Loading...
HomeMy WebLinkAboutNCS000597_NOV Response_20240417 01 April 17, 2024 Mr. Jerry W. Eplin, PE Acting Regional Engineer NC Department of Environmental Quality Division of Energy, Mineral, and Land Resources 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Subject: Galvan Industries, Inc. NPDES Stormwater Permit NCS000597 Partial Response to Notice of Violation (dated March 28, 2024) Dear Mr. Eplin: On behalf of Galvan Industries, Inc. (Galvan), HDR Engineering, Inc. of the Carolinas is providing the following response to the North Carolina Department of Environmental Quality (NCDEQ) Notice of Violation (NOV) issued on March 28, 2024 and received on March 29, 2024. Galvan holds a National Pollutant Discharge and Elimination System (NPDES) Individual Stormwater Permit (NCS000597) issued by the NCDEQ Division of Energy, Mineral, and Land Resources (DEMLR) in May 2022. Mr. Mathew Gigante, Environmental Specialist II from the Mooresville Regional Office, conducted a site inspection on March 20, 2024. After the site inspection, DEMLR summarized findings of the site inspection in a NOV issued on March 28, 2024. Please see the following responses to the items identified in NOV-2023-PC-0525, which we have been able to complete to date. Two permit condition violations were noted in the NOV: 1) Stormwater Pollution Prevention Plan (SPPP): The Galvan Stormwater Pollution Prevention Plan (SPPP) has not been fully updated for the current individual permit the facility holds. 2) Tier 111 Action Plan Galvan Industries' zinc management plan was sent in reply to the requirement in the NOV to submit a Tier 111 action plan for copper and zinc benchmark exceedances. The difference between the two types of documents was discussed during the meeting.A tier 111 action plan for copper and zinc is still required to be completed and sent to the DEQ Mooresville Regional Office. hdrinc.com 440 S Church Street,Suite 1200, Charlotte, NC 28202-2075 704.338.6700 J. Eplin April 17, 2024 Page 2 As noted during the March 20, 2024, inspection, Galvan Industries has maintained a SWPPP since 2008. After discussions and clarification by Mr. Gigante, Galvan understands the need to update the document to comply with the individual permit. Based on required components of the SWPPP and the Tier III Action Plan, Galvan is requesting a 30-day extension for completion, with submittal to NCDEQ by May 28, 2024. Should you have questions or require additional information following your review of the enclosed materials, please contact the undersigned at (704) 338-6787 or mark.fi lard i(@,hd ri nc.com. Regards, HDR Engineering, Inc. of the Carolinas Alex Lefitz Mark Filardi Senior Geologist Senior Geologist Southeast Remediation Lead CC: Laurens Willard, Galvan Laurens Y. Willard, Galvan Harshad Londhe, Galvan