HomeMy WebLinkAboutSW6231109_Supplemental Info Review_20240315 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 3/15/2024 10:51:53 AM (Supplemental Submittal)
Accept by Kaitlin Peck 3/15/2024 12:32:35 PM (Supplemental Info Submittal)
• The task was assigned to Kaitlin Peck 3/15/2024 10:51:54 AM
=DEQ •
Submittal from 3/15/2024
Permit Information:
Please provide specific permit details below.
................................................................................................................................................................................................................................................................................................................................................................................................
What Type of Permit? Choose one:
* NPDES Industrial or MS4 Permit
State Stormwater(Post-Construction)Permit
Other
Permit Number* SW6231109
Begins with"SW","NCG",or"NCS"
What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact.
the Primary Contact? Central Office
*
Washington Regional Office(Attn: Carl Dunn)
Wilmington Regional Office(Attn:Christine Hall)
................................................................................................................................................................................................................................................................................................................................................................................................
Project Name* Barker Laydown Yard(Cumberland)
Owner/Operator* Duke Energy Progress, LLC
County: Cumberland
Submitter Name:* Zachary Eulo, PE
Who is submitting this information?
E-mail Address:* Zeulo@dewberry.com
Phone Number* 9194257610
Additional E-mail for nuwan.wijesuriya@duke-energy.com
Submittal (Optional)
Confirmation:
State Stormwater (Post-Construction) Information Uploads
Choose file type and upload attachment(Reviewer may remove unnecessary submittals)
File Type* Application Form
File Upload Click the upload button,or drag and drop files to attach
1—Barker Laydown_Stormwater Application and
1.29MB
Supplemental_Rev1.pdf
Only PDF files are accepted.
File Type* BUA Allocations
File Upload Click the upload button,or drag and drop files to attach
2—Barker Laydown_BUA Allocations_Rev1.pdf 75.99KB
Only PDF files are accepted.
File Type* Construction Sequence
File Upload Click the upload button,or drag and drop files to attach
3—Barker Laydown_Construction
68.22KB
Sequence_Revl.pdf
Only PDF files are accepted.
File Type* Design Calculations
File Upload Click the upload button,or drag and drop files to attach
4—Barker Laydown_Stormwater Calcs_Revl.pdf 1.35MB
Only PDF files are accepted.
File Type* O&M Agreement/Plan
File Upload Click the upload button,or drag and drop files to attach
6—Barker Laydown_0-M-EZ-20201215-2.1--3-
316.54K6
(1)_Revl.pdf
Only PDF files are accepted.
File Type* Plansheet-Cover Sheet
File Upload Click the upload button,or drag and drop files to attach
8.1_Barker Laydown_Cover Sheet_Revl.pdf 2.82MB
Only PDF files are accepted.
File Type* Plansheet-Proposed Conditions/Site Plan
File Upload Click the upload button,or drag and drop files to attach
8.3_Barker Laydown_Site Plan Sheet_Revl.pdf 1.62MB
Only PDF files are accepted.
File Type* Plansheet-Grading/Drainage Plan
File Upload Click the upload button,or drag and drop files to attach
8.4_Barker Laydown_Drainage_Grading
1.62M6
Plan_Revl.pdf
Only PDF files are accepted.
File Type* Plansheet-Proposed Drainage Area
File Upload Click the upload button,or drag and drop files to attach
8.4_Barker Laydown_Drainage_Grading
1.62M6
Plan_Revl.pdf
Only PDF files are accepted.
File Type* Plansheet-Misc. Detail
File Upload Click the upload button,or drag and drop files to attach
8.5_Barker Laydown_Misc Detail_Revl.pdf 5.73MB
Only PDF files are accepted.
File Type* Response To Comments
File Upload Click the upload button,or drag and drop files to attach
10_Barker Laydown_Comment Response_Revl.pdf 208.29KB
Only PDF files are accepted.
File Type* Stormwater Narrative
File Upload Click the upload button,or drag and drop files to attach
13_Barker Laydown_Stormwater Narrative_Rev1.pdf 81.29KB
Only PDF files are accepted.
File Type* Stormwater Report
File Upload Click the upload button,or drag and drop files to attach
14_Barker Laydown_NCDEQ Stormwater
15.16MB
Report_Rev1.pdf
Only PDF files are accepted.
File Type* Supplement-EZ Form
File Upload Click the upload button,or drag and drop files to attach
15_Barker Laydown_SuppEZ-2020-Version-2.1.3
589.87K6
20201203-D E M L R-S W_Rev 1.pd f
Only PDF files are accepted.
Is this project funded No
with ARPA grant Yes
funds?*
Uploads contain NO
Confidential YES
Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant
or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided
by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)].
Notes about the attachments:
Revised submittal based on comments received from Jim Farkas on 2/20/24.
* By checking the box and signing box below, I certify that:
o I have given true,accurate,and complete information on this form;
o I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the
NC General Statutes(the"Uniform Electronic Transactions Act)
o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes
(the"Uniform Electronic Transactions Act');
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature;AND
o I intend to electronically sign and submit the Supplemental Information Upload form.
Full Name:* Zachary Eulo
Signature:
�r/rrr tf�i�lo
Date Submitted: 03/15/2024
Initial Review
Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary.
SW6231109
Who needs a Copy?* Reviewer selections will only be required for offices checked here.
Central Office Staff
Regional Office Stormwater Contact
State Stormwater RO Staff
No Copy Needed
Central Office Reviewer:*
Notifies CO Staff with Email
Jim Farkas
Any Comments or
Added Info for CO
Staff Reviewer?
Review Date* 03/15/2024