08-1.32) (1.30-1.58) (1.57-1.91) (1.76-2.15) (2.00-2.44) (2.18-2.66) (2.34-2.87) (2.49-3.08) (2.68-3.34) (2.83-3.54) 60-min 1.49 1.79 2.21 2.54 2.95 3.28 3.60 3.92 4.36 4.71 (1.35-1.65) (1.63-1.99) (2.01-2.45) (2.30-2.80) (2.66-3.26) (2.95-3.61) I (3.22-3.96) (3.49-4.31) (3.85-4.80) (4.12-5.18) 2-hr 1.73 2.10 2.64 3.05 I 3.61 4.05 4.50 4.96 5.58 6.07 (1.56-1.95) (1.89-2.36) (2.37-2.96) (2.74-3.42) (3.22-4.05) (3.60-4.54) (3.97-5.04) (4.35-5.55) (4.85-6.24) (5.23-6.79) 3-hr 1.84 2.22 2.81 3.27 3.92 4.44 4.99 5.56 6.37 7.02 (1.65-2.07) (2.00-2.51) (2.52-3.16) (2.93-3.68) (3.48-4.40) (3.93-4.98) (4.38-5.59) (4.85-6.22) , (5.48-7.13) (5.98-7.85) 6-hr 2.19 2.65 3.35 3.92 4.70 5.34 6.02 6.74 7.76 8.58 (1.98-2.45) (2.40-2.96) (3.03-3.73) (3.52-4.35) (4.20-5.21) (4.74-5.92) (5.30-6.66) (5.88-7.44) (6.68-8.55) (7.31-9.46) 12-hr 2.58 3.13 3.97 4.66 5.64 6.45 7.31 8.24 9.57 10.7 (2.33-2.88) I (2.83-3.49) (3.58-4.43) (4.18-5.19) (5.02-6.25) (5.70-7.14) (6.40-8.08) (7.14-9.09) (8.16-10.6) (8.98-11.7) 24-h r 3.04 3.68 4.67 5.45 6.54 7.41 8.30 9.24 10.5 I 11.5 (2.82-3.28) (3.42-3.98) (4.33-5.04) (5.04-5.88) (6.02-7.05) (6.80-7.98) (7.60-8.96) (8.43-9.96) (9.55-11.3) (10.4-12.5) 2-day 3.53 4.26 5.36 6.23 7.44 8.40 9.40 10.4 11.8 13.0 (3.29-3.80) (3.97-4.58) (4.98-5.76) (5.78-6.70) (6.87-7.98) (7.74-9.02) (8.62-10.1) (9.53-11.2) (10.8-12.7) (11.7-14.0) 3-day 3.75 4.52 5.65 6.55 7.79 8.78 9.80 10.9 12.3 13.5 (3.50-4.02) (4.22-4.84) (5.27-6.05) (6.09-7.01) (7.22-8.33) (8.11-9.39) (9.03-10.5) (9.96-11.6) I (11.2-13.2)I (12.2-14.4) 4-day 3.97 4.78 5.94 6.87 8.14 9.16 10.2 11.3 I 12.8 14.0 (3.72-4.24) (4.48-5.10) (5.55-6.34) (6.41-7.32) (7.57-8.68) 1 (8.49-9.76) (9.43-10.9) (10.4-12.1) (11.7-13.7) (12.7-14.9) 7-day 4.61 5.52 6.78 7.79 9.16 10.3 11.4 12.5 14.1 1 15.4 (4.31-4.93) (5.16-5.90) (6.33-7.26) (7.26-8.32) (8.51-9.79) (9.50-11.0) (10.5-12.2) (11.6-13.4) (13.0-15.2) (14.1-16.5) 10-day 5.28 6.30 7.63 I 8.66 10.1 11.2 12.3 I 13.4 14.9 16.1 (4.97-5.62) (5.93-6.70) (7.16-8.10) (8.13-9.19) (9.41-10.7) (10.4-11.8) (11.4-13.0) (12.4-14.2) (13.8-15.9) (14.8-17.2) 20-day 7.12 I 8.44 10.0 11.3 13.0 14.3 15.7 17.0 18.9 20.3 (6.72-7.56) (7.96-8.96) (9.46-10.7) (10.6-12.0) (12.2-13.8) r(13.4-15.2) (14.6-16.6) (15.8-18.1) i (17.5-20.1) (18.7-21.6) 30-day 8.86 10.4 12.2 13.6 15.4 16.8 18.2 19.6 21.4 I 22.8 (8.38-9.38) (9.88-11.1) (11.6-12.9) (12.8-14.4) (14.5-16.3) (15.8-17.8) (17.0-19.3) (18.3-20.8) (19.9-22.7) (21.2-24.3) 45-day 11.2 13.2 15.2 16.7 18.6 20.1 21.6 23.0 24.9 26.3 (10.6-11.8) (12.5-13.9) (14.3-16.0) (15.8-17.6) (17.6-19.7) (19.0-21.3) (20.3-22.8) (21.6-24.4) (23.3-26.4) (24.6-28.0) 60-day 13.4 15.7 17.9 19.6 21.7 23.4 24.9 26.5 28.5 30.0 (12.7-14.1) (14.9-16.5) (17.0-18.9) i (18.6-20.6) (20.6-22.9) I (22.1-24.6) (23.5-26.3) I (24.9-27.9) (26.8-30.1) (28.1-31.7) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0220&Ion=-79.1365&data=depth&units=english&series=pds 1/4 9/1/23,2:37 PM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.0220°, Longitude: -79.1365° 30 - Average recurrence interval (years) 25 - c - 1 c 20 - — 2 c 5cv 15 - __A — 25 50 a 10 — 100 200 tL 5 - Ill 500 -lr — 1000 0- c c c c c ; >. >,>, >, >, >, >. >,>. • - L L r r t ro ro ro ro ro ro ro ro ro A rn lb ry V -O "O"O 7 17 7 7 7 17 , A A4 N O rn $ Duration Ni O1 N rrnn v V) 30 - - 25 c Duration L 20PIII - cu '_� — 5-min — 2-day v c 15 _� J� - 10-min — 3-day •y -�� 15 nun — 4-day .a 10 - � � — 30 min — 7-day ai --- — 60-nun — 10-day a �� — 2-hr — 20-day 5 -�� —� — 3-hr — 30-day — 6-hr - 45-day 0 - — 12-hr — 60-day i i — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Fri Sep 1 18:37:18 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0220&Ion=-79.1365&data=depth&units=english&series=pds 2/4 9/1/23,2:37 PM Precipitation Frequency Data Server FORT BRAGG MILITARY RESERVATION mmommm A RPARX 401' 4 a ette \ 2mi Large scale terrain Winston-Salem • • Durham Greensboro • Rocky Mount Raleigh • NORTH CAROLINA Green •Charlotte Faye ±ill�. ' Jackson • [ H CAROLINA a Wilmington a 100km 60mi Large scale map Winston6' lem Greensboro U�uu Rocky Mount Raleigh North o eenvl Carolina arlotte F etteville Jackson Wilmin N n 100km I 60mi Carolina i Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0220&Ion=-79.1365&data=depth&units=english&series=pds 3/4 9/1/23,2:37 PM Precipitation Frequency Data Server Winston-Salem • Greensboro Durham . Raleigh Gr eenvi North • Carol in a Charlotte • • Fayett- Jackson 0 Wilmine� 100km fl 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0220&Ion=-79.1365&data=depth&units=english&series=pds 4/4 9/1/23,2:38 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 i°s" Location name: Raeford,North Carolina,USA* '''' Imo$; Latitude:35.022°, Longitude: -79.1365° none I Elevation:247 ft** i 4* *source:ESRI Maps "a -.nu° **source:USGS "`" y POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 - 200 500 1000 5-min 5.23 6.17 7.20 7.97 8.89 9.55 10.2 10.8 11.5 12.1 (4.75-5.80) (5.60-6.84) (6.53-7.98) (7.21-8.81) (8.02-9.80) (8.59-10.5) (9.11-11.2) (9.60-11.9) (10.2-12.7) (10.6-13.3) 10-min 4.18 4.93 5.76 6.37 7.09 7.61 8.09 8.54 9.11 1 9.52 (3.79-4.63) (4.48-5.47) (5.23-6.39) (5.77-7.04) I (6.38-7.81) (6.84-8.38) (7.24-8.90) (7.61-9.40) (8.03-10.0) (8.34-10.5) 15-min 3.48 4.13 4.86 5.38 5.99 6.42 6.82 7.19 7.64 7.96 (3.16-3.85) (3.76-4.58) (4.41-5.39) (4.86-5.94) (5.40-6.60) (5.78-7.07) (6.10-7.50) (6.40-7.90) (6.74-8.40) (6.98-8.76) 30-min 2.39 2.85 3.45 3.89 4.43 4.84 5.22 5.60 6.08 6.45 (2.17-2.64) (2.60-3.17) (3.13-3.83) (3.53-4.30) (4.00-4.89) _(4.35-5.32) (4.67-5.75) (4.98-6.15) (5.37-6.68) (5.65-7.09) 60-min 1.49 1.79 2.21 2.54 2.95 3.28 3.60 3.92 4.36 4.71 (1.35-1.65) (1.63-1.99) (2.01-2.45) (2.30-2.80) (2.66-3.26) I (2.95-3.61) (3.22-3.96) (3.49-4.31) (3.85-4.80) I (4.12-5.18) 2-hr 0.866 1.05 1.32 1.53 1.80 2.03 2.25 2.48 2.79 3.04 (0.779-0.976) (0.945-1.18) (1.19-1.48) (1.37-1.71) (1.61-2.02) (1.80-2.27) (1.99-2.52) (2.18-2.78) (2.42-3.12) (2.62-3.40) 3-hr 0.611 0.740 0.935 1.09 1.30 1.48 1.66 1.85 2.12 2.34 (0.550-0.690) (0.666-0.835) (0.839-1.05) (0.976-1.22) (1.16-1.46) (1.31-1.66) (1.46-1.86) (1.61-2.07) (1.83-2.37) (1.99-2.62) 6-hr 0.365 0.443 0.559 0.653 0.784 1 0.892 1.01 1.12 1.30 1.43 (0.330-0.408) (0.401-0.494) (0.505-0.622) (0.588-0.726) (0.701-0.870)1(0.792-0.988) (0.885-1.11) (0.982-1.24) (1.12-1.43) (1.22-1.58) 12-hr 0.214 0.259 0.329 0.387 0.468 0.535 0.607 0.683 0.794 0.885 (0.193-0.239) (0.234-0.289) (0.297-0.367) (0.347-0.430) (0.416-0.518) (0.473-0.592) (0.531-0.670) (0.592-0.754) (0.677-0.876) (0.745-0.974) 24-hr 0.126 0.153 0.194 0.227 0.272 0.308 0.346 0.384 0.438 0.480 (0.117-0.136) (0.142-0.165) (0.180-0.210) (0.210-0.245) (0.250-0.293) (0.283-0.332) (0.316-0.373) (0.351-0.414) (0.398-0.472) (0.434-0.518) 2-day 0.073 0.088 0.111 0.129 0.154 0.174 0.195 ' 0.217 0.246 0.269 (0.068-0.079) (0.082-0.095) (0.103-0.120) (0.120-0.139) (0.143-0.166) (0.161-0.187) (0.179-0.210)1(0.198-0.233) (0.224-0.265) (0.244-0.290) 3-day 0.052 0.062 0.078 0.090 0.108 0.121 0.136 0.150 0.170 0.186 (0.048-0.055) (0.058-0.067) (0.073-0.084) (0.084-0.097) (0.100-0.115) (0.112-0.130) (0.125-0.145) (0.138-0.161) (0.156-0.183) (0.169-0.200)I 4-day 0.041 0.049 0.061 0.071 0.084 0.095 0.106 0.117 0.133 0.145 (0.038-0.044) (0.046-0.053) (0.057-0.066) (0.066-0.076) (0.078-0.090) (0.088-0.101) (0.098-0.113) (0.108-0.125) (0.121-0.142) (0.132-0.155) 7-day 0.027 0.032 0.040 0.046 0.054 0.061 0.067 0.074 0.084 0.091 (0.025-0.029) (0.030-0.035) (0.037-0.043) (0.043-0.049) (0.050-0.058) (0.056-0.065) (0.062-0.072) (0.068-0.079) (0.077-0.090) (0.083-0.098) 10-day 0.022 0.026 0.031 0.036 0.041 0.046 ' 0.051 0.055 0.062 0.067 (0.020-0.023) (0.024-0.027) (0.029-0.033) (0.033-0.038) (0.039-0.044) (0.043-0.049) (0.047-0.054) (0.051-0.059) (0.057-0.066) (0.061-0.071) 20-day 0.014 0.017 0.020 0.023 0.027 0.029 0.032 0.035 0.039 0.042 (0.014-0.015) (0.016-0.018) (0.019-0.022) (0.022-0.024) (0.025-0.028) (0.027-0.031) (0.030-0.034) (0.033-0.037) (0.036-0.041)i(0.039-0.045) 30-day 0.012 0.014 0.016 0.018 0.021 0.023 0.025 0.027 0.029 0.031 (0.011-0.013) (0.013-0.015) (0.016-0.017) (0.017-0.019) (0.020-0.022) (0.021-0.024) (0.023-0.026) (0.025-0.028) (0.027-0.031) (0.029-0.033) 45-day 0.010 0.012 0.014 0.015 0.017 0.018 0.019 0.021 0.023 0.024 (0.009-0.010) (0.011-0.012) (0.013-0.014) (0.014-0.016) (0.016-0.018) (0.017-0.019) (0.018-0.021) (0.020-0.022) (0.021-0.024) (0.022-0.025) 60-day 0.009 0.010 0.012 0.013 0.015 0.016 0.017 0.018 0.019 0.020 (0.008-0.009) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020)1(0.019-0.022)I 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0220&Ion=-79.1365&data=intensity&units=english&series=pds 1/4 9/1/23,2:38 PM Precipitation Frequency Data Server PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.0220°, Longitude: -79.1365° Average recurrence 101 -__ interval (years) L_ c \\\ — 1 2 7 10° - \ — 5 c a, \\ — 10 — 25 `o :: TTTE E E E E N OS ki, N 4 v v-a7 7 v v 77 N A4 N 'n O2 4 m $ Duration Ni 0� N illv V) 101 - • L_ L C — Duration c — 5-min — 2-day a — 1 0-min — 3-day c 15-min — 4-day 0 — 30-min — 7-day ;° 10-1 - — 60-min — 10-day •a D — 2fir — 20-day cu a` — 3-hr — 30-day — 6fir — 45-day 10-2 — 12-hr — 60-day I I i i I i I — 24fir 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Fri Sep 1 18:37:50 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?Iat=35.0220&Ion=-79.1365&data=intensity&units=english&series=pds 2/4 9/1/23,2:38 PM Precipitation Frequency Data Server FORT BRAGG MILITARY RESERVATION mmommm A RPARX 401' 4 a ette \ 2mi Large scale terrain Winston-Salem • • Durham Greensboro • Rocky Mount Raleigh • NORTH CAROLINA Green •Charlotte Faye ±ill�. ' Jackson • [ H CAROLINA a Wilmington a 100km 60mi Large scale map Winston6' lem Greensboro U�uu Rocky Mount Raleigh North o eenvl Carolina arlotte F etteville Jackson Wilmin N n 100km I 60mi Carolina i Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0220&Ion=-79.1365&data=intensity&units=english&series=pds 3/4 9/1/23,2:38 PM Precipitation Frequency Data Server Winston-Salem • Greensboro Durham . Raleigh Gr eenvi North • Carol in a Charlotte • • Fayett- Jackson 0 Wilmine� 100km fl 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0220&Ion=-79.1365&data=intensity&units=english&series=pds 4/4 Scott Cole,NCLSS 312 Copples Road Ext Asheboro, NC 27205 (336) 460-4554 D&L Engineering, PLLC May 17,2023 Attn: Mr. Lee Humphrey 150 S. Page Street Southern Pines,NC 28387 Re: Seasonal High-Water Table Identification and Soil Infiltration Rates: N. Parker Church Road, Hoke County NC parcel 494560401059 Soil conditions and infiltration rates were evaluated and measured on the above-referenced property within the proposed storm water BMP device. Work was conducted in accordance with Parts A-2 and C-1 of the North Carolina Department of Environmental Quality Stormwater Design Manual. Soil samples were evaluated with a hand auger. SEASONAL HIGH WATER TABLE IDENTIFICATION Seasonal High Water Table depth is determined by field evaluation for soil wetness conditions which are indicated by the presence of redoximorphic (redox) features with chroma colors of 2 or less (in Munsell color notation) in mottles or the horizon matrix, and at times, saturated soil conditions and/or free water within the soil profile. Colors of chroma 2 or less due to relic minerals from parent material (underlying rock), anaerobic activity created by placement of fill material, or soil textural class transitions (perched water) are not considered as indicators for seasonal high water. Upon determination of SHWT depth, an additional 6" will be deducted from the observed depth to account for capillary fringe water movement above the SHWT. Stormwater infiltration trenches are designed to ensure the lowest point is at least two feet above the Seasonal High Water Table(SHWT). SATURATED HYDRAULIC CONDUCTIVITY (Ksat) Soils evaluated on this property are typical of those within Blaney Loamy Sand Soil series. These soils are well drained to moderately well drained soils with varying rates of permeability. Infiltration rates are measured to determine if soil conditions are suitable for the installation of stormwater infiltration devices. Infiltration rates are measured using a Johnson Constant Head Permeameter. Measurements are recorded at varying intervals until equilibrium is reached. The SHWT and Infiltration rates for the stormwater BMP devices are reported in the table below. BMP Device Site Test Location SHWT Munsell Color Ksat#1 Ksat#2 Ksat#2 (feet below Notation _ground surface) Free Water 0-4' 4-6' 6-11' Elevation 204' observed 11' 2.5Y 7/1 Loamy Sand/ Clay- Sandy Loam bgs(Elevation Sandy Loam Expansive Saprolite 193') 10"/hour Not with mottles Measured Not Measured Scott Cole,NCLSS 312 Copples Road Ext Asheboro,NC 27205 (336) 460-4554 CONCLUSION Field evaluation of hydraulic conductivity provides estimations of soil infiltration rates; however,methods used to measure these rates can influence the results. Side walls of the bore hole are "smeared"by the soil auger as the hole is prepared and loose soil in the bottom of the hole is placed in suspension when water is applied; both factors negatively influence water infiltration rates. To help overcome these issues, after excavation of each infiltration trench, it is recommended the trench bottom and sidewalls be raked and dusted with pulverized limestone. These are practices that have been in place within the on-site wastewater industry to help loosen the soil and aid in restoration of soil structure. I am pleased to be of service in this matter and can be contacted at your convenience should you have any questions concerning information within this report. Thank you, Scott Cole �\ +y... / co,, North Carolina Licensed Soil Scientist d# �0 t r Cr' �gR / �� V��CC �� co �I �� ,a?�vA LP ___________------- ?___:___----V _ , , :t1 .: •-4i ,, ,i. . ztt,, tutAto/1 tO . - 6::','11(' . `.4.7171111y71.7744allAkk4.17#1 ------------- -----___ _---- __.----s-- Nikk-110ihh„. -_______-- •N_ ry------_______-- .401k-4,-- —'NN‘ ---- kso\V .•--0.111.1111"w '------ „,, _ \S. 411,4111VZ , ' -. '4.1qfit ,— \ ‘‘,,,N._ i 71111, \ \ ... 4 lo0 Milik \1/4,,Ni:‘ ..* 444i,i&xXX in =Z - p \t;1/4,, ,...\\,---,,,,-....-. , ,, ,,,,\"‘,\, _,...,,, ,16.:„..." N___.7- .-10, c., \...... .. .. ,...) e. �``` , NN\N-- Op' a WmJ�oy: : ilkel \ a isi it el 6 \ m Y Y Y r 1\ _., --------- 4 i'it,' „) ,\ _____ N _ v..-z' p ` 3 \ 234 ,r ` `\\ ____ __________ to �z M tD O. ♦, ``�```` 8£Z C e ``10 ``♦`/ on et M ` ``I __, .:, M p . .� ` p ' .,:::* c..., it? tip: c)-- et (NI M V � , et 4:::: coco p �� p et Irsisor, M cOo +f IN "ftp44. / o� p Fpp� �p 4 O —� �------ boo,- .e... ` N cn to Ikp p co e et tl : / ut r F o et p / et �� — �— co et p _ _ e� N _i_ . . ej o M 9 0 . r (,. 1I2 cCO O h r c:o to et et et et Q I1 .. .-�t� \_ 1V/", \I" _. -:^ 'f-'1_Ili"_/,-/^^ - j- li _ ``y` "-1.---, \----- ----- —:=r-r':-s/1(''1.-ram �-\ `-' i''r.k I !t __ _ __ ———.r.-4.T -tom./--1- _,-- \_ \ ( \ 11.'2' •r: 7 -r J r r_-f\ r r" , , \--\rf='=q.-=_L_k_.....'..---- G,--"i ,, ), / Li-‘I--:__4 4..._,—_-) ..!---,-?r---r bra\ -=e- —— _✓ / 1\I ' ^ a l` ,4, .\ ▪ j~__ -\, \`\..\ _ _ ---- \� /' / / / ' __ `I- . --.-_ \ \r;...--- �h - -\._-_- - --• '- /` /1 J/ I / / / / f ♦ `� `:\ '��`�`. -- \/ — — __— —^ -, v . / . / \-// / / / /i 1-'-,_—\ - - -N-N_ __ �---� l /-"`_ _' \- ! _--\� '\ I ' I - r r'' ,' /r /, /\ / ♦i' '------ \ '" :\C,\_- --..--\---'''' � ---'--'\,-_.--_ `'--- -----' �\ _iJ'c' - C/ I' •' / `\ i �° ( IN / / /_`.\--——_'\-'`\ sj — � ---"i / I `:' '.;_- ----- `\` ---- r - _ ' / / - r\ 1 I /i I �w. .,:\\ - /---` _ '---- _`-1.- - _ ' • ---- .V ' I �``/ ( L/ I it \I ^- `\ /-- / I. .(' ' • 1 •,-. '\ �' \\•/ — �L lam' - -.'' -- '-� .i ._\ \� - - \ t .,/ it _C// ,I' J i v ,. /\a \`A i \ \`` \ \ ^/' - -- 1.> '- ._/-' - .. —\- --.\/```-` -.._` ""7 i C__i /_ . I 1 ♦ 1 \ \ \\ \-� _�i--`- J i \ S v /' i I 1 \ `\ , , .�_ ----, ,, r- 1 i-' \ 1 i , \ \ \ , w\ / • / -_ /:---,-/- -_ _ __ /� - \_/ _ _:I- / °v 1\, '\\`\`\` J//i \ _I/__' \� __ `---/ \r ` _' ..7,l/^_ _-___ / / ♦ I y \ \\\\\\\I\`r\\\( _ / ' ^.l 7/ , S' C C .. `Cl - 1 \_' __�\l- i I \\ 1 \\Y'1\\\ 1 /' __-- �,C "/f ,._ ' _ ^\1.' `---_ /-"-------'\"'' - i / \ \ \ k\�\\\\\ I y ./ , _I I /. , /,,\ Si I `_I __ -- `\ �- '-/ / `` `\\\\\\1\\\\\I\ - -/.' 4 /I \\ \ I-/ri,.- p,\.:+'\_-\ ✓;-. (_1 1-/'+�/-- — \: \ \\-'- /""------.♦ 9.' i 1\\j\\\\\\. -y • / - �L 1-" _ , / I- .\ \\ .- • - ,/•�_ -/1� r- 1-- 1` -.I , / / / / ,/\ • - < `^ - ?v - - _/ /C/ -__ .\ \\ i- i.-_ l ` \1 i/ ; I i',F- `, \ S'i--,- 1 - / - ` ` �J/`-\ i i 1 I /' _ • \ ` ♦ _ ' i/ i/ r"\\ N', ,, :-..,---,',...\ram`�- I / / /�_`- 'i-\ __ `- __''//'i/r `�i. r I .G ) - `-✓ -_-_. _▪ - ,,,._\,-,-__:,--:--,--- -/ / � r'// ' r 1 ` \ \ _ _1 - /�/ - :-'/�-Is'$'=�'-.,__--`.`. .-$� _ ':�`,: \-- --/// D /l //:./ "e\\\ ` -\/ --1,,,,--/'---i /// �'- -'�-`\. -_ -' , `'C \\``:`.� —1....----_,--'m //%/'� -\ I _ -\ �--/-; --,/-_/!_ - -J _� ; ` . \---- _D V/Ji/'//_. 1 'I ./.__` I / - /,--i j/� --- --- 41.—�./f _- - / mSom\ \ - - - -_� --_'-/ -- __ \L\ -\��-^-> i j,_ 5 \ ---'`_ 4�'.�'/- r—/ ' - -_- --IC `._\\C _ _II i'/ --11`- -_''\ ----_/'J '-_C--_'_- -/—/ ;.'"' l^ '/_-` �_ I� -`,� _-_ -2 '/iy \ tom'-_-'i7 —/ - ' /�- _ 1 C `_. � � /---,Lei" I� ` Ili .\S' -> \• 1 -'_-- %- *= r r'o` I __ . --`\- 5 ./III\\\\-___ -y ___ • �• _- _, / :-.' • --, 'b"l" —S\.� - \ i• ��I II11 \\,/ - _ N-,` '/-o•-•-/,„ -C _ r. r-. IL / \ �1 1 \\, \"��^ - i'` - ^/ /'r/C' `_-- - .,-1\ -.,,• _- `-. \J- I Imo- 1`r \ `. 1 _III\\\_'_---- - �` - ----'i/I( ' j/'.v_s, Q,` -- _\--'_ -/ - i I` i �" \ y /- ( .1 1i1\`� '\�_```�ecr\iL\`��n %'i ii \\\ r- \- \�i �..I \,`,—,.i\./�_/-,r U I�' \) `\ `1_ i- _I r� I� .� -_ -`-- - --��_i / \ /i-\/-y/�^ ten_- V _ _/ I/ 5 W.. `\ _1 pll E a V g Io i := PRE-DEVELOPED DRAINAGE AREA MAP BARRETT q`m. s= a; . yI LANCASTER ���� Bowman D �s "gy m p z on�s�;slss�s,o v$ ,2 ,,,, N PARKER CHURCH RD,RAEFORD,HOKE COUNTY,NC .m m 2 eo.me�rvonn c„oim,ua. � \_ 1 �J 1 I 1� !1 —1 i _ .. I 9 "I ' ,) f- _yam_ rf1 —_(;es —_---- J "- 1 I/— -- / _-_` .\ CF 7 /-- / ./. i f t -._ L \\—;\ \ --- ----"^r ___ a i �, — % r----- -,„-/_,_ \ID 17 �'3_ / / / L ,./; ,,- \\ —^_r\\ , Z--- `````\_ __-- ill, _ J / )/\ r- \ � , i ei�, I ` \mil\— . — . —_—_— "`—' _ss ity _`i\ _�= '-- /,--, r_ L, \\ r ;',. \, -1/4 .-', -fir r ,— --�� -\``- -Z / - ;-{ ,,, - /, - _ I`— -I -` -0 'i' \`\ --- --.�e,'.�/ k' a j "< -- . / , 7 L _-,,;, \I \ -. J I I i,�, \`` __ n_^ -i ` ` ,\--- i i' - .- __tit` - � . , ,"^ A �._ - J/^\ ^ /1 ./ ( it N\\ \\�— �-- -A •^ `__•—'/a✓ — =�_'_�` \�`� \ wM' , <,/' ,\ \\`\, ' ,\I R -Y --� - _ ; A m POST-DEVELOPED DRAINAGE AREA MAP am ma Now o q`a N s4= g LCASR oh Bowman T ; p 2 Phone Is,slssa-as�o 4$ q N PARKER CHURCH RD,RAEFORD,HOKE COUNTY,NC m m 8 eo.marvonn carow,ue Bowman NORTH CAROLINA APPENDIX B Wet Pond Calculations Design Supplement CN Values Time of Concentration Calculations Infiltration Basin Design Hydrograph Stormwater Management Details Spillway Design Lancaster -Storm water Design Report 8 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Lancaster 2 Project Area(ac) 10.82 3 Coastal Wetland Area(ac) - 4 Surface Water Area(ac) - 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 _ 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: • 11 Infiltration System 1 12 ,Bioretention Cell 0 13 !Wet Pond _ 0 14 Stormwater Wetland 0 _15 Permeable Pavement 0 16 .Sand Filter 0 17 ,Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 ;Treatment Swale 0 22 Dry Pond 0 23 'StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 i. FORMS LOADED 7DESIGNER CERTIFICATION 27 Name and Title: _ Carlo Pardo, PE 28 Organization: Bowman North Carolina,Ltd. 29 Street address: 4006 Barrett Drive,Suite 104 30 City,State,Zip: Raleigh,NC 27609 31 'Phone number(s): 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer \`,��tttillil:;ii;;/yy, ii SEAL r :,1--- Signatur f Designer 051571 i '•• t' ��///nimillttt���� 1) 17inti Seal Dale DRAINAGE AREAS 1 r0 Is this a high density project? I Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas Is all/part of this project subject to previous rule 5 ;versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 1 —'1 [ — 4 Type of SCM - ' Infiltration Basin 5 Total drainage area(sq ft) 471494 sf 393707 6 Onsite drainage area(sq ft) 471494 sf 386138 7 Offsite drainage area(sq ft) 7569 8 Total BUA in project(sq ft) 100880 sf 108449 sf New BUA on subdivided lots(subject to permitting) 9 ,(sq ft) 64000 sf 64000 sf New BUA not on subdivided lots(subject to 10 ,permitting)(sf) 36880 sf 36880 sf _ 11 Offsite BUA(sq ft) 7569 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) _ -Sidewalk(sq ft) 5026 sf 5026 sf -Roof(sq ft) -Roadway(sq ft) 31854 sf 31854 sf -Future(sq ft) __ -Other,please specify in the comment box below ss ft) New infiltrating permeable pavement on ' 13 'subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq� 16 Existing BUA that is already permitted(sq ft) _ 17 Existing BUA that will be removed(sq ft) 4117 sf 4117 sf 18 Percent BUA 21.40% 27.5% 19 Design storm(inches) 1.0 in 20 Design volume of SCM(Cu ft) 36158 cf 21 Calculation method for design volume Simple Method •ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Line 11-The 7,569 sf of off-site impervious is made up of ROW and neighboring parcels that were assumed 100%BUA. In the pond calculations the pre-developed drainage area has 11,240 sf(0.26 ac.)of BUA.The 4,117 sf listed above is the existing,on-site BUA.The remaining 7,123 sf of BUA is off-site,and is either included in Line 11, or will not drain to the infiltration basin after development. INFILTRATION SYSTEM 1 ;Drainage area number I 1 2 Minimum required treatment volume(cu ft) 9774 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 'Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V or enter"Vertical'for trenches)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered 4side slopes? No 7 'Are the inlets,outlets,and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? I Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? - j Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with General MDC 10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes_ 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 .Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes "INFILTRATION SYSTEM MDC FROM 02H.1051 18 Proposed slope of the subgrade surface(%) 0% 19 Are terraces or baffles provided? No 20 Type of pretreatment: Fore_bay Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes 22 SHWT elevation(fmsl) 193.00 23 Depth to SHWT per soils report(in) 132.00 24 Ground elevation at boring in soils report(fmsl) 204.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A 26 Soil infiltration rate(in/hr) 4 5.00 27 Factor of safety(FS) (2 is recommended): j 2.00 Elevations 29 Bottom elevation(fmsl) ( 200 ft 30 Storage elevation(fmsl) 201.7 ft 31 Bypass elevation(fmsl) 201.7 ft For Basins Only 32 Bottom surface area(ft2) 19800 ft 33 Storage elevation surface area(ft2) 22760.ft For Trenches Only 34 Length(ft) 35 Width(ft) 36 'Perforated pipe diameter,if applicable(inches) _ 37 Number of laterals 38 Total length of perforated piping 39 Stone type,if applicable 40 Stone porosity(%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? I Volumes/Drawdown L 44 Design volume of SCM(cu ft) 36158 cf 45 Time to draw down(hours) 18.9 hrs ADDITIONAL INFORMATION 46 'Please use this space to provide any additional information about the infiltration system(s): Line 26-The soils report found the infiltration rate of the soil for DA 1 to be 10.0"/hr.A =more conservative value of 5.0"/hr was used in the calculations,to account for clogging of the soils that will happen over time. Infiltration 1 4:21 PM 1/17/2024 Bowman North Carolina, Ltd. Lancaster, Hoke County, NC Curve Number Calculation (CN) Pre-Developed Conditions(Wet Pond) Drainage Area(acres): 9.55 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A WaB/NoB Candor Sand 7.03 74% C BaD/BaB Blaney,Gilead,Vaucluse loamy sand 2.52 26% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Stand A 1.66 45 7.8 Wooded -Thin Stand A 1.05 50 5.5 Wooded -Good Stand A 3.67 60 23.0 Wooded -Good Stand C 2.52 70 18.5 Road - Dirt A 0.39 72 2.9 Impervous Area A/C 0.26 98 2.6 Cumulative Curve#= 60.4 Bowman North Carolina, Ltd. Lancaster, Hoke County, NC Curve Number Calculation (CN) Post-Developed Conditions (Wet Pond) Drainage Area(acres): 9.04 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A CaB Candor Sand 5.88 65% C BaB/BaD/GdB/VaD Blaney,Gilead,Vaucluse loamy sand 3.16 35% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Condition A 3.94 55 24.0 Open Space - Good Condition C 2.61 77 22.3 Impervious Area 2.49 98 27.0 Cumulative Curve# = 73.2 TIME OF CONCENTRATION Existing Conditions DA SCS Methodology OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT 1 SEGMENT 1 Manning's Equation: Tc=(0.007(nL)"0.8)/(P2^0.5)(s^0.4) 2-year/24-hr Tc=L/60'V V=1.49R'S'°/n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's Ts, Length Elev2 Elev3 Slope Condition Vavg Ts, Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V Tcp ToTOToL Tc(minimum) Tlag Basin (ft (ft/ft) TP-40(in) "n" (min) (ft) (ft/ft) TR-55 Fig.3-1 (ft/sec) (min) Flow Area(ft"2) (ft) (ft) (ft) (fUft) "n" (fps) (min) (min) (10 min) 0.6*Tc(hrs) 1 100 253.0 251.9 0.011 3.68 0.24 16.90 1163 251.9 193 0.05064 Unpaved 3.60 5.38 22.29 22.29 0.22 1 9/5/20234:57 PM G:\HYDRO\projects\TIMECONC(Lancaeterl.Ne Infiltration Basin Design Site Information Sub Area Location: Drainage To Infiltration Basin #1 Drainage Area (DA) = 9.04 Acres 393,707 sf Impervious Area (IA) = 2.49 Acres 108,449 sf Percent Impervious (I) = 27.5 % Required Water Quality Volume Design Storm = 1 inch Determine Rv Value = 0.05 + .009 (I) = 0.30 in/in Water Quality Volume = 0.224 ac-ft Water Quality Volume = 9,774 cf Water Quality Volume = 0.298 inches of runoff NOAA 1-year, 24-hour event = 3.08 inches Minimum Surface Area SA= (12*FS*DV)/(K*T) Factor of Safety (FS) = 2 Design Volume (DV) = 36,158 cf Hydraulic Conductivity of Soil = 5.00 in/hr Max Dewatering Time = 72 hours SA= 2410.5 sf Drawdown Time T= FS * (DV*12)/(K*SA) Factor of Safety (FS) = 2 Design Volume (DV) = 36,158 cf Hydraulic Conductivity of Soil = 5.00 in/hr Surface Area Provided = 19,800 sf Drawdown Time = 8.8 hours 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 2.112 2 730 12,728 SCM Pre-Developed 2 SCS Runoff 13.62 2 718 27,449 SCM Post-Developed 3 Reservoir 0.000 2 740 0 2 200.51 10,579 Post Through SCM 5 SCS Runoff 0.092 2 360 634 1.0 Post-Developed to SCM 6 Reservoir 0.012 2 362 131 5 200.02 367 1.0inPost Through SCM Infiltration #1.gpw Return Period: 1 Year Monday, 09/ 18/2023 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 2.112 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 12,728 cuft Drainage area = 9.550 ac Curve number = 60.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.30 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 3.00 - 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 13.62 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 27,449 cuft Drainage area = 9.040 ac Curve number = 73.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 14.00 I 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 - — 2.00 ......: 0.00 - % - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 200.51 ft Reservoir name = BMP Pond Max. Storage = 10,579 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 14.00 1 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 10,579 cuft 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 5 1.0 Post-Developed to SCM Hydrograph type = SCS Runoff Peak discharge = 0.092 cfs Storm frequency = 1 yrs Time to peak = 360 min Time interval = 2 min Hyd. volume = 634 cuft Drainage area = 11.260 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to SCM Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 [ 0.08 _ 7// 0.07 [ 0.07 0.06 1 0.06 0.05 0.05 0.04 0.04 0.031 0.03 4 0.02 0.02 0.01 0.01 0.00 - ,- 0.00 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 6 1.0inPost Through SCM Hydrograph type = Reservoir Peak discharge = 0.012 cfs Storm frequency = 1 yrs Time to peak = 362 min Time interval = 2 min Hyd. volume = 131 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to SCIA/lax. Elevation = 200.02 ft Reservoir name = BMP Pond Max. Storage = 367 cuft Storage Indication method used. Exfiltration extracted from Outflow. 1.0inPost Through SCM Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 - 0.05 0.04 — 0.04 0.03 — 0.03 0.02 h 0.02 111 1 II 1 11 1 11 11 1 0.01 1 1 0.01 0.00 — — 0.00 0 120 240 360 480 600 720 840 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 367 cuft 7 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 4.736 2 730 22,183 SCM Pre-Developed 2 SCS Runoff 20.22 2 718 40,448 SCM Post-Developed 3 Reservoir 0.000 2 724 0 2 200.80 16,547 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 200.00 0.000 1.0inPost Through SCM Infiltration #1.gpw Return Period: 2 Year Monday, 09/ 18/2023 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 4.736 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 22,183 cuft Drainage area = 9.550 ac Curve number = 60.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.30 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 ( 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 20.22 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 40,448 cuft Drainage area = 9.040 ac Curve number = 73.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 200.80 ft Reservoir name = BMP Pond Max. Storage = 16,547 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 - 3.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 16,547 cuft 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 5 1.0 Post-Developed to SCM Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 11.260 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to SCM Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 0.10 0.10 0.09 I 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 12 Hydrograp i Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 6 1.0inPost Throug i SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to SCIA/lax. Elevation = 200.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication methoc used. Exfiltration racted from Outflow. 1.0inPost Through SCM Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 0 cuft 13 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 15.12 2 728 56,513 SCM Pre-Developed 2 SCS Runoff 40.47 2 716 81,720 SCM Post-Developed 3 Reservoir 1.315 2 746 2,481 2 201.77 37,824 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 200.00 0.000 1.0inPost Through SCM Infiltration #1.gpw Return Period: 10 Year Monday, 09/ 18/2023 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 15.12 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 56,513 cuft Drainage area = 9.550 ac Curve number = 60.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.30 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 18.00 - 18.00 15.00 1 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 I • 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 40.47 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 81,720 cuft Drainage area = 9.040 ac Curve number = 73.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 50.00 50.00 • 40.00 40.00 30.00 1 30.00 20.00 20.00 10.00 I 10.00 0.00 - • '- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 1.315 cfs Storm frequency = 10 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 2,481 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 201.77 ft Reservoir name = BMP Pond Max. Storage = 37,824 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 111 ��uuullll 0.00 - 0.00 0 120 240 360 480 600 720 840 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 37,824 cuft 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 5 1.0 Post-Developed to SCM Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 11.260 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to SCM Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 0.10 0.10 0.09 I 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 18 Hydrograph Report Hydraflow Hydrographs E xtension for Autodes4®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 6 1.0inPost Throuc h SCM Hydrograph type = Re;ervoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to SCIA/lax. Elevation = 200.00 ft Reservoir name = BM' Pond Max. Storage = 0 cuft Storage Indication method used. Exfiltration exfacted from Outflow. 1.0inPost Through SCM Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 — I 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 0 cuft 19 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 36.22 2 728 127,237 SCM Pre-Developed 2 SCS Runoff 76.68 2 716 156,907 SCM Post-Developed 3 Reservoir 46.12 2 720 52,044 2 202.48 54,752 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 200.00 0.000 1.0inPost Through SCM Infiltration #1.gpw Return Period: 100 Year Monday, 09/ 18/2023 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday, 09/18/2023 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 36.22 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 127,237 cuft Drainage area = 9.550 ac Curve number = 60.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 22.30 min Total precip. = 8.30 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 40.00 40.00 I 30.00 30.00 20.00 20.00 10.00 10.00 0.00 —L ...- i - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 76.68 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 156,907 cuft Drainage area = 9.040 ac Curve number = 73.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.30 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 80.00 I 80.00 • 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 I 10.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 46.12 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 52,044 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 202.48 ft Reservoir name = BMP Pond Max. Storage = 54,752 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0 120 240 360 480 600 720 840 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 54,752 cuft 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 5 1.0 Post-Developed to SCM Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 11.260 ac Curve number = 72.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to SCM Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 0.10 0.10 0.09 I 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 24 Hydrogra h Report Hydraflow Hydrograph Extension for Autodeskt Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 6 1.0inPost Thro gh SCM Hydrograph type = Res arvoir Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 mil Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to SCIA/lax. Elevation = 200.00 ft Reservoir nam ; = BMF' Pond Max. Storage = 0 cuft Storage Indication me hod used. Exfiltration extr.cted from Outflow. 1.0inPost Through SCM Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 - — 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 0 cuft 1 I \ oY \ 1 \ / / / \ \ \ice\ \ \ 1 / / f / / / N� \ \ \ ��\ —\—_� \ \ I �\ -- / / // / (/ // I �\ \ i��\ \ \ \ ( / f / / \� \ I \ \ \ /" \ --(-- \` \ \ —0 \ \ j \ \ \ GRASS SPILLWAY / \ \ \ \ REFER TO DETAIL / — \ /\ \ /1 \ \ , THIS SHEET I \\ \ \ \ \ �� \ ) \\ > I y N\ \ /\ / � \ \ \ I \ 1 \ r / \,_^\ ` ' . (0\\ I I I I LA `� \ \ TOP OF l \ / \ i' \ \ I 7 \ , , ,EMBANKMENT \ 1 II \ \ lk\%/c( 1 I \ p \ ELEV=203.0�,� \\ \, 11 \ 1xo\ I\ \\ v `' I \ / / \ 1 \ �i 1 \ \ I \\ o I \ I iJ ( ) \ STORMWATER 1 � - o ����'(��� ) \ � MANAGEMENT • �>yP \ 1 \ I \ 1 \ \ / 1 EASEMENT \ \ c � �'�I� \ A V \ 1 A c N\ ,\ ' \ (N \ 4 \) -, V AV A \ o \ � I 1 \ \ \ \ I \ / 1 \ \ \ \, 1 / , I � / / \ . !: 1 / \ :�f 1 \I 1 I \ \\ \ \\ \\ O I \ // r / / �\ k\ l� I \I I I\ST�QRM�VATER \TREATMENT \ \ > , 1 \ \\�N \ \ \ \ \\ I' 1 / '\\ / \\ // \ J I` \I o�.\' \ \ \\ bP N\SPACEI I \ 1 I -\ \ \ \ \ \ P, 43 \S F� \ I I 1 I / / RIP RAP \ \ o� \ \ \ 1\ N\ \ \ \ \ \ \ \ I \ 1 6' \ / _/ \ DISSIPATER PAD \\ \\\ \ \ \ \ \ \ l \ \ \ \ \ \ I \\ WIDTH=8' \ \ \ ) \ \ \ \ \ I rn 1 LENGTH=16' \\\ `\\\ \cc' \\ \\ \\ \ \ \ \\ \ \ \ \ \ \\ \\ I \ THICKNESS=24" \\ \ co •\ \ \ \ \ \ \ \ \ \ \ \ 1 RIP RAP CLASS=1 \\ \ c-� \ \ \ \ \ \ l \ \\ \ \ \ \ \ \. \I I / I \ � \ \ \ \ \ ( \ \ \ II ) / I \ \ o, \ \ \ I 1 i ( t \ 1 • 1 \ \ \\ \ ! c' \ \ \ \ \ 1 I 1 \ I 1 / / ^ - ` LOT I \ t\ `�' �o I \ \ \\ \ 1 I \ \ \�� f/ 1 , EMN 1 1 J \\20,2421 SF ly \ 11 \ o \ 1 \\ I \ \ I 1 I '� �1\\ \ / \\I \ �' I \. I \ 1 !.'�II I \\ \r, / 00 �� 1 / \ \ III \\\ / `\/ \ \\�\ \ \ + / \)\ ,, \ \`\ 1 II 11 I I / \\�\ 1 \ / ! \ \ 1 1 / / \ \ I \ / i 1 \\ I ( 1 I \� \ \ \ \ \ \ \ \\1 \�, / i I / -----____- --"\-- I (\ \1 \\ \\ \\ \\\\\\ \\\ \�\ \\ '( \\ I I ,I-- / / \ I l \ \\ \\ \\\ \ \\ \\ \ \ I 1 ( / I I I \ \\ \ \ \ \ \ \ \ l\\ (\\ J � � I 1 i I I ( \ I \ \ \ \ \\ \ \ � \ ) \. 1, \,-7 ��� \ ,1 J l \ l \2 > \ \ N \ \ \ \ GRAPHIC SCALE 50 0 25 50 100 200 l!Im PLAN VIEW ( IN FEET ) 1 inch = 50 ft. 1 STORMWATER MANAGEMENT SYSTEM DETAILS LLA NOT TO SCALE RIP-RAP PRE-TREATMENT FOREBAY AT PIPE INLETS SEE DETAIL THIS SHEET TOP OF EMBANKMENT=203.0 fr>NANNN, ` GRASS Sao �� IW-YEAR STORM ELEVATION=202.48 M - ��� %>>>%/ 10-YEAR STORM ELEVATION=201.77 SPILLWAY ELEVATION=201.7 /////�// A112FILTER FABRIC AT BOTTOM AND SIDES aF CLEAN SAND 2-YEAR STORM ELEVATION=200.80 /' ////�/'lIMgj, Y 4 �/� /�//�/%/%/%/%/*I ." 1'-0•CLEAN SAND �0��"�� I-YEAR STORM ELEVATION=200.51 '/' %//�//%% ZX T\N Wi\/\/ �A' 1.0•RAINFALL ELEVATION=200A2 �//j /�\��\. M , \�\�///�;���� //p EXISTING GRADE=204.0 BOTTOM OF BASIN=200.0 a \�j -M M .� �//�� ��/��/��/��/��/\\�\ • FILTER MIXTURE R co „//� • / 1'-0"OF CLEAN ASTM C-33 z,/ii i �� SAND(MEDIUM AGGREGATE SAND 1 '��'�'������ WITH A SIZE RANGE OF 0.02-INCH cdi TO 0.04-INCH DIAMETER) T �I=I I I_I _ 23 LAYER OF GEOTEXTILE PERMEABLE FILTER FABRIC(MIRAFI N-SERIES FILTER FABRIC OR EQUIVALENT) 1'-0"MIN.UNDISTURBED IN-SITU g- SOIL 2 • SEASONAL HIGH WATER TABLE=193.0 j>'11ta ,f e+t d.y,, INFILTRATION BASIN TYPICAL SECTION NTS 215 215 CI#11 210 _ EXISTING GRADE 21 0 FUTURE GRADE TOP OF EMBANKMENT ELEV=203.0 \ GRASS SPILLWAY ELEV=201.7 205 - \\ REF SHE ET THIS 205 \ 62'-24" CLASS-III RCP ® 9.18% 200 200 BOTTOM OF INFILTRATION BASIN = 200.0 -0+50 0+00 1+00 2+00 I \FILTATIO\ 3ASI \ OFILE VIEW HOIZO\ TAL SCALE: 1 "= 30' VERTICAL SCALE: 1 "= 3' C) W N O O 0 0 o o r`1 w r co Z rrn C/7 (➢j-1 `L I- I-- co z D D W N o 0 0 CD o o o o Z m VD 0 �— v m K� � -„, '^ P1 I 0 = O f— ➢ CO N 0 0 ND N.) N.) N O Z o * cn CA NDO -0 G7 P1 U) Ut W � NJ vl p N m N CD O CD ➢ D rn z m G ) o➢ I n m rn .C)ao W O r— c r) W m O cn 7➢ CA ^ Z z N ' A C•7 NJ -, N 2) 23 D z � rn Cn p ➢ m T O N ID a) 0 C) M W m o w Co rn Fri z r o X _ O O c=) m p Z CA = r r TI O _ co r -D Z O ✓z ➢ n_1 O CD -A w M 0 r -<o O iv o m o co rn cn OD O CO cD 00 O D m v 73 co D C/) CO NN W O �-- N -- � —1C') 0 —1 O c!) o -0 -0 = cc) C/) 212) �^ D C,) (/') 00 CP I I p C 7D O TI _H 70 O 770 C 71 < (n V, z Cn I m -< ' p-i C 3> D P1 D ZC O C'J 71 71 m 2: z m 3> c/) rT1 z r- Cr) — Z P 1 D D ) r r 37D cD O� ZC C 000 � � ZW 73 r cn U) 77 cnc) ai c) = 71 mmmmN nz " cDi z = c/) � CC CD CD Fri O DCcnZ O 0 X O O Z7 .Z7 m n Fri Z cn O m Z O cn X .. �m rrn * _ � m � � m Z � � mzND = C N .. ➢ D 0 or x * Z rT1 < r<T1mZ D � � C < m m z S fZ 71 Z -1 -H < ff� ➢ rT1 MI D I-O \ Z � � z OZ1 � � � (/) CD C 7 r O Z D O -0 CA C71 OD C7 CO C D > J z m Oz O C C 0 m D� O G7 D2) 0 NO -< P1 1Ji NJ � 2] m m Z 73 7D - Z O) 1 '� m oN c� —s � iN ivrncfl -H70 00 m co co —I 61 � J � NO � O .ZI 0 = I pm O N N Cn N W CD m Z c0 r- o q mO () C) () C (-) Z CA�Z l ml Z 0 < J cn cn Cn NJ cn V) ND m m I- Cl)C o O < O v -II CA C m n n O CD CI Z- O z Z I-- CO v4, N -" 0 CD -A CO -H1 Z z rr1 O) OO CA oC CDCC TI ➢ ic - co N N Co < N _ r z O I II z N N N N N C < D m 0 N P1 �I o M 0 N O N COrn O I— 0 CCOO J N 4, Z DD D D D C/) ND -< - -` 000 -H (') n (') CD 0 6' c; 000 = C mmMm -< v I- NCnCCC 0 -1 U) UU) U) rr1 < n n C-) C-) C-) C-) o y NNP = P = < m m M O C \ o J STORM DRAINAGE PIPE OR CONCRETE FLUME OUTFALL INTO POND LENGTH Sc WIDTH DIMENSIR TOBE PER RIP—RAP P .�__ =r . APRON DETAIL TAPER DEPTH oo FILTER BED ED ELEVATION BIO—RETENTION N POND II 111 11 iIII=ll 1-=I I .r P ° ° 1-III III III III III II III—III-1S- FOREBAY 1 'gogo°o°o °o°o_ r.. \'II I1=of 4-=111= 2 1=1IMI11=111 , _00 • I I I 1 I I I- _1 \ ��1�-- 1- —11I=11 fI11-1 I' •�—I H 11EI 11=1111 MII 111—I— —I11-111=1I I I1=1 -111= III-rnElIIIET n-T-n n=11=1E= —111-11 M 11E111-11 El I 1-111E11 M1 11-11 1=III IC I=I= Il III 1i1 0000 6" CLASS B o0 RIP—RAP OVER RIP-RAP FOREBAY FILTER FABRIC SCALE: N.T.S. FILTER MEDIA (SEE NOTE 2) SILT FENCE AS NEEDED 'UMP FLOW G cC NOTES: ATER LEVEL 1. PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS OF FILTER MEDIA SHALL BE REVIEWED TO ENSURE THAT DISCHARGE FROM FILTER MEDIA SHALL MEET OR EXCEED THE PROVISIONS OF THE CLEAN WATER ACT. 2. ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER MEDIA PRESSURE RATING. 3. FILTER MEDIA MAY BE, BUT NOT LIMITED TO, SAND MEDIA FILTRATION DEVICES, RATED FILTER FABRIC 1 BAGS OR POLYMER BASED DEWATERING PRACTICES. _ 4. PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM OF POND. �' I_ 1111= BMP POND DEWATERING LOW POINT 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,09/18/2023 Hyd. No. 3 Peak Flow Period Post Through SCM 13.70-11.90 = 1.80 - 2 hours Hydrograph type = Reservoir Peak discharge = 46.12 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 52,044 cuft Inflow hyd. No. = 2 - SCM Post-Develoftelservoir name = BMP Pond Max. Elevation = 202.48 ft Max. Storage = 54,752 cuft Storage Indication method used. Exfiltration extracted from Outflow. Hydrograph Discharge Table (Printed values>=1.00%of Qp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.90 66.44 201.85 3.988 2.667 3.988 11.93 76.68 << 202.14 19.70 2.728 19.70 11.97 75.18 202.37 36.30 2.776 36.30 12.00 59.59 202.48 << 46.12 2.801 46.12 12.03 37.73 202.48 46.03 2.800 46.03 12.07 20.87 202.40 39.14 2.783 39.14 12.10 13.00 202.30 30.84 2.761 30.84 12.13 10.71 202.21 24.10 2.742 24.10 12.17 10.27 202.14 19.41 2.727 19.41 12.20 9.854 202.09 16.06 2.716 16.06 12.23 9.434 202.05 13.73 2.708 13.73 12.27 9.011 202.02 11.89 2.701 11.89 12.30 8.583 201.99 10.44 2.696 10.44 12.33 8.153 201.97 9.279 2.691 9.279 12.37 7.721 201.95 8.343 2.687 8.343 12.40 7.287 201.93 7.541 2.684 7.541 12.43 6.850 201.92 6.848 2.681 6.848 12.47 6.409 201.91 6.223 2.678 6.223 12.50 5.968 201.89 5.665 2.675 5.665 12.53 5.561 201.88 5.134 2.673 5.134 Continues on next page... 11 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.57 5.256 201.87 4.673 2.670 4.673 12.60 5.066 201.86 4.256 2.668 4.256 12.63 4.944 201.85 3.889 2.666 3.889 12.67 4.846 201.84 3.598 2.665 3.598 12.70 4.748 201.84 3.343 2.663 3.342 12.73 4.649 201.83 3.114 2.662 3.115 12.77 4.550 201.82 2.909 2.661 2.909 12.80 4.450 201.82 2.728 2.659 2.728 12.83 4.350 201.81 2.574 2.658 2.574 12.87 4.250 201.81 2.429 2.657 2.429 12.90 4.150 201.81 2.292 2.657 2.292 12.93 4.049 201.80 2.160 2.656 2.160 12.97 3.948 201.80 2.033 2.655 2.033 13.00 3.847 201.79 1.910 2.654 1.910 13.03 3.751 201.79 1.792 2.653 1.792 13.07 3.668 201.79 1.694 2.653 1.694 13.10 3.602 201.78 1.600 2.652 1.600 13.13 3.545 201.78 1.510 2.651 1.510 13.17 3.491 201.78 1.425 2.650 1.425 13.20 3.437 201.77 1.343 2.650 1.343 13.23 3.383 201.77 1.266 2.649 1.266 13.27 3.328 201.77 1.192 2.649 1.192 13.30 3.274 201.77 1.120 2.648 1.120 13.33 3.219 201.76 1.051 2.648 1.051 13.37 3.165 201.76 0.984 2.647 0.984 13.40 3.110 201.76 0.931 2.646 0.931 13.43 3.056 201.76 0.880 2.646 0.880 13.47 3.001 201.75 0.828 2.645 0.828 Continues on next page... 12 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.50 2.946 201.75 0.776 2.645 0.776 13.53 2.892 201.75 0.724 2.644 0.724 13.57 2.844 201.75 0.672 2.644 0.672 13.60 2.800 201.74 0.620 2.643 0.620 13.63 2.760 201.74 0.570 2.643 0.570 13.67 2.721 201.74 0.521 2.642 0.521 13.70 2.682 201.74 0.473 2.642 0.473 ...End 9/18/23,9:05 AM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SPILLWAY ANALYSIS >>>Grass Spillway Name Grass Spillway Discharge 46.12 Peak Flow Period 2 Channel Slope 0.33 Channel Bottom Width 20 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sand(SP) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 46.12 cfs 11.35 ft/s 0.2 ft 0.025 8.5 lbs/ft2 4.12 lbs/ft2 2.06 STABLE F P300 Unvegetated Underlying Straight 46.12 cfs 11.35 ft/s 0.2 ft 0.025 5.25 lbs/ft2 4.05 lbs/ft2 1.3 STABLE F Substrate Shoremax w/ Straight 46.12 cfs 11.07 ft/s 0.21 ft 0.027 14 lbs/ft2 4.23 lbs/ft2 3.31 STABLE F P300 Reinforced Vegetation Underlying Straight 46.12 cfs 11.07 ft/s 0.21 ft 0.027 8.5 lbs/ft2 4.15 lbs/ft2 2.05 STABLE F Substrate https://ecmds.com/project/157518/spillway-analysis/251955/show 1/1 Project Name Riprap Dissipator#1 Date Lancaster Sep,2023 DD Project No. Location D&L Engineering, PLLC DL2202 Hoke County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By JLH STORM DESIGN: 25 Year BACKGROUND: Use the E&S Control Planning& Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 18 in. Pipe diameter in inches D-o= 1.50 ft. Pipe diameter in feet Q-25= 9.09 cfs Pipe outlet(from drainage calculations) d-50= 0.3 ft. from Figure 8.06 a L-a= 10 ft. from Figure 8.06 a Step 3. 3*D-o= 4.50 ft. 3 times the outlet pipe diameter W = 11.50 ft. Pipe diameter+Apron length Step 4. d-max 0.45 ft. Maximum Stone Diameter(1.5*d-50)in inches d-max 5 in. Maximum Stone Diameter(1.5*d-50)in feet Step 5. Thickness= 0.68 ft. Min.Apron Thickness With Filter Fabric(1.5*d-max)in feet Thickness= 8 in. Min.Apron Thickness With Filter Fabric(1.5*d-max)in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 10 12 5 18in. B TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o= Pipe Diameter, (in. &ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o= Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. &in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.)