Loading...
HomeMy WebLinkAboutSW6231109_Supplemental Info Review_20240315 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 3/15/2024 10:51:53 AM (Supplemental Submittal) Accept by Kaitlin Peck 3/15/2024 12:32:35 PM (Supplemental Info Submittal) • The task was assigned to Kaitlin Peck 3/15/2024 10:51:54 AM =DEQ • Submittal from 3/15/2024 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................ What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit State Stormwater(Post-Construction)Permit Other Permit Number* SW6231109 Begins with"SW","NCG",or"NCS" What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................ Project Name* Barker Laydown Yard(Cumberland) Owner/Operator* Duke Energy Progress, LLC County: Cumberland Submitter Name:* Zachary Eulo, PE Who is submitting this information? E-mail Address:* Zeulo@dewberry.com Phone Number* 9194257610 Additional E-mail for nuwan.wijesuriya@duke-energy.com Submittal (Optional) Confirmation: State Stormwater (Post-Construction) Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) File Type* Application Form File Upload Click the upload button,or drag and drop files to attach 1—Barker Laydown_Stormwater Application and 1.29MB Supplemental_Rev1.pdf Only PDF files are accepted. File Type* BUA Allocations File Upload Click the upload button,or drag and drop files to attach 2—Barker Laydown_BUA Allocations_Rev1.pdf 75.99KB Only PDF files are accepted. File Type* Construction Sequence File Upload Click the upload button,or drag and drop files to attach 3—Barker Laydown_Construction 68.22KB Sequence_Revl.pdf Only PDF files are accepted. File Type* Design Calculations File Upload Click the upload button,or drag and drop files to attach 4—Barker Laydown_Stormwater Calcs_Revl.pdf 1.35MB Only PDF files are accepted. File Type* O&M Agreement/Plan File Upload Click the upload button,or drag and drop files to attach 6—Barker Laydown_0-M-EZ-20201215-2.1--3- 316.54K6 (1)_Revl.pdf Only PDF files are accepted. File Type* Plansheet-Cover Sheet File Upload Click the upload button,or drag and drop files to attach 8.1_Barker Laydown_Cover Sheet_Revl.pdf 2.82MB Only PDF files are accepted. File Type* Plansheet-Proposed Conditions/Site Plan File Upload Click the upload button,or drag and drop files to attach 8.3_Barker Laydown_Site Plan Sheet_Revl.pdf 1.62MB Only PDF files are accepted. File Type* Plansheet-Grading/Drainage Plan File Upload Click the upload button,or drag and drop files to attach 8.4_Barker Laydown_Drainage_Grading 1.62M6 Plan_Revl.pdf Only PDF files are accepted. File Type* Plansheet-Proposed Drainage Area File Upload Click the upload button,or drag and drop files to attach 8.4_Barker Laydown_Drainage_Grading 1.62M6 Plan_Revl.pdf Only PDF files are accepted. File Type* Plansheet-Misc. Detail File Upload Click the upload button,or drag and drop files to attach 8.5_Barker Laydown_Misc Detail_Revl.pdf 5.73MB Only PDF files are accepted. File Type* Response To Comments File Upload Click the upload button,or drag and drop files to attach 10_Barker Laydown_Comment Response_Revl.pdf 208.29KB Only PDF files are accepted. File Type* Stormwater Narrative File Upload Click the upload button,or drag and drop files to attach 13_Barker Laydown_Stormwater Narrative_Rev1.pdf 81.29KB Only PDF files are accepted. File Type* Stormwater Report File Upload Click the upload button,or drag and drop files to attach 14_Barker Laydown_NCDEQ Stormwater 15.16MB Report_Rev1.pdf Only PDF files are accepted. File Type* Supplement-EZ Form File Upload Click the upload button,or drag and drop files to attach 15_Barker Laydown_SuppEZ-2020-Version-2.1.3 589.87K6 20201203-D E M L R-S W_Rev 1.pd f Only PDF files are accepted. Is this project funded No with ARPA grant Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: Revised submittal based on comments received from Jim Farkas on 2/20/24. * By checking the box and signing box below, I certify that: o I have given true,accurate,and complete information on this form; o I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act) o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Zachary Eulo Signature: �r/rrr tf�i�lo Date Submitted: 03/15/2024 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. SW6231109 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Central Office Reviewer:* Notifies CO Staff with Email Jim Farkas Any Comments or Added Info for CO Staff Reviewer? Review Date* 03/15/2024