Loading...
HomeMy WebLinkAboutSW3240101_Supplement-EZ Form_20240419 SUPPLEMENT-EZ COVER PAGE FORMS LOADED 'PROJECT INFORMATION 1 Project Name Huntley Brothers Home Office 2 Project Area(ac) 16.896 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0.003 5 Is this project High or Low Density? _ High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30'wide buffer for intermittent and perennial streams 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System _ 0 12 Bioretention Cell 0 13 Wet Pond _ 1 14 Stormwater Wetland 0 15 Permeable Pavement _ 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED (DESIGNER CERTIFICATION 27 Name and Title: James G.Eaves III,PE 28 Organization: CESI 29 Street address: 45 Spring St SW 30 City,State,Zip: Concord,NC 28025 31 Phone number(s): 704-791-3160 32 Email: javeaves@cesicgs.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer 001111III11////// \\\\,RL\ \ C A R 0 ill !ilLk SEAS _ Signature igner 7837 �9 1-10-2024 /'% S' c. Ep,�\����. //// 1\\\ Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas No 5 Is all/part of this project subject to previous rule versions? No DRAINAGE AREA INFORMATION 1 (Wet Pond) 4 Type of SCM Wet Pond 5 Total drainage area (sq ft) 324,522 6 Onsite drainage area (sq ft) 324,522 7 Offsite drainage area (sq ft) 0 8 Total BUA in project(sq ft) 215,109 9 New BUA on subdivided lots (subject to permitting) (sq ft) 0 10 New BUA not on subdivided lots (subject to permitting) (sf) 215,109 11 Offsite BUA(sq ft) N/A 12 Breakdown of new BUA not on subdivided lots: 215,109 - Parking (sq ft) 15,022 - Sidewalk (sq ft) 4,811 - Roof(sq ft) 10,707 I - Roadway(sq ft) 5,785 I - Future (sq ft) 0 - Other, please specify in the comment box below (sq ft) 178,785 (Gravel) New infiltrating permeable pavement on subdivided lots 13 (sq ft) N/A New infiltrating permeable pavement not on subdivided 14 lots (sq ft) NA Existing BUA that will remain (not subject to permitting) (sq 15 ft) NA 16 Existing BUA that is already permitted (sq ft) NA 17 Existing BUA that will be removed (sq ft) NA 18 Percent BUA 66.28% 19 Design storm (inches) 2 20 Design volume of SCM (cu ft) 34,590 Discrete NRCS Curve Number 21 Calculation method for design volume Method for Runoff Depth ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): WET POND 1 Drainage area number l 1 2 Minimum required treatment volume(cu ft) I 34,590 GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the No design volume? 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? _ Yes 20 Elevation of the excavated main pool depth(bottom of sediment 673.50 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 674.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 679.00 23 Elevation of the permanent pool(fmsl) 679.50 24 Elevation of the top of the vegetated shelf(fmsl) 680.00 25 Elevation of the temporary pool(fmsl) 680.00 26 Surface area of the main permanent pool(square feet) 11844 27 Volume of the main permanent pool(cubic feet) 29495 cf 28 Average depth of the main pool(feet) 5.00 ft 29 Average depth equation used Equation 2 30 If using equation 3,main pool perimeter(feet) 31 If using equation 3,width of submerged veg.shelf(feet) 32 Volume of the forebay(cubic feet) 3853 cf 33 Is this 15-20%of the volume in the main pool? Yes 34 Clean-out depth for forebay(inches) 5 in 35 Design volume of SCM(cu ft) 34,590 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 24 in 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 2.36 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes _ 43 Depth of forebay at entrance(inches) 48 in 44 Depth of forebay at exit(inches) 48 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) 6:1 _ 48 Does the orifice drawdown from below the top surface of the Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes yr,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Bermudagrass 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Vvet rums 3 8:48 AM 1/10/2024