Loading...
HomeMy WebLinkAboutSW8201006_Historical File_20210304 NORRIS & TUNSTALL CONSULTING ENGINEERS P.C. 2602 Iron Gate Drive,Suite 102 1429 Ash-Little River Road Wilmington,NC 28412 Ash,NC 28420 (910) 343-9653 (910) 287-5900 (910) 343-9604 Fax (910)287-5902 Fax John S.Tunstall,P.E. J.Phillip Norris,P.E. T.Jason Clark,P.E. Joseph K.Bland,P.E. Thomas J. Scheetz,E.I. January 25, 2021 NMr. C S StevenQ G. Pusey, Environmental Engineer II ECEIVE ll Division of Energy, Mineral and Land Resources— State Stormwater Program JAN 2 7 2021 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: State Stormwater Project No. SW8 201006 Wilmington Trade Center 4104 US Hwy. 421 North New Hanover County, NC N&T Project No. 19131 Dear Mr. Pusey: Pursuant to your comments of January 12, 2021, we offer the following responses. 1. 15A NCAC 02H.1042(2): Please email the supplement form to the email address provided below so that it can be preserved electronically per the regulatory requirements. Response. We will e-mail you the Supplement Form. 2. 15A NCAC 02H.1042(2)(g)(iii): A. If there are no surface waters located on this site, please provide confirmation from the Division of Water Resources and include a note on the plans that none exist. Response: The Site Data Table already states, "No Wetlands Exist on the Site". We have added to the note, "There are no surface waters, wetlands, regulatory flood zones, protected vegetated setbacks, or protected riparian buffers within the project boundary". B. Row 7 of the supplement-EZ cover page indicates that the width of the vegetated setback is not applicable. Please provide a note on the plans indicating that there are no surface waters within 50 feet of the project boundary. If a note is already provided on the plans, please provide a citation of where it is located. Mr. Steven G. Pusey/NC DEQ Stormwater Dept. January 25, 2021 Page 2 Response: The Site Data Table already states, "No Wetlands Exist on the Site". We have added to the note, "There are no surface waters, wetlands, regulatory flood zones, protected vegetated setbacks, or protected riparian buffers within the project boundary". 3. 15A NCAC 02H.1050(1) and .1003(3)(b): The design volume of SCMs shall take into account the runoff at build out from all surfaces draining to the system. Drainage from off-site areas may be bypassed. If offsite drainage from property not owned by the applicant or not part of the development project cannot be bypassed, the offsite area must be considered at its built-out potential or there must be recorded deed restrictions for BUA between the parties to treat that amount of BUA in the proposed system must be provided. The permit application lists a small amount of drainage area as offsite. . describe where this is located and its impact on the stormwater system. Response: Please see the revised Drainage Area Map and the Drainage Area Table showing DA1 and DA2 contains some off-site drainage area 6 n d 4' adjacent to the existing road to the Northwest That is the only off- site DA to account for in SCM. The other drainage areas shownwith offsite area are for culvert designs in the right-of-way, and do not go to the SCM's. 4. 15A NCAC 02H.1050(5): SCMs shall include an overflow or bypass device for inflow volumes in excess of the treatment volume, or, if applicable, the peak attenuation volume. A. For the infiltration trench system, the supplement indicates that an overflow or bypass device has been provided. The plans have a note saying that it is located at the curb inlets and I found a detail showing that. However, I do not see a detail showing the SDMH, which is at the center of the trench. If it overflows, will it lift the manhole cover? Response: CI-F12, CI-F18 and CI-F23 have emergency overflows towards the NC DOT right-of-way. The elevation of the overflow is 17.0 feet in each. The storm drain manholes are not overflow devices. They collect storm drainage and distribute to the Infiltration Trench. They also function as observation ports. There are many other curb inlets with top elevation at or near 17.0 feet. In extreme conditions water would back up and out of the top of the other curb inlets. B. For the infiltration basin system, there appears to be two (2) emergency overflow weirs on Basin 1 but none on Basin 2. I would recommend also putting an emergency overflow weir on Basin 2 in case the interconnecting pipe gets clogged. NCBELS License C-3641 Mr. Steven G. Pusey/NC DEQ Stormwater Dept. January 25, 2021 Page 3 Response: The emergency spillways have to provide positive flow. They are placed where positive flow from the basin can occur. If we could move the second overflow to the area of Basin 2 we would. The basins function as one with a large equalization pipe. This design provides the required overflow. 5. 15A NCAC 02H.1051(4): Pretreatment devices shall be provided to prevent clogging. Pretreatment devices may include. measures such as sumps in catch basins, gravel verges, screens on roof and patio drains, filters, filter strips, grassed swales, and forebays. Rooftop runoff that is discharged to the surface of an infiltration system shall not require pretreatment. Please advise what type of pretreatment device is provided for the infiltration basin and the infiltration trench systems. The catch basin detail does not show a sediment basin, however the drop inlet detail does (where are these)? As mentioned before, I do not see a detail for the SDMH. Response: It is noted on the Grading Plans that basin bottom elevations are to be one (1) foot below the invert out at each curb inlet on the Grading Plan. Please see details, typical details. They are all catch basins with differing tops, making them either drop inlets or curb inlets depending on if they are located in curb and gutter sections. I believe all on this plan happen to be Curb Inlets, however we still provide both details. There is a SDMH Detail. There is one (1) foot of depth below the inverts for sediment storage. This meets the requirement of the State. 6. 15A NCAC 02H.1051(6): For infiltration devices located under the ground surface, a minimum of one inspection port shall be provided. For the infiltration trench, please show the observation port(s) on the plans. Response: There are 9 SDMH's on the run of the Infiltration Trench. The SDMH's serve as observation ports that will also allow for maintenance of the Trench. Enclosed for your continued review and approval are two (2) sets of revised plans, one (1) set of revised calculations, the revised Pg. 3 of the Stormwater Permit application, and the revised pages of the Supplement EZ form (Drainage Areas & Infiltration System). Please note only revised calculations for the Infiltration Basin are enclosed. The Infiltration Trench calculations remain unchanged from previous submittal. We will also e-mail you the revised Supplement Form for your electronic files. Please let us know if you have any further questions or comments. NCBELS License C-3641 Mr. Steven G. Pusey/NC DEQ Stormwater Dept. January 25, 2021 Page 4 Sincerely, NORRIS & TUNS T ALL CONSULTING ENGINEERS, P.C. atIOL\ a �----� T. Jason i lark, P. E. TJC/jst/asn 19131 01-25-21-s-sw-response-Itr Enclosures NCBELS License C-3641 IIE E 'E '; J N c i 2,'1'. '. BY:, �. . ._<...T. < is> 0 Predeveloped Runoff 1140 Busi ess PArk Infiltration Basin 1 Ph se 5 A <2S> Infiltration Basin 1 Predeveloped Runoff to Property East of Site S I�W1 �('� I within Infiltration Basin g'406'' C 10-6" 1 (Sec 5GS gybogeolo9)c, 0i/0tl -t-ton/7o Allow for Rec1LtCeg& o/1) c2 ) QiiliQes = licFs M 5.° -p7S.3GcFs GSo= I456 1 Lj <Subca) Reach 'on• Llnk Drainage Diagram for 19131 Phase 51 i40 Basin jan 2021 �� Prepared by Norris&Tunstall Consulting Engineers 1/25/21 HydroCAD®7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 19131 Phase 51140 Basin jan 2021 Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 2 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff Area=22.790 ac Runoff Depth=0.00" Tc=10.0 min CN=36 Runoff=0.00 cfs 0.000 af Subcatchment 2S: Predeveloped Runoff to Property East of Runoff Area=3.810 ac Runoff Depth=0.00" Tc=10.0 min CN=36 Runoff=0.00 cfs 0.000 af Subcatchment 3S: 1140 Business PArk Phase 5 Runoff Area=22.790 ac Runoff Depth>0.58" Tc=10.0 min CN=89 Runoff=14.33 cfs 1.103 of Pond 3P: Infiltration Basin 1 Peak Elev=10.60' Storage=2,867 cf Inflow=14.33 cfs 1.103 af Discarded=10.41 cfs 1.102 af Primary=0.00 cfs 0.000 af Outflow=10.41 cfs 1.102 af Total Runoff Area=49.390 ac Runoff Volume= 1.103 af Average Runoff Depth =0.27" 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 3 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment IS: Predeveloped Runoff Infiltration Basin 1 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 1.5 inch Storm Rainfall=1.50" Area (ac) CN Description 22.790 36 Woods, Fair, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Site Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Hydrograph 1 7�Runoff Runoff=0.00 cfs 'Type III 24-hr 1.5 inch Storm Rainfall=1.50" Runoff Area=22.790;ac Runoff Volume=0.000 af .Runoff Depth=0.00" Tc=10.0 min CN=36 // / _ / /1//f/%J////!f/JffJ/!////f/fJf/Jf//J//,./7 ' 5 6• •7 8 , 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin jan 2021 Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 4 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 1.5 inch Storm Rainfall=1.50" Area (ac) CN Description 0.370 36 Woods, Fair, HSG A, DA 1 0.680 36 Woods, Fair, HSG A, DA 2 1.540 36 Woods, Fair, HSG A, DA 8 1.220 36 Woods, Fair, HSG A, DA 10 3.810 36 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Predeveloped Runoff to Tract East of Site Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 / Hydrograph p Runoff Runoff=0.00 cfs ;Type III 24-hr 1.5 inch Storm Rainfall=1.50" Runoff Area=3.810 ac Runoff Volume=0.000 af Runoff Depth=0.00" Tc=10.0 min CN=36 5 6 7• 6 9 10 11 12 • •13• • 14 • 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris &Tunstall Consulting Engineers Page 5 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 3S: 1140 Business PArk Phase 5 Runoff = 14.33 cfs @ 12.15 hrs, Volume= 1.103 af, Depth> 0.58" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 1.5 inch Storm Rainfall=1.50" Area (ac) CN Description 19.271 98 Bldgs,Asphalt, Concrete 3.519 39 >75% Grass cover, Good, HSG A 22.790 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Tract Subcatchment 3S: 1140 Business PArk Phase 5 Hydrograph 16- 157: - . i 1.,1 Runoff ' Runoff=14.33 cfs 13= Type.III...24-hr.1..5 inch_Storm._ 12- 11- Ra;infaII=1:50" 10 Iunoff'Area=22.790 ac 9� ' Runoff Volume=1.103 af 3 b Runoff Depth>0 58" ..8 3 :� 6 Tc 10.0 min 5= - C N=89 ... 4- , 4 fl 5 6 7 8 9 10 1�1 12 13 14. . ' �15" . '16. ' ' .17' ' . .18� � � '19. . . +20 Time (hours) 19131 Phase 51140 Basin jan 2021 Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 6 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 Inflow Area = 22.790 ac, Inflow Depth > 0.58" for 1.5 inch Storm event Inflow = 14.33 cfs @ 12.15 hrs, Volume= 1.103 af Outflow = 10.41 cfs @ 12.27 hrs, Volume= 1.102 af, Atten= 27%, Lag= 7.0 min Discarded = 10.41 cfs @ 12.27 hrs, Volume= 1.102 af Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 10.60'@ 12.27 hrs Surf.Area= 29,968 sf Storage= 2,867 cf Plug-Flow detention time=2.6 min calculated for 1.102 af(100% of inflow) Center-of-Mass det. time=2.2 min (811.2 - 808.9 ) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store �1 r (feet) (sq-ft) (cubic-feet) (cubic-feet) .A a ill.�S : '76 ISM 10.50 28,925 0 0 S r 15.00 77,114 238,588 238,588 v luMQ. e. 19.3 5! )q Cc $7($ Device Routing Invert Outlet Devices cP #1 Discarded 0.00' 15.000 in/hr Exfiltration over Surface area #2 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Qiscarded OutFlow Max=10.40 cfs @ 12.27 hrs HW=10.60' (Free Discharge) 1=Exfiltration (Exfiltration Controls 10.40 cfs) primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=10.50' (Free Discharge) 2=Broad-Crested Rectangular Weir(Controls 0.00 cfs) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 7 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 Hydrograph was f In .,. flow 114 _ DO Outflow Inflow Area.=22.790_a.c Discarded0 15= �. r Primary 14-: 1 v 4.3 a llflo�a--1 13.;. - O-u;tflow=.10.41-Cis 12-:: : :10.41 d9 � � 10.41 cfe � 1,1 ,. 1. Discarded--=10.41-cfs r P 9- imary �0 00 cfs Peak;Elev=10.60' 6- IS .: . : 6E Storage=2,867 cf . 5 !. , 4. . .. . 3- 2- si p. !/JJ���. .r�f����= J.�rJ�/yJJJJJ/JJ�JJJ/rl�1dr/ I o.aa ae ' .__.__ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin jan 2021 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 8 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment IS: Predeveloped Runoff Infiltration Basin 1 Runoff Area=22.790 ac Runoff Depth>0.03" Tc=10.0 min CN=36 Runoff=0.13 cfs 0.057 af Subcatchment 2S: Predeveloped Runoff to Property East of S unoff Area=3.810 ac Runoff Depth>0.03" Tc=10.0 min CN=36 Runoff=0.02 cfs 0.009 af Subcatchment 3S: 1140 Business PArk Phase 5 Runoff Area=22.790 ac Runoff Depth>3.10" Tc=10.0 min CN=89 Runoff=74.35 cfs 5.896 af Pond 3P: Infiltration Basin 1 Peak Elev=12.45' Storage=76,977 cf Inflow=74.35 cfs 5.896 af Discarded=17.31 cfs 5.892 af Primary=0.00 cfs 0.000 af Outflow=17.31 cfs 5.892 af Total Runoff Area =49.390 ac Runoff Volume= 5.962 af Average Runoff Depth= 1.45" 19131 Phase 51140 Basin jan 2021 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 9 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff = 0.13 cfs @ 15.69 hrs, Volume= 0.057 af, Depth> 0.03" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type Ill 24-hr 2-yr Rainfall=4.50" Area (ac) CN Description 22.790 36 Woods, Fair, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Site Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Hydrograph 0.14= ❑Runoff Runoff=0.:13 cfs i7 .1acrs 0.11 Type III 24-hr 2-y.rl° r 0.12 �i j . 0.1- Rainfall=4.50 ! _ 0.09_ Runoff Area=22.790 ac ; i : 1 0.08 Runoff Volume=0.057 af: 0.07 -. LL 3 Runoff Cepth'>0.03"..;. - .. _ , 0.06: 0.05 6_ Q.0 .m.i.n... . c _ - 0.04 CN=36 � '.. 0.03-i 0.02_ . . . . _. 0.01- 1 ; 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 10 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Runoff = 0.02 cfs @ 15.69 hrs, Volume= 0.009 af, Depth> 0.03" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 2-yr Rainfall=4.50" Area (ac) CN Description 0.370 36 Woods, Fair, HSG A, DA 1 0.680 36 Woods, Fair, HSG A, DA 2 1.540 36 Woods, Fair, HSG A, DA 8 1.220 36 Woods, Fair, HSG A, DA 10 3.810 36 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 . Direct Entry, Predeveloped Runoff to Tract East of Site Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Hydrograph 0.024' 0.023 • El Runoff 3 .. -looz cfs� 0.02 0i . Runoff=0.02 cfs. : • , , _ 0.02 0%19 1 Type III...24-hr 2-yr 0.017- aiinfati-4.50 0.01651. Runoff Runoff Volume=0.00. of - 0.013� ,• Runoff o.o„- Depth>0.03". 0.014 .. - 0.0091 TO=10.0••rain 0.008; 0.007; . CN=36.. :. . �. 0.0064 0.005=- . - •o.004 .. • 0.0034 0.o014 o ,iil/!//J11//!//!/ . , -. ter . , , 5 6. . . •7 8 • 9 10 11 12 13 14 • • 15, , , 16, ; , ,17, , , ,18,•. .19, , • •20 Time (hours) 19131 Phase 51140 Basin jan 2021 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 11 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 3S: 1140 Business PArk Phase 5 Runoff = 74.35 cfs @ 12.14 hrs, Volume= 5.896 af, Depth> 3.10" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 2-yr Rainfall=4.50" Area (ac) CN Description 19.271 98 Bldgs,Asphalt, Concrete 3.519 39 >75% Grass cover, Good, HSG A 22.790 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Tract Subcatchment 3S: 1140 Business PArk Phase 5 Hydrograph 60 °Runoff 75-E 174.35 a.) 70 - Runoff.-74 3-5-cfs.. ... 65E • Type III 24-h r 2=yr 55 , Rainfall=4.50". F 50= Runoff Area=22.790 ac 45_ ' ao- Runoff.Volume=5..896.af. LL 35. • Runoff-Depth>3-.10" _. 30= TO=- � 25 CN=89 20- ._ 15 10= ' � 1 ' ` i ' 5 6 7 8 9 10 11 12 13 14 15 16 4 17 16 19 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 12 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 Inflow Area = 22.790 ac, Inflow Depth > 3.10" for 2-yr event Inflow = 74.35 cfs @ 12.14 hrs, Volume= 5.896 af Outflow = 17.31 cfs @ 12.59 hrs, Volume= 5.892 af, Atten= 77%, Lag= 26.8 min Discarded = 17.31 cfs @ 12.59 hrs, Volume= 5.892 af Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 12.45'@ 12.59 hrs Surf.Area=49,853 sf Storage= 76,977 cf Plug-Flow detention time=33.1 min calculated for 5.873 af(100% of inflow) Center-of-Mass det. time=32.7 min (803.0-770.3) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 10.50 28,925 0 0 15.00 77,114 238,588 238,588 Device Routing Invert Outlet Devices #1 Discarded 0.00' 15.000 in/hr Exfiltration over Surface area #2 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Qiscarded OutFlow Max=17.31 cfs @ 12.59 hrs HW=12.45' (Free Discharge) 1=Exfiltration (Exfiltration Controls 17.31 cfs) Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=10.50' (Free Discharge) 2=Broad-Crested Rectangular Weir(Controls 0.00 cfs) 19131 Phase 51140 Basin jan 2021 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris &Tunstall Consulting Engineers Page 13 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 Hydrograph - -;. .__ .. ._ �. ---- !, El Inflow ?174.35 cis] Outflow Inflow Area=22:790 ac warded 80 p Primary 75 ! I0flow=74,35 cfs 70 ,0 65 utflow=17:31 cfs Discarded=17.31 cfs 50 ' ry=0 Pr..im 45 ak'E Peak 0 40 � � 2.45' Storage=76,977 cf 17Sfch 25 _ , • 20 10 /Ua, „ // 0.00 efe 0 y, 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin jan 2021 Type 111 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 14 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff Area=22.790 ac Runoff Depth>0.48" Tc=10.0 min CN=36 Runoff=5.36 cfs 0.916 af Subcatchment 2S: Predeveloped Runoff to Property East of S unoffArea=3.810 ac Runoff Depth>0.48" Tc=10.0 min CN=36 Runoff=0.90 cfs 0.153 af Subcatchment 3S: 1140 Business PArk Phase 5 Runoff Area=22.790 ac Runoff Depth>5.44" Tc=10.0 min CN=89 Runoff=126.31 cfs 10.324 of Pond 3P: Infiltration Basin 1 Peak Elev=13.87' Storage=158,007 cf Inflow=126.31 cfs 10.324 af Discarded=22.56 cfs 10.318 af Primary=0.00 cfs 0.000 af Outflow=22.56 cfs 10.318 af Total Runoff Area =49.390 ac Runoff Volume= 11.393 af Average Runoff Depth = 2.77" 19131 Phase 51140 Basin jan 2021 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 15 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff = 5.36 cfs @ 12.39 hrs, Volume= 0.916 af, Depth> 0.48" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 10-yr Rainfall=7.05" Area (ac) CN Description 22.790 36 Woods, Fair, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Site Subcatchment 1 S: Predeveloped Runoff Infiltration Basin 1 Hydrograph O Runoff 5.a6 of Runoff=5.36 s 5- , Type III 24-hr 10-yr Rainfall=7:05" 4 Runoff Area=22.790 ac Runoff Volume=0:91-6 af 3 LL . Runoff Depth>0.48" 2-' Tc=10:0 niin CN=36 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 16 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Runoff = 0.90 cfs @ 12.39 hrs, Volume= 0.153 af, Depth> 0.48" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 10-yr Rainfall=7.05" Area (ac) CN Description 0.370 36 Woods, Fair, HSG A, DA 1 0.680 36 Woods, Fair, HSG A, DA 2 1.540 36 Woods, Fair, HSG A, DA 8 1.220 36 Woods, Fair, HSG A, DA 10 3.810 36 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Predeveloped Runoff to Tract East of Site Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Hydrograph . ...... ... 1 , Runoff Runoff=0.90 cfs Type;III 24-hr 10-yr 11. Rainfall=7.05" Runoff Area=3.810 Oc Runoff,Volume=0.1531 of LL Runoff Depth>0.48" Tc=100 min CN=36 I � 5 6 7 8 9 10 11 12 • 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 17 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 3S: 1140 Business PArk Phase 5 Runoff = 126.31 cfs @ 12.14 hrs, Volume= 10.324 af, Depth> 5.44" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type Ill 24-hr 10-yr Rainfall=7.05" Area (ac) CN Description 19.271 98 Bldgs,Asphalt, Concrete 3.519 39 >75% Grass cover, Good, HSG A 22.790 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Tract Subcatchment 3S: 1140 Business PArk Phase 5 Hydrograph 140- . F7R off un 130- 120= Runoff=;12631 cfs 1107 Type III 24-hr 10-yr Rainfall=7.O soy Runoff Area=22.790'ac S0 Ruhoff.Volume=10.324.af 3 70= u�, LL 60� � noff Depth> 5:44. 50 Tc=10.0 min.... 40- 01 CN=89 30: 20= 101 •� 0Api"opsilifor ,f 't 4. �f 5 6 7 8 9 10 11 12 4 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 18 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 [82] Warning: Early inflow requires earlier time span Inflow Area = 22.790 ac, Inflow Depth > 5.44" for 10-yr event Inflow = 126.31 cfs @ 12.14 hrs, Volume= 10.324 of Outflow = 22.56 cfs @ 12.65 hrs, Volume= 10.318 af, Atten= 82%, Lag= 30.8 min Discarded = 22.56 cfs @ 12.65 hrs, Volume= 10.318 af Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 13.87'@ 12.65 hrs Surf.Area= 64,967 sf Storage= 158,007 cf Plug-Flow detention time=59.0 min calculated for 10.283 af(100% of inflow) Center-of-Mass det. time=58.5 min (816.4- 758.0) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismaticj_isted below(Recaic) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 10.50 28,925 0 0 15.00 77,114 238,588 238,588 Device Routing Invert Outlet Devices #1 Discarded 0.00' 15.000 in/hr Exfiltration over Surface area #2 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 iscarded OutFlow Max=22.56 cfs @ 12.65 hrs HW=13.87' (Free Discharge) =Exfiltration (Exfiltration Controls 22.56 cfs) Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=10.50' (Free Discharge) 2=Broad-Crested Rectangular Weir(Controls 0.00 cfs) 19131 Phase 51140 Basin jan 2021 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 19 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 Hydrograph M1 Inflow l 126.31 chd... 'J Outflow 140 -_- Inflow�Area=22.790 ac P ed . inflow=126.31 cfs -110;" . Outflow=22:56 cfs 1°0= • Discrdd 2256 -cfs 90= " P_ _ rirriiaryl 0,00 cf_ I soI ,. 70 Peak Elev 13.87' • IT. 60 Stolrage=158007 cf 50= 40' 22.56 _. 30= 2256�� l o 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin jan 2021 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 20 HydroCAD®7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 1/25/21 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Predeveioped Runoff Infiltration Basin 1 Runoff Area=22.790 ac Runoff Depth>0.77" Tc=10.0 min CN=36 Runoff=10.34 cfs 1.457 af Subcatchment 2S: Predeveloped Runoff to Property East of SunoffArea=3.810 ac Runoff Depth>0.77" Tc=10.0 min CN=36 Runoff=1.73 cfs 0.244 af Subcatchment 3S: 1140 Business PArk Phase 5 Runoff Area=22.790 ac Runoff Depth>6.32" Tc=10.0 min CN=89 Runoff=145.69 cfs 12.005 af Pond 3P: Infiltration Basin 1 Peak Elev=14.35' Storage=190,718 cf Inflow=145.69 cfs 12.005 af Discarded=24.36 cfs 11.998 af Primary=0.00 cfs 0.000 af Outflow=24.36 cfs 11.998 af Total Runoff Area =49.390 ac Runoff Volume= 13.705 af Average Runoff Depth = 3.33" 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 21 HydroCAD®7.10 sin 000479 ©2005 HvdroCAD Software Solutions LLC 1/25/21 Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff = 10.34 cfs @ 12.27 hrs, Volume= 1.457 af, Depth> 0.77" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 25-yr Rainfall=8.01" Area (ac) CN Description 22.790 36 Woods, Fair, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Site Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Hydrograph / : 11- 0 Runoff toss us I ; 10. Runoff=l0.' 4 cfs. . 9- type' III. .24-hr 25ryr 8 Rainfall=8:01 7_ ; Runoff Area=22:790 ac s Runoff:Voluirne=l A57:of - . LL 5- Runoff Depth 0.77"" 4- Tc.=10.0...rnin 3 / -36 CN 4 - 2 I 0 lAro< 1 ' 2(/ i ,t ' ,... :().'- ll, ' I: ' ' 1 : F ( 5 E3• • • •7• • • •8• • • •9• 10 11 •12 13 • • 14 • • 15 • • •16• • • •17 • • •18• • 19 • • 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 22 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Runoff = 1.73 cfs @ 12.27 hrs, Volume= 0.244 af, Depth> 0.77" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 25-yr Rainfall=8.01" Area (ac) CN Description 0.370 36 Woods, Fair, HSG A, DA 1 0.680 36 Woods, Fair, HSG A, DA 2 1.540 36 Woods, Fair, HSG A, DA 8 1.220 36 Woods, Fair, HSG A, DA 10 3.810 36 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Predeveloped Runoff to Tract East of Site Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Hydrograph p Runoff t.7s as 41; � Runoff=1.73 cfs Type;III 24-hr 25-yr Railnfall=8.01" Runoff =3. Area810 ;ac Runoffs Volume=0.244 of LL Runoff Depth>0.77" Tc`-100 min CN=36 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 '20 Time (hours) 19131 Phase 51140 Basin jan 2021 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 23 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 3S: 1140 Business PArk Phase 5 Runoff = 145.69 cfs @ 12.14 hrs, Volume= 12.005 af, Depth> 6.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type Ill 24-hr 25-yr Rainfall=8.01" Area (ac) CN Description 19.271 98 Bldgs, Asphalt, Concrete 3.519 39 >75% Grass cover, Good, HSG A 22.790 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Tract Subcatchment 3S: 1140 Business PArk Phase 5 Hydrograph 160- • �!R 150; EME1121 140= Runoffi-414569cfs Type III 4-hi..25=y_ Rainfall=8:0.. 110- . . .. 100-• Runoff Area=22:790'ad 90- Runoff.Volume'=12.005 af Runoff-Depth;>6:32 U. 70- 60 Tc=10.0 'min 40= } y CN -89. 30= ; 5 6 7 8 9 10 11 • 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin jan 2021 Type 111 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 24 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 [82]Warning: Early inflow requires earlier time span Inflow Area = 22.790 ac, Inflow Depth > 6.32" for 25-yr event Inflow = 145.69 cfs @ 12.14 hrs, Volume= 12.005 af Outflow = 24.36 cfs @ 12.67 hrs, Volume= 11.998 af, Atten= 83%, Lag= 31.9 min Discarded = 24.36 cfs @ 12.67 hrs, Volume= 11.998 af Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 14.35'@ 12.67 hrs Surf.Area= 70,152 sf Storage= 190,718 cf Plug-Flow detention time=67.8 min calculated for 11.997 af(100% of inflow) Center-of-Mass det. time=67.5 min (822.6-755.1 ) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data(Prismaticjisted below(Recaic) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 10.50 28,925 0 0 15.00 77,114 238,588 238,588 Device Routing Invert Outlet Devices #1 Discarded 0.00' 15.000 in/hr Exfiltration over Surface area #2 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 iscarded OutFlow Max=24.35 cfs @ 12.67 hrs HW=14.35' (Free Discharge) =Exfiltration (Exfiltration Controls 24.35 cfs) primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=10.50' (Free Discharge) 2=Broad-Crested Rectangular Weir(Controls 0.00 cfs) 19131 Phase 51140 Basin jan 2021 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 25 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 Hydrograph 0 Oulfiow Inflow�Area=22.790 ac Discarded 160 i.. .... ..I , ®Primary 150.' , - . .Inflow=145:69 cfs 130 Outflow=24;36 cfs 120- -. -. Discarded=24:36 cfs ,10` ,00 Primary,=0.00 cfs 90 - = 35 - - Peak E�lev 1-4 ' 80 LT. 70 Storage=190,718-cf. . - x4.36 cis 40 21 z rosy a.ao�cra Fr.,- o T f R - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 26 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff Area=22.790 ac Runoff Depth>1.12" Tc=10.0 min CN=36 Runoff=18.66 cfs 2.123 af Subcatchment 2S: Predeveloped Runoff to Property East of Runoff Area=3.810 ac Runoff Depth>1.12" Tc=10.0 min CN=36 Runoff=3.12 cfs 0.355 af Subcatchment 3S: 1140 Business PArk Phase 5 Runoff Area=22.790 ac Runoff Depth>7.24" Tc=10.0 min CN=89 Runoff=165.79 cfs 13.757 of Pond 3P: Infiltration Basin 1 Peak Elev=14.58' Storage=207,000 cf Inflow=165.79 cfs 13.757 af Discarded=25.21 cfs 13.015 af Primary=28.69 cfs 0.735 af Outflow=53.90 cfs 13.749 af Total Runoff Area =49.390 ac Runoff Volume= 16.235 af Average Runoff Depth= 3.94" 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 27 HydroCAD®7.10 s/n 000479 ®2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff = 18.66 cfs @ 12.20 hrs, Volume= 2.123 af, Depth> 1.12" Runoff by SCS TR-20 method, UH=SCS, Time Span=5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 50-yr Rainfall=9.01" Area (ac) CN Description 22.790 36 Woods, Fair, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Site Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Hydrograph 20= (� ee • 0 Runoff 19 :.. do l.. . 18= .Run_off-1-8 66 cfs 16= ' . ..Type:III 24= r 07yr Rainfall=9.01" Runoff-Area;22.790 121 ,ac 11 Runoff-.Volume.=2 `1123 of $ io Runoff.:Depth-?1.12" _. 8 Tc=10:0 min CN=36. _ 3' 2' IS 5 6 7 8 9 10 11 12 • • 13 • • 14 15 • •16 • 17 •18 • 19 • • 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 28 HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 2S: Predeveloped Runoff to Property East of Site within infiltration Basin 1 Runoff = 3.12 cfs @ 12.20 hrs, Volume= 0.355 af, Depth> 1.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 50-yr Rainfall=9.01" Area (ac) CN Description 0.370 36 Woods, Fair, HSG A, DA 1 0.680 36 Woods, Fair, HSG A, DA 2 1.540 36 Woods, Fair, HSG A, DA 8 1.220 36 Woods, Fair, HSG A, DA 10 3.810 36 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Predeveloped Runoff to Tract East of Site Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Hydrograph Runoff 13.12cfs I . 3- RLinciff3.12 cfs Types III 24-hr 50-yr • I Raififall=9.01" Runoff Area=3.810-ac Runoff.Volume=0.355 of LL Runoff Depth>1.1'2" Tc 100 min 1 CN=36 I 5 o 7 8 9 10 4 11 12 13 14 15 18 17 18 • 19 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 29 HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 3S: 1140 Business PArk Phase 5 Runoff = 165.79 cfs @ 12.14 hrs, Volume= 13.757 af, Depth> 7.24" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 50-yr Rainfall=9.01" Area (ac) CN Description 19.271 98 Bldgs, Asphalt, Concrete 3.519 39 >75% Grass cover, Good, HSG A 22.790 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ftt t) (ft/sec) (cfs) 10.0 Direct Entry, Entire Tract Subcatchment 3S: 1140 Business PArk Phase 5 Hydrograph 180=" . ... ... . 0• Runoff 170- 165.79 crs , 160= • ... Runoff=;16579cfs 150 - - -Type III 24-hr-•50i- r 140 130 • Rainfall=9.01.. R a=2- 920: ._ unoff Are 2:790 ac 110 100= ; Runoff... Volume=13757af 2 90_ -Runoff Depth>7.24" . LL 80-E 70= Tc___1 0..0 min 50= • CN=89 40= 30 20= , 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type 11124-hr 50-yr Rainfall=9.01" Prepared by Norris &Tunstall Consulting Engineers Page 30 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 [82] Warning: Early inflow requires earlier time span Inflow Area = 22.790 ac, Inflow Depth > 7.24" for 50-yr event Inflow = 165.79 cfs @ 12.14 hrs, Volume= 13.757 af Outflow = 53.90 cfs @ 12.49 hrs, Volume= 13.749 af, Atten=67%, Lag= 21.4 min Discarded = 25.21 cfs @ 12.49 hrs, Volume= 13.015 af Primary = 28.69 cfs @ 12.49 hrs, Volume= 0.735 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 14.58'@ 12.49 hrs Surf.Area= 72,595 sf Storage= 207,000 cf Plug-Flow detention time=66.6 min calculated for 13.748 af(100% of inflow) Center-of-Mass det. time=66.3 min (819.0-752.7) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismaticpsted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 10.50 28,925 0 0 15.00 77,114 238,588 238,588 Device Routing Invert Outlet Devices #1 Discarded 0.00' 15.000 in/hr Exfiltration over Surface area #2 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 iscarded OutFlow Max=25.20 cfs @ 12.49 hrs HW=14.58' (Free Discharge) =Exfiltration (Exfiltration Controls 25.20 cfs) Primary OutFlow Max=28.36 cfs @ 12.49 hrs HW=14.58' (Free Discharge) 2=Broad-Crested Rectangular Weir(Weir Controls 28.36 cfs @ 1.2 fps) 19131 Phase 51140 Basin jan 2021 Type iii 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 31 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 Hydrograph Xl Inflow ' 165.7a cis CI Outflow 180= , ` Inflow.Area=22.790: ac miP�aryed In flow 165:79 cfs 160 150i Outflow=53.90 cfs , Discarded 26.2'I cfs 130: P 2 r many : 8.69 cfs loot .. - Peak Elev=14:58' ill 80 .1,04 7 Storage=207,000 cf- 70: 60'. 50= ,` 40 l� -,,. _ , .. 30; ! .: 0 Jl f!%ir7. //////f�!�J/J/,/,!„„1", . •�iif .,. . ..,..'. .� 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 32 HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff Area=22.790 ac Runoff Depth>1.51" Tc=10.0 min CN=36 Runoff=28.63 cfs 2.873 af Subcatchment 2S: Predeveloped Runoff to Property East of RunoffArea=3.810 ac Runoff Depth>1.51" Tc=10.0 min CN=36 Runoff=4.79 cfs 0.480 af Subcatchment 3S: 1140 Business PArk Phase 5 Runoff Area=22.790 ac Runoff Depth>8.16" Tc=10.0 min CN=89 Runoff=185.60 cfs 15.493 af Pond 3P: Infiltration Basin 1 Peak Elev=14.70' Storage=216,141 cf Inflow=185.60 cfs 15.493 af Discarded=25.67 cfs 13.861 af Primary=56.06 cfs 1.624 af Outflow=81.73 cfs 15.485 af Total Runoff Area=49.390 ac Runoff Volume= 18.847 af Average Runoff Depth =4.58" 19131 Phase 5 1140 Basin jan 2021 Type II! 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 33 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff = 28.63 cfs @ 12.18 hrs, Volume= 2.873 af, Depth> 1.51" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 100-yr Rainfall=10.00" Area (ac) CN Description 22.790 36 Woods, Fair, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Site Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Hydrograph 32 I I , .... .. .._ _ .'.-.. _ _ t.. ... _ I. ........ I ..1.. 30 .. 17 Runoff ...I28.63 cfs( • 28 ,Runoff;28r03 cfs26 Type III 24-hr..;100;y 24 r.22 18 Rainfall=10:00" Runoff Area=22.790.ac - Runoff,Volume=2973 of 16 1 T. 14 Runoff Depth91:51 12 - - - : . .. _ T_c .1.0;.0_min. 10 ; CN=36 6 . 4 .. :2 5 6 7 8 9 10 11 12 13 14 15 • 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin jan 2021 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 34 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Runoff = 4.79 cfs @ 12.18 hrs, Volume= 0.480 af, Depth> 1.51" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 100-yr Rainfall=10.00" Area (ac) CN Description 0.370 36 Woods, Fair, HSG A, DA 1 0.680 36 Woods, Fair, HSG A, DA 2 1.540 36 Woods, Fair, HSG A, DA 8 1.220 36 Woods, Fair, HSG A, DA 10 3.810 36 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Predeveloped Runoff to Tract East of Site Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Hydrograph i7 Runoff 5 14.79 cfs { Runoff=4.79 cfs 4— - f Type III 24-h r ,100;y r Rainfall=10.00" ',- ;.. Runoff.Area=3.810.:ac_. :F 3 ' •Runoff Volume=0.480 of 3 Runoff Depth>1.51" 2- Tc=10.0 min CN=36 1 .• 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 35 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Subcatchment 3S: 1140 Business PArk Phase 5 Runoff = 185.60 cfs @ 12.14 hrs, Volume= 15.493 af, Depth> 8.16" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type Ill 24-hr 100-yr Rainfall=10.00" Area (ac) CN Description 19.271 98 Bldgs, Asphalt, Concrete 3.519 39 >75% Grass cover, Good, HSG A 22.790 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Tract Subcatchment 3S: 1140 Business PArk Phase 5 Hydrograph . 200=' .- .. _, - • . . ®Runoff ,85.so or. 190' 16o R V 5 .60.Cfs. off .;18 n. 170' , 160 Type-III 24-h r;1.00-yr 150 ' ,. Rainfall10:0 0 140' 130' H . ;. - .. Runoff-Area=22.7.90_'ac 120=. 110=' ,Runoff;Volume=15493 af: g 100=� ' E. 90.' ` Runoff Depth>8:16" 80= TC_ 0 .0 Min 70' 9 60 501 :_.- .. _. - 1 �I , . 40'_ ' 30= 20=' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin jan 2021 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 36 HydroCAD®7.10 s/n 000479 ©2005 HvdroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 [82]Warning: Early inflow requires earlier time span Inflow Area = 22.790 ac, Inflow Depth > 8.16" for 100-yr event Inflow = 185.60 cfs @ 12.14 hrs, Volume= 15.493 of Outflow = 81.73 cfs @ 12.40 hrs, Volume= 15.485 af, Atten= 56%, Lag= 15.7 min Discarded = 25.67 cfs @ 12.40 hrs, Volume= 13.861 af Primary = 56.06 cfs @ 12.40 hrs, Volume= 1.624 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 14.70'@ 12.40 hrs Surf.Area= 73,931 sf Storage= 216,141 cf Plug-Flow detention time=64.4 min calculated for 15.432 af(100% of inflow) Center-of-Mass det. time=63.9 min (814.6-750.7) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismatic Jsted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 10.50 28,925 0 0 15.00 77,114 238,588 238,588 Device Routing Invert Outlet Devices #1 Discarded 0.00' 15.000 in/hr Exfiltration over Surface area #2 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 iscarded OutFlow Max=25.67 cfs @ 12.40 hrs HW=14.70' (Free Discharge) =Exfiltration (Exfiltration Controls 25.67 cfs) Primary OutFlow Max=55.87 cfs @ 12.40 hrs HW=14.70' (Free Discharge) ,Primary Rectangular Weir(Weir Controls 55.87 cfs @ 1.5 fps) 19131 Phase 51140 Basin jan 2021 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 37 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 Hydrograph t _ . ' -185socrs 1 O I - I - - �Discariled 200. , ; Inflow;Ar-ea=22.790 ac- III 1904 , L. Inflow=1:85.60. .cfs 170= " - - - . ...Outflow 81.73. :ofs 150 _ 1650; 2 = , Dieters! d 5. .7 cfs 1401 130' ,. Primary=56.06 cfs g120 , 110, 73do Peak:Elev=14.70': 3 100 e�. I , u. 90 ,� Storage=216,141 cf.- 50= a- 20' 5 6 7 8 r 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin jan 20 NO INFIL Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulti • ••'- --rs HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 1/25/21 Pond 3P: Infiltration Basin 1 [82]Warning: Early inflow requires earlier time span Inflow Area = 22.790 ac, Inflow Depth > 7.24" for 50-yr event Inflow = 165.79 cfs @ 12.14 hrs, Volume= 13.757 af Outflow = 143.33 cfs @ 12.21 hrs, Volume= 9.306 af, Atten= 14%, Lag=4.2 min Primary = 143.33 cfs @ 12.21 hrs, Volume= 9.306 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 14.98'@ 12.21 hrs Surf.Area= 76,950 sf Storage= 237,410 cf Plug-Flow detention time=133.9 min calculated for 9.273 af(67% of inflow) Center-of-Mass det. time=65.6 min (818.3-752.7) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismatici_isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 10.50 28,925 0 0 15.00 77,114 238,588 238,588 Device Routing Invert Outlet Devices #1 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 rimary OutFlow Max=141.98 cfs @ 12.21 h HW=14.9:' ree Discharge) 1=Broad-Crested Rectangular Weir(VVei - - - • s 141.98 cfs @ 2.1 fps) Date Design NORRIS & TUNSTALJL Wilmington, NC Sheet 10-2-20 —CONSULTING ENGINEERS RC.--- Brunswick County, NC Of Check Job For Job No, EC Calc5 viiim;34tet -Vvilc. rit3 1 1 L still s SNe • 'is p" (AS- 411 . so-.(,, ,4,r. Vety cd,,‘c(i I.-,J WOA 44ia4'friA i RotesTP., f14-e. gas 2. !S-I-orm wei-4-el -7;e,441(1,14-ti- 4 r: i-- i • • , .a6,04 1r 2i (F.A.,c4.1.0", 104s (lite f,?c,5A).. AN3 1 CA1F_ #A4 ke-A70.3" . I i. , 117t4cil 4 i . i ! 1 • 1 i . 1 "t1.1 C;A 5 f k) i : I —"---- --------„t I Trke ; SA5 I Ni i5 /6k-.4- 4-ke ' Rear 04: he- ., kvi tri,v1,9is /142ciee'* : .1- , I 1 Serui. AS 4 Sec()ille. ..,-1- o ga.si,ci t..)-0.-\ c .s.tr • 4.-cyl' - . 1 : ' 1 1 ' , :c..c .F.,6 r !0 1801 1.' ‘.1S-1- #41C . = z_zici, Ac (ki,i ;si, Seits sdx,t - 'c, '= e), 35— I i 1 1 i 010 zi 0,'IC5(22.176‘ , . . Re. tdOre'cll giPst(rk9 = kee°CF/ 2Z.79 ?t-c-, 41,02F, . 2,iepAt'reri 1 34- --- 1355.F4Es' X i 5Gc As = 0?-1/34057 ,. . i.„---------- , 1 R,.,.elti A: je 4 ! e c/05 i / F6L135-) ,•' 1 ; ! . SA . , , . . , I I ! 5,14.1yAit.r i(N:q No- 0‘,-sciv?5c ?e,id, is..5- , . , , / 9, Jii,,:; -itf 241 ' , s-*/t,,.'ii,01 :Ls-- -= s-slt-,......relc,i-- :,-r----1- ' ,.,.. _, 0file ,_,:.. .4ieeil ! - . ........,..... I . . , . ..„....>, i i . . . 1 .-C ($ !,... d4- s 1 iies.tvii 6.4(7, r&ipeie (i e.,. 1/ ?.5- ! e /2 e .>/e7444,, - i ' • , . . : • i - , Date Design NORIIIS & TUNSTA1LL Wilmington, NC Sheet ----CONSULTING ENGINEERS P.C.— Brunswick County, NC Of Check Job For Job No. _ f ,,L • ! 1 . . Cr- 1 • 1._____7________,. 10.S-4. , c)t3 giIIIc 0 1 1 ' 1 • 1 1 1 11 i 311T?/; I /iS-6(1( 3%3 ! lqt7 .1 l't- 1 iffitni , c9,4/5-s- 1 1 :5-s--1341 I , re.rt 5-0,,3411 , ,,;3•E)832t 17i Z66 ' I ! 1 1 2 C. , G:!lotri 01118-r : Agi-C_IAe 1---)1Siljviinte,-, 1 , 6 4(0(:) 3q42- /44- nz• I ) 1 . , :)(i..35— ...0 . --)61.. , , 3,18'6 , / _______.),7!4____ • 1 ,.' i' ' ' '15-,ol 71 WI 97Akoi ' ' ol,30 3.'7/I I , . . . „ . : is hlrf & ha • , , . 6.44{44 E Ls-191.4.,..ci.Q.4 LS P 044J Cu Le-e. $2cf*e.44- C (cf ,4e 4,47 i 1 I , 1 1 1 : ! I . 1 - , I ! . , ! I ; I • 1 1 1 ' ! 1 Wen Tee& CE,er -Toefi1 re.A4. .A. gas)"/ &n*c v1l' Rasa Calculate Skimmer Size I Basin Volume in Cubic Feet 55.758ICu.Ft Skimmer Size 4.0 Inch Days to Drain* 3 Days Orifice Radius 1.9 Inch(es] Orifice Diameter 3.8 Inch(es] in NC mem 3 days to drain `Estimate Volume of Basin Length Width Top of water surface In feet Feet VOLUME 0 cu.Ft. Bottom dimensions in feet _Feet Depth in feet Feet Date Dey NORRIS & TUNSTALL Wilmington, NC Sheet CONSULTING ENGINEERS P.C.— Brunswick County, NC ( Of Check Jo iFor Job No. Ec Cis Wi'lirlit6irm Tra.6tc_ I q 13 1 Sccoro( _SCev1 6.7%-S( 1-e. i l'A- 44-Le- i -7;TeAcii 4'1_, . ..3,24),K.e.,. f :Cartel 6 4- t/vIte 74e i -rre-.4..k avun ' Cori:sie ci, 4.5: -- ._ -44. . : - AO Iit_€.7,-. ; tiEez ) L : .) ikt, ip.-.,-,sie,: k., !;.,' fin ! 1 „..) AI ! I ; I i_ r: .1-.01i -(rt(64-Kro c... ...')41. ! _St+ce,%."..,...1.-1-jt ,N,‘ il-k.LI' if i ire.... ' ./('gc. 1 C„ ,ffra 6-,;:( ; 1 1 ! 1 , ; tist•ItN- --it-e. z,, 44- a.J,J,- i :r '--7.; i 1 s 4-1/.-- ic;,ic., :' 6-Aorc • ' , . 1 , , 1 yeLs i-ead cr5 rp4s 4. i 1 I : i . . -7..K.F Ir‘ -1-1,‘I lir °!--:.- )1.19 90 i (Poliepie : . ; i ..51-fe ) . 1, ! ,• :a.--- • DA -G . "iiiiv,IeNv 2.S-e A cs , . , , i i., , , , 1 i i : . . reci _..,-.. 13.SZ„A I A- .4 ou t !__ /----- ; 1 „. 0: • , r-19g • d*., i ,•-•- ; ' ' i ; • i ii ; t• :; ,. i . Nor4 17-4- OA I as4.- ilto,*k 41 1--Cf: i,'3 ;e-ss -F-Aori 7/PhAcAleg:sil I ' g szo!Ac-fI . I • I . . . ! i . ! . . C. I' •-i 1 rity 4t1 tfrtc ' ii:dz.. z"-- iSOcia s-P 0 2 zi4 c...... , - , . r ' I i • i ' . ! ' ! ! , ' Re/4•L'Ircet .z. 012 94. 'A 40. 0 "i .ti: I 38 IP : f 1 - , , 9c,c4tri 56° L'' ' C:D'I'r i ..;,,,...........--..""."--7 ; . 1 i• ; 1 • . .• • : 1 . . ; . ! • • I i • • . • . I ! ;• 4 ' , . -.. 4 Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 30®by Autodesk,Inc. Thursday,Oct 8 2020 Swale 1 (5:1) Triangular Highlighted Side Slopes (z:1) = 5.00, 5.00 Depth (ft) = 0.27 Total Depth (ft) = 1.50 Q (cfs) = 0.660 Area (sqft) = 0.38 Invert Elev (ft) = 21.00 Velocity (ft/s) = 1.81 Slope (%) = 3.00 Wetted Perim (ft) = 2.75 N-Value = 0.035 Crit Depth, Yc (ft) = 0.26 Top Width (ft) = 2.70 Calculations EGL (ft) = 0.32 Compute by: Known Q Known Q (cfs) = 0.66 a Elev (ft) Depth Section (ft) 23.00 2.00 22.50 -- 1.50 22.00 1.00 21.50 0.50 21.00 I 0.00 20.50 i I I I 0 2 4 6 8 10 12 14 18 18 L0 -0.50 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk,Inc. Thursday,Oct 8 2020 Swale 1 (5:1) Triangular Highlighted Side Slopes (z:1) = 5.00, 5.00 Depth (ft) = 0.28 Total Depth (ft) = 1.50 Q (cfs) = 0.760 Area (sqft) = 0.39 Invert Elev (ft) = 21.00 Velocity(ft/s) = 1.94 Slope (%) = 3.00 Wetted Perim (ft) = 2.86 N-Value = 0.035 Crit Depth, Yc (ft) = 0.28 Top Width (ft) = 2.80 Calculations EGL (ft) = 0.34 Compute by: Known Q Known Q (cfs) = 0.76 QgC. Elev (ft) Depth ft Section p ( ) 23.00 2.00 22.50 1.50 22.00 1.00 • 21.50 0.50 21.00 I 0.00 I I 20.50 I 0 2 4 6 8 10 12 14 16 18 20 -0.50 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk,Inc. Thursday,Oct 8 2020 Swale 1 (5:1) Triangular Highlighted Side Slopes (z:1) = 5.00, 5.00 Depth (ft) = 0.31 Total Depth (ft) = 1.50 Q (cfs) = 1.000 Area (sqft) = 0.48 Invert Elev (ft) = 21.00 Velocity (ft/s) = 2.08 -- Slope (%) = 3.00 Wetted Perim (ft) = 3.16 N-Value = 0.035 Crit Depth, Yc (ft) = 0,31 Top Width (ft) = 3.10 Calculations EGL (ft) = Q.38 Compute by: Known Q Known Q (cfs) = 1.00 .- Q tsa Elev (ft) Section Depth (ft) 23.00 2.00 22.50 I 1 1.50 22.00 N"." ' 1.00 21.50 0.50 21.00 I I I I 0.00 I 20.50 I I I 1 0 2 4 6 8 10 12 14 16 18 20 -0.50 Reach (ft) STORMWATER SYSTEM & EROSION CONTROL CALCULATIONS WILMINGTON TRADE CENTER 4104 US Hwy. 421 North Wilmington, North Carolina For Seamist Properties, LLC 3807 Peachtree Avenue, Suite 200 Wilmington, NC 28403 (910) 395-6036 „d 111 11111 111 1, 11% • o' .l ry 7" EAL rF. 7-4 030869 'Ns'-; ✓ • b„ ry,,y�gsON G\- n1//1/lUlll l 11 1pp,p1111�„`,` Revised January 2021 (NC DEQ SW Response) Revised November 2020 (NHC EC Response) October 2020 Prepared by: NORRIS &TUNSTALL CONSULTING ENGINEERS, P.C. 2602 Iron Gate Drive, Suite 102 Wilmington, North Carolina 28412 (910) 343-9653 (910) 343-9604 (Fax) ; ECEIV, License#C-3641 ., hy9 N&T Project No. 19131 Site Data Site Area 1,215,263 SF 27.90 AC IMPERVIOUS SITE TOTAL BASIN 1 Building: 425,250 SF Building: 425,250 SF Asphalt,C&G: 413,411 SF Asphalt,C&G: 538,238 SF Sidewalk: 762 SF Sidewalk: 15,103 SF Total: 839,423 SF Total: 978,591 SF Off-Site IMP To Basin 1: 3,345 SF PERCENT SITE IMP: 80.53% TOTAL TO BASIN 1: 842,768 SF IMPERVIOUS TRENCH 1 Building: - Asphalt,C&G: 124,827 SF Sidewalk: 14,341 SF Total: 139,168 SF TOTAL TO TRENCH 1: 139,168 SF )ECEIVE I!. DIY: Infiltration Basins I TOTAL AREA(SF) ASPHALT(SF) CONCRETE CURB SIDEWALK(SF) BUILDING(SF) OFFSITE(SF) IMPERVIOUS %IMPERVIOUS &GUTTER(SF) TOTAL(SF) DA1 13,576 9,226 809 0 0 2,565 10,035 74 DA2 65,298 12,251 8,841 0 30,695 5,696 51,787 79 DA6 91659 27400 15072 0 47830 0 90302 99 DA8 80070 22246 14739 0 43100 0 80085 100 DA10 73640 23272 12796 0 36000 0 72068 98 DA12 2850 1382 202 93 0 0 1677 59 DA13 2670 1572 174 32 0 0 1778 67 DA15 3268 1360 210 120 0 0 1690 52 DA16 3093 1590 184 41 0 0 1815 59 DA18 73160 23330 12206 0 35200 0 70736 97 DA20 80000 22238 14747 0 43000 0 79985 100 DA22 78079 21693 14378 0 42020 0 78091 100 DA24 77613 25524 12889 0 37152 0 75565 97 DA26 3290 1350 200 108 0 0 1658 50 DA27 1949 799 118 65 0 0 982 50 DA29 4515 1350 200 182 0 0 1732 38 DA30 2676 802 119 121 0 0 1042 39 DA32 75823 25532 12377 0 34618 0 72527 96 DA34 78082 21700 14400 0 42000 0 78100 100 DA36 67861 23513 10620 0 33635 0 67768 100 DA41 84095 0 0 0 0 0 0 0 DA42 29274 0 0 0 0 0 0 0 TOTAL(SF) 992,541 268,130 145,281 762 425,250 8,261 839,423 84.6 TOTAL(AC) 22.79 6.16 3.34 0.02 9.76 0.19 19.271 •'On the Plans the Basin is split into two basins,Basin 1 and 2.They function as one Basin. *DA1 INCLUDES 2565 SF OF OFFSITE AREA WITH 2565 SF BEING IMPERVIOUS(ROW ACCOUNTED FOR IN INFILTRATION BASIN) •DA2 INCLUDES 5696 SF OF OFFSITE AREA WITH 7Rn cF BEING IMPERVIOUS(ROW ACCOUNTED FOR IN INFILTRATION BASIN) INCcu©S 17A- ONSITE = �1S ZSQsF/Zz G,4c 3 gyssr Or&s)7c = e zC i 5F / o.19 Ac, (OFF-SIT ) TM ? ONStrg t Q3G,0'78sFAc .iggA 0 Fr 1,,C.7 3,3'1Ssp j O'77,1 OECEWEi BY: . • RV6 3QA 2oz i Date Design NORRIS & TUNSTALL Wilmington, NC Sheet CONSULTING ENGINEERS P.C.— Brunswick County, NC Of Check Job For Job No. ‘,(/ a/CS T1'1 1444-ea A #( eac'ft 410 7-Mk (en , 11(3 1 ' 1 , ' BLIA‘+5 S f Rear ?c,(1.41r 46 A (f- 1 :' I I 1 : ! t 1, 4' - : • , I : i I E-6s Pcti-.-ct4 kirif 0-11/14,1 Tr Zi 4 1 eal-ef /, ",-,,:ii. z, 2_0 g_c) . i iCal-C )4ats 141.5 0 ero4 etact AI:4141v SiS yi..q red r;. diloutel Fo.,1_1,,A Mle.14:10,1 84 i'llrtS 42) Fix:(-0ac 4 ?ek '1-4) I l'il,,T,.. 1 2- .ac.rr- .s;:e4tte,,,i;:0,1, 2ikl/ -rihs i CeAr. c 1TA 1 . e ,:lIeecr!1 , ,A1 E.- 6), Filo T: : ; . I S 1 , w--7 I `I- ' / tit--C4d For .EN ilfr t-. LOu aiG-) --4 9,i c ( . i ' 4 : , I . ; .i ' i : pic.cl(A.s. isiki, 1 - 1 1 , . . fi, N A _ ,27:-:;i : A g 1 I ' %°--- , 'SLAT.----- I" 14C- . •••••"---, 1 3-ti„p..., )q,27( Ac.1 °4 71:hive.i .eq.G 9.; '. e, D.g i/ ; • : i ! I i ! ! i i. : ,' 1/1 o•Blt - ,e. z277 A. :7: 100 1 (930 C,P ' 1,-- S!iite‘ -62"3 1 1 1 • , .. , , . . S747 .7 i_7e9e,cit4 :SsA-r, ibef(03E 2___ ;_c_._€jie ,..... 7o ..f, ! . ....."" i , . . . V(A,IGH (eg Veloote :: 0 7/9 C -. .(fie4t-i-er- 86161 rias) l' 1 - i:P , ,ra4dga, -vi---- ,i;Ra. c(25- "..,C (.... CFryfielit, ) ' : 1 i I • . .1 1 , • IA . • _____................................... .... ..ws , 1 • .....................— Et7vEll! EH . „qeqz.s.-:•-_, x tsrmiki 1 , 1 ! , I ' • :-Cit bn . V kt+it C al/ F-W.i 17 ''Oliotie.S. ) -= agoz7, ,X 'l'C 1.1 ivH02 ) be rk , I 1 .. . BP . ._...., 1 ./?--7-----i'--- 1 : 1 i ... . Date Design 'I NORRIS & TUNSTALL Wilmington, NC Sheet --CONSULTING ENGINEERS P.C.----- Brunswick County, NC Of Check Job For Job No. SC--) Cc S, 'Ai:tridt 71--ad.e... jell? 1 . , , , 1 . i -jr'fl 4 i 4re.-i- -aik.'ack-t-Ini IS -zir' Iii-f-• ehA frieb,.,c ,.,k-tal time ,s,%0 4. 7 rt-C.'A C.....•, i I i 1 1 A ITsCki Aft CO A il ed-c a ; rein Jon '"frs OVF . ! ; • i . 1 , i • 1 .•- I Sepc„letcka,ASe4%,:L* ak.Siiv So'14-00-1 .•-: (01s— i 1 % 1 : . . . i . . 1 1 . . , 1 , i 2 i ' EE12.6 ISA(C't 5P(Z24-44; V.S ,ce ,,_ T-0 ? 1...---)" oss-'Ff i 1 41 3.5- - 1 i I .._____ . : ! i 1 0 o a , •P„'„,s_i_ ' -2 J i i I i I . 1 , I ; • 1 ! , , . 1 1 . I , 1 i I . . i I ! .I : .1 I i 1 . , • ! I I . 1 I . • • 1 1 , ! , I . . 1 I i ! i . . . . i i . : . , I i I I 1 ., . i ! ! I i I 1 ! , • . . , . I I i I 1 1 I . ? • i 1 I I. 1 i 1 • . ! i ' I: , . : ! 1 I , I ! ! ' , . I . . . . . . • i i • . i BECEIVE ; 1 • i I ! . I ! BY: . ! ,.........--, , I . : , . ! . . . i • . . , . , . ! I 1 • I ; i 1 - I Pusey, Steven From: Pusey, Steven Sent: Tuesday,January 12, 2021 2:27 PM To: Ken Dull (kdull@mckinleybuilding.com);Jason Clark(jclark@ntengineers.com); Pete Avery(pavery@mckinleybuilding.com) Subject: Stormwater permit SW8 201006 -Wilmington Trade Center/Request for Additional Information Attachments: 2021 01 addinfo 201006.pdf Gentlemen: Please reference the attached letter requesting additional information for subject project. I look forward to your response. Let me know if you have any questions. Best regards, Steven G. Pusey Environmental Engineer II Division of Energy, Mineral and Land Resources State Stormwater Program North Carolina Department of Environmental Quality 127 Cardinal Drive,Wilmington, NC 28405 Office: (910) 796-7215 Direct: (910) 796-7331 Email: steven.pusey@ncdenr.gov D E )) !c ar.7 j"{... '4ress:s •i ::Cat 7::fna,�:i'u:'�r?_ i�rcL L',w G;)i]:'; .y oc t S J 2u is :1 pi;des. 1 ROY COOPER ,(('' "1 ;} Governor YM}i # ., �QVV9911 :.`-. YF MICHAEL S.REGANv.t r ;� i 'fin • Se ctelpry ` }� t BRIAN WRENN NORTH CAROLINA Director EAr m[ y January 12,2021 Via email only: kdull(a)mckinleybuildinQ com Seamist Properties,LLC Attn: Ken Dull,Manager 3807 Peachtree Avenue, Suite 200 Wilmington,NC 28403 Subject: Request for Additional Information Stormwater Project No. SW8 201006 Wilmington Trade Center New Hanover County Dear Mr. Dull: The Wilmington Regional Office received and accepted a State Stormwater Management Permit Application for the subject project on October 13,2020. A preliminary in-depth review of that information has determined that the application is not complete and that additional information is needed. To continue the review,please provide the following additional information in a hard copy submittal package: 1. 15A NCAC 02H.1042(2): Please email the supplement form to the email address provided below so that ✓ it can be preserved electronically per the regulatory requirements. 2. 15A NCAC 02H.1042(2)(g)(iii): Va. If there are no surface waters located on this site,please provide confirmation from the Division of Water Resources and include a note on the plans that none exist. 7 b. Row 7 of the supplement-EZ cover page indicates that the width of the vegetated setback is not applicable. Please provide a note on the plans indicating that are no surface waters within 50 feet of the project boundary. If a note is already provided on the plans,please provide a citation of where it is located. 3. 15A NCAC 02H.1050(1)and.1003(3)(b): The design volume of SCMs shall take into account the runoff at build out from all surfaces draining to the system. Drainage from off-site areas may be bypassed. If offsite drainage from property not owned by the applicant or not part of the development project cannot be bypassed,the offsite area must be considered at its built-out potential or there must be a recorded deed restriction for BUA between the parties to treat that amount of BUA in the proposed system must be provided. The permit application lists a small amount of drainage area as offsite. Please describe a+here this / is located and its impact on the storm water system. 4. 15A NCAC 02H.1050(5): SCMs shall include an overflow or bypass device for inflow volumes in excess of the treatment volume,or,if applicable,the peak attenuation volume. a. For the infhration trench system,the stppiemeni indicate:that an overflow or bypass device h:,s been provided. The plans have a note saying that It is located at the curb inlets any;I found a detail showing that. However, l do not see a detail showing the SDK-I. which is at the center of the trench. If it overflows,will it lift the m<.nl.ole cover? North Comtua Denartment cat Environmental Quaiiry Diviiion i t Energy heneval met Lard'triourt e. iel Wilmington itegianat Offier is Can lnai Chive E ztensio t Wilmington,"i onth Cwolina3„MgtS State Stormwater Permit No.SW8 201006 Page 2 of 2 b. For the infiltration basin system.there appears to he two(2) emergency overflow weirs on Basin I but none on Basin 2. 1 would recommend also putting an emergency overflow weir on Basin 2 in case the interconnecting pipe gets clogged. 5. 15A NCAC 02H.1051(4): Pretreatment devices shall be provided to prevent clogging.Pretreatment devices may include measures such as sumps in catch basins,gravel verges,screens on roof and patio drains,filters,filter strips, grassed swales,and forebays. Rooftop runoff that is discharged to the surface of an infiltration system shall not require pretreatment. Please advise what type of pretreatment device is provided for the infiltration basin and the infiltration trench systems. The catch basin detail does not show a sediment basin, however the drop inlet detail does (where are these?). As mentioned before, I do not see a detail for the SDMH. ✓ 6. 15A NCAC 02H.1051(6): For infiltration devices located under the ground surface,a minimum of one inspection port shall be provided. For the infiltration trench, please show the observation port(s)on the plans. Please remember to confirm that any revised information is presented consistently throughout the application documents including calculations,supplements,narrative,and plans. Please also remember to provide two (2) hard copies of any updated documents per 15A NCAC 02H.1042(2). All of the requested information listed above should be received in this Office by January 28,2020,or the application will be returned as incomplete. If additional time is needed to submit the requested information, please email your extension request prior to this due date to the email address provided below with a justification and a date of when the requested information will be submitted,which shall be no later than 15 days past the original due date.Please note that only two letters requesting additional information is allowed in the State Stormwater Program for a total of 30 days to submit the requested additional information. If the information is not satisfactorily provided after either the second request or 30 days, the project will be returned. If the project is returned and you wish to re-submit later,you will need to resubmit all required items at that time, including the application fee. The construction of any impervious surfaces,other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter,please feel free to call me at(910)796-7215 or email me at steven.pusey@ncdenr.gov. Sincerely, s P Steven G.Pusey Environmental Engineer II DES/sgp: \\\Stormwater\Permits&Projects\2020\201006 HD\2021 01 addinfo 201006 cc: Jason Clark, PE—Norris&Tunstall;via email:jclarkAntent'ineers.com Pete Avery, via email: paver�w,nckinleybuilding com Wilmington Regional Office Stormwater File Burd, Tina J From: Burd, Tina J Sent: Friday, October 16, 2020 3:05 PM To: kdull@mckinleybuilding.com; pavery@mckinleybuilding.com;John Tunstall;Amy Norris Subject: SW8 201006 -Wilmington Trade Center The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources(Stormwater Section)accepted the Stormwater Permit Application and$505.00 fee for the subject project on October 13, 2020. The project has been assigned to Steven Pusey and you will be notified if additional information is needed. Please be advised that the construction of built-upon area may not commence until the Stormwater Permit is issued. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance&Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Email corrr','vl`):r:ile12.o v1'. . r. .. i i'i " L) the wr ih Carolina 1 Application Completeness Review Checklist(Non-Transfers)-Short Version Project Name: 1 I L r-'i r f.G f 0 N T Li UCcE. 13 7t; le Date Delivered to W IRO: /b+,kJ/2c 2 u Project County/Location: M Gr,3 E-(A a0 L,+C L. l4{34 J S i 7 Q 11-1 RIMS Received/Accented Date: is �j�Zc) L J Rule(s): 02017 Coastal 02008 Coastal E. S Coastal BIMS Acknowledged Date:: /— DPhase II Eurtiversal 01988 Coastal 1 Permit Action: Ne� New Permit#2: S 64 ;O / 00 Major Mod/Minor Mod/Renewal Existing Permit#: Permit Type: HD i LD I LD Overall/-ID&LD Combo Expriation Date : General Permit i Offsite I Exempt/Rescission EOffsite to SWB: Development Type: Commercial Residential I Other Lot is in Master Permit? Subdivided?: Subdivision or Single Lot OPE Cert on File? Permittee Type&Documents Needed: Property Ownerls) Purchaser Lessee EHO�+ �Deveiooer 'Jiabie? �tiiabie? Viable? EViabie? DViable? Deed OPurchase Agmt ELease Election ,vilcriutes Not Subdivided: Deed E5ubcPkos:on• Common Area Deed Paperwork r A.plication Fee. 125505(wrthrn Gmo) Cherk#(s): 14:,' G, ENo Fee i aupplement'r(1 new form or for older forms:1 original per SCM) a&M2 Soils Report(Infil or PP) Calculations(signed/sealed) ❑Deed Restrictions, if subdivided/ MProject Narrative EIL15GS Map(or on fife?) Subject to SA?: Y /0 Subject to ORW? Y /'✓ 12Plans(2 Sets) EPE Certification 1ZElectronic Copies ,E1 Easements, Recorded(2017 Rules) • NOTES: , 1Enter RIMS Acknowledged Date on this Sheet 2For New Projects-Enter New Permit#on Supplements& Deed Restiction Templates. 3lf w/in 6 months and they are requesting a mod,STOP. Needs a renewal first. EMAILED ENGINEER DATE: Comments: REVIEWER NAME: jTEUs .e?erence Library\Procer.tt, \Caecklists\Completeness Review Ci;ecklisr_2020 01 31 NORRIS & TUNSTALL CONSULTING ENGINEERS P.C. 2602 Iron Gate Drive,Suite 102 1429 Ash-Little River Road Wilmington,NC 28412 RECEWED Ash,NC 28420 (910) 343-9653 (910) 287-5900 (910) 343-9604 Fax (910)287-5902 Fax iOCT I 3 120 John S.Tunstall,P.E. J.Phillip Norris,P.E. T.Jason Clark,P.E. NCOEQ Joseph K.Bland,P.E. WILMINGTON RO Thomas J. Scheetz,E.I. October 12, 2020 NC DEQ Division of Energy, Mineral and Land Resources — State Stormwater Program 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: State Stormwater Permit Submittal Wilmington Trade Center 4104 US Hwy. 421 North New Hanover County, NC N&T Project No. 19131 Dear Sir or Madam: Enclosed are two (2) sets of plans for the above referenced project, one (1) set of calculations (which includes the soils report), one (1) copy of the Stormwater Narrative, one (1) USGS map, one (1) copy of the Deed, one (1) copy of the Articles of Organization, the original Division of Water Quality Stormwater Management Permit application, the original Supplement EZ form, the original Operation and Maintenance EZ Agreement, a $505.00 check for the permit review fee, and one (1) CD (PDF of the complete submittal). Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS & TUNSTALL CONSULTING ENGINEERS, P.C. EDL O T. Jaso Clark, P. E. TJC/jst/asn 19131 10-12-20-s-sw-Itr Enclosures cc: McKinley D. Dull, Manager/Seamist Properties, LLC (by E-Mail Only) Pete Avery/ McKinley Building (by E-Mail Only) NCBELS License C-3641 STORMWATER SYSTEM & EROSION CONTROL NARRATIVE WILMINGTON TRADE CENTER 4104 US Hwy. 421 North Wilmington, North Carolina For Seamist Properties, LLC 3807 Peachtree Avenue, Suite 200 Wilmington, NC 28403 (910) 395-6036 , 1011111/ 1 ...i.s.44:00,1e, ,. ..,,▪ , /04.,....ekst. , „:., f 03 08 SEAL i 69 S NG October 2020 Prepared by: NORRIS &TUNSTALL CONSULTING ENGINEERS, P.C. 2602 Iron Gate Drive, Suite 102 Wilmington, North Carolina 28412 (910) 343-9653 (910) 343-9604 (Fax) /�`�C T4 License# C-3641 (,r { 4x N&T Project No. 19131 e1• I �6� * r r" NARRATIVE WILMINGTON TRADE CENTER Receiving Stream Name: NE Cape Fear River Stream Class: SC; SW Stream Index Number: CFP17 18-74-61 DESCRIPTION: The project site is a 27.899± AC tract located at 4104 US Hwy. 421 North in Wilmington, NC. The soils of the site consist of highly permeable Sandy Soils with grades ranging from 10% (NW Property Line) to 0%. Approximately 29.3 AC will be graded to allow construction of the Wilmington Trade Center, which consist of three (3) buildings with paved parking and paved access. The runoff from the site is estimated using the rational method for the required design storms and rainfall data for the area. Construction is scheduled to begin as soon as all permits and approvals are obtained. EROSION CONTROL MEASURES: The attached plans and specifications outline the requirements for erosion control measures. Silt fencing will be provided along each side of the entrance drive where stormwater would be expected to sheet flow from disturbed areas directly to adjacent property. Gravel check dams will not be provided unless the contractor has to temporarily discharge into an open ditch instead of the proposed storm drain outfall. There are two (2) Stormwater SCM's designed for the site. One (1) is an Infiltration Basin (NE Property Line — Rear of the Buildings) that will function as a sediment basin during construction. The front of the site drains into a subsurface Infiltration Trench for stormwater treatment. During construction, sediment will not be allowed to enter the system. The inlets for the Infiltration Trench will be protected with silt sacks and hardwire and rock inlet protection. Erosion control in this area will be accomplished with the inlet protections. Along the perimeter erosion control is accomplished with temporary silt fence. The provided tsf is above the required minimum of 400 If/AC. Rip-rap energy dissipaters are sized appropriately at all storm drainage outlets. Along the NW property line there is a roadside swale that will include 12" diameter Wattles to decrease velocity and provide erosion control. A gravel construction entrance will be constructed at all entrances. Maintenance will be provided by the grading contractor and developer. STORMWATER MANAGEMENT MEASURES: The project site is located in New Hanover County. Land disturbing on the site will exceed one (1) acre, which requires the site to comply with NHC and State regulations. The stormwater runoff from the development will be directed to the two (2) infiltration systems. The first is a large Infiltration Basin (Made up of Basins 1 and 2 per the plans, act as one basin) and the second is an Underground Infiltration Trench. ECS provided a Hydrogeologic Analysis of the site and soils to allow for the infiltration basin to reduce the 2 required separation between the basin and the SHWT from 2 feet to 1 foot. Per NHC Requirements the site meets the Pre-Post Requirements for the 2, 10 and 25-year storms. CONSTRUCTION SEQUENCE: The contractor will install the gravel construction entrance(s) and silt fence prior to beginning any clearing and grading operations. Additional silt fence will be installed when and if conditions warrant during construction. The Infiltration basin/sediment basin will be constructed immediately after that portion of the site is cleared, and outlet structure with protection will be installed. Disturbed areas will be landscaped or seeded or sodded upon completion. 3 EROSION CONTROL NOTES AND MAINTENANCE PLAN 1. All erosion and sediment control measures will be checked for stability and operation following every runoff-producing rainfall, but in no case, less than once every week and within 24 hours of every half-inch rainfall. 2. All points of egress will have construction entrances that will be periodically top- dressed with an additional 2 inches of#4 stone to maintain proper depth. They will be maintained in a condition to prevent mud or sediment from leaving the site. Immediately remove objectionable material spilled washed or tracked onto the construction entrance or roadways. 3. Sediment will be removed from hardware cloth and gravel inlet protection, block and gravel inlet protection, rock doughnut inlet protection and rock pipe inlet protection when the designed storage capacity has been half filled with sediment. Rock will be cleaned or replaced when the sediment pool no longer drains as designed. Debris will be removed from the rock and hardware cloth to allow proper drainage. Silt sacks will be emptied once a week and after every rain event. Sediment will be removed from around beaver dams, dandy sacks and socks once a week and after every rain event. 4. Diversion ditches will be cleaned out immediately to remove sediment or obstructions from the flow area. The diversion ridges will also be repaired. Swales must be temporarily stabilized within 21 calendar days of cease of any phase of activity associated with a swale. 5. Sediment will be removed from behind the sediment fence when it becomes half filled. The sediment fence will be repaired as necessary to maintain a barrier. Stakes must be steel. Stake spacing will be 6 feet max. with the use of extra strength fabric, without wire backing. Stake spacing will be 8 feet max. when standard strength fabric and wire backing are used. If rock filters are designed at low points in the sediment fence, the rock will be repaired or replaced if it becomes half-full of sediment, no longer drains as designed or is damaged. 6. Sediment will be removed from sediment traps when the designed storage capacity has been half filled with sediment. The rock will be cleaned or replaced when the sediment pool no longer drains or when the rock is dislodged. Baffles will be repaired or replaced if they collapse, tear, decompose or become ineffective. They will be replaced promptly. Sediment will be removed when deposits reach half the height of the 1st baffle. Floating skimmers will be inspected and kept clean weekly. 7. Sediment will be removed from the sediment basin when the design storage capacity has been half filled with sediment. Rock will be cleaned or replaced when the sediment pool no longer drains or if the rock is dislodged. Baffles will be repaired or replaced if they collapse, tear, decompose or become ineffective. They will be replaced promptly. Sediment will be removed from baffles when deposits 4 reach half the height of the 1st baffle. Floating skimmers will be inspected weekly and will be kept clean. Land Quality Requires: 8. All seeded areas will be fertilized, reseeded as necessary and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. All slopes will be stabilized within 21 calendar days. All other areas will be stabilized within 15 working days. Water Quality Requires: 9. All seeded areas will be fertilized, reseeded as necessary and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. All perimeter dikes, swales, ditches, perimeter slopes, all slopes steeper than 3' horizontal to 1' vertical (3:1) and all high quality water (HQW) zones shall be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within seven (7) calendar days from the last land- disturbing activity. All other disturbed areas shall be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within fourteen (14) calendar days from the last land-disturbing activity. 10. Flocculants will be used to address turbidity issues. The pumps, tanks, hoses and inject systems will be checked for problems or turbid discharges daily. 11. Refer to new NPDES rules regarding basin outlet structures and skimmers shall withdraw water from the surface. 5 SECTION 02920 SOIL EROSION AND SEDIMENTATION CONTROL 1. GENERAL 1.1 Contractor shall take every reasonable precaution throughout construction to prevent the erosion of soil and the sedimentation of streams, lakes, reservoirs, other water impoundments, ground surfaces, or other property as required by State and Local regulations. 1.2 The Contractor shall install all required silt fences, and construction entrances at the initiation of work, and have these measures reviewed and approved by the local permit authority prior to clearing and grading operations. 1.3 The Contractor shall, within 21 days of suspension or completion of land disturbing activities, provide permanent protective covering for disturbed areas. Temporary and permanent erosion control measures shall be coordinated to assure economical, effective, and continuous erosion and siltation control throughout the construction and post-construction period. Use the specified seed for both temporary and permanent seeding. 2. PRODUCTS 2.1 Asphalt for anchoring mulch shall be Type SS-1 Emulsion. 2.2 Fertilizer shall be 10-10-10 grade or equivalent. 2.3 Lime shall be dolomitic agricultural ground limestone containing not less than 10 percent magnesium oxide. 2.4 Mulch shall be small grain straw, hay, wood chips, asphalt emulsion, jute or other suitable material free of undesirable weed seed. 2.5 Phosphate shall be 20 percent superphosphate or equivalent. 2.6 Seed shall be 20% carpet grass, 24% Bermuda, 20% turf Fescue, 10% Creeping Red Fescue, and 24% Annual Rye grain. Bermuda seed shall be hulled for warm weather planting and unhulled for cool weather planting. Purity of seed shall be a minimum of 98 percent and germination shall be a minimum of 85 percent. 2.7 Silt fence shall consist of NCDOT Class A fabric supported by metal posts spaced not more than 6 feet on center. The bottom of the fabric shall be buried a minimum of 6 inches. 2.8 Gravel for check dams shall be#57 washed stone. 2.9 Aggregate for construction entrance shall be#4 washed stone. 6 2.10 Stone rip rap for check dams and erosion control shall be NCDOT Class A or B as shown. 3. EXECUTION 3.1 General: Take every practicable measure during construction or suspension to work to minimize erosion and siltation. Measures should include good construction practices, temporary physical barriers to sediment travel, settling basins for new ditches, and establishment of vegetative cover. 3.2 Construction Practices 3.2.1 Avoid dumping soil or sediment into any wetland or watercourse. 3.2.2 Maintain an undisturbed vegetative buffer where possible between a natural watercourse and trenching and grading operations. 3.2.3 Avoid equipment crossings of streams, creeks, and ditches where practicable. 3.2.4 Grade all cut, fill and ditch slopes to minimum slope of 3:1, unless otherwise shown or directed. 3.3 Temporary Physical Barriers are required where sedimentation on offsite property or excessive erosion is a problem. 3.3.1 Mulch shall be used for temporary stabilization of areas subject to excessive erosion and for protection of seedbeds after planting where required. 1. Apply grain straw and hay at a rate of 75 to 100 pounds per 1,000 square feet and wood chips at a rate of 500 pounds per 1,000 square feet. Jute and mesh should be installed as per manufacturer's instructions. 2. Asphalt emulsion for slope stabilization should be applied at a rate of 1,000 gallons per acre. Asphalt emulsion used for anchoring straw should be applied at a rate of 150 gallons per ton of straw. 3.3.2 Silt Fences shall be used at the base of slopes to restrict movement of sediment from the site. Clean silt fence of accumulated sediment after each rainfall event or when it exceeds a depth of 0.5 feet above natural grade. 3.3.3 Stone Check Dams, placed at the discharges of creeks, ditches, and swales, shall consist of Class A or Class B erosion control stone at minimum two feet high and three feet thick across the watercourse, with a one foot thick iayer of gravel on upstream side. Remove sediment if accumulated to a depth of 1.0 feet at upstream face. 7 • 3.4 Vegetative Cover: Establish and maintain permanent vegetative cover on all unpaved areas disturbed by the work. 3.4.1 Preparation of Seedbed: Areas to be seeded shall be scarified to a depth of 4 inches and until a firm, well pulverized, uniform seedbed is prepared. Lime, phosphorous and fertilizer shall be applied during the scarification process in accordance with the following rates: Lime: 45 pounds per 1000 square feet Phosphorous: 20 pounds per 1,000 square feet Fertilizer: 17 pounds per 1000 square feet 3.4.2 Seeding: Disturbed areas shall be seeded with 2 to 3 pounds per 1000 square feet of the specified seed mixture. Seed shall be worked into the bed to a depth of 1/4 inch. Regrade and seed eroded areas immediately 3.4.3 Mulch all areas immediately after seeding. Mulch shall be applied and anchored as specified hereinbefore. Reapply as necessary to retain cover until grass is established. 3.5 Construction Entrance: Provide an aggregate drive, 20 feet wide by 50 feet long by 6 inches thick at each entrance to the site used by construction vehicles, until such time as the permanent roadway is constructed. Remove soil if accumulated to a depth greater than 0.5 inches. 3.6 Maintenance: The Owner and Contractor shall be responsible for maintaining all temporary and permanent erosion control measures. Temporary structures shall be maintained until such time as vegetation is firmly established in the area protected by the structure. Permanent streambank protection and grassed areas shall be maintained until completion of the project. Areas that fail to show a suitable stand of grass or which are damaged by erosion shall be immediately repaired. END OF SECTION 8 DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 2 Is all/part of this project subject to previous rule -1 3 versions? No i FORMS LOADED DRAINAGE AREA INFORMATION 1 Entire Slte I 1 2 I i —IF UG Infiltration 4 Type of SCM N/A _ ' Infiltration Basin Trench k--_ 5 Total BUA in project(sq ft) 974556 sf 835388 sf r 139168 sf New BUA on subdivided lots(subject to permitting)F (_ , 6 (sq ft) �_ 0 sf 'I 0 sf 0___ _sf _ New BUA outside of subdivided lots(subject to t• '�I'� �� �� 7 permitting)(sf) ' 974556 sf i' 835388 sf_ 139168 sf .1 8 Offsite-total area(sq ft) 4852 sf 4852 sf 0 sf II 9 Offsite BUA(sq ft) •I" 0 sf 1 ,^0 sf—_______ —_,0 sf �_ 11' 10 Breakdown of new BUA outside subdivided lots: ' I( 4 j -Parking(sq ft) 383610 sf J,a 265565 sf r._ 118045 sf l -Sidewalk(sq ft) 15103 sf 762 sf I 14341 sf_ -Roof(sq ft) 423780 sf ,' 423780 sf �_ �0 sf 1 -Roadway(sq ft) I __ g...0___ i� 0 sf__ 0 sf Future(sq ft) 0 sf �I O sf r 0 sfr -Other,please specify i the omm b ! .i 'I I below(sq ft) I,u,r�4, 1jr 152063 sf I 145281 sf 6782 sf II New infiltrating permeable pavement on 11 subdivided lots(sq ft) L0 sf 'I--- New 0 sf 0 sf I infiltrating permeable pavement outside of I ���( 12 subdivided lots(sq ft) I 0 sf ; 0 sf I 0 sf Exisitng BUA that will remain(not subject to 11— —� 13 permitting)(sq ft) F__, 0 sf__,._,_,� _ 0 sf B 0 sf l 14 Existing BUA that is already permitted(sq ft) 0 sf _ i 0 sf 0 sf __. 15 Existing BUA that will be removed(sq ft) - 0 sf .r 0 sf ___ 0 sf_ 16 Percent BUA L 809(uPr+ -% 0% 17 Design storm(inches) Is_ 1.5 in I 1.5 in 1.5 in _I 18 Design volume of SCM(cu ft) 1 0 cf ji�100112 cf 16618 cf _ I _ 19 Calculation method for design volume � . Simple___II Simple_____, Simple_ 1 ADDITIONAL INFORMATION Please use this space to provide any additional information about the 20 drainage area(s): i ► 4". 164CPC4 sea, r E c, 8 BY INFILTRATION SYSTEM 1 - Drainage area number 1(Basin) 1__2(Trench) 2 Design volume of SCM(cu ft) L_100112 cf——II 16618 cf -_ GENERAL MDC FROM OM.1050 +-- _^--3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes4 Is the SCM located away from contaminated soils? Yes _ Yes �y- 5 What are the side slopes of the SCM(H:V)? 3.1 1 1 6 Does the SCM have retaining walls,gabion walls or other engineered side slopes? _No E,�_ No 7 Are the inlets,outlets,and receivingstreamprotected from erosion(10-year storm)? i Yes ��'r 1 ( Ye _ I Yes ___i 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred) I 10 If applicable,will the SCM be cleaned out after construction? Yes ± Yes 1 ____. 11 Does the maintenance access comply with General MDC(8)? _ Yes _ - Yes— -1 12 Does the drainage easement comply with General MDC(9)? Yes Yes ) If the SCM is on a single family lot,does(will?)the plat comply with General MDC _ -'� 13 (10)? _ N/A__ _ N/A _ 14 Is there an O&M Agreement that complies with General MDC(11)? __Yes I _Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes — Yes 16 Does the SCM follow the device specific MDC? L---_--w--,---� r-- Yes it 17 Was the SCM designed by an NC licensed professional? Yes jr.. Yes NFILTRATIgN M,MDCFROMo3H,,05,4 18 Proposed slope of the subgrade surface(%) 0% — 0% _—_ 19 Are terraces or baffles provided? 1 No _1r No fl 1 , 20 Type of pretreatment: Sump©DI 11Sump ia DI -4(ZInvio `� W SISOIIS DOtO _,_—� e Was the soil investigated in the footprint and at the elevation of the infiltration 74 •, -,\ 21 system? Yes Yes 22 SHWT elevation(fmsl) 9.50 9.81 23 Depth to SHWT per soils report(in) W *69.57 id *50 _1 24 Ground elevation at boring in soils report(fmsl) 15.30 1 _ 13.97 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? ® Yes No �1 26 Soil infiltration rate(in/hr) 24.92 14.44 _ 27 Factor of safety(FS) (2 is recommended): 1.66 �2,00�� _ Elevations — ---- 29 Bottom elevation(fmsl) 10,5 ft _ 12 ft _ 30 Storage elevation(fmsl) - 1485 ft 17 ft 31 Bypass elevation(fmsl) 14.35 ft 17 ft For Basins Only_ ____________1___' _ 32 Bottom surface area,ft2: _ - —�_28925ft T_ �- N/A • 1 33�Storage elevation surface area(ft2) W— 70150 ft 0 - N/A [For Trenches Only 34 Length(ft) N/A 1990 ft 35 Width(ft) N/A 7.5 ft 36 Perforated pipe diameter,if applicable(inches) N/A 36 in 37 Number of laterals N/A 1 38 Total length of perforated piping N/A 1990 ft 39 Stone type,if applicable N/A #57 40 Stone void ratio(%) N/A 40% 41 Is stone free of fines? N/A Yes 42 Is the stone wrapped in geotextile fabric? N/A yes__ _43 Has at least one infiltration port been provided? N/A J Yes Volumes/ADrawdown_ _ 44 Design volume of SCM(cu ft) —Y — I ' 100112 cf 16618 c f _ 45 Time to drawdown(hours) 4 'T1.85 hrs ��- ..ri.�aw-rr_-air_--. _�.v-s• rr-aaawae - _ - Y ADDITIONAL INFORMATION Please use this space to provide any additional information about the infiltration `„ t y4 ) ,,, IA evil 46 system(s): �y`„ 1. Borings 11-17 average to find SHWT&Rate for Basin. {{ �--n 1~ __-.� 2 Borings 18-110 average to find SHWT&Rate for Trer I E F 14 . ;,;.;- 3. ECS did report to allow Infiltration Basin#1 to have 1 foot separation between I bottom&SHWT. I OCT 13 202j i B Infiltration 1 2:34 PM 10/8/2020 LIMITED LIABILITY COMPANY ANNUAL REPORT ■ 10/2017 NAME OF LIMITED LIABILITY COMPANY: Seamist Properties, LLC Filing Office Use Only SECRETARY OF STATE ID NUMBER: 0593182 STATE OF FORMATION: NC E-Filed Annual Report 0593182 REPORT FOR THE CALENDAR YEAR: 2020 CA202010611295 4/15/2020 02:45 SECTION A: REGISTERED AGENTS INFORMATION Changes 1. NAME OF REGISTERED AGENT: Dull, McKinley D 2.SIGNATURE OF THE NEW REGISTERED AGENT: SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 3. REGISTERED AGENT OFFICE STREET ADDRESS&COUNTY 4.REGISTERED AGENT OFFICE MAILING ADDRESS 3807 Peachtree Ave.,Suite 200 3807 Peachtree Ave.,Suite 200 Wilmington, NC 28403-6725 New Hanover County Wilmington,NC 28403-6725 SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: Real Estate Investments 2. PRINCIPAL OFFICE PHONE NUMBER: (910) 395-6036 3.PRINCIPAL OFFICE EMAIL: Privacy Redaction 4. PRINCIPAL OFFICE STREET ADDRESS 5.PRINCIPAL OFFICE MAILING ADDRESS 3807 Peachtree Ave.,Suite 200 3807 Peachtree Ave.,Suite 200 Wilmington, NC 28403-6725 Wilmington, NC 28403-6725 6.Select one of the following if applicable. (Optional see instructions) The company is a veteran-owned small business The company is a service-disabled veteran-owned small business SECTION C: COMPANY OFFICIALS(Enter additional company officials in Section E.) NAME: McKinley D Dull NAME: NAME: TITLE: Manager TITLE: TITLE: ADDRESS: ADDRESS: ADDRESS: 3807 Peachtree Avenue,Suite 200 Wilmington, NC 28403 SECTION D:CERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business entity. McKinley D Dull 4/15/2020 SIGNATURE DATE Form must be signed by a Company Official listed under Section C of This form. McKinley D Dull Manager Print or Type Name of Company Official Print or Type Title of Company Official This Annual Report has been filed electronically. MAIL TO:Secretary of State, Business Registration Division,Post Office Box 29525,Raleigh,NC 27626-0525 10/12/2020 North Carolina Secretary of State Search Results • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • Print a Pre-Populated Annual Report form • Print an Amended a Annual Report form Limited Liability Company Legal Name Seamist Properties, LLC Information Sosld: 0593182 Status: Current-Active 0 Date Formed: 6/4/2001 Citizenship: Domestic Annual Report Due Date: April 15th Registered Agent: Dull, McKinley D Addresses Mailing Principal Office 3807 Peachtree Ave., Suite 200 3807 Peachtree Ave., Suite 200 Wilmington, NC 28403-6725 Wilmington, NC 28403-6725 Reg Office Reg Mailing 3807 Peachtree Ave., Suite 200 3807 Peachtree Ave., Suite 200 Wilmington, NC 28403-6725 Wilmington, NC 28403-6725 Company Officials All LLCs are managed by their managers pursuant to N.C.O.S. 57D-3-20. Manager McKinley D Dull E •.,,,. _,R. 3807 Peachtree Avenue, Suite 200 Wilmington NC 28403 LL T 13 2020 BY https://www.sosnc.gov/online servicesisearch/Business_liegistration_Results 1 1 frt."' w LIMITED LIABILITY COMPANY ANNUAL REPORT 10/2017 NAME OF LIMITED LIABILITY COMPANY: Seamist Properties, LLC Fling Office se Only SECRETARY OF STATE ID NUMBER: 0593182 STATE OF FORMATION: NC E-Filed Annual Report 0593182 REPORT FOR THE CALENDAR YEAR: 2020 CA202010611295 4/15/2020 02:45 SECTION A:REGISTERED AGENT'S INFORMATION Changes 1.NAME OF REGISTERED AGENT: Dull, McKinley D 2.SIGNATURE OF THE NEW REGISTERED AGENT: SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 3. REGISTERED AGENT OFFICE STREET ADDRESS&COUNTY 4.REGISTERED AGENT OFFICE MAILING ADDRESS 3807 Peachtree Ave.,Suite 200 3807 Peachtree Ave.,Suite 200 Wilmington,NC 28403-6725 New Hanover County Wilmington,NC 28403-6725 SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: Real Estate Investments 2.PRINCIPAL OFFICE PHONE NUMBER: (910)395-6036 3.PRINCIPAL OFFICE EMAIL: Privacy Redaction 4.PRINCIPAL OFFICE STREET ADDRESS 5.PRINCIPAL OFFICE MAILING ADDRESS 3807 Peachtree Ave.,Suite 200 3807 Peachtree Ave.,Suite 200 Wilmington,NC 28403-6725 Wilmington,NC 28403-6725 6.Select one of the following if applicable.(Optional see instructions) ❑ The company is a veteran-owned small business ❑ The company is a service-disabled veteran-owned small business SECTION C: COMPANY OFFICIALS(Enter additional company officials in Section E.) NAME: McKinley D Dull NAME: NAME: TITLE: Manager TITLE: TITLE: i ADDRESS: ADDRESS: ADDRESS: B 3 zz) 3807 Peachtree Avenue,Suite 200 Wilmington,NC 28403 SECTION D:CERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business entity. McKinley D Dull 4/15/2020 SIGNATURE DATE Form must be signed by a Company Official listed under Section C of This form. McKinley D Dull Manager Print or Type Name of Company Official Print or Type Title of Company Official This Annual Report has been filed electronically. MAIL TO:Secretary of State, Business Registration Division,Post Office Box 29525,Raleigh,NC 27626-0525 3 1�1I 3 9/51 1iHIl N10111111f11i1111111HU'�I1 2015010746 FOR REGISTRATION REGISTER OF DEEDS NEW HANOVEERRCCOUNTTY'Nc 2015 APR 17 02 21 07 PIS BK 5882 PG 450-456 FEE $26 00 KG REV STAMP� IN OOUIiI 21151111746 Excise Tax $1,481 00 Recording Tune,Book and Page Tax Lot No Parcel Identifier No A portion of R02400-001-001-000 Verified by County on the a day of 201_by Mail after recording to Grantee at address shown below This instrument was prepared by Womble Carlyle Sandridge&Rice,LLP(Hunter S Edwards) **No title search performed and no title opinion given or implied by the preparer** Brief Description For The Index 25 357 acres of real property located off of Highway 421 in New Hanover County,North Carolina NORTH CAROLINA SPECIAL WARRANTY DEED THIS DEED made as of April 17,2015,by and between GRANTOR.; GRANT ;,.; INVISTA S.a r.I., SEAMIST PROPERTIES,LLC, a Luxembourg societe responsabilite limitee, a North Carolina limited liability company doing business in North Carolina as 1NVISTA Sar1,LLC Address Address 4123 East 37"'Street North 3807 Peachtree Avenue,Suite 200 Wichita,Kansas 67220 Wilmington,North Carolina 28403 Enter in - appropriate block for each party name, address, and, if appropriate, character of corporation or partnership "1z t, is , The designation Grantor and Grantee as used herein shall include said parties, their heirs, successo d44 assigns,and shall include singular,plural,masculine,feminine or neuter as required by context RETURN TO: Douglas A. Fox 9 WITNESSETH, that Grantor, for a valuable consideration paid by Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain,sell and convey unto Grantee m fee supple the property situated in New Hanover County,North Carolina and more particularly described on Exhibit A attached hereto and incorporated herein by reference(the"Property") The Property herein described is a portion of the property which was acquired by Grantor in instrument recorded in Book 2485,Page 978 The Property herein conveyed does not include the primary residence of the Grantor, per NCGS 105- 317 2 TO HAVE AND TO HOLD the Property and all privileges and appurtenances thereto belonging to the Grantee in fee simple,subject to the restrictions described on Exhibit B attached hereto and incorporated herein by reference And Grantor covenants with the Grantee, that Grantor has done nothing to impair such title as Grantor received, and Grantor will warrant and defend the title against the lawful claims of all persons claiming by,under or through Grantor,except for the exceptions hereinafter stated This conveyance is expressly made subject to all matters set forth below and incorporated herein which shall bind Grantee(and its successor in title)and run with the title to the Property 1 Lien(s)of ad valorem taxes for the year 2015 and thereafter which are not yet due and payable, 2 Matters affecting title to the Property as shown on survey or from a current inspection of the Property, 3 Zoning ordinances,building codes and other applicable laws,ordinances and governmental regulations affecting the Property, and 4 All easements,encumbrances,covenants,restrictions,and conditions of record,and rights-of-way of public and private streets and roads [Signatures Begin on Following Page] 2 IN WITNESS WHEREOF,this deed has been duly executed as of the date first above written GRANTOR; INVISTA S.a rJ., a Luxembourg societe responsabihte limitee,doing business in North Carolina as INVISTA S e r 1,LLC By 1( f ,its William Kmg,Authorized Si iatory Sic‘,t...k.sx.\ STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER I certify that the following person personally appeared before me this day, acknowledging to me that he voluntarily signed the foregoing document for the purpose stated therein and m the capacity mdicated William King Date April 17 ,2015 0, cy\e..._. , 0�9ct Signature otaty Notary Public = Lori A. Lewis New Hanover County Notary's printed or typed name,Notary Public 4 �T` (Official Seal) '�i,;'11rC,aRO`.��`�� My commission expires 09/01/2018 •Nttt3 ACCEPTED and duly executed by the Grantee as of the date first above written GRANTEE: SEAMIST PROPERTIES,LLC, a North Carolina limited liability company By Nam McKinley Du l Title Member/Manager STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER I certify that the following persons personally appeared before me this day,acknowledging to me that they voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated McKinley D. Dull Date April 17 ,2015 y0.1 A LE "4s','4 cral ature o ataxy Lori A. Lewis Notary Public = Notary's printed or typed name,Notary Public a New Hanover County (Official Sealf: P My commission expires 09/01/2018 4 Exhibit"A" BEING ALL of that 25.357 acre tract of land as shown on that plat entitled"Survey for INVISTA S.A.R..L. Properties Lands on U.S.421 Part of R02400-001»001-000, Cape Fear Township, New Hanover County,North Carolina"recorded in Plat Book 60 ,at Page L61 0 ,in the New Hanover County Public Registry. Further described as: LEGAL DESCRIPTION OF PARCEL A,INVISTA S a.r.I.PROPERTY Beginning at an existing iron rod located in the eastern right-of-way of U.S. Highway 421,said iron pipe being located North 50°27'37" East 149.00' from NCGS Monument "FINA" N: 204,041.30' E: 2,307,567.82 NAD 83(2001),said iron pipe also being at southwest intersection of a point formed by the eastern right-of-way of Highway 421 and a 65'wide access and utility easement as recorded in DB 5447, Page 1139 in the New Hanover County Register of Deeds; running thence from said beginning point North 57°11'51" East 500.12'along the southern line of the aforementioned 65' wide access and utility easement to a newly set iron rod; thence South 32°47'47" East 1026.94 to a point; thence South 57°12'13"West 25.0' to a point;thence South 32°4747"East 50.0'to a point; thence North 57°12'13" East 25.0' to a point; thence South 32°47'47" East 141.19' to a newly set iron rod; thence South 32°45'55"East 1011.38'to an existing iron pipe,said iron pipe being located in the northeast corner of property now or formerly owned by BGM Properties,LLC as recorded in DB 5166,Page 2738 of the New Hanover County Register of Deeds,thence South 57°12'531' West 500.12'along the northern property line of the BGM Properties, LLC land to a newly set iron rod in the eastern right-of-way of Highway 421; thence running along the eastern right-of-way of the Highway North 32°45'55"West 1011.38'feet to an existing concrete monument in the eastern right-of-way of the Highway;thence continuing along the right-of-way of the Highway North 32°47'47"West 1197 81'to the point and place of beginning. The subject property is located in New Hanover County North Carolina and contains 25.357 acres as shown on a survey prepared by Paramounte Engineering, Inc. The property is subject to an existing 60' wide Permanent Easement as shown in DB 5351 Page 302 of the New Hanover County Register of Deeds and a 30'wide CP&L Easement (centered on the eastern right-of-way of U.S. Highway 421) as recorded in DB 1142 Page 56 of the New Hanover County Registry. EXHIBIT B to North Carolina Special Warranty Deed Restrictions 1. The Property shall never be used for residential purposes and this restrictive covenant shall run with the title to the Property and be binding upon the Property and upon Grantee,its successors and assigns and inure to the benefit of Grantor,its successors and assigns. 2. No groundwater from the Property shall be used for consumption and this restrictive covenant shall run with the title to the Property and be binding upon the Property and upon Grantee, its successors and assigns and inure to the benefit of Grantor,its successors and assigns. 3. No more than thirty-five thousand(35,000)gallons of groundwater per day shall ever be pumped for removal for use by occupiers of the Property and this restrictive covenant shall run with the title to the Properly and be binding upon the Property and upon Grantee, its successors and assigns and inure to the benefit of Grantor,its successors and assigns. Grantor shall have the right to prohibit the installation of any pumping equipment on the Property (the"Pumping Equipment")if the Pumping Equipment would allow more than 35,000 gallons of groundwater per day to be removed from the Property and subsequent modification of the Pumping Equipment that would increase its pumping capacity is prohibited unless consented to by Grantor in writing prior to any such modification. Upon reasonable advance notice to Grantee,Grantor shall have the right to enter the Property from time to time to ensure compliance with this restrictive covenant; provided that such inspection and audit shall not unreasonably interfere with Grantee's operations on the Property,and Grantor's representatives check in at the time of such inspection or audit with the Grantee's on-site manager(s) and comply with all of Grantee's reasonable safety requirements. 4. Should public water service ever become available to the Property,Grantee shaft tie the Property into and connect the Property to such public water service and this obligation shall run with the title to the Property and be binding upon the Property and upon Grantee, its successors and assigns and inure to the benefit of Grantor,its successors and assigns 11 ii 'i I j ,r "4. s n Aiusllo TAMMY THEUSCH BEASLEY REGISTER OF DEEDS, NEW HANOVER 216 NORTH SECOND STREET WILMINGTON, NC 28401 Filed For Registration: 04/17/2015 02:21:07 PM Book: RE 5882 Page: 450-458 Document No.: 2015010746 7 PGS $28.00 NC REAL ESTATE EXCISE TAX: $1,481.00 Recorder: CRESWELL,ANDREA State of North Carolina,County of New Hanover PLEASE RETAIN YELLOW TRAILER PAGE WITH ORIGINAL DOCUMENT. * 2015010746 * 2015010746 WrIrn 1 Ck CeA r 1q is I U.S.DEFARTR4ENPOFTAEINTERIOR y�dM, CASTLE HAYNE QUADRANGLE .r_�U$G$ U.S. USTopo WORTH CAROLINA ,ew> a•vrn., 'T9eE _- 'n 'n Oa MM1 i.S 11E SERIES . i • / /Ir.,. .if 3 a•:tea- ,,,,,�... x • • nO" .. sy • • 20 1 b • •22 • 4 '1'! roe � : __ f 'Atli•� • .r ��IiIN - • . • MI }. r� ?� 1� `. _ * Yle•.o ._7 ,t. "o ,. ate. Y 1• 41. ii°". . qb� rk5 •• • eh• •• '++I 4 r .. • • •• • . near m m 4. emu+ — 9 E .1.aw`M Y10nW O. e• mma qt S • fe nSSa e_ yY SCALE 1:4 000 o[ugecSlp. M®.r•n.ryr.ny.wnw Mra 4rnue. w Mr ...,. ... WIF �_�rm'�ew4 e•4�•o vrw.Zw! 4 S e 1 W,M ss�e•� M.eMes•rnS .. NM II Myer_._-...._......_...-aes.en lM.a•x-. •nor vrm• m' ill liell IT MITICY/04.WITIDLOMINIO,FM MEC CASTLE HAYNE.NC 72013 BY. STORMWATER SYSTEM & EROSION CONTROL CALCULATIONS WILMINGTON TRADE CENTER 4104 US Hwy. 421 North Wilmington, North Carolina rereu For 3 2023 Seamist Properties, LLC BY: 3807 Peachtree Avenue, Suite 200 Wilmington, NC 28403 (910) 395-6036 1 1u1 III,, SEA�Lg **.A, L,.' SON GAP°,,. ,ry,,,,,,,111111111t 111tttttttt October 2020 Prepared by: NORRIS &TUNSTALL CONSULTING ENGINEERS, P.C. 2602 Iron Gate Drive, Suite 102 Wilmington, North Carolina 28412 (910) 343-9653 (910) 343-9604 (Fax) License#C-3641 N&T Project No. 19131 Date Design NORRIS 8,7._ TUNSTALL Wilmington, NC Sheet I 0-1-20 e_.„ —CONSULTING ENGINEERS P.C.— Brunswick County, NC Of Check Job For Job No. rc. CalC.S Nettilliniiy.;4-oil -Voic. ititS ( 1 i ' 1 I s 1)t.. 4A 5 42-1 . So 1, , ,o,,Aes It:t, S 4e, Pas '2_ '54-otiv4 reed44 me.,,,,, /1- ce 4-f. I-11 -1,'4 NEw.fi-vvet : 13eAnA I "ZI (R1-"Ci-hwx AS siile• EckS^).. A-N3 on.--- - n4,1414,-,47- ,), 1.t rt Itt- - r i TRe A.c f NI •,i' A--I- 4-ike Rear ea,.r 4-A-e- 7.- .11 ''/N9"' (-441Y4 ,... 44 4 (....,:e4)/vie'et71- &.Syl f-3 Gil ivN3 1 ' i6 g- - 1 i, L f- ) /1/1 i . I i 1 : 9 ,-.1 7 4 56cE5 0.,e,L,A,, ecii iii;tich .. / eCO cc i' vgr--/ 1/1.,, ''Pe-A0 tA 'red 54 -Vaic CiF/ A 1 50c.cs 1= diLl 3605.4 ' ' '1 1 , 9,61 ;c.(f.: 41t,v11 C /9e.4-4,e-er &40.1 (ib,5J 1 /qcri (iace, i• -• 1 , SI (---1--- ,....--------7.-- " 1 1 c ( 3,5--(= , is--- 5r-- r ci • • 1 1 ,i - 1 • 1 1 il I 1 • ' 1 . 1 / Skyvottr 144,:ii Nor • 1 1 1 1 I . ( , , _. 1 1 e- ,,,-, 1 , , --1-4 . .m Ptti• ,,, ,e, ' e„,. 1 _ t_ , -, .) (2 e >fe,/p4,6-- RI/ ,5 S 6 cc 1 1 . 1 Date Design NORRIS & TUNSTALL Wilmington, NC Sheet CONSULTING ENGINEERS P.C.— Brunswick County, NC Of Check Job For Job No. 1 ' I 1 : ; I 1 I ! ' I . 1 i 11 % 3.1.Z...r.2.1; ts-eci.t. t .--6.81 1 - ' . • , I-. — • - 1 it,g7. 3ii'61. ...---.. . 11117% I) A1.15s . s-s- li 3 9 _ ... 5431 i c23 f33Z1- rig a . - 13,0_ ,SP7s7aolet. cP. ),Coq /617,-. F7Sj_r_". 1? CI . 44/Veit 0118:?; . 6.-..- --. -------1*e_ D =-> Sk., (iin,4.--- 1 )9,0 ol: t(o0 31iVo 2- 1 . /il(P Cetei)2 -ClAWi ei e2;63,(01• - • i 5;0 '7' ilq 9 75t I . , ,,, , .,,.„).45. & 1-a TgtEr.S 7.',_. _ It Fe.14, .c.c.. L. /40a It..,,,I;(1-e... .5.:/crtmiet.:14- C.0,4(I 10.!4.e )-IN. - ' ' , • ' ! : 1 .•, , i / tvt Truk Ce, et "Trab l.6.14.: sly./ SeeS.mxe.At Rum I Calculate Skimmer Size Basin Volume in Cubic Feet 55,758 Cu.Ft Skimmer Size 4.0 Inch Days to Drain* 3 Days Orifice Radius 1.9 Inch[esi Orifice Diameter 3.8 Inch[esj l'In NC assume 3 days to drain Estimate Volume of Basin Length Width Top of water surface in feet Feet VOLUME 0 Cu.Ft. Bottom dimensions in feet Feet Depth in feet Feet Date Dey NORRIS & TUN STALL Wilmington, NC 7...::>-"----// CONSULTING ENGINEERS P.C.--- Brunswick County, NC Of Check Jo For Job No. EC, 604-ICS WIPthl 1129 4A"fra-ek /1/3 II I 1 ! 1 l' il 1 IIIIII , I 11C- S .,C-0,1‘.0( 4C64 Oel-2 LI-e- i$ 11'1- 44 T .'.e- 7-4;0441 Rvki51 4relr- , 4,47&c.,4,s, . 1 , , ; 11 i.,,,, , 4.... • ecbtwok. i'' lectrItrto 4. E/Vre 17r4-e 774c.k te.17.5 CanSitk.4404. 1 Ai iii.JLET:s tfE.(41 1,4 0.. 14,--c. S0.4— 5."1.11--Seido 1/ 7 / Ig-e44\f-e. 1 ; 11 g."crlk 71--+.(c,4, Pro Lei c.„1-,1 !bet. 1. _SecGAL-t-4-1 .?,,,. i41....‘j, Afel,.... l ,V t gc. 1 C ,ifl ,ed .6tf 11°4PN-• ILI T& Le-' f aird 4c-411 -4!1. ,1 `".r 11-elly.. or r' --(... 1 retiC,C ' L-4Aef_ , 1 - ic\\I-3 A-. 44-"'F( 6FFI's14e1- 1 ' 1 1 7 111 . Hj - 1 A-4)--1--1 6 e/5q1A.,4)r - --/ f ttc,) 1 ,4,, .., ---,--241j01 ( froi-4 111 , 11 ; 1 ' 1 I i s'- ') r 1 I ee'', e,, wa TsPE z-- SsStAc ! ek: f, I 1 1 4/4(e.‘ I RSZ,01.4f--1! 1 1 1 1 1 I 1 i 1 1 F t ! I: — J, 1/ / ,j41 ....r-tH 11 - 1 -—/;...e ,. :),..,- 1, q(.. fAt 4...1.frke rf 3 It..._x"ely 1,1_! 7. ,fr--- 1 6) -- 'ilctlf,' hcrE-. * )..1 .7,6190 s.P.;(0,2 LI(4c--1 j )0244 e/Pci /Ac 1 1 . VeLsttetj 15d0 LIF c-r)1(1--- 1 1 1 1 -- ...L..— — ,---H-- 1 1 1 1 1 1 1 1 1 - 1 1 1 1 ' I 1 1 1 1 ' , 1 1 1 1 11 1 1 1 .1 1 1 ' 1 1 1 . . 1 1 , 1 1 1 _1 1 1 , 1 1 I 1 1 I 1 I 1 I 1 1 Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk,Inc. Thursday,Oct 8 2020 Swale 1 (5:1) Triangular Highlighted Side Slopes (z:1) = 5.00, 5.00 Depth (ft) = 0.27 Total Depth (ft) = 1.50 Q (cfs) = 0.660 Area (sqft) = 0.36 Invert Elev (ft) = 21.00 Velocity (ft/s) = 1.81 Slope (%) = 3.00 Wetted Perim (ft) = 2.75 N-Value = 0.035 Crit Depth, Yc (ft) = 0.26 Top Width (ft) = 2.70 Calculations EGL (ft) = 0.32 Compute by: Known Q Known Q (cfs) = 0.66 a Elev (ft) Depth (ft) Section 23.00 2.00 22.50 =- - - 1.50 22.00 1.00 i 21.50 0.50 '7.7 i 21.00 20.50 I I I -0.50 0 2 4 6 8 10 12 14 16 18 20 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk,Inc. Thursday,Oct 8 2020 Swale 1 (5:1) Triangular Highlighted Side Slopes (z:1) = 5.00, 5.00 Depth (ft) = 0.28 Total Depth (ft) = 1.50 Q (cfs) = 0.760 Area (sqft) = 0.39 Invert Eiev (ft) = 21.00 Velocity (ft/s) = 1.94 Slope (%) = 3.00 Wetted Perim (ft) = 2.86 N-Value = 0.035 Cult Depth, Yc (ft) = 0.28 Top Width (ft) = 2.80 Calculations EGL (ft) = 0.34 Compute by: Known Q Known Q (cfs) = 0.76Qtr Elev (ft) Depth ft( ) Section 23.00 2.00 22.50 --- 1.50 7--- 22.00 0 1.00 21.50 i 0.50 21.00 I 0.00 I. 20.50 I 1 I ( E -0.50 0 2 4 6 8 10 12 14 16 18 20 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk,Inc. Thursday,Oct 8 2020 Swale 1 (5:1) Triangular Highlighted Side Slopes (z:1) = 5.00, 5.00 Depth (ft) = 0.31 Total Depth (ft) = 1.50 Q (cfs) = 1.000 Area (sqft) = 0.48 Invert Elev (ft) = 21.00 Velocity (ft/s) = 2.08 Slope (%) = 3.00 Wetted Perim (ft) = 3.16 N-Value = 0.035 Crit Depth, Yc (ft) = 0.31 Top Width (ft) = 3.10 Calculations EGL (ft) = 0.38 Compute by: Known Q Known Q (cfs) = 1.00 -- 010 Elev (ft) Depth ft( ) Section 23.00 2.00 22.50 --Q- 1.50 7 22.00 1.00 \ ,-/// 21.50 0.50 pp o. l 1 21.00 i I I i 0.00 20.50 1 -0.50 0 2 4 6 8 10 12 14 16 18 20 Reach (ft) • Infiltration Basins I % 2 CONCRETE,CURB IMPERVIOUS TOTAL(SF) 4, TOTAL AREA(SF) ASPHALT(SF) &GUTTER(SF) SIDEWALK(SF) BUILDING(SF) OFFSITE(SF) %IMPERVIOUS DA1 11,100 6,661 809 0 0 0 7,470 67 80 DA2 64,486 12,251 8,841 0 30,587 4,852 51,679 DA6 91659 27400 15072 0 47543 0 90015 98 DAB 80070 22246 14739 0 42859 0 79844 100 DA10 73640 23272 12796 0 35884 0 71952 98 DA12 2850 1382 202 93 0 0 1677 59 DA13 2670 1572 174 32 0 0 1778 67 DA15 3268 1360 210 120 0 0 1690 52 OA16 3093 1590 184 41 0 0 1815 59 DA18 73160 23330 12206 0 35043 0 70579 96 DA20 80000 22238 14747 0 42850 0 79835 100 DA22 78079 21693 14378 0 41858 0 77929 100 DA24 77613 25524 12889 0 36933 0 75346 97 DA26 3290 1350 200 108 0 0 1658 50 DA27 1949 799 118 65 0 0 982 50 DA29 4515 1350 200 182 0 0 1732 38 DA30 2676 802 119 121 0 0 1042 39 DA32 75823 25532 12377 0 34616 0 72525 96 DA34 78082 21700 14400 0 41998 0 78098 100 DA36 67861 23513 10620 0 33609 0 67742 100 DA41 84095 0 0 0 0 0 0 0 DA42 29274 0 0 0 0 0 0 0 TOTAL(SF) 989,253 265,565 145,281 762 423,780 4,852 835,388 84.4 TOTAL(AC) 22.71 6.10 3.34 0.02 9.73 0.11 19.178 **On the Plans the Basin is split Into two basins,Basin 1 and 2.They function as one Basin. 80 SkS j ' Z (As No c( v,if leo s) r ,,t Amp Ore 19,m14.1 ifiel A., 0 qe Date Design NORRIS & TUNSTALL Wilmington, NC Sheet —CONSULTING ENGINEERS P.C.— Brunswick County, NC Of Check Job 11C-/ For Job No. a1( atiC.S Itr,1444'qiil &Kill tdetilA —r-r4tf.k CeAt.4-e,f I I : I I aGl.1 i& S Rear Part415 ///fp).10( . EdS OC)tiCkf S '11, Jrti74( f,4 Vit ;' ‘._; 1(1, i1 eal-e 1 ? ei 4z ,Loic) Repo,* 1 1--;'C-6 g .S Ifitst,1 er..,c(.„(.. 4,',,fy S'Z‘' -tt k_t_ tee( • 0 *If lo fell Few; 1 147w, : •,s,',/4 i Fac,rCAL Pt 71--A T h t 1 2. P7-001- , c:7-no! (6,4'ifi 2-4 -II,' s. d.re. i7-4e ,...790ae.t.4ce) 0 I () F86—. Pr 4 i 5 VO L.) , AE. 1 ' ( ' 1 1 1 • : . 1i ; ' • 1 1 1 , 1:31A:4,S I V tad F-TOr Etitevr Ftu (Au6-) 9,1s— ( ' ' _ 1 ' ' 1: 70-42./.14464i RoAt (AA 7 a/flit, ,ilife i1 I i' z ril A-c, -4=-H jr(fi:= j (r? Ac,. 1 1 I ' 1 24/SO (6'' bler / 1)f 0 943T )(1.. C' ' 7?th '''' te9tAivect E4- /4) illic r(2_ r , 1 Ill ' i ! 1 - , . 1 1 ,.. _ Pril:dgc -SA-- ,• eitc(Z.-5.' '''P ' e -t-' (.1 .1.ki% ) : 1 ' ' ; 1,5" 7- /1r- 64 I ia cp t -I 4 II -, d , , ,aL Y. 1 , 1.011.12:: ' I ' - - 1 I • 1 ,a8 qtr - Il Pa-Sri I L 1 1 I i 1 1 i i ry I r ,4 I VOi(rizte IRV Or)117) '‘.4Ale=I' ) ( c.v ' e , 1 1 ' i . 11 . , 1 I ', Date Design NORRIS & TUNSTALL Wilmington, NC Sheet - CONSULTING ENGINEERS P.C.— Brunswick County, NC Of Check Job For Job No. SC.-- CCA-kC.S , likAffv;- —6:41462_ ce,t.1-, lett7 --31-kt‘t 4-rc,,V-aA.''act•KIn ;S ..s:ri:-.1.-- oi" Pi i i 1 -1e., ! 4,' c 1 ,,..4.7- et F f,' 1/4-s / V. 1 s- -%.: , , 1 ti-ne; IVA , 1 ! 1 I 1 r I 1 1 1 1 I . Shi WT 7= q,57 1 . 1.11r, ut S El 7- Iti kjvl lle" . , 1 ; A 21. E/ki t----(z.. emc,-( f P(ac.._,04, (e_s 5-5 ./.- ---,2 ( 1 -'''> toS7 •-- -- e .., • 1 I 1 ' 0 ,2„s, 7 1.0 . 2., T • -:-_- . 1 . : , , , 1 , 1 11 : , 1 1 ,1 : 1 .1 , Il , 1 . 1 I , , , 1 111 , , 1: 1 1 , 1 , , , , : ! • 11 . 1 . , , 0 0 Predeveloped Runoff 1140 Busi ess PArk Infiltration Basin 1 Ph se 5 0 A Infiltration Basin 1 Predeveloped Runoff to Property East of Site Civrre q.s within Infiltration Basin ,f.�,,,, e «,c ('See. ,GCS 1 gydroleo(05k 646g.4 :on;To P11ot...) Fiv r c e4 Sc ►c4,A n t CA.SeCI = 1 Sin A/. Qro i Oar - COC FS IQs0 v Z 17.* "cps Fru = f eiS1 ' (Subca) Reach 'on. Drainage Diagram for 19131 Phase 5 1140 Basin OCT 2020 Prepared by Norris&Tunstall Consulting Engineers 10/9/20 HydroCAD®7.10 sin 000479 0 2005 HydroCAD Software Soiutions LLC 19131 Phase 5 1140 Basin OCT 2020 Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 2 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff Area=22.710 ac Runoff Depth=0.00" Tc=10.0 min CN=36 Runoff=0.00 cfs 0.000 af Subcatchment 2S: Predeveloped Runoff to Property East of SSunoff Area=3.810 ac Runoff Depth=0.00" Tc=10.0 min CN=36 Runoff=0.00 cfs 0.000 af Subcatchment 3S: 1140 Business PArk Phase 5 Runoff Area=22.710 ac Runoff Depth>0.58" Tc=10.0 min CN=89 Runoff=14.28 cfs 1.099 af Pond 3P: Infiltration Basin 1 Peak Elev=10.60' Storage=2,834 cf Inflow=14.28 cfs 1.099 af Discarded=10.40 cfs 1.098 af Primary=0.00 cfs 0.000 af Outflow=10.40 cfs 1.098 af Total Runoff Area = 49.230 ac Runoff Volume= 1.099 af Average Runoff Depth =0.27" 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 3 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 1.5 inch Storm Rainfall=1.50" Area (ac) CN Description 22.710 36 Woods, Fair, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Site Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Hydrograph ®Runoff Runoff=0.00 cfs Type III 24-hr 1.5 inch Storm Rainfall=1.50" Runoff Area=22:.710 ac Runoff Volume=0.000 af ;Runoff Depth=0.00" Tc=10.0 min CN=36 5 6 7 8 9 10 • 11 • 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 4 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 1.5 inch Storm Rainfall=1.50" Area (ac) CN Description 0.370 36 Woods, Fair, HSG A, DA 1 0.680 36 Woods, Fair, HSG A, DA 2 1.540 36 Woods, Fair, HSG A, DA 8 1.220 36 Woods, Fair, HSG A, DA 10 3.810 36 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Predeveloped Runoff to Tract East of Site Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Hydrograph 0 Runoff Runoff=0.00 cfs Type III 24-hr 1.5 inch Storm Rainfall=1.50" Runoff Area=3.810'ac Runoff Volume=0.000 af Runoff Depth=0.00" Tc=10.0 min !CN=36 l a.ao as s� ; 0�{ �r %>; 7iir�//f/ _ ///f� /(< �"FT 5 6 7 8• 9 10 'ii 12. 13 14 15 16 .17. 18 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 5 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 3S: 1140 Business PArk Phase 5 Runoff = 14.28 cfs @ 12.15 hrs, Volume= 1.099 af, Depth> 0.58" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 1.5 inch Storm Rainfall=1.50" Area (ac) CN Description 19.178 98 Bldgs, Asphalt, Concrete 3.532 39 >75% Grass cover, Good, HSG A 22.710 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Tract Subcatchment 3S: 1140 Business PArk Phase 5 Hydrograph 15: ErEa 1 r Runoff ' 14- R�ulnoff fs _14.28 . Type III.24-hr-1.5 inch St rm 12. Rainfall=1:50"- 11 10. Runoff A rrea=22:710:ac.. : s 'Runoff Volume-T.-1.099 af t 8 ;Runoff Depth>0 58" s _ 10.0 s' : CN=89n � . i. 4 ... , 3 2 1L -_ p ?i0lriirrrrirrirrr rirer. ��- � /4 f/97 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin OCT 2020 Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstail Consulting Engineers Page 6 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 Inflow Area = 22.710 ac, Inflow Depth > 0.58" for 1.5 inch Storm event Inflow = 14.28 cfs @ 12.15 hrs, Volume= 1.099 af Outflow = 10.40 cfs @ 12.27 hrs, Volume= 1.098 af, Atten= 27%, Lag= 7.0 min Discarded = 10.40 cfs @ 12.27 hrs, Volume= 1.098 af Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 10.60'@ 12.27 hrs Surf.Area= 29,956 sf Storage= 2,834 cf Plug-Flow detention time=2.6 min calculated for 1.094 af(100% of inflow) Center-of-Mass det. time=2.2 min ( 811.1 - 808.9) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store �A 1y�35 970 /$o5R (feet) (sq-ft) (cubic-feet) (cubic-feet) J 10.50 28,925 0 0 r 7o1.4M a )e4.3,51. I(0 71$de 15.00 77,114 238,588 238,588 �J Device Routing Invert Outlet Devices #1 Discarded 0.00' 15.000 in/hr Exfiltration over Surface area #2 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Qiscarded OutFlow Max=10.40 cfs @ 12.27 hrs HW=10.60' (Free Discharge) 1=Exfiltration (Exfiltration Controls 10.40 cfs) rimary OutFlow Max=0.00 cfs @ 5.00 hrs HW=10.50' (Free Discharge) 2=Broad-Crested Rectangular Weir(Controls 0.00 cfs) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 7 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 Hydrograph *1 Inflow 1 Outflow Inflow-.i4 _rea 22.7'L ICI DiscardedO.ac Primary 14: In# —ow 14 28 "cfs- 13= �- . 12: t -- . L70-40da ', ®l.�tfiOW 40 cfs _ --" .. ; o.aofcrs - - „ Discarded=10.40--cfs PeiMar00.00 cfs ", Peak Elev-10.60' . -Storage 2,834 cf I . .... .... .. . . _... o.on" tor y/�//�/�/�//r/y/f��f 1 0 raft.f*d'i::1 "YY�f�+'€� 4V4;.(i.74d.71;›—el;e#M.'',1`.f f;.: i✓�J', _. P S�d'P;^r� 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 8 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: Predeveloped Runoff Infiltration Basin 1 Runoff Area=22.710 ac Runoff Depth>0.03" Tc=10.0 min CN=36 Runoff=0.13 cfs 0.056 af Subcatchment 2S: Predeveloped Runoff to Property East of Runoff Area=3.810 ac Runoff Depth>0.03" Tc=10.0 min CN=36 Runoff=0.02 cfs 0.009 af Subcatament 3S: 1140 Business PArk Phase 5 Runoff Area=22.710 ac Runoff Depth>3.10" Tc=10.0 min CN=89 Runoff=74.09 cfs 5.875 af Pond 3P: Infiltration Basin 1 Peak Elev=12.45' Storage=76,599 cf Inflow=74.09 cfs 5.875 af Discarded=17.28 cfs 5.872 af Primary=0.00 cfs 0.000 af Outflow=17.28 cfs 5.872 af Total Runoff Area=49.230 ac Runoff Volume= 5.941 af Average Runoff Depth = 1.45" 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 9 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff = 0.13 cfs @ 15.69 hrs, Volume= 0.056 af, Depth> 0.03" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 2-yr Rainfall=4.50" Area (ac) CN Description 22.710 36 Woods, Fair, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Site Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Hydrograph 7 : ©Runoff 0.13= • /%�lh'►� i. Runoff=0'413_cfs : . „.. 0.12_ ; .. Type III .24-h r 2-y r ; _ : 0.11 , i , , 0.1 Rainfa11=4.50 :. 0.09 Runoff Area=,22.710 ac , 0.06� .- Runoff Volume=0..056 at iFliPi � 0.07_ LL R :moff Depth>0.03 0.06 i 0.05- -. . Tc=10.0 thin - 0.04 CN=36 ... 0.02-. / 0.01. ; �- 0 t'i�{..///////////!/4/ /, f/JfJ�. .. / 5 6 7 8 9 10 11 12 13 ir'14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 10 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Runoff = 0.02 cfs @ 15.69 hrs, Volume= 0.009 af, Depth> 0.03" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 2-yr Rainfall=4.50" Area (ac) CN Description 0.370 36 Woods, Fair, HSG A, DA 1 0.680 36 Woods, Fair, HSG A, DA 2 1.540 36 Woods, Fair, HSG A, DA 8 1.220 36 Woods, Fair, HSG A, DA 10 3.810 36 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Predeveloped Runoff to Tract East of Site Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin I Hydrograph 0.024 • ; ' 0.023 ®Runoff T ..,. .. ... O -... .. .... 0.022 cfs . 0.021 Runoff=0:02.:cfs..; ;:'� 0.0 0.0219 . Type.-I11.24-hr 2 . r , . . _ 0.017 OInfa11= 50" .. . . 00..0015 =. !16 Runoff Area-3.8' 0....ac 0.01 0.013 - -Runoff-Volume=0.009 of ,...- 0.012 1 '. . .._ 1_ _. . LL 0.011 Runoff Dep th>0.0 3" _ - 0.01 0.000 To=10.0 min . _ ; 0.008 0.007 - I.. CN=36 i 0.006 , 0.005 0.004 0.003 ' 0.002 I .. 0.0001 t;'////// ./.7 ./!///._<4:7 / 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin OCT 2020 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 11 HydroCADe 7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 3S: 1140 Business PArk Phase 5 Runoff = 74.09 cfs @ 12.14 hrs, Volume= 5.875 af, Depth> 3.10" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 2-yr Rainfall=4.50" Area (ac) CN Description 19.178 98 Bldgs, Asphalt, Concrete 3.532 39 >75% Grass cover, Good, HSG A 22.710 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Tract Subcatchment 3S: 1140 Business PArk Phase 5 Hydrograph _. CI Runoff 75 _ 70 unoff=7409-cfs 65 • Type_111 24-hr 2-y.r Rainfall=4•.50"• .. 55 50- I ; I Runoff Area=22:710 ac e ' 1 0 40= � . . . . �. � af unoff.Volum 5.:8751 '� LL 35: Runoff Depth>3.1;0 . 0. 100 min 25- 20 � CW=89 104 . .., sYs Ts�—r s —oT ,�'-�s��s s�—V�'•r�--T�o e-I'�r—�s—s•rsy a sTs s 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 12 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 Inflow Area = 22.710 ac, Inflow Depth > 3.10" for 2-yr event Inflow = 74.09 cfs @ 12.14 hrs, Volume= 5.875 af Outflow = 17.28 cfs @ 12.59 hrs, Volume= 5.872 af, Atten= 77%, Lag= 26.8 min Discarded = 17.28 cfs @ 12.59 hrs, Volume= 5.872 af Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 12.45'@ 12.59 hrs Surf.Area=49,771 sf Storage= 76,599 cf Plug-Flow detention time=32.8 min calculated for 5.872 af(100% of inflow) Center-of-Mass det. time=32.6 min ( 802.8 -770.3) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismatic Jsted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 10.50 28,925 0 0 15.00 77,114 238,588 238,588 Device Routing Invert Outlet Devices #1 Discarded 0.00' 15.000 in/hr Exfiltration over Surface area #2 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Discarded OutFlow Max=17.28 cfs @ 12.59 hrs HW=12.45' (Free Discharge) L1=Exfiltration (Exfiltration Controls 17.28 cfs) Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=10.50' (Free Discharge) L2=Broad-Crested Rectangular Weir(Controls 0.00 cfs) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 13 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin I Hydrograph • L'_�Inflow '7: , - i , _ _ ® -Outflow . t Inflow Area=22:71 0 ac r Discarded 80= 0 Primary 754 "._ I _ nflow-74 09 cis 70` _ 65- O_ufflow=17.28 cfs i a e D sc rd d=17.28 cfs 55= 50- i. � P r fYlarY 90 C..S 30 40= • ' u_ 35- - - - =- - Storage 76,599 ;cf 30- r 1. i 25 1728 cts 1728ch 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 14 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff Area=22.710 ac Runoff Depth>0.48" Tc=10.0 min CN=36 Runoff=5.34 cfs 0.913 af Subcatchment 2S: Predeveloped Runoff to Property East of SSunoffArea=3.810 ac Runoff Depth>0.48" Tc=10.0 min CN=36 Runoff=0.90 cfs 0.153 af Subcatchment 3S: 140 Business PArk Phase 5 Runoff Area=22.710 ac Runoff Depth>5.44" Tc=10.0 min CN=89 Runoff=125.87 cfs 10.288 af Pond 3P: Infiltration Basin 1 Peak Elev=13.85' Storage=157,281 cf Inflow=125.87 cfs 10.288 af Discarded=22.52 cfs 10.282 af Primary=0.00 cfs 0.000 af Outflow=22.52 cfs 10.282 af Total Runoff Area =49.230 ac Runoff Volume= 11.354 af Average Runoff Depth = 2.77" 19131 Phase 5 1140 Basin OCT 2020 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 15 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 1S: Predeveloped Runoff Infiltration Basin I Runoff = 5.34 cfs @ 12.39 hrs, Volume= 0.913 af, Depth> 0.48" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 10-yr Rainfall=7.05" Area (ac) CN Description 22.710 36 Woods, Fair, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Site Subcatchment 1S: Predeveloped Runoff Infiltration Basin Hydrograph ' Runoff I 5.34!fs Runoff=5.34 cfs 5- Type III 24-hr106yr - • Rainfalliz7;05" 4- RUnoff Aiva*22.710 ac I 3- :Runoff Volume=0.913:af o Runoff Depth>0.48" - 2- , TcF10:.0 rnin ; CN=36 1 ----44f4fezez27, 5 6 7 8 9 10 11 12 113 14 1'5 16 17 118 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 16 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Runoff = 0.90 cfs @ 12.39 hrs, Volume= 0.153 af, Depth> 0.48" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 10-yr Rainfall=7.05" Area (ac) CN Description 0.370 36 Woods, Fair, HSG A, DA 1 0.680 36 Woods, Fair, HSG A, DA 2 1.540 36 Woods, Fair, HSG A, DA 8 1.220 36 Woods, Fair, HSG A, DA 10 3.810 36 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Predeveloped Runoff to Tract East of Site Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Hydrograph 1 0 Runoff 0.90 cfs Runoff=0.00 cfs 1 Type:III 24-hr 10-yr Rainfall=7.05" Runpff Area=3.810 ;ac ,S Runoff.Volume=0.,153 of Runoff Depth>0.48" Tc=10L 0 min CN=36 0 7//./<, JJJJJJ�J�/J/�/f/ff 5 6 7 S • • •9 • 10• • •11 12 13. . . .14. . • •15. . . .16, . . *17. • . .18" . ,1g, • . .20 Time (hours) 19131 Phase 5 1140 Basin OCT 2020 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 17 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 3S: 1140 Business PArk Phase 5 Runoff = 125.87 cfs @ 12.14 hrs, Volume= 10.288 af, Depth> 5.44" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 10-yr Rainfall=7.05" Area (ac) CN Description 19.178 98 Bldgs, Asphalt, Concrete 3.532 39 >75% Grass cover, Good, HSG A 22.710 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Tract Subcatchment 3S: 1140 Business PArk Phase 5 Hydrograph 140 . ,. , ...._ . ..... ©Runoff 131 112517 cr.I r 120 Runoff=`12587 cfs 110 Type III 24-hr 10-yr 10o Rainfall=7.05" 80 Runoff Area:22.710 70 ' •Runoff Volume=l..0288 -af... Runoff Depth;>5:44" IL 60 50 Tc=10.0 min 40 CN=89. .. 30 20 • 10 •dic�` • —• Jr 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin OCT 2020 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 18 HydroCADO 7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 [82] Warning: Early inflow requires earlier time span Inflow Area = 22.710 ac, Inflow Depth > 5.44" for 10-yr event Inflow = 125.87 cfs @ 12.14 hrs, Volume= 10.288 af Outflow = 22.52 cfs @ 12.65 hrs, Volume= 10.282 af, Atten= 82%, Lag= 30.8 min Discarded = 22.52 cfs @ 12.65 hrs, Volume= 10.282 af Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 13.85'@ 12.65 hrs Surf.Area=64,847 sf Storage= 157,281 cf Plug-Flow detention time=58.8 min calculated for 10.247 af(100% of inflow) Center-of-Mass det. time=58.2 min ( 816.2 -758.0 ) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismaticjisted below(Recaic) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 10.50 28,925 0 0 15.00 77,114 238,588 238,588 Device Routing Invert Outlet Devices #1 Discarded 0.00' 15.000 in/hr Exfiltration over Surface area #2 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 iscarded OutFlow Max=22.52 cfs @ 12.65 hrs HW=13.85' (Free Discharge) =Exfiltration (Exfiltration Controls 22.52 cfs) Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=10.50' (Free Discharge) L2=Broad-Crested Rectangular Weir(Controls 0.00 cfs) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 19 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 Hydrograph -- Inflow, OutW _ r de iInflowArea210 ac Pn140_ 0nary : Inflow=125.87 cfs 120.. _ _ . . a- - Outflow=22:52 cfs 110:" 100== , Discarded=22.52 Cfs so ' Plr 00 - - —ima 0, cfs 80_"` Peak Elev=73:85' LL 60 Stora a=157 281'cf 50 0 �.e zGI fs - .. 22-52 cfa . � .. 77. f o.00 crs f 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 20 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff Area=22.710 ac Runoff Depth>0.77" Tc=10.0 min CN=36 Runoff=10.30 cfs 1.452 of Subcatchment 2S: Predeveloped Runoff to Property East of Runoff Area=3.810 ac Runoff Depth>0.77" Tc=10.0 min CN=36 Runoff=1.73 cfs 0.244 af Subcatchment 3S: 1140 Business PArk Phase 5 Runoff Area=22.710 ac Runoff Depth>6.32" Tc=10.0 min CN=89 Runof=145.18 cfs 11.963 of Pond 3P: Infiltration Basin 1 Peak Elev=14.34' Storage=189,848 cf Inflow=145.18 cfs 11.963 af Discarded=24.31 cfs 11.956 af Primary=0.00 cfs 0.000 af Outflow=24.31 cfs 11.956 af Total Runoff Area =49.230 ac Runoff Volume= 13.658 af Average Runoff Depth = 3.33" 19131 Phase 5 1140 Basin OCT 2020 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 21 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment IS: Predeveloped Runoff Infiltration Basin 1 Runoff = 10.30 cfs @ 12.27 hrs, Volume= 1.452 af, Depth> 0.77" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 25-yr Rainfall=8.01" Area (ac) CN Description 22.710 36 Woods, Fair, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Site Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Hydrograph 11_ 9 Runoff 10.30 cfs 10 h; A 'Runoff;10 30 cfs Type:I I 124-h r 25=y r 8 Rainfall=8.01" 7= " - Runoff Area=22.710 ac Runoff V(*lit a=1 452 of 0 Runoff Depth>0.77" LL 5_ Tc=10:0 4- 3 CI@:36 5 6 7 8 9 10 11 12 13 14 15. 16 17. 18. 119• . . 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 22 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Runoff = 1.73 cfs @ 12.27 hrs, Volume= 0.244 af, Depth> 0.77" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 25-yr Rainfall=8.01" Area (ac) CN Description 0.370 36 Woods, Fair, HSG A, DA 1 0.680 36 Woods, Fair, HSG A, DA 2 1.540 36 Woods, Fair, HSG A, DA 8 1.220 36 Woods, Fair, HSG A, DA 10 3.810 36 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Predeveloped Runoff to Tract East of Site Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Hydrograph U Runoff Runoff=1.13 cfs Type;III 24-hr 25 yr Rainfall=8.01" Runoff Area=3.$10 ac 1- Runoff Volume=0:244r of LL Runoff Depth>0.77" Tc=10:0 min CN=36 5 6 7 8 9 10 11 12 13 14 15 '16 1 18I 19 • 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 23 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 3S: 1140 Business PArk Phase 5 Runoff = 145.18 cfs @ 12.14 hrs, Volume= 11.963 af, Depth> 6.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 25-yr Rainfall=8.01" Area (ac) CN Description 19.178 98 Bldgs, Asphalt, Concrete 3.532 39 >75% Grass cover, Good, HSG A 22.710 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Tract Subcatchment 3S: 1140 Business PArk Phase 5 Hydrograph • . . :..... .. 160- Runoff : 1504 145.18 cis • 140: .:. un ff=;14518 cfs 130_ , Type III 24-hr 25=yr 120_-' no.; Rainfall=8:04-" Runoff.Area=22:710-:ac 90: Runoff V.olumer411 963;-af 80= ay LL 70- Runoff Depth>6;32" ,_ ] 60- Tc=10:0 min f �._ 30= 20= � 10= 0 n i er o n � 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin OCT 2020 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 24 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 [82] Warning: Early inflow requires earlier time span Inflow Area = 22.710 ac, Inflow Depth > 6.32" for 25-yr event Inflow = 145.18 cfs @ 12.14 hrs, Volume= 11.963 of Outflow = 24.31 cfs @ 12.67 hrs, Volume= 11.956 af, Atten= 83%, Lag= 31.9 min Discarded = 24.31 cfs @ 12.67 hrs, Volume= 11.956 af Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 14.34'@ 12.67 hrs Surf.Area= 70,019 sf Storage= 189,848 cf Plug-Flow detention time=67.6 min calculated for 11.955 af(100% of inflow) Center-of-Mass det. time=67.3 min (822.4 -755.1 ) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feetL_ (sq-ft) (cubic-feet) (cubic-feet) 10.50 28,925 0 0 15.00 77,114 238,588 238,588 Device Routing Invert Outlet Devices #1 Discarded 0.00' 15.000 in/hr Exfiltration over Surface area #2 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Qscarded OutFlow Max=24.31 cfs @ 12.67 hrs HW=14.34' (Free Discharge) 1=Exfiltration (Exfiltration Controls 24.31 cfs) Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=10.50' (Free Discharge) L2=Broad-Crested Rectangular Weir(Controls 0.00 cfs) 19131 Phase 5 1140 Basin OCT 2020 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 25 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 Hydrograph �J ... . , if;Inflow 1_ 78 : Outflow 1so_ inflowArea=22:710 ad oP aryed 1 :: In'flow-145' 8 cfs 140 , 130 ' ;. . ... _ r Outflow=24 31 cfs ._.. 120 - 110,' . Dlscarded-;24.3; cfs 100_ : _ . rimary 0.00 cfs , , Peak f lev 14.34' 80 , _ it 70_ . _ . - Storage=1.89,848cf 60= 50 ® 'r`r vi 30 r,. •-' : ///sty - rriiirrirr f g 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19' 20 Time (hours) 19131 Phase 5 1140 Basin OCT 2020 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 26 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Predeveloped Runoff infiltration Basin 1 Runoff Area=22.710 ac Runoff Depth>1.12" Tc=10.0 min CN=36 Runoff=18.60 cfs 2.116 af Subcatchment 2S: Predeveloped Runoff to Property East of$funoff Area=3.810 ac Runoff Depth>1.12" Tc=10.0 min CN=36 Runoff=3.12 cfs 0.355 af Subcatchment 3S: 1140 Business PArk Phase 5 Runoff Area=22.710 ac Runoff Depth>7.24" Tc=10.0 min CN=89 Runoff=165.20 cfs 13.709 af Pond 3P: Infiltration Basin 1 Peak Elev=14.57' Storage=206,718 cf Inflow=165.20 cfs 13.709 af Discarded=25.19 cfs 12.991 af Primary=27.95 cfs 0.710 af Outflow=53.15 cfs 13.701 af Total Runoff Area =49.230 ac Runoff Volume= 16.180 af Average Runoff Depth = 3.94" 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 27 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Runoff = 18.60 cfs @ 12.20 hrs, Volume= 2.116 af, Depth> 1.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 50-yr Rainfall=9.01" Area (ac) CN Description 22.710 36 Woods, Fair, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Site Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Hydrograph 20 El Runoff 19' l 18 6(cfs 18_ ... _ . _. .. Runoff' 1.8.60 cfs _. ;6 Type' III-24-hr 50=yr 15= ; 151 =9.01' a Rainfall Runoff Area-22.710 ac 11 . . _ _ .Runoff.Volume=2:1l-1.6.'a.f... ,o= LL 0. . .Rt noff Depth>1.12" - 8 7-E Te=10'.0 niin 6- CN='36 .. 4 I , -777 tz-7, ti . , I ,2' P " . , i _ 0.1,417.-,/.-<_<-7, /-1,-.<, . . . , . . . . , . . .,:".r.A': . , . : : . . , ' , . . '. . . , , . . : . , : . -: . , ( 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 28 HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Runoff = 3.12 cfs @ 12.20 hrs, Volume= 0.355 af, Depths 1.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 50-yr Rainfall=9.01" Area (ac) CN Description 0.370 36 Woods, Fair, HSG A, DA 1 0.680 36 Woods, Fair, HSG A, DA 2 1.540 36 Woods, Fair, HSG A, DA 8 1.220 36 Woods, Fair, HSG A, DA 10 3.810 36 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Predeveloped Runoff to Tract East of Site Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Hydrograph ©Runoff 1 9.12 cfs 1 3- i u n off=3.12 cfs Type;III 24-hr 501r Rainfall=9.01" Runoff-Area=3..8-10-ac- w 2-, I I Runoff:Volume=0.355:of fL Runoff Depfih>1.12" • Tc=10 0 min 1- g '�/ CN 36 5 6 7 8 9 10 11 12 '13 '14' '15. •16. .17. '18• • . .19' .20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 29 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 3S: 1140 Business PArk Phase 5 Runoff = 165.20 cfs @ 12.14 hrs, Volume= 13.709 af, Depth> 7.24" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 50-yr Rainfall=9.01" Area (ac) CN Description 19.178 98 Bldgs, Asphalt, Concrete 3.532 39 >75% Grass cover, Good, HSG A 22.710 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Tract Subcatchment 3S: 1140 Business PArk Phase 5 Hydrograph 180= :. ®Runoff 170=" 6520 ds i ,60: . .unoff:;165 1;20 cfs .. 150' Type IFI 24-h;r 50�yr 130t RainfailL-9 01" 120 s 110- Runoff Area=22-.710-ac Runoff yol lme=13 709'.af o . Runoff Depth;>7:24" �- 80q 70' ' Tc.=10.0. min _. 60 CN=89 50= 40= 6 7 8 9 10 ,1 12 • 13 14 75 18 17 • • 18 • • 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type 111 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 30 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 [82] Warning: Early inflow requires earlier time span Inflow Area = 22.710 ac, Inflow Depth > 7.24" for 50-yr event Inflow = 165.20 cfs @ 12.14 hrs, Volume= 13.709 af Outflow = 53.15 cfs @ 12.50 hrs, Volume= 13.701 af, Atten=68%, Lag= 21.6 min Discarded = 25.19 cfs @ 12.50 hrs, Volume= 12.991 af Primary = 27.95 cfs @ 12.50 hrs, Volume= 0.710 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 14.57'@ 12.50 hrs Surf.Area= 72,553 sf Storage= 206,718 cf Plug-Flow detention time=66.9 min calculated for 13.655 af(100% of inflow) Center-of-Mass det. time=66.3 min ( 819.0- 752.7) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismatic Jsted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 10.50 28,925 0 0 15.00 77,114 238,588 238,588 Device Routing Invert Outlet Devices #1 Discarded 0.00' 15.000 in/hr Exfiltration over Surface area #2 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Qiscarded OutFlow Max=25.19 cfs @ 12.50 hrs HW=14.57' (Free Discharge) 1=Exfiltration (Exfiltration Controls 25.19 cfs) rimary OutFlow Max=27.73 cfs @ 12.50 hrs HW=14.57' (Free Discharge) 2=Broad-Crested Rectangular Weir(Weir Controls 27.73 cfs @ 1.2 fps) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris &Tunstall Consulting Engineers Page 31 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 Hydrograph / , ; ---crsI l._ 1 .. . _ . _. .. -i inflow D sccard .1 D 180i :.Inf Ow /olrea=22 7.10.. ac Primaryed Inflow 165;20 cfs 160- 150= . Outflow=53:1 5 cfs. .; 140 130- . ' Discarded=25:1 9-cfs 110 ;. _ .. . .. .._p.rlmary=2795 cfs... Peak Ele 100 v=14:57' , 3 90 80 -53.,5�s Storage=206,718 cf.. so _ 50 • 1 Ea _ 1 ';• I- r� r. ELM 10 i --- '��''''' - - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 32 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 15: Predeveloped Runoff Infiltration Basin 1 Runoff Area=22.710 ac Runoff Depth>1.51" Tc=10.0 min CN=36 Runoff=28.53 cfs 2.863 af Subcatchment 2S: Predeveloped Runoff to Property East of SiunoffArea=3.810 ac Runoff Depth>1.51" Tc=10.0 min CN=36 Runoff=4.79 cfs 0.480 af Subcatchment 3S: 1140 Business PArk Phase 5 Runoff Area=22.710 ac Runoff Depth>8.16" Tc=10.0 min CN=89 Runoff=184.95 cfs 15.439 af Pond 3P: Infiltration Basin 1 Peak Elev=14.70' Storage=215,900 cf Inflow=184.95 cfs 15.439 af Discarded=25.66 cfs 13.836 af Primary=55.25 cfs 1.594 af Outflow=80.91 cfs 15.430 af Total Runoff Area = 49.230 ac Runoff Volume= 18.783 af Average Runoff Depth=4.58" 19131 Phase 5 1140 Basin OCT 2020 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 33 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment IS: Predeveloped Runoff Infiltration Basin 1 Runoff = 28.53 cfs @ 12.18 hrs, Volume= 2.863 af, Depth> 1.51" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 100-yr Rainfall=10.00" Area (ac) CN Description 22.710 36 Woods, Fair, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Site Subcatchment 1S: Predeveloped Runoff Infiltration Basin 1 Hydrograph ❑Runoff 30 Wit! 28 ,� ;Runoff=28.53 cfs Type 0124-hr 100;yr- 24 22_ , nfall= - ai 1 0.0,0 20-ERunoff Area_=22.710 ac .. 18- 16 . Runoff,-Volume=2..J8.63:of T. 14. Runoff Depth>1.51" - 12=,' , 1 Tc-= 0.0_Irrin S - CN=36 , . /%J7j, 2- - 1,' 1 f�f_V-4:f.47 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin OCT 2020 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 34 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin 1 Runoff = 4.79 cfs @ 12.18 hrs, Volume= 0.480 af, Depth> 1.51" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 100-yr Rainfall=10.00" Area (ac) CN Description 0.370 36 Woods, Fair, HSG A, DA 1 0.680 36 Woods, Fair, HSG A, DA 2 1.540 36 Woods, Fair, HSG A, DA 8 1.220 36 Woods, Fair, HSG A, DA 10 3.810 36 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Predeveloped Runoff to Tract East of Site Subcatchment 2S: Predeveloped Runoff to Property East of Site within Infiltration Basin Hydrograph El Runoff 5- 14.79c1s 1 Runoff=4.79 cfs • Type III 24-hr100tyr 10 4- ROinf0111=10.09" • . Runoff Are07.-L73.8.10 Oc_ 3: Runoff,Volume=0A80:af g Runoff Depth>1.51" 2-, . Td=10.0 k' • CN=.36 1-4 '-" i 5 6 7 8 9 10 12' 13' -—14 15 16 17 18 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 35 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Subcatchment 3S: 1140 Business PArk Phase 5 Runoff = 184.95 cfs @ 12.14 hrs, Volume= 15.439 af, Depth> 8.16" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 100-yr Rainfall=10.00" Area (ac) CN Description 19.178 98 Bldgs, Asphalt, Concrete 3.532 39 >75% Grass cover, Good, HSG A 22.710 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Entire Tract Subcatchment 3S: 1140 Business PArk Phase 5 Hydrograph O Runoff 190• .. ... ., ,. :... • 1184.95 ens I , 1804 I'r . Runoff-184 .95::cfs... 160 Type III 24-tir100 yr 150 - Rainfall=10:00 140 "- ® a�22.71 .iA 120- - . un ff Are O;arc 110; - :Runoff 10ol:ume=t1:51439af b 100'_ rr. 90_' . Runoff Depth;>8-1600 80 , 7o= =1min . _N89 50_ • 404 A_ 30 F. . 20`�. -I. i. 5 6 7 8 j' 1b 1,1 12. 15 14 15 116 17 (; 18 19 20 Time (hours) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 36 HydroCADO 7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 [82]Warning: Early inflow requires earlier time span Inflow Area = 22.710 ac, Inflow Depth > 8.16" for 100-yr event Inflow = 184.95 cfs @ 12.14 hrs, Volume= 15.439 of Outflow = 80.91 cfs @ 12.40 hrs, Volume= 15.430 af, Atten= 56%, Lag= 15.8 min Discarded = 25.66 cfs @ 12.40 hrs, Volume= 13.836 af Primary = 55.25 cfs @ 12.40 hrs, Volume= 1.594 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 14.70'@ 12.40 hrs Surf.Area= 73,896 sf Storage=215,900 cf Plug-Flow detention time=64.3 min calculated for 15.429 af(100% of inflow) Center-of-Mass det. time=63.9 min (814.6-750.7) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 10.50 28,925 0 0 15.00 77,114 238,588 238,588 Device Routing Invert Outlet Devices #1 Discarded 0.00' 15.000 in/hr Exfiltration over Surface area #2 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Discarded OutFlow Max=25.66 cfs @ 12.40 hrs HW=14.70' (Free Discharge) 4L-1=Exfiltration (Exfiltration Controls 25.66 cfs) Primary OutFlow Max=55.09 cfs @ 12.40 hrs HW=14.70' (Free Discharge) L2=Broad-Crested Rectangular Weir(Weir Controls 55.09 cfs @ 1.5 fps) 19131 Phase 51140 Basin OCT 2020 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 37 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 Hydrograph 84 95Outflow �i l+ �1 L zoo flow A = 2.710 ac ®Primary ed In rea 2 1904 , ... --- - .W=1 180`- ... _. . .. Inflo 84.95 cfs 170 . _ Ou -tfLgW 80.�1- cfS-.. 160' 150_ ?. isc rded=�5.6-6 cfs 140=' 130a ! .. Plr...ry_: 55.25 _cfs:: . To- 120' : , 1 1 11, . _ - Pe 3 100 .eo.a,�, �. a ev � 4 70� Storage215,900"cf. 80 70= 60_ � t:: r 30 /fir ii.=,. f �I 1 O %V(.4.4 I.////./�rr rr rrrr, �nr d I 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 19131 Phase 5 1140 Basin OCT 202 NO INFIL Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting • -- • Page 1 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 [821 Warning: Early inflow requires earlier time span Inflow Area = 22.710 ac, Inflow Depth > 7.24" for 50-yr event Inflow = 165.20 cfs @ 12.14 hrs, Volume= 13.709 af Outflow = 142.66 cfs @ 12.21 hrs, Volume= 9.258 af, Atten= 14%, Lag=4.2 min Primary = 142.66 cfs @ 12.21 hrs, Volume= 9.258 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 14.98'@ 12.21 hrs Surf.Area= 76,929 sf Storage= 237,255 cf Plug-Flow detention time=135.2 min calculated for 9.256 af(68% of inflow) Center-of-Mass det. time=65.8 min ( 818.5-752.7) Volume Invert Avail.Storage Storage Description #1 10.50' 238,588 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 10.50 28,925 0 0 15.00 77,114 238,588 238,588 Device Routing Invert Outlet Devices #1 Primary 14.35' 105.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=141.22 cfs @ 12.21 hrs HW=14.98' (Free Discharge) 1=Broad-Crested Rectangular Weir(Weir Controls 141.22 cfs @ 2.1 fps) Pedk 5'0 Eleo = 4.gia 19131 Phase 51140 Basin OCT 2020 NO INFIL Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris &Tunstall Consulting Engineers Page 2 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/9/20 Pond 3P: Infiltration Basin 1 Hydrograph ... _ . IC Inflow 180 I 165.20... chi ®Primary 170 In flow 22�7.10 ac 160 150 1„2.66 : n� ow=165-:20 cfs- 140 . 130 � - Primary=142.66 cfs Peak Elev-14:98' a '°° Storage=237,255'.cf__. 3 90 ': I 70 .. 50 40 30 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ig 131 Infiltraton Trench CONCRETE, SIDEWALK TOTALAREA(SF) ASPHALT(SF) CURB&GUTTER BUILDING(SF) OFFSITE(SF) IMPERVIOUS %IMPERVIOUS (SF) (SF) TOTAL(SF) DA5 12152 9106 607 1159 0 0 10872 89 DA7 13827 10351 576 1366 0 0 12295 89 DA9 13718 10302 567 1323 0 0 12192 89 DA11 14589 11169 572 1407 0 0 13148 90 DA14 909 827 86 0 0 0 913 100 DA17 1800 1611 183 0 0 0 1794 100 DA19 12406 9456 478 1235 0 0 11169 90 DA21 13724 10316 541 1355 0 0 12212 89 DA23 13727 10300 542 1332 0 0 12174 89 DA25 14187 10954 534 1412 0 0 12900 91 DA28 2387 1770 268 0 0 0 2038 85 DA31 3474 2743 202 0 0 0 2945 85 DA33 9814 7468 421 988 0 0 8877 90 DA35 18961 14521 722 1857 0 0 17100 90 DA37 9432 7151 483 905 0 0 8539 91 TOTAL(SF) 155107 118045 6782 14341 0 0 139168 89.7 TOTAL(AC) 3.56 2.71 0.16 0.33 0.00 0.00 3.19 4 Date Desigr NORRIS & TUNSTALL Wilmington, NC Sheet IIIP —CONSULTING ENGINEERS P.C.— Brunswick County, NC Of Check J1 For Job No. i V I is i't". l'f? 14(0410/1 Tiri-ch \nil 1m -7-i-acic Ce/14-et. ICI "3 1---1 , I I / eort-rr lark nj LT "7:1-0;Ayr-441011 Z S DA = 155, jorMF73, 42 "lc- Tp , /39) /CoSsF / 5T A4'r % .likp 7. 47% Pi,= e 9,o sr 09 6, 1'417 j , VoLip,e 3 A x 8Eifc _JI 4 , Ackle, (4:14 ,1e-1.d 3,1 7----, 4 = F--"s r) hc if 2- Do = 161 (e(8 .4c 16- 11 •q i chLici )1 117 Z 1 flit 4 FAT, 33-S : F I l'efie i'l Le r‘54h " ." I 90 -ro E-"lev f) 4c62,a sqw-r= qfg/Fq (Aetc- gottej 3-- ) --cill.7 / ) E7c-c (3-21r2A ) 4i2A/J t 6' (Ail& 11-8 .1.--9 f_fita) '---- II.L(q ,,Ii -=‘) Liin r7 221-1 /4.- 1 " • ,I 1 - ) 6181- X '---1' c- _ i F .- ii t r- e?,-0 7'1 avyss i 011" iLf,42sLsP x '4,27.-JA,1 ... ,r,„ 7- 1 Poitm --CA 1 I I 1 OU f ,f 1 q , s. - 2 F- x ‘ e ci iri AL (Pe .10 9 11 ) - mq g fr7 2? k ) 1 r ' , ..1.----1..- -,..„,,lc...__ I i 1 Date Design NORRIS & TUNSTALL Wilmington, NC Sheet erzs--2-. .9e.. _CONSULTING ENGINEERS P.C.— Brunswick County, NC Of Check Job ForJob No. \ 4f tirn tag\i5 ‘ ...ii.:6. ece. (,,,,..7d.x.r e G\Ai n ke. Li ri-iito PI4iZ) lar3i 7 1 1 ' 1 ' o3.-.,-. -------1.0....-57" r., ,1e.:.&;:0-4.::: :".,'; •As9i4AL1-450.:,;.&:Itar/k:i. 1 , -if 1 1 . • 1 1 i 1 Aa. i ....,.., _ ,I ' . 2)4 NOIS1 1.- 10 A If-.6kcii\ Q, 111---1 IF "1 • • 1 r I 1 . X. ‘ " ' 14) 6'7 Li' i 1 /)f/ •: ! / H-s- /, „. • Trentik- 50o,vi e i--.2.1 1 q f I . - 1 i ! • ! • 1 -' 1 , 1 1 i . 1 .. /2.4,,,, 1 4.2,.„... 1 , , il -r ••1• -• 1: • 1 r! -; - 05E.. • 267/ i-liD e - ( ,E2F) A t-- 4 g 71-,.- 11.0rive ! cyg_. .1o.11)e Pi-.! . 1 i I i 1 /4,06#.‘„F --TifeNCke 1—eqirk =' r• CA.1.0.41_:" "i 1 1 1 ' I . i Y ' 1 1 90i‘''''' " 47 T - 14e,ic‘m- ir- ,'.:) .."- V-7: __FT 1,.". , 1 ..... . V... Irootiory) r,i`s-,-A s--... V-f lc/-45 r'-- i • Te k -Jv.-. r7-4 6±ric , 1 ; I 1" ••! j ' ' 1 66 s",...- ! K400, ( A ,--7---e.rict,,, 16/01(46lie =T... rf. 016,!;/c. 4, ?1-1-22 4c. , ; I I . I ) , I - -. I. 1 r ! • 1 r l7. 4' t9-4011) 4.7 A.IP,ill ' I , .. r.) .1f ._ .1 J Or 1.---1(ler --,..f ok,,tvx c It.--roL4 0(..* 1 I ! • ; 1 ; t . ' .. I r ./ 1 -— 1-- ' - - -1—--71----4------.- ---1 - • ' • -, :Q 0 , ..- : 0 0 / 1f7 ; - -- : ,--. ------.-- • , !.- • - - , - - -- - • - .1 • ! ; - • 1 ! Yz..,. R -11-e., ';3 ,Pif 824 cF,s te P 4 ge.- tivee,t 4- 04,-,r-F!c4..., ci.k.74 14.• 4.s ../ " • 1 1 - 1 on Hwy! .4z(_S,Jk: crc'.,,....Pur..1.4c.)--, 0 4: Licrs lio .!iir.2.. 1- 1 al 1 t 1 , • 'p ,1 1 ea if• 5::•••teu• .i.-- i r:iirac.?•- L • 1 H . i • , II Nag !! tl YdroCA U w% t I No &&Lor i A ?r1c Lc 41i G'ewt-ef fAcv% 1Jdoo Ft buk 'o7,4L tcvj4r:s ç1ffo . lie S,ot i+ t`. -ii gals e 1 EQALL.eni fk 4 int Jet (qqcr ) 41:1 K 2S Pre-Development Front Par ng Lot and Runoff Drive ays of Devel pment A I Rowl'") e r/t- 'h a 4.k. A 4 1 47tP i °&S. 1 $ Undergound Infiltration System 19 sa = :°. � ,= • CFI fpi:4 3e4,...ee.i 4 Ou,ze4t,e., 7,1 le 4.-s Oki ?eats 1:1e,40 ' I 177 oc Subca Reach on Link�N� Drainage Diagram for 19131 Ph 51-140 Infiltration Pipe Trench June 20 0 Prepared by Norris&Tunstall Consulting Engineers 10/7/20 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 19131 Ph 51-140 Infiltration Pipe Trench June 21:Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 2 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10R/20 Time span=5.00-48.00 hrs, dt=0.05 hrs, 861 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-Development Runoff Runoff Area=3.560 ac Runoff Depth=0.00" Tc=5.0 min CN=30 Runoff=0.00 cfs 0.000 af Subcatchment 2S: Front Parking Lot and Driveways of DevekRunoffArea=3.560 ac Runoff Depth=0.80" Tc=5.0 min CN=92 Runoff=3.35 cfs 0.238 af Pond 3P: Undergound Infiltration System Peak Elev=12.09' Storage=511 cf Inflow=3.35 cfs 0.238 af Discarded=2.49 cfs 0.238 af Primary=0.00 cfs 0.000 af Outflow=2.49 cfs 0.238 af Total Runoff Area = 7.120 ac Runoff Volume= 0.238 af Average Runoff Depth = 0.40" 19131 Ph 5 1-140 Infiltration Pipe Trench June 21Type III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 3 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Subcatchment 1 S: Pre-Development Runoff [49] Hint: Tc<2dt may require smaller dt [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt=0.05 hrs Type III 24-hr 1.5 inch Storm Rainfall=1.50" Area (ac) CN Description 3.560 30 Woods, Good, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Front portion of Site Subcatchment 1S: Pre-Development Runoff Hydrograph E Runoff Runoff=0.00 'cfs 1 ;Type III 24-hr 1.5 inch Storm Rainfall=1.50° Runoff Area=3.560 ac Runoff Volume=0.000 of Runoff Depth=0.00°°• LL Tc=5:0 min' CN=30 0.00 cts o 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748 Time (hours) 19131 Ph 5 1-140 Infiltration Pipe Trench June 21ype III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 4 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Subcatchment 2S: Front Parking Lot and Driveways of Development [49] Hint: Tc<2dt may require smaller dt Runoff = 3.35 cfs @ 12.08 hrs, Volume= 0.238 af, Depth= 0.80" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Type III 24-hr 1.5 inch Storm Rainfall=1.50" Area (ac) CN Description 3.190 98 Paved parking & roofs 0.370 39 >75% Grass cover, Good, HSG A 3.560 92 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Front Parking Area Subcatchment 2S: Front Parking Lot and Driveways of Development Hydrograph I ri Runoff Runoff 3.35 cfs 31 Type Storm III 24-hr 1�.5 inch ' I ` • , : Rainfall=1.50"• • ; : • • : : • Runoff Area=3.560 ac : • • • ;• ;• ; : • Runoff Volue=038-af 2- • Runoff Depth=0.80". Tc=50 nlin 1- 0 ; ; f. :�flit 5 6 7 8 9101112131415161718"192021222324252627282930313233343536373839404142434445464748 Time (hours) 19131 Ph 51-140 Infiltration Pipe Trench June 20"ype 111 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 5 HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 10R/20 Pond 3P: Undergound Infiltration System Inflow Area = 3.560 ac, Inflow Depth = 0.80" for 1.5 inch Storm event Inflow = 3.35 cfs @ 12.08 hrs, Volume= 0.238 af Outflow = 2.49 cfs @ 12.05 hrs, Volume= 0.238 af, Atten= 25%, Lag= 0.0 min Discarded = 2.49 cfs @ 12.05 hrs, Volume= 0.238 af Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 12.09'@ 12.15 hrs Surf.Area= 14,925 sf Storage= 511 cf Plug-Flow detention time=2.1 min calculated for 0.237 af(100% of inflow) Center-of-Mass det. time=2.1 min (829.6- 827.4 ) Volume Invert Avail.Storage Storage Description #1 12.00' 24,223 cf Custom Stage Data (Prismatic)Listed below 74,625 cf Overall- 14,066 cf Embedded = 60,559 cf x 40.0%Voids #2 12.50' 14,066 cf 36.0"D x 995.00'L Horizontal Cylinderx 2 Inside#1 38,290 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 12.00 14,925 0 0 17.00 14,925 74,625 74,625 Device Routing Invert Outlet Devices #1 Discarded 0.00' 7.220 in/hr Exfiltration over Surface area #2 Primary 17.00' 24.0" Horiz. Orifice/Grate X 4.00 Limited to weir flow C= 0.600 iscarded OutFlow Max=2.49 cfs @ 12.05 hrs HW=12.05' (Free Discharge) =Exfiltration (Exfiltration Controls 2.49 cfs) Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=12.00' (Free Discharge) 2=Orifice/Grate (Controls 0.00 cfs) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2tType III 24-hr 1.5 inch Storm Rainfall=1.50" Prepared by Norris & Tunstall Consulting Engineers Page 6 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Pond 3P: Undergound Infiltration System Hydrograph il Inflow 3.35 eh _I OUi1IOW I ' 1 I n flow ail Discaryed -; , , - Prima �4ras3.5-60 ac Inflow=3.35 cfs 3 ._ae ore Outflow=2.49 cfs ♦ d Disc..a rde =2.-4 9 cfs- - Primary=0.00 cfs 3 2 Peak; Elev=12109' LL , ,i0 . . Storage=511 c'f / ' 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 7 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Time span=5.00-48.00 hrs, dt=0.05 hrs, 861 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-Development Runoff Runoff Area=3.560 ac Runoff Depth=0.00" Tc=5.0 min CN=30 Runoff=0.00 cfs 0.000 af Subcatchment 2S: Front Parking Lot and Driveways of DeveldRunoff Area=3.560 ac Runoff Depth>3.60" Tc=5.0 min CN=92 Runoff=14.46 cfs 1.067 af Pond 3P: Undergound Infiltration System Peak Elev=13.63' Storage=12,635 cf Inflow=14.46 cfs 1.067 af Discarded=2.49 cfs 1.067 af Primary=0.00 cfs 0.000 af Outflow=2.49 cfs 1.067 af Total Runoff Area = 7.120 ac Runoff Volume= 1.067 af Average Runoff Depth = 1.80" 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 8 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Subcatchment 1S: Pre-Development Runoff [49] Hint: Tc<2dt may require smaller dt [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Type Ill 24-hr 2-yr Rainfall=4.50" Area (ac) CN Description 3.560 30 Woods, Good, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Front portion of Site Subcatchment 1S: Pre-Development Runoff Hydrograph , ; 111 Runoff Runoff=0;00 cfs; Type III 24-h'r 2�-yr: Rai lfall�4.50" : i = ! Runoff Area=3 560'ac Runoff Volume=0 000 of LL I Runoff Depth'=000"' Tc=5.0 `nin' CIV 3;0: I 5 6 7 8 9101112131415161718192021222324252627282930313233343536373839404142434445464748 Time (hours) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 9 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Subcatchment 2S: Front Parking Lot and Driveways of Development [49] Hint: Tc<2dt may require smaller dt Runoff = 14.46 cfs @ 12.07 hrs, Volume= 1.067 af, Depth> 3.60" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Type III 24-hr 2-yr Rainfall=4.50" Area (ac) CN Description 3.190 98 Paved parking & roofs 0.370 39 >75% Grass cover, Good, HSG A 3.560 92 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Front Parking Area Subcatchment 2S: Front Parking Lot and Driveways of Development Hydrograph 16: : RI Runoff � I I ' 1 . lb= 14=' R �I unoff , * (ifs 13= Type I - T . II 24=h'r-,2 ylr ... Rainfall=4:50": _.. 10- 56 ros Ru60f.f Area=3. • Runoff:Volume=1.067 of 0 _ , I LL ono ept 60" • T075.0.min: =92, . , : J 1 _ ,,, �. �/ fib// I 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748 Time (hours) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 10 HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Pond 3P: Undergound Infiltration System [82] Warning: Early inflow requires earlier time span Inflow Area = 3.560 ac, Inflow Depth > 3.60" for 2-yr event Inflow = 14.46 cfs @ 12.07 hrs, Volume= 1.067 af Outflow = 2.49 cfs @ 11.70 hrs, Volume= 1.067 af, Atten= 83%, Lag= 0.0 min Discarded = 2.49 cfs @ 11.70 hrs, Volume= 1.067 af Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 13.63'@ 12.53 hrs Surf.Area= 14,925 sf Storage= 12,635 cf Plug-Flow detention time=29.8 min calculated for 1.066 af(100% of inflow) Center-of-Mass det. time=29.7 min (815.7-786.0) Volume Invert Avail.Storage Storage Description #1 12.00' 24,223 cf Custom Stage Data (Prismatic Jsted below 74,625 cf Overall- 14,066 cf Embedded = 60,559 cf x 40.0%Voids #2 12.50' 14,066 cf 36.0"D x 995.00'L Horizontal Cylinderx 2 Inside#1 38,290 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 12.00 14,925 0 0 17.00 14,925 74,625 74,625 Device Routing Invert Outlet Devices #1 Discarded 0.00' 7.220 in/hr Exfiltration over Surface area #2 Primary 17.00' 24.0" Horiz. Orifice/Grate X 4.00 Limited to weir flow C= 0.600 iscarded OutFlow Max=2.49 cfs @ 11.70 hrs HW=12.06' (Free Discharge) =Exfiltration (Exfiltration Controls 2.49 cfs) Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=12.00' (Free Discharge) L2=Orifice/Grate (Controls 0.00 cfs) 19131 Ph 51-140 Infiltration Pipe Trench June 2020 Type III 24-hr 2-yr Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers Page 11 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Pond 3P: Undergound Infiltration System Hydrograph 4. , , i , , I, 46craf ow .. . , _ Inflow • 167 , ;. . Inflow.Area.=.3...56_0_.ac scaryed D Prima 15: fs w 14 I or . 4.- C 13 - , . .O w=2 ut l0 49 cfs- iLf 4_ 11- :.. .....,._ Discarde.d= ` ...9 .� _cfs. 10. : = J _ :00:'cfs Primary=0 a: Peak Elev= 363__ olra e S � 1 ,65cf_ 5: 2.48 cfe / II .,... -iAl ' ':. , I , . 11 : 4' I - 2.49 ch g, 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 19131 Ph 51-140 Infiltration Pipe Trench June 2020 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 12 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Time span=5.00-48.00 hrs, dt=0.05 hrs, 861 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-Development Runoff Runoff Area=3.560 ac Runoff Depth=0.22" Tc=5.0 min CN=30 Runoff=0.11 cfs 0.066 af Subcatchment 2S: Front Parking Lot and Driveways of Develeunoff Area=3.560 ac Runoff Depth>6.06" Tc=5.0 min CN=92 Runoff=23.78 cfs 1.798 af Pond 3P: Undergound Infiltration System Peak Elev=15.13' Storage=26,543 cf Inflow=23.78 cfs 1.798 af Discarded=2.49 cfs 1.798 af Primary=0.00 cfs 0.000 af Outflow=2.49 cfs 1.798 af Total Runoff Area= 7.120 ac Runoff Volume= 1.864 af Average Runoff Depth = 3.14" 19131 Ph 51-140 Infiltration Pipe Trench June 2020 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 13 HydroCAD D 7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Subcatchment 1S: Pre-Development Runoff [49] Hint: Tc<2dt may require smaller dt Runoff = 0.11 cfs @ 13.73 hrs, Volume= 0.066 af, Depth= 0.22" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Type III 24-hr 10-yr Rainfall=7.05" Area (ac) CN Description 3.560 30 Woods, Good, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Front portion of Site Subcatchment 1S: Pre-Development Runoff Hydrograph 0.115= �. . 1 ' i r . 1 Runoff U.11? 110.11611 • I I ... 0.1054- = 0, ,, � � Ru , , ff= , cfs 0.095 :Type III 24-hr'10 r. .. 0.09. 0.085 Rainfa;Il=705": 0.0754 ff a= uno ; Q►r� 3 560 'ac 130.0653 Runoff V lume=0 6'61 af. o 0.055= _ f D - 0.05 . _ _ ept 0.2 I�unof � h� =5.0 n CNI I3:O 0.03 0.025 ; 0.02' 0.0151 , 0.005 , 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748 Time (hours) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 14 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Subcatchment 2S: Front Parking Lot and Driveways of Development [49] Hint: Tc<2dt may require smaller dt Runoff = 23.78 cfs @ 12.07 hrs, Volume= 1.798 af, Depth> 6.06" Runoff by SCS TR-20 method, UH=SCS, Time Span=5.00-48.00 hrs, dt= 0.05 hrs Type III 24-hr 10-yr Rainfall=7.05" Area (ac) CN Description 3.190 98 Paved parking & roofs 0.370 39 >75% Grass cover, Good, HSG A 3.560 92 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ftfft) (ft/sec) (cfs) 5.0 Direct Entry, Front Parking Area Subcatchment 2S: Front Parking Lot and Driveways of Development Hydrograph ; ; 267 ,.. I .. 1 I I El 123.78cfa1._. - .- - .. .. 24- '- Runoff,=23 7,8 cfs;- _ T .„. e l l l 24-h r 10 r 20= P" ;Rainfa11=7:05" -. 16 Runoff i4 rea=3:560 ac 14: : I Runoff'Volume=1.798 af LL ,2= f D �r , Runof epth 6:06 8- V 6 92: . 4- iirrrt � 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748 Time (hours) 19131 Ph 51-140 Infiltration Pipe Trench June 2020 Type Ill 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 15 HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 10R/20 Pond 3P: Undergound Infiltration System [82]Warning: Early inflow requires earlier time span Inflow Area = 3.560 ac, Inflow Depth > 6.06" for 10-yr event Inflow = 23.78 cfs @ 12.07 hrs, Volume= 1.798 af Outflow = 2.49 cfs @ 11.55 hrs, Volume= 1.798 af, Atten= 90%, Lag= 0.0 min Discarded = 2.49 cfs @ 11.55 hrs, Volume= 1.798 af Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 15.13'@ 12.77 hrs Surf.Area= 14,925 sf Storage= 26,543 cf Plug-Flow detention time=73.6 min calculated for 1.798 af(100% of inflow) Center-of-Mass det. time=73.5 min (848.8-775.3) Volume Invert Avail.Storage Storage Description #1 12.00' 24,223 cf Custom Stage Data (Prismatic)Listed below 74,625 cf Overall- 14,066 cf Embedded = 60,559 cf x 40.0%Voids #2 12.50' 14,066 cf 36.0"D x 995.00'L Horizontal Cylinderx 2 Inside#1 38,290 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 12.00 14,925 0 0 17.00 14,925 74,625 74,625 Device Routing Invert Outlet Devices #1 Discarded 0.00' 7.220 in/hr Exfiltration over Surface area #2 Primary 17.00' 24.0" Horiz. Orifice/Grate X 4.00 Limited to weir flow C= 0.600 Discarded OutFlow Max=2.49 cfs @ 11.55 hrs HW=12.05' (Free Discharge) =Exfiltration (Exfiltration Controls 2.49 cfs) Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=12.00' (Free Discharge) L2=Orifice/Grate ( Controls 0.00 cfs) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 10-yr Rainfall=7.05" Prepared by Norris & Tunstall Consulting Engineers Page 16 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Pond 3P: Undergound Infiltration System Hydrograph L ... 23.78 cis _. _... _.., -- _ ._. .-._.J_ _ _., ,7i In flow -, a=3.560 D Discarded , Pr imary - flowAre IIIIIIL • -at 24= , , ; Inflonr 23.78 Ccfs .�. '. •.. A i 20_ Outflow_.2.49-„ 18= Discarded=2.49-dfs - 16 , - =0.00 cfs Primary , 3 I II ' .. = o Peak E leer 'I 5:1 I 10: 'S 25,54 forage ; 3 of 6- 2 49 cfs & : ._ ... ... �i - .$ - err//r. 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 4.8 Time (hours) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 17 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Time span=5.00-48.00 hrs, dt=0.05 hrs, 861 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment IS: Pre-Development Runoff Runoff Area=3.560 ac Runoff Depth=0.42" Tc=5.0 min CN=30 Runoff=0.43 cfs 0.124 af Subcatchment 2S: Front Parking Lot and Driveways of DevekRunoff Area=3.560 ac Runoff Depth>6.99" Tc=5.0 min CN=92 Runoff=27.26 cfs 2.074 af Pond 3P: Undergound Infiltration System Peak Elev=16.00' Storage=32,309 cf Inflow=27.26 cfs 2.074 af Discarded=2.49 cfs 2.074 af Primary=0.00 cfs 0.000 af Outflow=2.49 cfs 2.074 af Total Runoff Area = 7.120 ac Runoff Volume= 2.198 af Average Runoff Depth =3.70" 19131 Ph 51-140 Infiltration Pipe Trench June 2020 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 18 HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Subcatchment 1S: Pre-Development Runoff [49] Hint: Tc<2dt may require smaller dt Runoff = 0.43 cfs @ 12.40 hrs, Volume= 0.124 af, Depth= 0.42" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Type Ill 24-hr 25-yr Rainfall=8.01" Area (ac) CN Description 3.560 30 Woods, Good, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Front portion of Site Subcatchment 1S: Pre-Development Runoff Hydrograph 0.46- ®Runoff 0.44- . ..[b1 ! ; • 1 0.42= . I , . Runoff=0�443' cfs: 0.4 0.36- Type III 24 h'r'2:5-yr. _ 0.34i - Ra;i nfa11=8-01,"' - 0.28a3i _ a , 35 a ,R unoff Are 60 e' Runoff Volume= 0.124 of 3 0.241I• , b : 0.22- : D ���, u off' LL o.z R � epth'-'0 4 . 0.14 /' 0.12 // C1V;30'. 0.1 - .,� 0.080.0 /�% 0.04 a 1:/ 5 6 7 8 9 10 11 1213 14 1516 1718192021 222324 5' 2627282930313233343536373839404142434445464748 Time (hours) 19131 Ph 51-140 Infiltration Pipe Trench June 2020 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 19 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Subcatchment 2S: Front Parking Lot and Driveways of Development [49] Hint: Tc<2dt may require smaller dt Runoff = 27.26 cfs @ 12.07 hrs, Volume= 2.074 af, Depth> 6.99" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Type III 24-hr 25-yr Rainfall=8.01" Area (ac) CN Description 3.190 98 Paved parking & roofs 0.370 39 >75% Grass cover, Good, HSG A 3.560 92 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Front Parking Area Subcatchment 2S: Front Parking Lot and Driveways of Development Hydrograph m Runoff - 26= , , : : : : : . : , ; I ' �unofif_ -27 26. c. fs 24= . - 11 : ' type 11[ 24 hr25'' yr 22- � - : Rain 'I"'fa11�8�0 2,0 : 18, , , , , Off-A = .R un , 16� , ,.7g. : : Runoff, meii2'0 4' of Volu - 14= De h'> , mi Runoff: � .6.9 12 10= i Tc 5.0 !rim-/� C,N - 8 Oil ! 9,2 • 4_ _ , jy f J , g /t Z 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748 Time (hours) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type I1124-hr25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 20 HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Pond 3P: Undergound Infiltration System [82] Warning: Early inflow requires earlier time span Inflow Area = 3.560 ac, Inflow Depth > 6.99" for 25-yr event Inflow = 27.26 cfs @ 12.07 hrs, Volume= 2.074 af Outflow = 2.49 cfs @ 11.40 hrs, Volume= 2.074 af, Atten= 91%, Lag= 0.0 min Discarded = 2.49 cfs @ 11.40 hrs, Volume= 2.074 af Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 16.00'@ 12.91 hrs Surf.Area= 14,925 sf Storage= 32,309 cf Plug-Flow detention time=93.4 min calculated for 2.071 af(100% of inflow) Center-of-Mass det. time=93.2 min ( 866.1 -772.9) Volume Invert Avail.Storage Storage Description #1 12.00' 24,223 cf Custom Stage Data (Prismatic)Listed below 74,625 cf Overall- 14,066 cf Embedded = 60,559 cf x 40.0%Voids #2 12.50' 14,066 cf 36.0"D x 995.00'L Horizontal Cylinderx 2 Inside#1 38,290 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 12.00 14,925 0 0 17.00 14,925 74,625 74,625 Device Routing Invert Outlet Devices #1 Discarded 0.00' 7.220 in/hr Exfiltration over Surface area #2 Primary 17.00' 24.0" Horiz. Orifice/Grate X 4.00 Limited to weir flow C= 0.600 Qiscarded OutFlow Max=2.49 cfs @ 11.40 hrs HW=12.05' (Free Discharge) T--1=Exfiltration (Exfiltration Controls 2.49 cfs) Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=12.00' (Free Discharge) 2=Orifice/Grate (Controls 0.00 cfs) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 25-yr Rainfall=8.01" Prepared by Norris & Tunstall Consulting Engineers Page 21 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Pond 3P: Undergound Infiltration System Hydrograph ' 'Inflow 127.28c(sJ FlOutflow _ 30 ' ... ..,.. ' l .. ove;. . .. ...In Area=3.560 ac. . 01JDiscarded Primary 28= f .= 28- =-. .. . . ... . .... . .. .:. ... . ow=27�26...cfs Infl za= / _ - I OutflO r=2.49 cfs. =" • Discarded=2:49 cfs 20-" i - 18- - a = . is � � I Prim ry 0 00 cfs -- 16:' I I I _ _6,0 0 14- - - . Peak. Elev='I �. i - - I 12iStorage- 32,309 df 10 , ... .. ..... ,._.. I 8- 6_.' 2.49cfs I I I , . I L • 1 I I 4- ' . . 4,'J- III /.ri•.. ,%'i� 0 ,,, :OZ. , #����.', 6 8 10 12 14 16 18 20 22 24 2.6 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 22 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Time span=5.00-48.00 hrs, dt=0.05 hrs, 861 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment IS: Pre-Development Runoff Runoff Area=3.560 ac Runoff Depth=0.68" Tc=5.0 min CN=30 Runoff=0.98 cfs 0.202 af Subcatchment 2S: Front Parking Lot and Driveways of Develeunoff Area=3.560 ac Runoff Depth>7.96" Tc=5.0 min CN=92 Runoff=30.86 cfs 2.360 af Pond 3P: Undergound Infiltration System Peak Elev=17.05' Storage=38,290 cf Inflow=30.86 cfs 2.360 af Discarded=2.49 cfs 2.352 af Primary=0.82 cfs 0.008 af Outflow=3.32 cfs 2.360 af Total Runoff Area = 7.120 ac Runoff Volume= 2.563 af Average Runoff Depth =4.32" 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 23 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Subcatchment 1S: Pre-Development Runoff [49] Hint: Tc<2dt may require smaller dt Runoff = 0.98 cfs @ 12.32 hrs, Volume= 0.202 af, Depth= 0.68" Runoff by SCS TR-20 method, UH=SCS, Time Span=5.00-48.00 hrs, dt= 0.05 hrs Type Ill 24-hr 50-yr Rainfall=9.01" Area (ac) CN Description 3.560 30 Woods, Good, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Front portion of Site Subcatchment 1S: Pre-Development Runoff Hydrograph 1 1 1 i ' Runoff I O 98 cfa I ; Runoff,=0:98, cfs • Type III 24-h�r50-yr Rainfall'=9'01 Runoff Area=3.560 ac' Runoff Volume=0:202 of Runoff D 8 Tc=5.0 CN--;30 0 5 6 7 8 91011121314151617181920212223242526Wii 30313233343536373839404142434445464748 Time (hours) 19131 Ph 51-140 Infiltration Pipe Trench June 2020 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris &Tunstall Consulting Engineers Page 24 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Subcatchment 2S: Front Parking Lot and Driveways of Development [49] Hint: Tc<2dt may require smaller dt Runoff = 30.86 cfs @ 12.07 hrs, Volume= 2.360 af, Depth> 7.96" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Type lil 24-hr 50-yr Rainfall=9.01" Area (ac) CN Description 3.190 98 Paved parking & roofs 0.370 39 >75% Grass cover, Good, HSG A 3.560 92 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Front Parking Area Subcatchment 2S: Front Parking Lot and Driveways of Development Hydrograph 34- i. El Runoff 32- :130•86 cfs I ; ' R,unpff=$0.86 cfs; 26 Type : 24- . ! : all= , a f 901 22_ p 46 , uno e � � _ : ffArea- Oac; L 20 n : R 3 • Runoff Volume=2 60 af. Li_ . •, Runoffs Depth>7.96', 123 ; . : _ 8- .7 min , . C,N2 . 6 o� .i. ' ' f ff�ii�/riririrrrr�rii 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748 Time (hours) 19131 Ph 51-140 Infiltration Pipe Trench June 2020 Type III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 25 HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Pond 3P: Undergound Infiltration System [82] Warning: Early inflow requires earlier time span [93] Warning: Storage range exceeded by 0.05' Inflow Area = 3.560 ac, Inflow Depth > 7.96" for 50-yr event Inflow = 30.86 cfs @ 12.07 hrs, Volume= 2.360 af Outflow = 3.32 cfs @ 12.81 hrs, Volume= 2.360 af, Atten= 89%, Lag=44.1 min Discarded = 2.49 cfs @ 11.25 hrs, Volume= 2.352 af Primary = 0.82 cfs @ 12.81 hrs, Volume= 0.008 af Routing by Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 17.05'@ 12.81 hrs Surf.Area= 14,925 sf Storage= 38,290 cf Plug-Flow detention time=114.3 min calculated for 2.357 af(100% of inflow) Center-of-Mass det. time= 114.0 min ( 884.9-770.9) Volume Invert Avail.Storage Storage Description #1 12.00' 24,223 cf Custom Stage Data (Prismatic)Listed below 74,625 cf Overall- 14,066 cf Embedded =60,559 cf x 40.0%Voids #2 12.50' 14,066 cf 36.0"D x 995.00'L Horizontal Cylinderx 2 Inside#1 38,290 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 12.00 14,925 0 0 17.00 14,925 74,625 74,625 Device Routing Invert Outlet Devices #1 Discarded 0.00' 7.220 in/hr Exfiltration over Surface area #2 Primary 17.00' 24.0" Horiz. Orifice/Grate X 4.00 Limited to weir flow C= 0.600 piscarded OutFlow Max=2.49 cfs @ 11.25 hrs HW=12.05' (Free Discharge) '-1=Exfiltration (Exfiltration Controls 2.49 cfs) Primary OutFlow Max=0.68 cfs @ 12.81 hrs HW=17.04' (Free Discharge) 2=Orifice/Grate (Weir Controls 0.68 cfs @ 0.7 fps) 19131 Ph 5 I-140 Infiltration Pipe Trench June 2020 Type III 24-hr 50-yr Rainfall=9.09" Prepared by Norris & Tunstall Consulting Engineers Page 26 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Pond 3P: Undergound Infiltration System Hydrograph _ 30.86 ..... Inflow' ' asJ ulw 34-1 Inflow Area3.560 ac-11 . 11 rye dEJ Primary nfloW-3Q.86 30- utf low_3.3 O2 cfs : s d Di car ed--1. -cfs - . Prima .i r .. ... .. ._I.. .. ._ 16 Peak Elev=1.705' . :Stotage=38 290 .. 'f I 8 • 3.32 ds 6 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 27 HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Time span=5.00-48.00 hrs, dt=0.05 hrs, 861 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: Pre-Development Runoff Runoff Area=3.560 ac Runoff Depth=0.99" Tc=5.0 min CN=30 Runoff=1.74 cfs 0.294 af Subcatchment 2S: Front Parking Lot and Driveways of DeveldRunoff Area=3.560 ac Runoff Depth>8.91" Tc=5.0 min CN=92 Runoff=34.42 cfs 2.644 af Pond 3P: Undergound Infiltration System Peak Elev=17.26' Storage=38,290 cf Inflow=34.42 cfs 2.644 af Discarded=2.49 cfs 2.488 af Primary=9.08 cfs 0.156 af Outllow=11.58 cfs 2.644 af Total Runoff Area= 7.120 ac Runoff Volume= 2.938 af Average Runoff Depth =4.95" 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 28 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Subcatchment 1 S: Pre-Development Runoff [491 Hint: Tc<2dt may require smaller dt Runoff = 1.74 cfs @ 12.15 hrs, Volume= 0.294 af, Depth= 0.99" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Type Ill 24-hr 100-yr Rainfall=10.00" Area (ac) CN Description 3.560 30 Woods, Good, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Front portion of Site Subcatchment 1 S: Pre-Development Runoff Hydrograph 0 Runoff Runoff=1474 cfs Type III 244hr'100-yr: Rainfall=10 00 Runoff Area=3.560ac ,- Runoff Volulme=0. -�2 94 af LL Runoff Depth=0.99 Ta=5.0 rnin CN=30: i 4%Jff//!//f/f fririiirrirf 5 6 7 8 9..110 11 1213 1415 16 17181920 21 222324 25 26 27.L.293031 32 33 34 5i363738.819.A?041-;6434VZ.A4ViZt Time (hours) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 29 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Subcatchment 2S: Front Parking Lot and Driveways of Development [49] Hint: Tc<2dt may require smaller dt Runoff = 34.42 cfs @ 12.07 hrs, Volume= 2.644 af, Depth> 8.91" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Type III 24-hr 100-yr Rainfall=10.00" Area (ac) CN Description 3.190 98 Paved parking & roofs 0.370 39 >75% Grass cover, Good, HSG A 3.560 92 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Front Parking Area Subcatchment 2S: Front Parking Lot and Driveways of Development Hydrograph 38= • .. t 1 ' 1... 1 . ®Runoff 36 34.42 di . . I I I - I I A I Runoff=34*42 cfs, 32j ;_30j ' Type Ill 24=.hr,1100 yr 28= I • • Raanfall 10 00"'26- I _ IRunoff-Area=3.060 ac 20- ! 3 uno ,f Volume,=2 644 af. .. 18_ , R " 16- f 91' , .. I , i _ _ ' un >:8'� ep � I : T c •5.�D min- : 1 8= . •i I C,N 92 ioi , Or ' . . : : : . . : : : — , :2' _ T7 // I : : : 5 6 7 8 9 11011121'3 141516 171819 20212223 242526 272829 30313233 343536 37383940414243444546 4746 Time (hours) 19131 Ph 51-140 Infiltration Pipe Trench June 2020 Type III 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 30 HydroCAD®7.10 sin 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Pond 3P: Undergound Infiltration System [82] Warning: Early inflow requires earlier time span [93] Warning: Storage range exceeded by 0.26' [85] Warning: Oscillations may require Finer Routing>1 Inflow Area = 3.560 ac, Inflow Depth > 8.91" for 100-yr event Inflow = 34.42 cfs @ 12.07 hrs, Volume= 2.644 af Outflow = 11.58 cfs @ 12.37 hrs, Volume= 2.644 af, Atten= 66%, Lag= 18.2 min Discarded = 2.49 cfs @ 11.15 hrs, Volume= 2.488 af Primary = 9.08 cfs @ 12.37 hrs, Volume= 0.156 af Routing by Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 17.26'@ 12.37 hrs Surf.Area= 14,925 sf Storage= 38,290 cf Plug-Flow detention time=109.8 min calculated for 2.644 af(100% of inflow) Center-of-Mass det. time= 109.7 min ( 878.9 -769.3) Volume Invert Avail.Storage Storage Description #1 12.00' 24,223 cf Custom Stage Data (Prismatic)Listed below 74,625 cf Overall- 14,066 cf Embedded = 60,559 cf x 40.0%Voids #2 12.50' 14,066 cf 36.0"D x 995.00'L Horizontal Cylinderx 2 Inside#1 38,290 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 12.00 14,925 0 0 17.00 14,925 74,625 74,625 Device Routing Invert Outlet Devices #1 Discarded 0.00' 7.220 in/hr Exfiltration over Surface area #2 Primary 17.00' 24.0" Horiz. Orifice/Grate X 4.00 Limited to weir flow C= 0.600 Discarded OutFlow Max=2.49 cfs @ 11.15 hrs HW=12.05' (Free Discharge) L1=Exfiltration (Exfiltration Controls 2.49 cfs) Primary OutFlow Max=8.00 cfs @ 12.37 hrs HW=17.21' (Free Discharge) L2=Orifice/Grate (Weir Controls 8.00 cfs @ 1.5 fps) 19131 Ph 5 1-140 Infiltration Pipe Trench June 2020 Type 111 24-hr 100-yr Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers Page 31 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Pond 3P: Undergound Infiltration System Hydrograph : ,. ._ ' 134.42 ars l. _ - .. _ Inflow 38- Inflow Area=S.560 -at- Pnmary Outflow 3s= i t , I , �,Discarded 1 _ . , nflow=84:42 ifs 30 : Outtlow=11:58'cf• S 26_ _ • • Discarded= :49 cfs.. .. 24= ; • F 2.2 Primary= S ifs I i I I 90 ,6: Peak, Elev=17 26 , 14_ Storage 38,290 cf 12= 1 , it m Ai 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 19131 Ph 5 1-140 Infiltration Pipe Trench OCT 2020 NO IlNype 11124-hr50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 1 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Pond 3P: Undergound Infiltration System [82] Warning: Early inflow requires earlier time span [93] Warning: Storage range exceeded by 0.72' [88] Warning: Qout>Qin may require Finer Routing>1 [85]Warning: Oscillations may require Finer Routing>1 Inflow Area = 3.560 ac, Inflow Depth > 7.96" for 50-yr event Inflow = 30.86 cfs @ 12.07 hrs, Volume= 2.360 af Outflow = 49.01 cfs @ 12.05 hrs, Volume= 1.520 af, Atten= 0%, Lag= 0.0 min Primary = 49.01 cfs @ 12.05 hrs, Volume= 1.520 af Routing by Stor-Ind method, Time Span= 5.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 17.72'@ 12.06 hrs Surf.Area= 14,925 sf Storage= 38,290 cf Plug-Flow detention time=179.3 min calculated for 1.520 af(64% of inflow) Center-of-Mass det. time=81.2 min (852.1 -770.9) Volume Invert Avail.Storage Storage Description #1 12.00' 24,223 cf Custom Stage Data (Prismaticjisted below 74,625 cf Overall- 14,066 cf Embedded = 60,559 cf x 40.0%Voids #2 12.50' 14,066 cf 36.0"D x 995.00'L Horizontal Cylinderx 2 Inside#1 38,290 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 12.00 14,925 0 0 17.00 14,925 74,625 74,625 Device Routing Invert Outlet Devices #1 Primary 17.00' 24.0" Horiz. Orifice/Grate X 4.00 Limited to weir flow C= 0.600 Primary OutFlow Max=46.19 cfs @ 12.05 hrs HW=17.68' (Free Discharge) 1=Orifice/Grate (Weir Controls 46.19 cfs @ 2.7 fps) 19131 Ph 5 1-140 Infiltration Pipe Trench OCT 2020 NO Iftype III 24-hr 50-yr Rainfall=9.01" Prepared by Norris & Tunstall Consulting Engineers Page 2 HydroCAD®7.10 s/n 000479 ©2005 HydroCAD Software Solutions LLC 10/7/20 Pond 3P: Undergound Infiltration System Hydrograph t t , LI Inflow Elrim ' 4 • , , , Pary' _ ;Iasi co I ; 50 , Inflow•Atea=3.560 ac , . , 45 ' , ' ' inflo30.86 Cf$ „ '- • ; li ' -Primary=49.01 cfs , , , I ' 1 ' Peak: Elev=17:721 it2; 30 1111. :Sto eage=38,290 cf , I io-] 5-:. , ./. 01 ''',-,,, -7 0: ....,''''''7 /1.7.A , ' • 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) v o :„ 4 it''' 7A ct 6 E Ow Iz' ,Oo C41, IF co o N VI-B1s co Q 1B18 V IL � �J � • W C N V v U cO ` c � o n o m cl-B1c. m Q 4140 _ CI-B14 � U �U a Y �. 1I-B13 73 to • Z1-B12 �` To I-B11 Q YDI-B5 It_ co 0 511 a CI-B6 rnU CI-Be 103 U IIggo 0 43 M v o® Nm+ Cn 1-B3 a 0-o x UJ AL i W, N O W C m r^ O C E O M e 1` I ID LE n. NI `� F24 4 € aco �w_.CI F23 -3 '" a v I i-:;,:8 A g _ 1 <--ic:..1- g Q !`• 3 '. r'.. 0' ,Isms o mom �L _ _ i Ill N t 1:11( Y• mA U U Q H 1 r_ N 's,,c► '� N V q"w {7^ k �... N _ -y m iJ$0. m � Z � o!T CO . N C V J ''tl m pF,K (.1 o 4' • a 1, ..'' CI-F12 Q. l' L. C NI' Z. O _To o®co - 0 0, ,..k i.... 4-1 �`" CI-F1 4-1 LLI L U Q /3� 6 , `', ♦W V ,J E E i c+> I a) 0 � � M Q\\AGOG( CI v♦ I Q0 r b. c E 0 N ea ea z I.iii `,tki Pi I ) I a a) `o o v. 0 at) a) > Ci c e c 0 a) N COd L CD n 0 CO0) o w r N '.C3 00 °° COm M m m m m Is. m m m m m m m m o c m m m € 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d 0 0 0 2 co 0 N w 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 In 0 0 0 0W 0. N ID n n n Is- Ill LC) LC) IC) n N 1 tO 6 to toN Ps Is- N. 0... u) Ili et of O V m ai ai eO- r E .. .e... d W O O tototO to If) co O O If) IC) Il) 0 0 O O uIll u)) I 0 "C) N N N N N N N IO 10 IC) N N N N 10 10 IC) N N N N c C7 - LC) ai ID ui Lei to 6of of 6 ui to ui 0i of ai 6 6 ui 6 ce 'Oa' N Nt VN.' CO OO CO CO N et CO CO N N N N N CO � d' � CO 4 ui a et et v 6 6 <c 6 et v et ui cfl cm cri 10 4 of 4 aa)) LU -I et •cr 'U et et et CD CO CO et ' et et 'U of CD et 4 4 CO IC) CO CO co CO CO 0) 0) CO CO CO CO CO CD 0) N M CO N CO = 0 $ 4. 4 et 4 of 4 4 6 6 O 4 4 4 NI: to O CD et 4 et 4 O c) in to u) IC) O to O c) to in to O go to O to intoaa)) Co N n n n n O n O O n I. n co O n 0 N. n n n c O r O O O O tli 10 CC CO O 0 O 6 cc; ii co r ci ci ci m O W I- a) t o 0 0 0 0 o o 0 o to o 0 0 o o In 0 o 0 o o E a) to CD LC) II) O u) K) 0 0 Is- u) 10 IC) tO 0 0 n to to IC) IC) 7 c c ^, C) O O O O O o ui 6 ui O c; O O ui O Cri .- O O ci Z 0 p, o o n n N n o co n co n n N. to n aD CD CD n n CO p et 'If el' et el' et 1C) CO IC) CO 'It el: et. 10 CO CO N of of CO O O O e en v CO O a-- e- a- r CO O O O .t- ,t- c; a) Q m_m N N N 'Cr N N � XI tr O V et 'st ID CC) IC) LC) 0 e} et �F. N C r N N N r e- r r CO N N N Cq et CI CI a) a-CO CD 0 a) 0- IC) CD CO IC) CO CO CO N e-o n O N IC) 0 ID I- Ii) co co a) C) O N CD co co O n0 .x0 CD to 6a v ' O c i of .- t- 6 6ui N t-- r t.- cii Iii Ip v 11 0..- CO co M VM' ro co to N N co co co N M 'V CO COO Q w ,E a NI: Ps: N N N n O eN- O N N N n O O N N N N O II ... N CO00 MM CD n p ^ t. coCh 0) CD C) CO CD 00 I- 0 IO r 03 e: CV C N: u ICi IvrO onCri O vn0C+) O m `' 1-v o %N ` .- r N O O O M ii C)gm C^ C IS/ CO CD CO Co CO 0) CO CO CO CO CO Is. CD N CD PsCD CO CO . ce c...... .:. Qi 0) 0) ai CO 0) O to CO oi Di W ai aC1 O O D) 6Oi O 0 O d l T CO O O O O O co O co co O O O o) O to 0 1O O O O N •E I(i 1ri 6 ui ui 6 o: CO 6 O 6 6 to ad ui CO 6 r ui 6 tri II O C o co o o o 0 0 0 O 0 0 0 0 0 0 0 0 6 ~ N 0 o a 'E E ui tri ui ui Iri to Iri Iri U) ui 6 U) Ili Ili tri ui ui r ui Iri tri E L w ODill CO CO 0 CO n M I,- CO O ID n CO 0 CO a) p M O cc! CO CD N T. C) coc0 o.: o: N O e- ,- r I� t(j Q-' 0 () 1- e- CV .- e- e- O O O O t- t- r c; o o c; 6 r r r Ero x H co ■. co �, O co CD 0 CO CD CO n n CO O IA eF 0 CO CD et CO r �' O L v N CCO O CO CO CO O O O O CD C n r O O O r r IC) o . CS Q c O UM r 0 O 0 O r O O O 0 ui 0 II.� r INIME Y 00 r 00 0 CO 00 CO CO CO CO CO CO CO CO CO OD CO CD aD a) CO CO CO N CON o a) ' 0 rn rn CD CI) 0) CD 0) rn o) 0) CD 0) ' CD 0) o CD CD 0),� Ir u 0 O O O o O O O O O O O O O O O o O O O O O 0 + 0 CIS ro E CO 00 ' o) 0) OD VI I. CO a 0) 'et 03 CO0) 0 CO et 01 CO C) N eF r tq CO CO N r O O aD N n N O r) O n n I` IC ~ I 0 e- e" CV a- a- O C O O a- .- r O O C = Ci r r c CL 1-- v W o CD C ' 13. Il) 00 0 � a) 0) 00 N. n CD Cr a) CO 0 CO CD V. CO 0) CD C CD N 'r r m is 0 0 0 0 tb ti N- r o CO n 1. to. E i 0 0 c ` C3 r N r ci O O O r O O O O ui rn 0 Q 0 0 0 0 0 p O 0 0 O O O O O 0 0 0 0 0 �"CO O O O CO O O O O O O O O 0 O Co 0 O M II COCI) J a. N eO- N r N O O N N r e- a- O O O N CIO a- a- C 0) ' CO r M N N CO r CO C Q) +� 'C 'C "C C C _ C L. c 1°o 1i1 r LU ul w w LU I. n• co in LU LU w . - f— LU LU w w 11- al Q o - a') al dd 0 o O 03 0 Cl) ,-I e- N CO NI- tO CO Is. 00 0) e- N CO '�! LC) CO Is- CO 0) N N a Z N N 1 1 I N N • t o 0) CO C) 5 j a d I- N 7 7 i 0 I. 0 0 0 0 a d O .- N CO sr u) IN. CO 0) CDN C) 'V' C.) CO C lL LI. LL LL LL !L LL LL lL LL Cal LNL LL LNI. LNLr Z Z Z a € c 0 c0 0 0 C 0 v C 0 c) Q 0 t) C.. 0 m 0 O 0 0 y a N d O O O 0 0 O 0 O 0 0 )O u) 0 0 0 0 0 O 0 0co 0 0 O CO O 0 0 O 0+) 0) N N M O 0 0 10 CO 0 O O W LI N O) 0) ri n r n n r r No a 0) E 0 - - 12 Y o 0 0 0 0 0 O 0 0 0 0 u) 0 0 0 0 0 0 0 0 0 0 10 0 IC) M 0 0 O 0 ID C') O N CO lO LO CD0 IC) 0 10 C Co O n N 0 aD N D N. a h ao aD aD N C W60 - < - N N - - - • 0) Cr CD 0 Ni. O O 00 - N C7 c u) LC)CO ) 03 CO N s- N IC) LC)O N N . N IC) 0 0 O o N. 0) C) N NI: ^.r CO co CD CD CD CO CD CO CO CO 0 a CO CD CD N: N: ci C) N N N CO J 0 CC) O 0 0 0 I,- O C') O N 0 0 0 0 C) CD CO 0 0 st 0 u) 0 O 0 st O O 0 Co 0 0 0 CD CO 0) N. N 2 G CO Co CD CO co CD CD CO 0 CO CO CD CO CD CD N: N: N: 10 - iti N Cp N 10 C) 0 0 O I� Ill N O O 0 u) - u) N CO 0 0 lO C _ N 0 - - - - ' ' .a NI: st NI: st O CD sr st st s- st . sr st . n N w a) N O W63 O 10 0 00 0 0 0 10 0 10 0 N 0 O 0 0 u) O 0 0 E d) u) N ID N MI0 10 a- LC) N u) a- in u) 10 N IC) _ O ) CO O C C CV 4 N 4 N 6 N 4 N 4 N V N N N N- N. N.: CD 4Z 0a) 10 'V u) C) CA 0) u) st 0 N 0) 0) CO10 - N. f1 - - p N - N 00 CO CO u) N 7 st 0) co O co - CO eh CO co - CO - r N IC) - co - IC) ci 10 11i ID a 0 - 0 ci P- a) 0. 10 u) 1C) u) CO u) u) 10 u) u) 10 10 CO u) O 10 u) CO 10 O Y. CO �. co to O) C) n co co O co C) N. CO r O) N 0) N. N 1"') X ) I) st CO u) st C) CO - CO u) 0) CD N. M CD N. O C) CD a 'U N sr N 0 - NI: CAI st N 0 0 a- C) - a- N CV N II co a p.O y - CO0 COO O 000 r 03 O 0 COD COO COO 4) CO O 1 CO 0A co O. co 0 a `� 6 O 6 CD 00 o 6 os CD 6 10 6 6 6 iti N c7 N M 6 p) II a) CND O 0 - 1C�) COr) CCOO CD CD0) 0 .- LC) CO NI*- O 0N) 00) N. N n 8 = V.. ID CM as CM ci a 6 N CD Co . a CV 4 N ci a 0 0) . •V II i O C CO CD CD CO - CD CD CO CD CD et CD CO CD CD 0 st CO O N. .- Of O CA 6) 0) O 0) O O) 0) W O a 0) O O a co N: to O .1+ C O O W a - O - 0 - O N 0 - O O O O O O ID 00 0 a E 6 6 66 N 6 in 6a 6 CO 6 6IC) 6 N 66 0 O O O I- • E O O O O O O O O O O O co 000000 O 6a C .E u) Iri u) u) It) 6 6 IC) 6 6 u) K) 6 u) '0 0 ui 6 - - o. E C !o - 0) C) N CD st O I.... M) Nr N COeO CO N 0 0 CO CO illu) M CD 0�) 0 0 LC) N CO 0+) a- O N N - - 0 O O V a a a a ci a a ci a a a a ci a a 0 0 0 - N Et0 O X 3 O ■ CO N u) CO C) C°) N 0 N CO CO u) �' ci �� tl N CO 0 C O CD C) N CO 01 CO O N st N 0 0 0 O 0 0 CU Q C CI 0 0 0 0 0 0 0 0 0 0 0 a O 0 0 0 0 - Ni ' 0 �� .mod. O 3 g co CO CO CO CO 00 CO O CO OD CO O CI LC) O CO CO CO CO 0 C N /� v a C a 0) 0) 0) CO 0) 0) 0) 0) 0) 0) 0) O) 0) 0 0) 0 a- 10 NI: LC) + C) 0 0 0 a a a ci ci ci a ci ci a ci ci a o a) •V a)) E I N O N CD C°) CD s! 0 CO CO C+) n Co M st N CO CO 10 1C) 0 F- Ti O CI CD M CD M 0 0 CO N CO CO - 0 N NI: N N N - N - C L. e 1 L- a a a a a ci ci a O a a a 0 o a a a C N V O C cL) coo) co N 0,1 N st N CO N CO u) CO M st N O CO 10 N O -G co ` I v y N M CO CO O O 01 N CU CO 0 O N NI" N O - - - /�� 0 I E :a O ci ci0 0 a a a 0 0 0 0 0 a 0 0 a N 4 2 00) W O O O O O O O O O 04 O O O O O O O O 8 M II Cl) C O O O O O O O O O O 10 C COO O O O O � CD N OD CV N CO CD N OD N O CD OD 6 00 O a O O O 0) _>` 3 riv' N N N N C) CO N N N N CO M N N N t-D CO CO in Ch C a- C E - 4) C 'C 'c 'O 'C 'O 'C C C 1 p C f LU N W N W co W NFL W Co W M W W W W N. CV) W W W 0 o L-J 0 C N sr If) CO CO 0) 0 N sr CO CO CO 0 2 0. I M N. a-. Co Is N N N N N N N N C) CM M C'C) CM C) Cr) r) C) Or) st t 1 o a0 0V. C0 E_ 0N r) st In CO N. 0 CO CO 0 CO J m m CO m 9 m CO CO N. 0) m m °? m m m m c m m m € O I I . o 0 N� 0) 0 0 CD C) 0 0 0 0 0 0 0 0 0 0 0 0 0 IO 0 0 0 03 0) O. N IC) n N. n n IC) 4) In O N Is. N If) LC) O LC) N N n N O tri 6 el: V' O) o O) O) V' o 0 O) CA u7 V r 'V r E r r r r r N Fe el 0 4) 0 lO IO IO IO Ill 0 0 0 O O LC) IO 0 0 0 O 4) In 4) C N N N N N N N IO IO I) N N N N µ) I) lO N N N N 7 ( 0ig 0 6 4) o 66 Oi O) Oi ui 10 Iri 6Oi Di Oi 4) O O I0 re O) N N ON) O) W N1 v N NN N) N CAN CO rM O NN n C) 0) N ri 4 r) r) r) C') 6 Co Co Co r) Cr) C'') K) m o Co V• r) ri C°) a) W J Lc) 0) 4) I) LC) IO In CO CO N 4) IO IO IC) d' V 4) IC) IllIO O O) c0 00 CO co CO CD CO r) CD CC) CO Cb CO CO N CO CO CO CO 0 0 ri ri ri r) r) 6Cr) IC) 4) 6 r) ri r) r) 6 IC) 6ri CM r) ri ifi O O IC) Nb N. IIN) O nO O O O IO No O O N O Or on N. n C 0. 0 .- 0 0 0 o 6 66 Co 0 0 0 6 ro 10 Co r o 0 0 m o W a) t 0 0 0 0 O 0 0 O 0 IC) 0 0 0 O 0 O IC) 0 O O O .0 E Cu IC) co 4) to 6 6 IO O o I. IC) 4) IO IO 0 0 n IO IC) Ill4) 0 C C $^ 0 0 0 0 ci o o 6ui IC) 0 O O O tri 6 10 r o O O Z Op. O o N n I. I. 0 CO n O) N. N. N o N CO O) CO n 1• CO 0 O O 'Q 't tO o 4) O V. IO CO CO N CC) C0 ... 0 r) O r r r r r) O o O r r 0 d O. N N N N el- N ao- .- LO— LC) N N N ,- a- co .- 0 V' 14'N V'd C M N N N O 00 0 0 00 0 N. CO CO N O N CO CO Cr) I. 0 CO CD CO IO IC) t(OO r CCO. a. P. V' 0 N. XX gr V' r) ui sr 4 V' CV CV e- r it 4 4 CV r r r CD V' 4 0) II a._ o74 M Vim' IM N O MV,' ts) co N M Or n fop. o w �V" N N N N 4) rN- O N N N ^ eN- O O N N N N 0) 0) r - II COO a00 IN. CO CO IO CD 0 CO N N 0)). m CD COC 0) 0 N VO' yy O O 10 H M 0 CV O Co V' CM M N r, C 0 a- r r o 0 o CO a- a- N 'C.) V II C .CI 0 n CO o cc; o CC ^ OC) n C 0 ,Ctl^ v In CO N a- CO a- a- a- r :.. o 0 o O o CC) nD Co 6OD 6 O N C n O O O O 4. N 00 0 OD COO CO 0 0 0 0 0 > In •E Ir) 4) O 47 In IO O CO co to 6 6 6 In O) In CO 6 r 6 4) 4i II o0 N. m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O ,' 0 0 o a E E IC) Ir) 4) 6 6 Ir) Ic) 6 6 6 IO 6 4) Ir) 6 4) 4) r IC) 6 Ir) c co CO) CO 0 CD CO n CO n CD 0 Ill v n co O CO r IO Cr) II 0 O co CO cc! N r O O 00 n n N O r r t` n Ir) O () F N r r r o O 0 O r r r ci o O O to r r r E CD x N Co •vime l. N IO CO CD 0 CD CD CO N. N. CO 0 CO V' 0 CO CO O IC) CO >, o CO m_ 0 N � 0 CO CO CO O O O 0 CO I I r n O < Q 5. C CV r o C o O o G o 0 o r v 0 w N CA CO CO CO N co 0 0 O CA CA O) 0) CA CA A CA 0) O) C O) CI) 0) O) CO CA CA CO 0) C) V + „O re oV o o o o 0 0 0 o o 0 0 0 0 0 0 0 0 o o o 0 a) CO a E coII 0) 0 V' CA CA CO CO n CD et 0) CO Co CO 0 CO CA CO H co c ei n V Co C0 1O N 0 0 (0 I. n N o CDN I. I. 4) d I. Q F- — r N r r r O O C 0 r r r o O O O tr) r O C C CD O) O en CO O -. o 67 Ct) N n CO 4 O) CD 0 CO CD V' CD V• 0) CD c cr1 E N r CD CC! CO O Q O o co .n- .n r O o O n LC! E v U faO 0 C .RI O CV a- 0 0 o O a- 0 0 O O O r IO O O O 0 O O O O0 q CO'f . O O 00 O 0 O O O O O i to CO C _ u7 CD O o O O O O r 6 O M -I `�' N r r o O N coN tD o CD .- o ` II) M r Ch CS! N O) r frJ C E d 'O 'O 'O 'a V 'p Ti 'O 'O N w L. I-O- W W W LU W W N N CO W al W W .- .- ,—cs) W W LU W tL C7. O O O a) III CO 43 to :3 r N r) Nr IO CO n CO 0) O r N r) 4 603 n CO O) O r a z N N N cso g 10 > M > a c C O - N M et O N- CO CO O 0 N N N N C) U 3 %co as CI) J LL lL LL LL Ur LL LL ll. LLr lL lL lL lL lL LL Z W > 0 0 0 0 0 0 0 0 0 U 0 0 0 0 0 ca. 0 a 0 0` Co O o o O O O O CD CC0 0 CD CD10 4) CD0 0 O CoCc0 O O O O M M 0 0 0 0 CO M N N M 0 O 0 O 0 O K) o W G — N. N: F- N o) Oi N: N: N I: N F- N N: O 0) et Oi N: E - a- - N N ai 0 0 0 0 0 0 0 0 0 0 0 Ur) CD 0 o O 0 0 0 0 0 a U) 0 O le 0 Cc O 0 to CO 0 N CO CO 100 0 ID 0 LC) C E C 2. co N: O I: O O OD N: O I: O) I: CID 0D eel N O of ci N: O - - — N N N a- a- - re - N. - 01f ID Ps 0D CO N N vp a- OOD CO CO '- CO '- N O N N CO h CO Cl ai N` D. $ o ID o Ili ID CD U) toto 1ri ari v t!) 10 O N: N: — W ci N — N so -ICOat CO CO CO I- Cc) M LA M elC'J M 07 CD Ps cc) tO al O a- h - C0 a- CO a- et a- CO N CD 03 M 0 0 rr O to Lei U) tO U) tr) L[) Lei 10 tt) to O lei tri N. N: N: N: Lf) 00OOo 0 O 0IDCO10 O O 0 0 CD CN Al N to N U) U") N K O 0 to 0N - O W Zr) .0 O 10 Co O O O 0 O 0 a) 0 to 0 O O 0 10 0 0 0 E toto N 10 N K) o u) - µ) N O - Al CO CO 0 N O CO 0 C OC CV 'd' N 4 N LC) N 4 CV 4 N 4 N N N N: N: N: CO 4Z ig O N - N co coM coO CD N ' O N 0) 0) C D O - co.a to el N 0 - CO - is.: Ni O a- co a- Al O In LC) 10 C) C a- O O as a K7 to Co O CO b o 10 O O 1C) LL) 10 Co tp O o 10 CO to a M c U) CD GD to O et 10 CD CO toet CO CD CO at U) C7 To- et 0 n - s. CO o o N - CD M co CO CO Into N: O N th N` X TD et C)i et N - - 4 CV 4 N C - - t'i - - N N CO O .0 II 74. sli- O , O O �O COO st . C N C70 GD C10 - ODO O .0 Cco.)D. - -- tco O CO COO' OD O co CO CO ui „ ui ui tC) N 6 N 6 6 0. N II co i. N- 10 0) M LC) N CO vt P.- CO O et et - CO f� N. tO N .13 to 0 CO et M a- N-Ns N CO 0 CO co 10 N. I� Gp CO C„) I-= 0 4 N LC) CN O 0 er N ui CV - O - t') - O O O h - '8 II O C t a- a- a- — CO COtO CO — N et re E .11 N O GD cc; cc; N: co0D tO CO GD N: GD GD tq tb N: N: GD I: CI) .- W C a N O N 0 et O N 0 N O N 0 Cc 0 CD 0) 0 o L0 } - to lt) to O uiO uiari tC) CO lei O tp tC) N: O Lei - - II es O C F-- z C O O O O co O O O O O O O o O o o O O o o E o C l0 to to ui O to tri 16 tri tC) tp 6 tO 10 to O O to O s- C 7 t cc. CON CO et 0) N. et N Cal CO M cc) N 0 0 CO CO to N Cto tO CO 01 0 O to N CO M I- Cc et N a- a- O 0 0Et O aH O G Ca O o O C O C ci O O O O C O C - N E Et)4 GOGll N 10 CO CO CO N 0 N GD CO 10 T O '� G t) N M C0'l CNC) O 00 O) N P) M 0 O N et N 0 O 0 0 O CO�V < C C ci O O C ci O O o O O O o C O o C O - N N O O N 0D CO COCO CO GD CO CO 00 OD CO GO C0 CO GD 0 tO t0 oD 0 N 0f CD CD CD CD0) CD CD CD CD CD CD O) CD CD CD 0 - m 11) et tO 0 + rt V (� O O O O O O O O O O O O O O O O O O O O m 0 N et CO CD0 CO t0 M M GD CO Nt N OD CO 1O t0 0 CU o E pis CD el M 0 01 CO N CO CO - 0 N N N N - N - C N SIM N— .'q,, O CD O O O O O O O O O O O O O O O ci N er t w C a) CI0 coO N M N Cl tt0 N 01 LL7 CO CO N 00 CO LO N 0 _E I E Ca C1 N CO M M O 0 t7 N M CO O O N O p�+ 0 C � O Ci ci O O O O O O O 0 O O O ci O ci O N 4 o O O O O O O O O O O O Tr O O O O O O O o ( II Cl) C O O O O 0 O O CD 0 1C'l C) 0 0 o o 0 O O O \/♦ CU OD N 03 N N GD 03 N 03 CV O O 03 00 O O O O O O -IN N N N M t7 N N N N CO M N N N O O l7 VI C'' G co m C I. 10—J W N W N W N W N W C07 W tt7 W W W W to to W W V' O o w 0 - N 4.0 Vc 0 •Q co CO ` N N N N CD N N N to P) N CO M C01 t07 C CO CC0 C0 vt et a Z NEW HANOVER COUNT YST opf WATER DESIGN MANUAL SECTION SO-PIPE SYSTEM DESIGN PROCEDURES �� If (use. �,ches+.) . ___-- -- FIGURE 50-14 (02.5 �e paNEW YORK DOT DISSIPATER METHOD FOR USE IN DEFINED CHANNELS It' 7;s'i 434 Source: `Bank and Channel Lining Procedures",New York Department of ay.c, Transportation,Division of Design and Construction. 1971 1 ASS 1�.iI 's x ,► Note: To use the following chart you must know: 1) Q full capacity ,, , . (CN-s,•r�) 2) Qio 5- Iuse hacke 3- 3) V full I. 4) Vio >x :. 4 II � e r- Where Q=discharge in cfs and V=velocity in fps. ? ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT•APRONS 4, tt .4 Zee-0 r Step 1) Compute flow velocity Vo at culvert or paved channel outlet. 1 S r 'Xis-ert2 , CLi • .• '' _ Step 2) For pipe culverts Do is diameter t r For pipe arch, arch and box culverts,and paved channel outlets, Do=(Ao) ,where A.=cross-sectional area of flow at outlet. _ a q/ For multiple culverts,use Do= 1.25 x Do of single culvert. . _ ? , eFi Step 3) For apron grades of 10%or steeper,use recommendations for next V w 6.914 higher zone. (Zones 1 through 6). / - / n, / /r A^ . liana G'Tiara f n ti-nr .l'11u WARN a 1iGl,;Il ly MIA Wa.Pit WTI VI C V ,✓ /V �(�jV �L�j ••.. Wall 'Circe an Eat'KAYJYc-Ilia Raw!,Irr, ;a aRFRa2,4.FalaTdaa•gjT, 1e l'.i • MM.,ill"T11-17 MNT Srl MIlaETTh G1 nIIa .T RIIIaNI$7I a Wy=J_ •.. /1Brt LT.lrMl li-3.1((3.1.1n�t1.1ra a -It �nxa.T.,.Taaa n.""". • • all--_1 C-�U1p'Vqlyil yT�1 1 1(7J reyr$nlppttLnjri1_Ia.iThitl-Da-c-Ern-a r321::11ulli11/;1,1. l j+4.h� ,anSinpii yfl..iti O_T:r.tl1 iii"g anini GilIt..Syy!y�Ytps.■y.��II-.1pIA�Rr- `y 4�.■.["'y{t('""-'` -yymyy1 1. l r/I�// [[�y�'� •: i•y'.•,EL-1-m-FnU 3 11C�RS3?Z.111Ya InSIZ1:.77■71�r miffCiR 7m 1 is-- /`IC: of N..Till" Fr I,1,➢31I/r T'_T_ILorRt MILLI?a�i1 a wirazI.mm ITFw;,rutint>_']' 7 in.,L-i1LL_..3-7i5 L4'*9AJ a-t.1-'7 FT'NIt-CIEM-.X-S11LIIIfe Z n a r[reazcri III-lira:. 14aYt ua-I car l Yl E-9-2Rrnas CTI a aPran.41111n4mlaMn■IIj III ECCLIIIty Im •��yp �ISo ^alal Syy�m 4Lal,LI nnuila 'rf �YL'r- O •. •..a.- .. Qc�•.c�uLs:7:ycC�Qacx¢i�7 yvzca�sl x a¢r.�o a1.am-< I�.i llit7FAR7ifri[Li7An II `IlIEIIPt.:nf Anal a I 3•( ' ,:estS r 1 l'1Sll., € PaR� w161f�L9�i11 : •'`,, � x .-.1.c .a➢aac-..In mlFki L'a ino:_u ,� URarl?A..14 r4f tip...; 1 '' C„. :ii -r .git,:nii-•Y'�InM�❑ler• •-'zrr:vna t �r,.�- �p.7 nvs:e � '.�� tad lrlc�r� - III41cram r„41 • rp' • k � yy a A. t . b')1� • I k_ Kr .'"-4 ranz El n na —at)" .. .;;r am r- oi�"JC WV1'134`a!L'A;rRn Tr•,1:,ti' � 'LC AIl �fr• la UT QL4-n.❑ G la Al i:G`I�I11J�.= ,)4-,11 LT'}1,Y YJC'•:rl C'L ice, 9W—Li-lrtt -Z d -A A.r-i"1 lil.[ 3"' I3111"11 ` I""`• • t, RILLS .L.T 1..3Lfuni L'Y ,rxruslnc,un OH .: U.Ar 1-,/,'EYO.I" alga ...,,u;LLT 3 SoL,EArc,f13Awl%l.•�.g-ip.1 t r t+.r(�'.1iy3y-4.1i10,..'4Jf')((1E1 ::�y_:]�'1 U .LL.,'.Ki1 IIII., C'.•I•M'LTf''.7• •+`a p,,?III 5�C 1L..,7m1I 9y7r1a Y.2li� ]ILI:irR4pYYd II LT.iaulnl 211C!111.1 to - /I'/(J 1XJ/•J� f/ Gr.,1"(aa�!ra15 W aOySaaal lun -IL1.E➢-rsZ1_al lalr,;3 lyyrry[R•• I I6 7 i V //,✓ A�yWN.`�'TntinnA�IIa. z.0,11C a art 12 211(�lY'n225_w1�U li.I.,11111101:iy111-1,0 1rn }.rruc`srnr a tnT.GISE'A9E®.cao�rpan1n1�u��;Iua t•:en Nl.'-'1�Crsla -... .. •, • •,� r�rn alga Lva",\M'rc.gir"INCrI►'al$n4iJ Li tlf n..Al 1naII • a••r- • ". • . . ,dFAMEYER• : . . . - ' ADOPTED SEPTEMBER 5, 2000 PAGE 50-25 NEW HANOVER COUNTY STORM WATER DESIGN MANUAL SECTION 50-PIPE SYSTEA1 DESIGN PROCEDURES FIGURE 50-15 RIPRAP APRON DIMENSION REQUIEM ENTS • LENGTH OF APRON TO PREVENT SCOUR ZONE TO PROTECT HOLE USE L2 APRON MATERIAL CULVERT ALWAYS 1 STONE FILLING(FINE) CLASS A ) 3 X Do L2 4XDo 2 STONE FILLING(LIGHT) �"1 3 X Do 6 X Da 3 STONE FILLING(MEDIUM) CLAS ' —, 4 X Do 8 X D 4 STONE FILLING(HEAVY) CLASS 1 4 X Do 8 X Do 5 STONE FILLING(HEAVY) CLASS 2 5 X Do 10 X Do. 6 STONE FILLING(HEAVY) CLASS 2 6 X Do 10 X Do Width=3 times pipe diameter(min) DETERMINATION OF STONE SIZE FOR DUMPED STONE CHANNEL LINING AND REVETMENTS Step 1) Use figure F-18a to determine maximum stone size(e.g.for 12 fps or 550 lbs. Step 2) Use.figure F-18b to determine acceptable size range for stone(for 12 fps it is 125-500 lbs.For 75%of stone,and the maximum and minimum range in weight should be 25-500 lbs.) NOTE: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter .. Manning's Minimum Thickness (inches) "n" of lining (inches) Fine 3 0.031 . 9 12 Light 6 0.035 12 18 Medium 13 0.040 18 •24 Heavy 23 0.044 30 36 (Channels) (Dissipaters) Source: Erosion and Sediment Control Planning and Design Manual,NC Department of NRCD,Land Quality Section,September 1988,rev. 12/93. ADOPTED SEPTEMBER 5,2000 PAGE 50-26 Date DesApl NORRIS Lk.- TUNSTAIL Wilmington, NC Sher —.CONSULTING ENGINEERS P.C.— Brunswick County, NC si '----- Of 3 Check Job(' For Job No. Row CLAJet;".1'.; i 1 PEs l'''l +a PES443 HO ( ! 1 . 1. J , ,..! i ,_, 1 rN )1\1e. o \t'e 1- Cledt.fr.eit "1-4 120tAcke czok-Itilri---S I Gtrkexer I he. cUtiveL-14-vS, 1-11%e_fcl IS. f\10 T 1 AN 17---S71AeLi S(.*J17. 0 Prici-h. b-P re..,,,,,i{.05...c.. ,-. 140-d" Fiebevl -11-e 'iow, -1-rw. D,40,,iv,,,,L.4-1 bie il/fl 4f)I r5+xi A- Tric. C1C..6.4-4k5 Rokcl S; e f6rt.ykrAse ff— ts co / _../..^.1.‘ er.1 (Ate/lief. Dr)\det,..aleil-S. 7A-C- Pf0 0,Se-44 GraCS;r5 ?kk.;;keS Si-. /ILFTs For <.-tfloiltt "le., Caltet4. ,,it , -t A-'1 a "P Go k I -kefIN 1:1 -P, Oic,k, -r1/04/I 4t-t. It My Pe/Ike-Wit Iii.i. 1 Cir.S 14 1 -1-01P .s ui 1 i isq K . ?Es' I*s Arco._ -6_ Atioc..„ Ft/ 74.4 1.1/a.)(104, ?i1U : NO ( SA 4/cioosf TA4)141,40„ .c'o_k__ c: =I. /5;1cm ;1/k , ols.e- 1 1 rb --=-- CA 3, .0A i/ -- 4g&, 4 teOf 1 1 -" 9(011'75Ft/(t lqq/41C- rei-P 3:3p3'7 f3sD'ir- 1. -z- 3elcr-Fisr 1 0 -0-4-140 44 . V-- = p 43--- 0,44ric ri) .1 i•zif, ...A(Jre\ 11 v - *3- - . 7260,joio --c.p _ 11 ..-1.1,,t ,e4q --... L.K '13>F1[ -7;s--1' ciltiL-- 'it /NAT ..y.:,...sx.- ii 01 r ---- ..... pr- 1 1 Ii , . Date D7 NORRIS ez TUNSTALL Wilmington, NC Set ' CONSULTING ENGINEERS P.C.— Brunswick County, NC (--- r2, Of ----' Check Job For Job No. IRO\AI CcA_tuteiS PE-5+4 -iv •ftS* <7 1$3,1 con 1. 1 ;•1; I ; I . TO--. I i ..1 , 11 ' : 1 ) I ‹t' ' I . • 1 ' ' I I I I , . tau ' ite. 4 ( : . ifer, 40 4110(1, An ' I . 18 1 1 : 'Ac_ , '1--- 00'r 4C:f :.--- ..dorisib : • tJA -.1-I I i ' / i ! , C-:•- 161, 1371/k, )t.VE'. 7>iiiile • -10)9'-'• ' a5-irn s A/618( . 1 , • 1°1 -r f- 4 t9( ; R,I 7- ,0,or-f-,0 , 10,iiim) t-- ,..e14 1 I , I ' • I ' 1 I Sivpiel (n4h,d__ ' ! 1 ; ' 1 , . 1 i I 1 i , ' 1 6 erki / q7 x r7\,,,,'_ 1r .aq,s."-?-2c.Ft IcH I ' , )i 3650 x 0,-/ •xf.,9t- r 2, 1:: ,t730q32--c-P ' - • • 1 ' I ' _P_CC4i..,..din, /1 • : . 1 1 . I 7 i 1 ' 1 , o-ii. 1 1 i: , i ' 1 1-- 620°$2.- cp /2-LA-7 1 - 1 t , 23- v. lo: 1 ' , I 1 : . I . , 1 : : i : , , , i , 1 : : 1 ! , 1 • II Date Design NORRIS l�®RRIS & TUII � L Wilmington,Brunswick County, NC S et CONSULTING ENGINEERS P.C. y, NC Of Check Job For Job No. 1 4/ 1 - /1/ 7/1 14e Alit, Far /PIl:l a-4-.gin 1 ! ' ¶ )c 5�:' /6 ,r 0+ cGy, QG,`,, , , ' ' 1 1 , ,, '' 1 , ' r- 11! ..A-- 1 D A"-4 PA 90 ,4 L'i 21i 1 try 1 ' 1 .' )21 gYA, ! IA ' ''''' r' ''' 1.1-li'' ' "-,f')1 ,,e, '-- .09 1-413-4/0 srfth' 4c—: 437,)e, ..ir /c) ...", ( ., i --...--1 i .9 (97.d . P :../1 1 III . 4 O. , . .0i 2' -I 4-14 4 itli 1 1 = 0 el'r +- A eoto zeei ), =. 4$--,. . - tr.olt 6. •.- • , rr,..s T- , , . , . , i 6 42-tik ... /19, srl' e..R.: , : 1i loyr r ! ! 1 1 "Zit, , 4:3 6 FivOc J (,,,), , Y /, '4., 1 1 i: . H ' I 1 1 , I. I". 1. "I I F 1 I ,41.„. , , 1 1 . 1 r-y,-; i ,.....,,„„1 1 ,, ,_ i ! it/i , ------5,- A.- ("9"3 M 1 k_ , . _ , ' s-'1f[ ..-R- 1 G,,m. I L , I 1 1 I 1 1 i 1 II ' ' 1 ' ' I .. I I I I i 0._ r, ...(r. -1) „ l y L L P "Setting the Standard for Service" . A,. Geotechnical • Construction Materials • Environmental • Facilities NC Reg'sieree Engrneer,n i=irm F-l0 NC.Registerel Gentogists F,m C-sGu March 2, 2020 SC Registered'Engineering=rtm:i2j:' Mr. John S. Tunstall, P.E. Norris &Tunstall Consulting Engineers 2602 Iron Gate Drive Wilmington, North Carolina 28412 Reference: Report of Seasonal High Water Table Estimation and Infiltration Testing 1-140 Business Park Wilmington, New Hanover County, North Carolina ECS Project No. 49.10786 Dear Mr. Tunstall: ECS Southeast, LLP (ECS) recently conducted a seasonal high water table (SHWT) estimation and infiltration testing within the stormwater control measure (SCM) area(s) off of US Highway 421 in Wilmington, New Hanover County, North Carolina. This letter, with attachments, is the report of our testing. Field Testing On December 19th, 20th 2019 and February 27, 2020, ECS conducted an exploration of the subsurface soil and groundwater conditions, in accordance with the NCDEQ Stormwater Design Manual section A-2, at ten requested locations shown on the attached Boring Location Plan (Figure 1). ECS used GPS equipment in order to determine the boring locations. The purpose of this exploration was to obtain subsurface information of the in situ soils for the SCM area(s). ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at each of the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the SHWT and groundwater elevation observed at the time of the hand auger borings. The attached Infiltration Testing Form provides a summary of the subsurface conditions encountered at the hand auger boring locations. The SHWT and groundwater elevation was estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: Location SHWT R/ Groundwater 1-1 /4. p 76 inches q, 88 inches 1-2 / ,c' 62 inches g'JT 70 inches kWl 1-3 Oise ?. .SI 44 inches , 50 inches 1-4 /4,57 62 inches ",,4 68 inches 2r:i ....xy 1-5 ifergf 100 inches /7. 7 108 inches 6 qo 1-6 /'�./e) 63 inches 9. ' 70 inches -w~".' 1-7 !7; 80 inches ,gyp.4C 90 inches 1-8 /r,d 66 inches /,A /r 71 inches 1-9 j7_, 36 inches 0 2. 42 inches 1-10 /,, ft.. 48 inches , 58 inches r Ag7 r / " v I• it ! irr-jvoli ECS Capitol Services.PLLC • ECS Florida;LLC • ECS Mid-Atlantic,LLC • ECS Midwest,LLC • ECS Southeast.LLP • ECS Texas,LLP www.ecslimited.com Report of SHWT Estimation and Infiltration Testing 1-140 Business Park Wilmington, New Hanover County, North Carolina ECS Project No. 49.10786 March 2, 2020 ECS has conducted ten infiltration tests utilizing a compact constant head permeameter near the hand auger borings in order to estimate the infiltration rate for the subsurface soils. infiltration tests are typically conducted at two feet above the SHWT or in the most restrictive soil horizon. Tests in clayey conditions are conducted for durations of up to 30 minutes. If a more precise hydraulic conductivity value is desired for these locations, then ECS recommends collecting samples by advancing Shelby tubes and performing laboratory permeability testing. Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/ hour I-1 Tan/orange fine to med. SAND 52 inches 26.77 1-2 Tan/orange fine to med. SAND 38 inches 28.28 1 ��'/ Tan/orange fine to med. SAND w/ v r 1-3 g clay lens 20 inches 20.77 A � � 1-4 Gray/tan fine to med. SAND 38 inches / �� 27.42 1-5 Tan/orange fine to med. SAND 70 inches 29.78 1-6 Brown/gray fine to med. SAND 39 inches 28.25 4,1.:I 1-7 Gray fine to med. SAND 56 inches 31.22 1-8 Brown fine SAND 36 inches 15.97 lri s / 1-9 Tan/orange fine to med. SAND w/ 24 inches Aj ii' H clay lens 14.37 1-10 Brown/gray fine SAND w/silt 24 inches 12.98 /- / 1'0 Infiltration rates and SHWT may vary within the proposed site due to changes in elevation, soil classification and subsurface conditions. Closure ECS's analysis of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, analysis and revision of our recommendations, if necessary. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this geotechnical exploration. 2 ECS Repaii-s emflookS Se prifeethrel Ffireyt S4WT ;s PCS SOUTHEAST LLP ¢ , "Setting the Standard far Service" Geotechnical • Construction Materials • Environrnen al • Facilities 'CRegrst.-^.d=nglneer:ngf=umF-1373 4C Re •:terr I G,alogrs's F.in C-44d SC ntered Engmeenng Firm 3239 October 5, 2020 Mr.John S. Tunstall, P.E. Norris&Tunstall Consulting Engineers 2602 Iron Gate Drive Wilmington, North Carolina 28412 Reference: Report of Hydrogeologic Evaluation Wilmington Trade Center Wilmington, New Hanover County, North Carolina ECS Project No. 49.10786-A Dear Mr. Tunstall: ECS Southeast, LLP (ECS) recently conducted a seasonal high water table (SHWT) estimation and infiltration testing within the proposed stormwater control measure (SCM) area(s) off of US Highway 421 in Wilmington, New Hanover County, North Carolina. (Figure 1). ECS was then requested to provide a Hydrogeologic Evaluation of the site in accordance to the North Carolina Department of Environmental Quality (NCDEQ) standard for relaxing the 24-inch separation between infiltration systems and the SHWT. This letter, with attachments, is the report of our evaluation. Field Testing On December 19th, 20"', 2019 and February 27, 2020, ECS conducted an exploration of the subsurface soil and groundwater conditions, in accordance with the NCDEQ Stormwater Design Manual section A-2, at ten requested locations shown on the attached Boring Location Plan (Figure 1). ECS used GPS equipment in order to determine the boring locations. The purpose of this exploration was to obtain subsurface information of the in situ soils for the SCM area(s). ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at each of the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the SHWT and depth to groundwater observed at the time of the hand auger borings. The attached Infiltration Testing Form provides a summary of the subsurface conditions encountered at the hand auger boring locations. The SHWT and depth to groundwater was estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: Location SHWT Groundwater I-1 76 inches 88 inches 1-2 62 inches 70 inches 1-3 44 inches i 50 inches 1-4 62 inches 68 inches 1-5 100 inches 108 inches i-6 63 inches I 70 inches ECS Capitol Services,PLLC • ECS Florida,LLC • ECS Mid-Atlantic,LLC • ECS Midwest.LLC • ECS Southeast,LLP • ECS Texas,LLP mon.ecslimited.corn Report of Hydrogeologic Evaluation Wilmington Trade Center Wilmington, New Hanover County,North Carolina ECS Project No.49.10786-A October 5, 2020 1-7 80 inches 90 inches 1-8 66 inches 71 inches 1-9 36 inches 42 inches I-10 48 inches 58 inches ECS conducted ten infiltration tests utilizing a compact constant head permeameter near the hand auger borings in order to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT or in the most restrictive soil horizon. Tests in clayey conditions are conducted for durations of up to 30 minutes. If a more precise hydraulic conductivity value is desired for these locations, then ECS recommends collecting samples by advancing Shelby tubes and performing laboratory permeability testing. Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/ hour I-1 Tan/orange fine to med. SAND 52 inches 26.77 1-2 Tan/orange fine to med. SAND 38 inches 28.28 I-3 Tan/orange fine to med. SAND w/ 20 inches 20 77 clay lens 1-4 Gray/tan fine to med. SAND 38 inches 27.42 1-5 Tan/orange fine to med. SAND 70 inches 29.78 1-6 Brown/gray fine to med. SAND 39 inches 28.25 1-7 Gray fine to med. SAND 56 inches 31.22 1-8 Brown fine SAND 36 inches 15.97 1_9 Tan/orange fine to med. SAND w/ 24 inches 14.37 clay lens 1-10 Brown/gray fine SAND w/silt 24 inches 12.98 Infiltration rates and SHWT may vary within the proposed site due to changes in elevation, soil classification and subsurface conditions. Hydrogeologic Evaluation There are required components listed in the NCDEQ Stormwater Design Manual in order to reduce the 24-inch separation between infiltration systems and the SHWT. In order to evaluate the hydrogeologic conditions of an area designated for an infiltration SCM, these components are evaluated. The SCM in question is to be constructed between I-1 and 1-6 (i.e., in the area of borings 1-1 through i-6), ECS will be averaging the data from these six borings for the purposes of this report. Below are the required component descriptions for this site. 2 Report of Hydrogeologic Evaluation Wilmington Trade Center Wilmington, New Hanover County,North Carolina ECS Project No. 49.10786-A October 5, 2020 • The site is located in the Coastal Plain Physiographic Province. The Coastal Plain is composed of seven terraces, each representing a former level of the Atlantic Ocean. Soils in this area generally consist of sedimentary materials transported from the other areas by the ocean and rivers. These deposits vary in thickness from a thin veneer along the western edge of the region to more than 2,000 feet near the coast. The sedimentary deposits of the Coastal Plain rest upon consolidated rocks similar to those underlying the Piedmont and Mountain Physiographic Provinces. The groundwater flow direction is believed to be to the east towards the Northeast Cape Fear River, based on surface topography. • The site was observed to vary in elevation by a few feet from the north to the south. The site is bordered by commercial properties to the north and south, US HWY 421 to the west and undeveloped woods to the east. No stormwater treatment SCM was observed. No abandoned wells or rock outcrops were observed. • Based on regional geology and observations made in a previous on-site geotechnical boring approximately a half mile from the current study area advanced by ECS on August 17, 2020 (see attached boring sounding logs), the site consists of surficial deposits of sandy sediment with silt to a depth of approximately 50 feet. The Castle Hayne Limestone underlies the surficial sediment at depths greater than 50 feet. • The saturated infiltration rate, which is also referred to as the vertical hydraulic conductivity rate, of the surficial sediment within the proposed SCM footprint was tested and resulted in a value of approximately 26. inches per hour(53.8 feet/day), based on the averaged values obtained from infiltration testing of borings I-1 through 1-6. The ratio of vertical hydraulic conductivity to horizontal hydraulic conductivity (i.e., anisotropic ratio) typically ranges between 0.1 and 0.5 for unconsolidated sediments, not including clay. Site-specific horizontal hydraulic conductivity testing would be required to evaluate the anisotropic ratio at the subject site. However, in lieu of this information, ECS has estimated the site's anisotropic ratio as a means to assessing the site's horizontal hydraulic conductivity. Based on grain sizes encountered at tested locations I-1 through 1-6 and the resulting vertical hydraulic conductivity values, it appears most likely that an anisotropic ratio closer to the mid to upper end of the typical anisotropic ratio range would yield horizontal hydraulic conductivity values that are more typical of the sediment encountered at the tested locations. For I-1 through 1-6, an anisotropic ratio of 0.5 was used. As such, utilization of an anisotropic ratio of 0.5 yields an average horizontal hydraulic conductivity value at tested locations I-1 through 1-6 of approximately 107.6 feet/day. Based on this horizontal hydraulic conductivity value and the approximate saturated unconfined aquifer thickness beneath the site (43.5 feet) (this thickness is based on the geotechnical boring, which was terminated at 50 feet below the existing grade elevation, and a depth to groundwater at the site of approximately 6.5 feet), transmissivity (i.e., horizontal hydraulic conductivity multiplied by saturated aquifer thickness)was estimated to be approximately 4,681 square feet per day. 3 Report of Hydrogeologic Evaluation Wilmington Trade Center Wilmington,New Hanover County,North Carolina ECS Project No.49.10786-A October 5, 2020 • The SHWT was observed between 36 and 100 inches below the existing grade elevation at the locations tested. • The surficial aquifer of the site consists of sandy conditions where groundwater is assumed to flow under unconfined conditions. The site currently consists of undeveloped areas. Stormwater is currently infiltrating into the natural areas. A proposed infiltration SCM (infiltration system) is to be constructed in order to contain and treat the runoff of the anticipated impervious areas. • Groundwater recharge at the site in its current state consists of direct surface infiltration of precipitation and irrigation water at the vegetated portions of the site and infiltration of runoff of precipitation into the grassy areas of the site. The most prominent groundwater receptor in the area is the Northeast Cape Fear River, which is approximately 1.0 mile to the east of the site. The topography of the area is variable and the subsurface flow media consists of clean sands which results in surface water movement in the swales with most surface water removal by infiltration. The pre and post flow calculations for the site will be generated by Norris &Tunstall Consulting Engineers, PLLC and will be submitted separate from this report. • A mounding analysis was generated utilizing the United States Geological Survey (USGS) spread sheet solving the Hantush (1967) equation for groundwater mounding beneath an infiltration basin. The data used for calculating the mounding conditions was collected from site specific field data, design data, and soil characteristics. On the chart, (R) represents a one inch storm event over a 12 hour period (i.e., a storm event infiltration rate of 0.1667 feet/day for an infiltration period duration of 0.5 days). The mounding analysis only accounts for precipitation that directly enters the stormwater basin and does not account for stormwater runoff that will enter the basin. As such, ECS recommends that post-flow design criteria, including stormwater basin drainage area, be used to complete additional evaluation of potential groundwater mounding. Specific yield (Sy) was estimated as 0.32, based on values for similar sediment types published within the USGS Compilation of Specific Yield for Various Materials by A.I. Johnson, 1963. Horizontal hydraulic conductivity (K)was calculated based on infiltration rate data measured in the field and is referenced in the text above. The value of 26.88 inches per hour infiltration rate, which is comparable to a horizontal hydraulic conductivity rate of approximately 107.6 feet/day, given the site's estimated anisotropic ratio, should be used for this analysis and for the SCM design. Basin dimensions (X and Y) were provided by Norris & Tunstall Consulting Engineers, PLLC (the site civil designer). A mounding analysis was generated for the SCMs being designed using the data collected from I-1 through 1-6, as these borings are located within the planned SCM footprint. As previously discussed, the infiltration period duration (T) was assigned as 0.5 days to simulate a one inch storm event over a 12 hour period. The USGS mounding spreadsheet is only capable of calculating the maximum groundwater mounding height and maximum thickness of the saturated zone at the end of a storm event, and is not designed to calculate the rate of groundwater mounding subsidence. Thickness of 4 Report of Hydrogeologic Evaluation Wilmington Trade Center Wilmington, New Hanover County,North Carolina ECS Project No.49.10786-A October 5, 2020 saturated zone HI(0) was derived by subtracting the depth to the assumed confining layer (approximately 50 feet) from the approximate depth to groundwater at the site (6.5 feet). The spreadsheet is included with the attachments. The maximum mounding at the end of the storm event beneath the infiltration basin is calculated to be 0.045 feet. Based on limited data collected at the site, ECS does not anticipate groundwater mounding beneath the proposed stormwater retention basins resulting from precipitation directly entering the infiltration basins and not accounting for potential stormwater runoff to exceed 0.045 feet following a storm event of 1 inch over a 12-hour time period. Groundwater mounding would be expected to subside significantly during a dry period of 5 days following the storm event. ECS recommends that post-flow design criteria, including stormwater basin drainage area, be used to complete additional evaluation of potential groundwater mounding. Closure ECS's analysis of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, analysis and revision of our recommendations, if necessary. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this environmental exploration. ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us at(910)686-9114. Respectfully, ECS SOUTHEAST, LLP gkzoot5 l/�i` 2,744APY K. Brooks Wall Michael L. Maloy, C.P.G. Project Manager Principal Geologist bwalltu'�.ecslimited.com mmalovCa)ecslimited.com 910-686-9114 540-785-6100 Attachments: Figure 1 —Site/Boring Location Plan Infiltration Testing Form Geotechnical Boring Logs USGS Mounding Spreadsheets GBA Document 5 .- �i. i "� _ •'` a pm_ _ '' r f s .. =+ 'y • i iii;,. 1 r (tc, -- ,: ' ..'.1-5,,-"- xa ... tag-� i .. r tt I - 'wu -. - '. l' . . ' 4'441/44k I jj „...t 1 J7 % 0it a S.,f 1,1 I ii •� .t. .t''?' y •fib.: }. ,l • it _—--tkt . .:-., '')-,\‹: , ‘ ...„..// s;� 'c ii t �� ,r+3'13 yf it 1 may. } �` u'. 1 j. ' f 1j ' 4 AT ' i Li 2..,,...._ 1, ., 1, _. , , \ ; . , ido ...- „a,. ,..` ... !. 411 ,`r ,. . r _ 'r- •1•✓ 1 . CO i. 4- 1{ A7 t• r"� �, Nfi• err /1 '� r' .'Ifs - •• ,..,. ' ,.... r----- ,r,..,..,,i,i ' .1 ' ,� v:... a1Trlllr ' t ,. /Frn`,,. ♦ a,� ::'k r t' „4 1 t... , °I+ " Vi,-, k, r - .r . r 1I ---,v.r + t y . ` `. r' �l ' /. rt j , .li, El iti S ( / ^ I rt wr,T3 r 4- o; ! sL tZ11,:i -�yN� � 4� 'T. � �� y� r r i, 4 , -44,. *.' ,', ..‘,"1:11.V.,...41;,s,-7,:i:NA 10 ' - - 4 - '1 ! 4, ;T. ^girt t+ �e6 fit Wh!,� y..'• 1, ~' -•- _. 9 14a4`R t. ! .4,' ` r *r '.:� a �, l kftr....loti-+; i w4f�" 1�,� N2It,/7..408111100 #� tit I' ►* rw+ �; it:) �� yr, /► + i l t.. 1,-x t ' s.0„. .- roll, t ♦i'# r, ��+ ► ti, f , ♦/,t , Y • -'� a7 art\�{1;'' ,r•r+,u J N .ti* !!'_ ,• 4 , y 7C ;1I ( � ` i. . ralt Y / li _ - 1.- T r f,�,rr y17, tr ., sM ./ " •'/" -S. 4Y 1,' ( ., )ti;f. .„,, . g �" ! 1 1'.. . f Lilt'! _ .1 iv a �.`. •?• 1. e N SCALE 1:100,000 w —y E Wilmington Trade Center Figure 1-Site Location Plan Provided b : 1990 USGS Wilmington, New Hanover County, 1- �' North Carolina ���� ECS Project#49.10786-A �) KBW F.je,r.ty,-;_.7.- p - 7,. --,,i,,,p;riTi:,7,:•7 7,,a- , • : _z--?.-,..- ._.,, -_i , - -,-,r-,7 1 : . •. r% 'r:fo'f'..tirr. • ii.•'. 42'. ! -.,• r '. •'1.•-: ::•_,, - i • . , • _ •,- ° Tit • •• 4 L - - .', I \\ • • , -"'et!' `'i F-• 6 - 1 - IF': sri••• -kit. e ..,. ,. L, ...., ... ,, . = 11\ A ' 1 t c s 1 s. •• 'IN .1 op- -• „hr1•11-' i, ...fir .. : L 6.2..r; ` • - . 1 , t_ , • ,,. - 1P.ic. •‘-• -- • ' ': .•- -- . .. 4., ,•k .o'- ••„It.N. ',,t ..., -i•4 1 o= ,, - . 4°i-. - - . - • 1411,it'W* ' •'`, •pfv.• ' I S t .--,47+,//' _P. r; -• '. .• ' ' 'L , ' P t . al. . • i .. . •'''- - .-.: i , 4 '.' - ....' _ .1.• ...-.71 N 'r'' - ?.L ' • 4 lir 1.,4,..' ....I •, ,r,• ... 5 • 1 ' • % e -, . -'F , i, , -I ' r r. .1 . I i v-•• iii,;-..., .= , l'` 4. * 1 ' 1 - - . . 4 or: ,); er 1 , ' 4, i 4 •1' 4.1?'r_,„ '4), _...."'t.7•••• ' . • ,i...., ' "•E ..•, , , :4.1 • . '•"- •L' t ' ' • - ' i • . 11'4,11:41 -...?e,..,•,:i2"- -••n;a.1- C! • 1 • „,.ir i„„o* - ..., hi ,..„. .. il'a 'T'r ')1. 4 1,'g ,i4 . • 1 4. rr ...t...;..4 1 - Air :IF .:_, • 4 I to, , --.k ,.. , I .1 , r. -.1. . r I • m ... 6. INI ', , . ,- , , 7 • 'ire A, _ ii :-•'. 4 ' 1-6iY6 61 . ' . I ,, I,, ,I , I I. I A:*-irOj .5 .L, s-'ill `i ''' A'3";1,-•q' . , •, ir I ..,_ '' r r ---•' •...."---It. ...: i ... .if ' 'i i . ' +, • f L r 6,.., , 4 , • -.1 . i• ..: k '' f..)-• 6sv .3/4_, , ...., i't a • .1. ••,, t 4 . r - •44,4z:I. 7N,i, J°61. •P,TA,- -.'irit.1-'''.1' - .1,. ' •r ° IN frpr•-* '5',•tri4L., I - / rt114.11•'.:1.'s in. lie r k• 4. .44.,.,,,nrt....'. -,!: • • - • ••• , 4 t 1 I -' \ 4"4 ' ..- - . ' . - . ••• * ' - '1'4. • -1-9 _...)--.i: • . • ' . 1 ' *--1 4E•1 '• - ) 4 1:4 , - , ei )''.• .-' i • P. .. '5 5 , — .•:- 1 JO . 1 I tl,,, i,.,. ,., 1-4 -. % • a 4.(1.4":• . . . • '.....• .1.0. pi . , \ • '.• - % J1f1 '. , • 4• 44, ' ' - ,, p 1-3 . . IP 1 •• kL 'Iv -• • - , . . - . . , ,.. _ _ i - \ .• ,. .. -.. 0.4•., .f • '. ',' • ' ' ...' .. 1•••• . . . . i " • I Ilk 4. 1-2 ...i. '4 4'..- r -. '' ' ..a . ' ' " •'' e.-•' ,-I: './ v•-•%. $.1'4,‘ - ..,, , , , ,"• '' 1. ;., ,I•i• I • ' I • • • , r . . ...,... - • L , • .. .I-1 0 1'1 .# ,L.1••. I ilk. 4 . . ... 4 t414,1 . ...:, •t 1 , Lir. 1 fl--4 ir •• lir 'I ).• r 4.-.1' ...,, , „_ .4,. A • • ir il'' ,)Pk ' ... L PI^ ''91 44 i - i 1., -t p,, , 6 .1.ii, I ...••;,,, - . ••.. I., - .) - .-•1 p • w I° - —.-If Ad- -,t .. 4,1 ' ' • •• ,,,' ,p.".. ' . . • , ,, . . I.'17, i.,1 '' ' .,•, _.44' r . ,. 4. .. -11• t 1r I '.0• • . .I ... • . a 1 -,r,r--ft. • ' . e%AtiN; ' -4'1 •t-• • • - •: i ..I. -. • „, , '!',- •W. 4, - • '4, • ,- ' -iiir T 6.. ..le 1 •g O. '74- • .,..‘ke-JG • r• ,. . _• •'11. - f'.. :" ..1 • ".• • 0_ N APPROXIMATE BORING LOCATIONS • el APPROXIMATE GEOTECHNICAL SOUNDING LOCATION W —..,L E SCALE SHOWN ABOVE • ririllik i 1-140 Business Park Ph 5 Hanover County, • Grov Figure 2—Boring Location Plan Cherry e, New North Carolina Provided by: Google Earth ECS Project#49.10786 December 2019, Feb. and Aug. 2020 I I' KBW I 17.% Infiltration Testing Form 1-140 Business Park PH 5 Wilmington, New Hanover County, North Carolina ECS Project No. 49.10786 February 27, 2020 Location Depth USCS Soil Description I-1 0-15" SP Gray fine SAND 15"-88" SP Tan/orange fine to med. SAND Seasonal High Water Table was estimated to be at 76 inches below the existing grade elevation. Groundwater was encountered at 88 inches below the existing grade elevation. Test was conducted at 52 inches below existing grade elevation Infiltration Rate: 26.77 inches per hour Location Depth USCS Soil Description 1-2 0-26" SP Gray fine to med. SAND 16"-30" SM Brown silty SAND 30"-70" SP Tan/orange fine to med. SAND Seasonal High Water Table was estimated to be at 62 inches below the existing grade elevation. Groundwater was encountered at 70 inches below the existing grade elevation. Test was conducted at 38 inches below existing grade elevation Infiltration Rate: 28.28 inches per hour Location Depth USCS Soil Description 1-3 0-15" SP Gray fine SAND 15"-18" SM Brown silty SAND 18"-50" SP Tan/orange f. to med. SAND w/clay lens Seasonal High Water Table was estimated to be at 44 inches below the existing grade elevation. Groundwater was encountered at 50 inches below the existing grade elevation. Test was conducted at 20 inches below existing grade elevation Infiltration Rate: 20.77 inches per hour Infiltration Testing Form 1-140 Business Park PH 5 Wilmington, New Hanover County, North Carolina ECS Project No. 49.10786 February 27, 2020 Location Depth USCS Soil Description 1-4 0-26" SP Gray/white fine to med. SAND 26"-30" SM Brown silty SAND 30"-70" SP Gray/tan fine to med. SAND Seasonal High Water Table was estimated to be at 62 inches below the existing grade elevation. Groundwater was encountered at 68 inches below the existing grade elevation. Test was conducted at 38 inches below existing grade elevation Infiltration Rate: 27.42 inches per hour Location Depth USCS Soil Description 1-5 0-110" SP Tan/brown fine to med. SAND Seasonal High Water Table was estimated to be at 100 inches below the existing grade elevation. Groundwater was encountered at 108 inches below the existing grade elevation. Test was conducted at 70 inches below existing grade elevation Infiltration Rate: 29.78 inches per hour Location Depth USCS Soil Description 1-6 0-34" SP Gray/white fine to med. SAND 34"-39" SM Brown silty SAND 39"-70" SP Gray/tan/orange fine to med. SAND Seasonal High Water Table was estimated to be at 63 inches below the existing grade elevation. Groundwater was encountered at 70 inches below the existing grade elevation. Test was conducted at 39 inches below existing grade elevation Infiltration Rate: 28.25 inches per hour Infiltration Testing Form 1-140 Business Park PH 5 Wilmington, New Hanover County, North Carolina ECS Project No. 49.10786 February 27, 2020 Location Depth USCS Soil Description 1-7 0-70" SP Gray/white fine to med. SAND 70"-80" SM Brown silty SAND Seasonal High Water Table was estimated to be at 80 inches below the existing grade elevation. Groundwater was encountered at 90 inches below the existing grade elevation. Test was conducted at 56 inches below existing grade elevation Infiltration Rate: 31.22 inches per hour Location Depth USCS Soil Description 1-8 0-36" SP Brown fine SAND 36"-50" SM Brown silty SAND 50"-70" SP Tan fine to med. SAND Seasonal High Water Table was estimated to be at 66 inches below the existing grade elevation. Groundwater was encountered at 71 inches below the existing grade elevation. Test was conducted at 36 inches below existing grade elevation Infiltration Rate: 15.97 inches per hour Location Depth USCS Soil Description 1-9 0-24" SP Brown/tan fine SAND 24"-36" SM Tan/orange fine SAND w/clay lens 50"-70" SP Tan fine to med. SAND Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Groundwater was encountered at 42 inches below the existing grade elevation. Test was conducted at 24 inches below existing grade elevation Infiltration Rate: 14.37 inches per hour Infiltration Testing Form 1-140 Business Park PH 5 Wilmington, New Hanover County, North Carolina ECS Project No. 49.10786 February 27, 2020 Location Depth USCS Soil Description -10 0-60" SW Brown/gray fine SAND w/silt Seasonal High Water Table was estimated to be at 48 inches below the existing grade elevation. Groundwater was encountered at 58 inches below the existing grade elevation. Test was conducted at 24 inches below existing grade elevation Infiltration Rate: 12.98 inches per hour dt ECS Southeast,LLP 6714 Netherlands Drive Fo5 Wilmington,NC 28403 i ,,,,,.:., -...A.. ECS Protect 0 22-29395 CPT:S-5 Project: Wilmington Trade Center Total depth:49.87 ft.Date:8/17/2020 Location: Wilmington,New Hanover County,North Carolina Cone Operator:Austin Fowler Cone resistance Sleeve friction Pore pressure u o- SPT N60 o Seismic Velocity Norm.o Soil Behaviour Type 0 o a 2- 2- 2 2- 212 ._ 4- 4- q 4- 4 4 6 6 6 6- 6_ 6 sadasIly • 8 8 a 8- 8- 8 10- 10- 10 10- 10- 10 12- 12- 12 12- 12- 12 Silynndas: • sill 14- 14- 14- 14- - 14- 14 16- 16- 16- 16- 16- 16 Sad 18- 18- 18- 18- 18- 18 20- 20- 20 20- 20- 20 22- 22- 22- 22- 22- 22 24- 24- s 24- 24- 24- 11 24 26- a 26- 15.26- 26- 4 t 26- G 26 • CI 28- 28- 28- 28- 28- °28 �ndaslly,-• 30- 30- 30- 30- 30- 30 32- 32- 32- 32- 32- 32 34- 34- 34- 34- 34- 34 36- 36- 36- 36- 36- 36 38- 38- 38- 38- 38- 38 i 40- 40 40- 40- 40- 40 Sllry aaM aa-• ell 42- 42- 42- 42- 42- 42 44- 44- 44- 44- 44- 44 i� 46- 46- 46 46- 46- 46 11 .I sad a slly • 48- 48- 481 48- 48- 48 50 • 50 d r 50 I5 50" 504 • i 50 . 0 200 0 1 0 10 20 0 10 20 30 40 50 60 0 500 1,000 0 4 8 12 16 Tip resistance(tsf) Friction(tsf) Pressure(psi) N60(blows/ft) Velocity(ft/s) SBTn(Robertson 1990) CPeT-IT v.2.0.1.16-CPTU data presentation&interpretation software-Report created on:8/25/2020,10:00:29 AM 0 Project lie:I:IPRWKt5129351-29400%29395011soundlrs,_8les.cpt This spreadsheet will calculate the height of a groundwater mound beneath a stormwater infiltration basin. More Information can be found in the U.S.Geological Survey Scientific Investigations Report 2010-5102"Simulation of groundwater mounding beneath hypothetical stormwater infiltration basins". The user must specify infiltration rate(R),specific yield(Sy),horizontal hydraulic conductivity(Kh),basin dimensions(x,y),duration of infiltration period(t),and the initial thickness of the saturated zone(hi(0),height of the water table if the bottom of the aquifer is the datum).Fora square basin the half width equals the half length(x=y).For a rectangular basin,if the user wants the water-table changes perpendicular to the long side,specify x as the short dimension and y as the long dimension.Conversely,if the user wants the values perpendicular to the short side,specify y as the short dimension,x as the long dimension.All distances are from the center of the basin. Users can change the distances from the center of the basin at which water-table aquifer thickness are calculated. Cells highlighted in yellow are values that can be changed by the user.Cells highlighted in red are output values based on user-specified inputs.The user MUST click the blue "Re-Calculate Now"button each time ANY of the user-specified inputs are changed otherwise necessary iterations to converge on the correct solution will not be done and values shown will be incorrect.Use consistent units for all input values(for example,feet and days) use consistent units(e.g.feet&days or inches&hours) Conversion Table Input Values inch/hour feet/day 0.1667 R Recharge(infiltration)rate(feet/day) 0.67 1.33 0.320 Sy Specific yield,Sy(dimensionless,between 0 and 1) 107:60 K Horizontal hydraulic conductivity,Kh (feet/day)* 2.00 4.00 In the report accompanying this spreadsheet 150.000 x 1/2 length of basin(x direction,in feet) (USGS SIR 2010-5102),vertical soil permeability 15.600 Y 1/2 width of basin(y direction,in feet) hours days (ft/d)Is assumed to be one-tenth horizontal 0300 t duration of infiltration period(days) 36 1.50 hydraulic conductivity(ft/d). 43.500 hi(0) initial thickness of saturated zone(feet) I 43.54S I h(max) maximum thickness of saturated zone(beneath center of basin at end of infiltration period) L 6.04 si Oh(max) maximum groundwater mounding(beneath center of basin at end of infiltration period) Ground- Distance from water center of basin Mounding,in in x direction,In feet feet fi; a Re-Calculate Now 6u 1. Groundwater Mounding,in feet .` 2I 710 0.050 7 y.. 90 - _ :Oda 100 0.035 • -® .—.—__..,...- _.-.._ ...--._.,.....r,�__.® 4 . . 0.030 - __.0Oi4 120 0.025 -----' --- .— _ 0.020 0.015 --- 0,010 • --_— ----- 0.005 - _._._... 0.000 --— — 0 20 40 60 50 100 120 140 Disclaimer --- - This spreadsheet solving the Hantush(1967)equation for ground-water mounding beneath an infiltration basin is made available to the general public as a convenience for those wishing to replicate values documented in the USGS Scientific Investigations Report 2010-5102"Groundwater mounding beneath hypothetical stormwater infiltration basins"or to calculate values based on user-specified site conditions.Any changes made to the spreadsheet(other than values identified as user-specified)after transmission from the USGS could have unintended, undesirable consequences.These consequences could include,but may not be limited to: erroneous output,numerical instabilities,and violations of underlying assumptions that are inherent in results presented in the accompanying USGS published report.The USGS assumes no responsibility for the consequences of any changes made to the spreadsheet.If changes are made to the spreadsheet,the user is responsible for documenting the changes and justifying the results and conclusions. Important Information about This • • • ,-- GeotechnicalEngineepuig Report Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes. While you cannot eliminate all such risks, you can manage them. The following information is provided to help. The Geoprofessional Business Association (GBA) Typical changes that could erode the reliability of this report include has prepared this advisory to help you—assumedly those that affect a client representative—interpret and apply this • the site's size or shape; geotechnical-engineering report as effectively • the function of the proposed structure,as when it's as possible.In that way,clients can benefit from changed from a parking garage to an office building,or from a light industrial plant to a refrigerated warehouse; a lowered exposure to the subsurface problems • the elevation,configuration,location,orientation,or that,for decades,have been a principal cause of weight of the proposed structure; construction delays, cost overruns,claims,and • the composition of the design team;or disputes. If you have questions or want more • project ownership. Information about any of the issues discussed below, contact your GBA-member geotechnical engineer. As a general rule,always inform your geotechnical engineer of project Active involvement in the Geoprofessional Business changes-even minor ones-and request an assessment of their Association exposes geotechnical engineers to a impact.The geotechnkal engineer who prepared this report cannot accept wide array of risk-confrontation techniques that can responsibility or liability for problems that arise because the geotechnical be of genuine benefit for everyone involved with a engineer was not informed about developments the engineer otherwise construction project. would have considered. This Report May Not Be Reliable Geotechnical-Engineering Services Are Performed for Do not rely on this report if your geotechnical engineer prepared it: Specific Purposes, Persons, and Projects • for a different client; Geotechnical engineers structure their services to meet the specific • for a different project; needs of their clients.A geotechnical-engineering study conducted for a different site(that may or may not include all or a for a given civil engineer will not likely meet the needs of a civil- portion of the original site);or works constructor or even a different civil engineer.Because each • before important events occurred at the site or adjacent geotechnical-engineering study is unique,each geotechnical- to it;e.g.,man-made events like construction or engineering report is unique,prepared solely for the client.Those who environmental remediation,or natural events like floods, rely on a geotechnical-engineering report prepared for a different client droughts,earthquakes,or groundwater fluctuations. can be seriously misled.No one except authorized client representatives should rely on this geotechnical-engineering report without first Note,too,that it could be unwise to rely on a geotechnical-engineering conferring with the geotechnical engineer who prepared it.And no one report whose reliability may have been affected by the passage of time, -not even you-should apply this report for any purpose or project except because of factors like changed subsurface conditions;new or modified the one originally contemplated. codes,standards,or regulations;or new techniques or tools.If your geotechnical engineer has not indicated an apply-by"date on the report, Read this Report in Full ask what it should be,and,in general,if you are the least bit uncertain Costly problems have occurred because those relying on a geotechnical- about the continued reliability of this report,contact your geotechnical engineering report did not read it in its entirety.Do not rely on an engineer before applying it.A minor amount of additional testing or executive summary.Do not read selected elements only.Read this report analysis-if any is required at all-could prevent major problems. in full. Most of the "Findings" Related in This Report Are You Need to Inform Your Geotechnical Engineer Professional Opinions about Change Before construction begins,gcotechnical engineers explore a site's Your geotechnical engineer considered unique,project-specific factors subsurface through various sampling and testing procedures. when designing the study behind this report and developing the Geotechnical engineers can observe actual subsurface conditions only at confirmation-dependent recommendations the report conveys.A few those specific locations where sampling and testing were performed.The typical factors include: data derived from that sampling and testing were reviewed by your • the client's goals,objectives,budget,schedule,and geotechnical engineer,who then applied professional judgment to risk-management preferences; form opinions about subsurface conditions throughout the site.Actual • the general nature of the structure involved,its size, sitewide-subsurface conditions may differ-maybe significantly-from configuration,and performance criteria; those indicated in this report.Confront that risk by retaining your • the structure's location and orientation on the site;and geotechnical engineer to serve on the design team from project start to • other planned or existing site improvements,such as project finish,so the individual can provide informed guidance quickly, retaining walls,access roads,parking lots,and whenever needed. underground utilities. J This Report's Recommendations Are perform their own studies if they want to,and be sure to allow enough Confirmation-Dependent time to permit them to do so.Only then might you be in a position The recommendations included in this report-including any options to give constructors the information available to you,while requiring or alternatives-are confirmation-dependent.In other words,they are them to at least share some of the financial responsibilities stemming not final,because the geotechnical engineer who developed them relied from unanticipated conditions.Conducting prebid and preconstruction heavily on judgment and opinion to do so.Your geotechnical engineer conferences can also be valuable in this respect. can finalize the recommendations only after observing actual subsurface conditions revealed during construction.If through observation your Read Responsibility Provisions Closely geotechnical engineer confirms that the conditions assumed to exist Some dient representatives,design professionals,and constructors do actually do exist,the recommendations can be relied upon,assuming not realize that geotechnical engineering is far less exact than other no other changes have occurred.The geotechnical engineer who prepared engineering disciplines.That lack of understanding has nurtured this report cannot assume responsibility or liability for confirmation- unrealistic expectations that have resulted in disappointments,delays, dependent recommendations if you fail to retain that engineer to perform cost overruns,claims,and disputes.To confront that risk,geotechnical construction observation. engineers commonly include explanatory provisions in their reports. Sometimes labeled"limitations,many of these provisions indicate This Report Could Be Misinterpreted where geotechnical engineers'responsibilities begin and end,to help Other design professionals'misinterpretation of geotechnical- others recognize their own responsibilities and risks.Read these engineering reports has resulted in costly problems.Confront that risk provisions closely.Ask questions.Your geotechnical engineer should by having your geotechnical engineer serve as a full-time member of the respond fully and frankly. design team,to: • confer with other design-team members, Geoenvironmental Concerns Are Not Covered • help develop specifications, The personnel,equipment,and techniques used to perform an • review pertinent elements of other design professionals' environmental study-e.g.,a"phase-one"or"phase-two"environmental plans and specifications,and site assessment-differ significantly from those used to perform • be on hand quickly whenever geotechnical-engineering a geotechnical-engineering study.For that reason,a geotechnical- guidance is needed. engineering report does not usually relate any environmental findings, conclusions,or recommendations;e.g.,about the likelihood of You should also confront the risk of constructors misinterpreting this encountering underground storage tanks or regulated contaminants. report.Do so by retaining your geotechnical engineer to participate in Unanticipated subsurface environmental problems have led to project prebid and preconstruction conferences and to perform construction failures.If you have not yet obtained your own environmental observation. information,ask your geotechnical consultant for risk-management guidance.As a general rule,do not rely on an environmental report Give Constructors a Complete Report and Guidance prepared for a different dient,site,or project,or that is more than six Some owners and design professionals mistakenly believe they can shift months old. unanticipated-subsurface-conditions liability to constructors by limiting the information they provide forbid preparation.To help prevent Obtain Professional Assistance to Deal with Moisture the costly,contentious problems this practice has caused,indude the Infiltration and Mold complete geotechnical-engineering report,along with any attachments While your geotechnical engineer may have addressed groundwater, or appendices,with your contract documents,but be certain to note water infiltration,or similar issues in this report,none of the engineer's conspicuously that you've included the material for informational services were designed,conducted,or intended to prevent uncontrolled purposes only.To avoid misunderstanding,you may also want to note migration of moisture-induding water vapor-from the soil through that"informational purposes"means constructors have no right to rely building slabs and walls and into the building interior,where it can on the interpretations,opinions,conclusions,or recommendations in cause mold growth and material-performance deficiencies.Accordingly, the report,but they may rely on the factual data relative to the specific proper implementation of the geotechnical engineer's recommendations times,locations,and depths/elevations referenced. Be certain that will not of itself be sufficient to prevent moisture infiltration.Confront constructors know they may learn about specific project requirements, the risk of moisture infiltration by including building-envelope or mold including options selected from the report,only from the design specialists on the design team.Geotechnical engineers are not building- drawings and specifications.Remind constructors that they may envelope or mold specialists. GEOPROFESSIONAL s BUSIr ESS B * ASSOCIATION Telephone:301/565.2733 e-mail:info@geoprofessional.org www.geoprofessional.org Copyright 2016 by Geoprofessional Business Association(GBA).Duplication,reproduction,or copying of this document,in whole or i n part,by any means whatsoever,Is strictly prohibited,except with GBAs specific written permission.Excerpting,quoting,or otherwise extracting wording from this document is perr:stted only with the express written permission of GBA,and only for purposes of scholarly research or book review.Only members of GBA may use this document or its wording as a complement to or as an element of a report of any kind.Any other firm,individual,or other entity that so uses this document without being a GBA member could be committing negligent