HomeMy WebLinkAboutNCC240909_Site Plan or Location Map_20240402 PROJECT NARRATIVE
THE PROPOSED CRAGGY-VANDERBILT 115KV-REPLACE SWITCH 14 WITH REMOTE SWITCH IS �g� ommui �� .��,
LOCATED IN BUNCOMBE COUNTY,NORTH CAROLINA.THE PROJECT INCLUDES THE REPLACEMENT N.
OF AN EXISTING SWITCH WITH A REMOTE SWITCH ALONG THE CRAGGY-VANDERBILT 115KV TAP wooLINE.THE PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT OF WAY. I
THE PRIOR USE IS THE SITE IS TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT DUKE �� ���� •*�� Y
CHANGE THE EXISTING LAND USE.PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION
CONTRACTCONSTRUCTIONOR WILL INSTALL LIMITS.PREDEVOSION CONTROL ELOPMENT CONDITIONS WILL BE RESRES TO TORED AND THE APASS THE RPATED EA WILL �_� �.� �� � �-
BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION.AN AVOIDANCE AND MINIMIZATION OF4 '
DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION rah
to
>•�� s�CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY � lipopf
ACCESS ROUTES,WHENEVER POSSIBLE.EROSION CONTROL MEASURES ARE INDICATED HEREIN 4 �����-
FOR PERMITTING USE ONLY BY NCDEQ.THE INITIAL PROJECT DURATION IS ANTICIPATED TO START
ENERGYIN MARCH 2O24. O � � * � LOCATION
DROGRESS * IIII"� '
ir#11111k4lOpilb
CRAGGY-VANDERBILT 115KV - REPLACE
SWITCH 14 WITH REMOTE SWITCH NORTH do SOUTH CAROLINA STATE MAP
EROSION & SEDIMENT CONTROL & ACCESS PLAN
BUNCOMBE COUNTY, NORTH CAROLINA
GENERAL NOTES LATITUDE: 35.633793° SHEET LIST:
1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED BY DUKE ENERGY AND ARE FOR REFERENCE ONLY. LONGITUDE: -SZ.59 Z63° COVER SHEET SHT 1 OF 8
THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. OVERALL PROJECT LAYOUT SHT 2 OF 8
2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES. AERIAL PHOTOGRAPHY EROSION CONTROL MEASURE QUANTITIES SHT 3 OF 8
WAS OBTAINED FROM STATE AGENCIES. EROSION&SEDIMENT CONTROL PLAN SHT 4 OF 8
3. THE LOCATION OF JURISDICTIONAL FEATURES ARE FROM THE NATURAL AND CULTURAL RESOURCES REPORT _ ,i _ EROSION&SEDIMENT CONTROL DETAILS 1 SHT 5 OF 8
TITLED UPDATED-CRAGGY VANDERBILT ENVIRONMENTAL SURVEY MEMORANDUM,DATED OCTOBER 2023. - EROSION&SEDIMENT CONTROL DETAILS 2 SHT 6 OF 8
NCGO1 DETAIL 1 SHT 7 OF 8
4. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S �r,awnsPe`o� o` c W, „�r "0,„o NCGO1 DETAIL 2 SHT 8 OF 8
RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL,EXISTING UTILITIES PRIOR TOS'
net""
THE START OF CONSTRUCTION.THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION. F°` ay �.
CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY a - -
UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO REPAIR DAMAGED UTILITIES z v '_
SHALL BE BORNE BY THE CONTRACTOR. _ x btwr,",
5. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL a 6
NOT DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE ENERGY. PROJECT AREA ;�s. 0 `
6. PROJECT IS LOCATED IN THE FRENCH BROAD RIVER BASIN.THERE ARE NO STATE-REGULATED BUFFER Eu - II
REQUIREMENTS WITHIN THE BUFFER AREA. "'°°""'" ;a''"r, v Y
7. SEE SHEET 5 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. emorns"ry NF"-Ro m 'eF'�"`
8. THE ACCESS PLAN DEPICTS BRIDGES ASSOCIATED WITH ACCESS OVER STREAMS,DITCHES AND DRAINAGE '3""' Q'
CHANNELS.ACCESS TO EACH STRUCTURE IS THE RESPONSIBILITY OF THE CONTRACTOR. • _ ""^crKa e
9. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DEP SITING,PERMITTING t%, �_ Elk Mountain 0 �251
AND ENGAGEMENT(SPE)PRIOR TO USE. u~ m^ r,
10. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU OF ROCK -
CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY DEP REPRESENTATIVE. a-c m a�� .e Elhd,nr
E. a
11. ACCESS LOCATIONS WITHIN THE TRANSMISSION LINE RIGHT-OF-WAY ARE APPROXIMATE. ACTUAL LOCATION - n " - W
MAY VARY BASED ON THE FEASIBILITY AND WEATHER CONDITIONS. WHEN MATS ARE REQUIRED,2 ROWS OF 4, _ coma°e s
MATS MAY BE INSTALLED IN PARALLEL TO COVER THE 28-FT WIDE ACCESS ROAD WITHIN THE TRANSMISSION -
LINE RIGHT-OF-WAY. ACCESS OUTSIDE OF THE TRANSMISSION LINE ROW IS LIMITED TO 14 FT UNLESS — - Fi_ e,r uw
OTHERWISE PERMITTED AND APPROVED BY DEP SPE AND NCDEQ. '�iG MOuor,",^Ra s
12. WETLAND MATTING SHALL BE COMPOSITE AND/OR HEAVY DUTY TIMBER/"CRANE"MATS. NO LATTICE OR _ I.
TWO-PLY MATTING SHALL BE USED IN JURISDICTIONAL WETLANDS AND/OR STREAMS. . - ' ,e n '.' ml m{13. NO FILL IN WETLANDS MAY OCCUR.ALL EXCESS SOILS FROM STRUCTURE INSTALLATIONS IN WETLAND AREAS g �`" + U
SHALL BE DISPOSED OF IN PERMITTED UPLAND AREAS AND STABILIZED. NO SLURRY MAY BE DISPOSED OF 3Y - y:i SPILL REPORTING HOTLINE H
WITHIN THE RIGHT-OF-WAY. SLURRY MUST BE DISPOSED OF IN A PERMITTED LANDFILL. _ _ N -'�� o IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS ,^ CO
14. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 50 FEET OF WETLANDS OR SURFACE _ 4 w
WATER WITHOUT CONTAINMENT. _ _ � REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER W
�`� REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR _ '-
15. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. �'-'�" >r7 SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS O
16. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE DRIVES NOT 1' DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF W
INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. \\ THE DUKE ENERGY SPILL REPORTING HOTLINES AT: CC
17. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND COVER `\0`� CAROLINAS&MIDWEST:800.527.3853 2
SHALL BE USED FOR STABILIZATION. .'N` FLORIDA:866.769.1266
i,.... �,d'E
• p \ CONTACTS
,-3' 1 A
OWNER: ENGINEER: I
DUKE ENERGY PROGRESS,LLC DEWBERRY ENGINEERS INC. H
MIGRATORY BIRD HOTLINE ,_ _ \ '. TUCKER PRIDGEN DAVID ROSS,PE
`, rtknroroHo; \ 1 411 FAYETTEVILLE STREET 2610 WYCLIFF ROAD SUITE 410 CO
STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY . W
RALEIGH,NC 27601 RALEIGH,NC 27607
SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, U
PHSUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO VICINITY MAP TU (R.P252) IDGE 11 DRPH SS DEWBE232-678
BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND Lil
TUCKER.PRIDGEN@DUKE-ENERGY.COM DROSS@DEWBERRY.COM
CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. SCALE:1:1,200 ce
CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 Y
Lc)
I—
J_
m
w
CONTRACTOR SHALL NOTIFY"NORTH CAROLINA ONE CALL"(811)OR
(1-800-632-4949)AT LEAST 48 HOURS PRIOR TO BEGINNING z
CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. >
CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDED ,t,A myio }
��P ,..... <i,'. C7
THEIR OWN LOCATOR SERVICES INDEPENDENT OR"NORTH CAROLINA o poFeaai;•.ti; o 0
ONE CALL".REPORT ANY DISCREPANCIES TO THE ENGINEER S " /'" I f DUKE T E CRAGGY-VANDERBILT 115KV-REPLACE z Q
r` Dewberr
IMMEDIATELY. �� ® 0
y-i4• / SWITCH 14 WITH REMOTE SWITCH U
e/�11
•-o ..Qnrt.••a;
:0Ri� 7V,OA,QoOS Dewberry Engineers Inc. t, ENERGY®
rr^ 2610 WYCLIFF ROAD
C 170217A01 01/26/2024 100%FOR PERMITTING DM JFA DAR SUITE 410 PROGRESS COVER SHEET
100% FOR PERMITTING RALEIGH, NC 27607
B 170217A01 11/27/2023 90%DESIGN TO DEP DM JFA DAR PHONE: 919.881.9939
A 170217A01 11/01/2023 60%DESIGN TO DEP DM JFA DAR FAX: 919.881.9923 411 FAYETTEVILLE STREET
DO NOT USE FOR CONSTRUCTION NCBELS#F-0929 RALEIGH N.G.27601 sizE MAW. SHEET
REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED Dewberry Project No.50163195 www.dewberry.coru TELEPHONE NO.(919)546-2090 D 170217A01 1 OF 8