Loading...
HomeMy WebLinkAboutSW3240303_Design Calculations_20240308 ue ENGINsEERING SITE IMPROVEMENTS FOR TA TRUCK STOP In Town of Spencer, North Carolina COMPREHENSIVE STORMWATER POLLUTION PREVENTION PLAN (C-SWPPP) SWPPP Preparer: Primary Permittee: Fulfilled Engineering LLC AGS Salisbury, LLC 146 Leisure Lane, Suite A I Columbia, SC 29210 Mr. Harry Singh P.O. Box 2088 I Lexington, SC 29071 12051 Retail Drive Ph: 803-612-3940 Fax: 803-845-3372 Wake Forest, NC 27587 fulfilledengineering.com Ph: 804-605-8248 Project Location: Approx. 1007 Long Ferry Road Salisbury, NC 28144 C-SWPPP Date: March 1, 2024 Modification Date: N/A FE No. 22008 it* 44 * <4 44 # i» 41/4,44 4 i > :4> 44 <4** 4,45), 44 4 44 44 L vc ue ENGINEERING SITE IMPROVEMENTS FOR TA TRUCK STOP In Town of Spencer, North Carolina COMPREHENSIVE STORMWATER POLLUTION PREVENTION PLAN (C-SWPPP) SWPPP Preparer: Primary Permittee: Fulfilled Engineering LLC AGS Salisbury, LLC 146 Leisure Lane, Suite A I Columbia, SC 29210 Mr. Harry Singh P.O. Box 2088 I Lexington, SC 29071 12051 Retail Drive Ph: 803-612-3940 Fax: 803-845-3372 Wake Forest, NC 27587 fulfilledengineering.com Ph: 804-605-8248 Project Location: Approx. 1007 Long Ferry Road Salisbury, NC 28144 C-SWPPP Date: March 1, 2024 Modification Date: N/A FE No. 22008 it* 44 * <4 44 # i» 41/4,44 4 i > :4> 44 <4** 4,45), 44 4 44 44 L vc C-SWPPP Fulfilled Engineering LLC TABLE OF CONTENTS 1.0 PROJECT OVERVIEW 1 1.1 Narrative (CGP Section 3.2.1) 1 1.2 Stormwater Management and Sediment Control (CGP Section 3.2.2) 2 1.2.1 Minimize Disturbed Area and Protect Natural Features and Soil. 2 1.2.2 Control Flowing onto and Through the Project 2 1.2.3 Stabilize Soils 3 1.2.4 Protect Slopes: 3 1.2.5 Protect Storm Drain Inlets: 4 1.2.6 Establish Perimeter Controls and Sediment Barriers 4 1.2.7 Retain Sediment On-Site and Control Dewatering Practices 5 1.2.8 Establish Stabilized Construction Exits 5 1.2.9 Additional BMPs 5 1.3 Sequence of Construction 6 1.4 Non-Numeric Effluent Limits 6 1.5 Buffer Zone Management 9 1.6 Certification Statement 10 2.0 SITE FEATURES AND SENSITIVE AREAS 11 2.1 Sources of Pollution 11 2.2 Surface Waters 12 2.3 Impairments and TMDLs 12 2.4 Critical Areas (CZC only) 12 3.0 COMPLIANCE REQUIREMENTS 13 3.1 SWPPP Availability 13 3.2 Pre-Construction Conferences 13 3.3 Inspection Requirements 13 3.4 Maintenance Requirements 13 3.5 Record Keeping 13 3.6 Final Stabilization 14 C-SWPPP Fulfilled Engineering LLC APPENDIX A: PROJECT MAPPING 15 APPENDIX B: INSPECTION LOG AND REPORTS 16 APPENDIX C: RAINFALL LOG AND REPORTS 19 APPENDIX D: ADDITIONAL SITE LOGS AND RECORDS 22 APPENDIX E: CONSTRUCTION GENERAL PERMITS NCG000000 31 APPENDIX F: COPY OF NOI AND NPDES APPROVAL 32 APPENDIX G: STORM DRAINAGE CALCULATIONS REPORT 33 APPENDIX H: CONSTRUCTION PHASE PLANS 34 Fii C-SWPPP Fulfilled Engineering LLC 1.0 PROJECT OVERVIEW 1.1 Narrative (CGP Section 3.2.1) AGS Salisbury, LLC is proposing a TA Truck Stop on an approximately 32.99-acre property that will have approximately 25.1-acres of disturbance as part of the proposed improvements. The proposed TA Truck Stop is currently proposed to have a 20,000-SF C-Store, an 11,100-SF tractor trailer maintenance building, car pumps,truck pumps, 81 regular parking spaces, and 196 tractor trailer spaces. A detailed construction sequence has been included in the construction drawings. The site currently consists of vacant existing residential homes, existing woods and grass in fair condition and existing tributaries. Most of the parcel's topography generally slopes from the northwest to the southeast draining to an existing perennial stream towards the southeastern portion of the property. The project site is located at the intersection of Long Ferry Road and Montclair Drive in the Town of Spencer, Rowan County, North Carolina; see the Site Location Map and Aerial Map in Appendix A. The stormwater for the proposed development will drain to a proposed retention basin that will discharge the stormwater at a rate less than that of the pre-developed site for the 2-year, 10-year and 25-year storms. See Tables 1.1.1 - 1.1.3 for the summary of pre/post discharge flows. The full storm drainage calculation report can be found in Appendix H. Table 1.1.1 Pre/Post-Development Peak Flowrate Summary (Outfall 1) OUTFALL 1 Storm Event Pre-Dev Peak Post-Dev Peak Flow (cfs) Flow (cfs) 2-year, 24-hour 33.97 27.28 10-year, 24-hour 78.43 70.89 25-year, 24-hour 106.55 99.98 100-year, 24-hour 146.07 138.46 Table 1.1.2 Pre/Post-Development Peak Flowrate Summary (Outfall 2) OUTFALL 2 Storm Event Pre-Dev Peak Post-Dev Peak Flow (cfs) Flow (cfs) 2-year, 24-hour 0.52 0.12 10-year, 24-hour 1.28 0.30 25-year, 24-hour 1.79 0.41 100-year, 24-hour 2.51 0.56 II 1 C-SWPPP Fulfilled Engineering LLC Table 1.1.3 Pre/Post-Development Peak Flowrate Summary (Outfall 3) OUTFALL 3 Storm Event Pre-Dev Peak Post-Dev Peak Flow (cfs) Flow (cfs) 2-year, 24-hour 8.36 8.24 10-year, 24-hour 16.25 16.10 25-year, 24-hour 20.94 20.79 100-year, 24-hour 27.37 27.15 1.2 Stormwater Management and Sediment Control (CGP Section 3.2.2) 1.2.1 Minimize Disturbed Area and Protect Natural Features and Soil: See the Construction Phase Plans for description and location of BMPs. See Construction Details sheets for how to install the BMPs. Reference the general sequencing notes on the Construction Phase Plans and General Notes & References sheets for installation scheduling. Reference the Sediment and Erosion Control notes on the General Notes & References sheets and Construction Details sheets for specific instructions on minimum installation, maintenance, and inspection requirements. Minimal clearing and the installation of BMPs shall precede the mass clearing delineated by the clearing limits as shown and noted on the Construction Phase Plans. Installations shall be governed by the specifications and details shown on the Construction Details sheets and as noted on the General Notes and References sheets. Installation and maintenance logs shall be kept by the staff responsible for installation and maintenance. The inspection logs shall be kept on a scheduled basis as deemed proper for the site by the designated sediment & erosion control inspector. Maintenance schedules shall be set through inspections by the designated NCDEQ certified sediment & erosion control inspector. See the Construction Phase Plans for: BMP placement, description, inspection and maintenance. See the Construction Details sheets for construction details and description of BMPs. See the Construction Phase Plans and General Notes & References sheets for construction sequence and planned BMP installation schedule. See the General Notes and References sheets and details for notes regarding erosion control methods to be implemented and best management practices to be followed should it become necessary to add temporary measures that do not affect the Construction Phase Plans as designed. They shall be installed in accordance with the details and notes in the plan. Should there be a specific temporary problem, prior to implementation of the plan BMPs, which the party held responsible for the installation and maintenance of the BMPs cannot readily solve, the manager and SWPPP preparer shall be contacted for advice and/or revision of the plans if necessary. Plan revision logs shall be kept by the NCDEQ certified sediment & erosion control inspector. The SWPPP manager will issue drawings with revision dates and a brief reason in the revision box area of each plan affected. 1.2.2 Control Flowing onto and Through the Project II 2 C-SWPPP Fulfilled Engineering LLC See the Construction Phase Plans for description and location of BMPs. See the Construction Details and General Notes & References sheets for installation details for BMPs. Reference the general sequencing notes on the General Notes & References sheets for installation scheduling. Reference the Sediment and Erosion Control notes on the General Notes & References sheets and details for specific instructions on minimum installation, maintenance, and inspection requirements. BMP Description: • Silt Fencing • Rip Rap Velocity Breaker • Construction Exit • Grassing Installation Schedule: • See Construction Sequence 1.2.3 Stabilize Soils See the Construction Phase Plans for description and location of BMPs. See the Construction Details sheets for installation details for BMPs. Reference the general sequencing notes on the General Notes & References sheets for installation scheduling. Reference the Sediment and Erosion Control notes on the General Notes & References sheets and details for specific instructions on minimum installation, maintenance and inspection requirements. There is a section on how to select the proper ground cover (grassing). BMP Description: • Permanent & Temporary Grassing Installation Schedule: • See Construction Sequence Maintenance and Inspection: • See Notes on General Notes & References sheets Responsible Staff: • Appointed Personnel 1.2.4 Protect Slopes: See the Construction Phase Plans for description and location of BMPs. See the Construction Details for installation details for BMPs. Reference the general sequencing notes on the General Notes & References sheets for installation scheduling. Reference the Sediment and Erosion Control notes on the General Notes & References sheets and details for specific instructions on minimum installation, maintenance, and inspection requirements. BMP Description: • Sediment Fence • Rip Rap Velocity Breaker • Erosion Control Fabric • Grassing II 3 C-SWPPP Fulfilled Engineering LLC Installation Schedule: • See Construction Sequence Maintenance and Inspection: • See Notes on General Notes & References sheets Responsible Staff: • To Be Determined 1.2.5 Protect Storm Drain Inlets: See the Construction Phase Plans for description and location of BMPs. See the Construction Details for installation details for BMPs. Reference the general sequencing notes on the General Notes & References sheets for installation scheduling. Reference the Sediment and Erosion Control notes on the General Notes & References sheets and details for specific instructions on minimum installation, maintenance, and inspection requirements. BMP Description: • Inlet Protection Installation Schedule: • See Construction Sequence. Maintenance and Inspection: • See Notes on General Notes & References sheets Responsible Staff: • Appointed Personnel 1.2.6 Establish Perimeter Controls and Sediment Barriers See the Construction Phase Plans for description and location of BMPs. See the Construction Details sheets for installation details for BMPs. Reference the general sequencing notes on the General Notes & References sheets for installation scheduling. Reference the Sediment and Erosion Control notes on the General Notes & References sheet and details for specific instructions on minimum installation, maintenance and inspection requirements. BMP Description: • Gravel Construction Exit • Locate Clearing Limit • Sediment Fence Installation Installation Schedule: • Prior to Land Disturbance Maintenance and Inspection: • See Notes on General Notes & References sheets Responsible Staff: • Appointed Personnel II 4 C-SWPPP Fulfilled Engineering LLC 1.2.7 Retain Sediment On-Site and Control Dewatering Practices See the Construction Phase Plans for description and location of BMPs. See the Construction Details sheets for installation details for BMPs. Reference the general sequencing notes on the General Notes & References sheets for installation scheduling. Reference the Sediment and Erosion Control notes on the General Notes & References sheets and details for specific instructions on minimum installation, maintenance, and inspection requirements. Should it become necessary to pump water offsite to drain, the pump discharge shall be filtered of sediment before discharge to any offsite location. BMP Description: • Sediment Fence Installation Installation Schedule: • Prior To Land Disturbance Maintenance and Inspection: • See Notes on General Notes & References sheets Responsible Staff: • Appointed Personnel 1.2.8 Establish Stabilized Construction Exits See the Construction Phase Plans for description and location of BMPs. See the Construction Details sheets for installation details for BMPs. Reference the general sequencing notes on the General Notes & References sheets for installation scheduling. Reference the Sediment and Erosion Control notes on the General Notes & References sheet and details for specific instructions on minimum installation, maintenance, and inspection requirements. Should it become necessary to re-establish or clean the construction exit to prevent tracking of mud offsite by vehicles leaving the site, the person responsible for maintenance shall determine the best method of maintenance up to and including removal and replacement of the temporary structure. BMP Description: • Gravel Construction Exit Installation Schedule: • Prior To Land Disturbance Maintenance and Inspection: • See Notes on General Notes & References sheets Responsible Staff: • To Be Determined 1.2.9 Additional BMPs Additional BMPs may be required for temporary control of sediment until the plan controls are completed or in case of failure. The SWPPP manager should be contacted to offer advice to the responsible party for installation and maintenance for temporary control measures specific to the II 5 C-SWPPP Fulfilled Engineering LLC problem encountered. Should properly installed and maintained plan BMPs fail, immediately contact the SWPPP manager for an on-site meeting and determination for plan revision and temporary measures to be implemented until the plan revision can be issued and installed. BMP Description: • As Necessary Installation Schedule: • Asap Maintenance and Inspection: • See General Notes & References sheets Responsible Staff: • Appointed Personnel 1.3 Se. uence of Construction The construction sequence for this project has been provided in the Construction Phase Plans of the construction site plans. Each item/step of that construction sequence has been listed is the sequence that they should be implemented. What is the function of the construction activity? n Residential X Commercial n Industrial Road Construction Linear Utility ❑ Other (please specify): Estimated Project Start Date: 7/3/2024 Estimated Project Completion Date: 7/3/2025 For additional information or questions on the sequencing please contact the SWPPP Preparer or the Permittee referenced on the cover of this SWPPP. 1.4 Non-Numeric Effluent Limits Stormwater Volume and Velocity Control During the remainder of construction activities, all responsible parties performing work at this construction site must be informed of and directed on how to comply with the Non-Numeric Effluent Limit, which requires the management of stormwater runoff within the construction site and at each outfall in order to control the stormwater volume and velocity to minimize soil erosion. Specifically, each responsible party should be made aware of the practices that have been or have yet to be implemented at the construction site to accomplish these particular stormwater management practices. Below is a list of practices that may be utilized within the disturbed area and at each outfall at construction sites to control stormwater volume and velocity, to the extent practicable: 6 C-SWPPP Fulfilled Engineering LLC Volume Control • Limiting of the Amount of Disturbed Area Not Stabilized at a Time; • Staging and/or Phasing of the Construction Sequence; • Sediment Basins and Sediment Traps • Diverting off-site flow around the construction site; • Controlling the Drainage Patterns within the Construction Site; • Temporary Stabilization of Disturbed Areas. Velocity Control • Surface Roughening and/or other Slope Stabilization Practices; • Level Spreaders, Riprap Plunge Pools and/or other Velocity Dissipation BMPS located at the Construction Site's and Sediment Basin Outfalls. • Use of Rock Checks, Sediment Tubes, Etc. in Temporary Diversions Swales and Ditches. • Use of Erosion Control Blankets, Turf Reinforcement Mats, and other Non-Vegetative BMPs that can be used to Quickly Stabilize Disturbed Areas. The SWPPP Preparer/Engineer should approve any modifications (Additional BMPs or Changes to Existing BMPs) to address the management of stormwater volume and velocity prior to implementation. The majority of approved SWPPPs, especially if approved under the 2006 CGP, should include ample BMPs and other control measures to address this specific Non-Numeric Effluent Limit. Soil Exposure, Compaction and Preservation Throughout the remainder of the construction activities, the amount of soil exposed during construction shall be kept to a minimum. This may be accomplished by reducing the disturbed area within the Limits of Disturbance (shown on the approved construction site plans) to only that which is necessary to complete the proposed work. For areas that have already been disturbed and where construction activities will not begin for a period of 14 days or more, temporary stabilization techniques must be implemented. Prior to implementation of any major grading activities, topsoil is to be preserved by placing it in areas designated as stockpiles until final grades are reached. Each stockpile must be equipped with proper Sediment and Erosion Controls to preserve the topsoil and protect adjacent areas from impacts. Once final grades have been reached, the preserved topsoil should be placed within all areas that are to be stabilized through temporary and permanent seeding techniques. The Compaction of Soil should also be avoided to the best extent practicable during all clearing and grading activities. This is especially important during the replacement of topsoil to aid in a quick establishment of vegetative cover. Soil Stabilization Throughout the remainder of the construction activities, soil stabilization techniques are to be implemented as soon as practicable whenever any clearing, grading, excavating, or other land- disturbing activities have permanently or temporarily ceased on any portion of the construction site and will not resume for a period exceeding 14 calendar days. For areas where initiating stabilization C-SWPPP Fulfilled Engineering LLC measures is infeasible, (e.g., where snow cover, frozen ground, or drought conditions preclude stabilization), initiate vegetative or non-vegetative stabilization measures as soon as practicable. Steep Slopes (Slopes of 30% grade or greater) All previously disturbed steep slopes (30% grade, —3H:1V, or greater), and steep slopes to be created through grading activities must be managed in a fashion that limits the potential of erosion along the slopes. All parties responsible whose work is/was responsible for the creation/disturbance of steep slopes must comply with the following items: • Minimize the Disturbance of all Steep Slopes, when possible. • Divert Concentrated or Channelized Flows of Stormwater Away From and Around Steep Slope Disturbances. • Use Specialized BMP Controls Including Temporary and Permanent Seeding with Soil Binders, Erosion Control Blankets, Surface Roughening, Reducing Continuous Slope Length with Terracing or Diversions, Gradient Terraces, Interceptor Dikes and Swales, Grass-Lined Channels, Pipe Slope Drains, Subsurface Drains, Level Spreaders, Check Dams, Seep Berms, and Triangular Silt Dikes to Minimize Erosion. • Initiated Stabilization Measures as soon as Practicable on any Disturbed Steep Slope Areas where Construction Activities have Permanently or Temporarily Ceased, and will not Resume for a Period Exceeding 7 Calendar Days. • A Vegetative and/or Non-Vegetative Cover must be established within 3 working Days from the Time that Stabilization Measures were initiated. Stabilization of disturbed steep slopes should be the first priority for those performing work at the construction site. At the very least, runoff control BMPs should be implemented to transport stormwater runoff from the top of the slope to the toe of the slope. An example of this is to install diversion swales along the top of slope the slope that direct runoff to pipe slopes drains, which are equipped proper outlet protection at the toe of the slope. Sediment Discharge Minimization Permittees, Contractors, and all other responsible parties for conducting land-disturbing activities are required to install and maintain all erosion and sediment BMPs that are located on the approved construction site plans. These BMPs have been designed and approved to address such factors as the amount, frequency, intensity and duration of precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soils particle sizes expected to be present on the construction site. Proper installation, inspection, and maintenance will allow these BMPs to operate at maximum efficiencies in order to minimize sediment discharges to the maximum extent practical. Pollutant Discharge Minimization Permittees, Contractors, and all other responsible parties for conducting land-disturbing activities are required to install, implement, and maintain effective Pollution Prevention measures to minimize the C-SWPPP Fulfilled Engineering LLC discharge of pollutants. At a minimum, the following items must be followed: Minimize the discharge of pollutants from dewatering trenches and excavations by managing runoff with the appropriate controls. Otherwise these discharges are prohibited; Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge; Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste and other materials present on the site to precipitation and to stormwater; and Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures. Prohibited Discharges Permittees, Contractors, and all other responsible parties for conducting land-disturbing activities are prohibited to discharges, from the construction site, the following items: • Wastewater from washout of concrete, unless managed by an appropriate control; • Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds and other construction materials; • Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and • Soaps or solvents used in vehicle and equipment washing. Non-Stormwater Discharges Any additional non-stormwater discharges, as referenced in the CGP, should be eliminated or reduced to the maximum extent feasible. All unpreventable non-stormwater discharges shall be treated through the approved stormwater management system before release off-site. The following is a list of allowable non-stormwater discharges: • Fire hydrant flushing • Wash water without detergents • Water used for dust control • Potable water • Building wash down water without detergents • Uncontaminated pavement wash water • Uncontaminated condensation from mechanical equipment • Uncontaminated ground or spring water • Water from foundation of footing drains • Uncontaminated excavation dewatering • Landscape irrigation 1.5 Buffer Zone Management There are jurisdictional wetlands on the southeastern portion of project site associated with perennial and intermittent tributaries. Additionally, there are existing shoreline wetlands associated with an II 9 C-SWPPP Fulfilled Engineering LLC existing pond on the southwestern most portion of the property. There will be no impact to the streams or ponds. However, averaging of the buffer will take place from pre- to post-development on the buffers associated with the perennial and intermittent tributaries. 1.6 Certification Statement "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Name: Dustin Johnson, PE, LEED AP ND Title: PROFESSIONAL ENGINEER Signature: Date: March 1, 2024 „so .\\-\ CAR() , = SEAL 52064 ST B. JOS N /',,,,,,,,,,,I,,``, 10 C-SWPPP Fulfilled Engineering LLC 2.0 SITE FEATURES AND SENSITIVE AREAS 2.1 Sources of Pollution Throughout construction activities, each permittee, contractor, and person responsible for conducting work will need to ensure that sources of pollution are managed to prevent their discharge from the construction site. Expected pollution sources during construction have been identified in Table 2.1-A, but due to the nature of construction activities, it is often tough to predict all pollution sources that may appear throughout the life of a construction project. For that reason, the following table has also been provided to help all those performing work at this construction site identify possible sources of pollution Stormwater runoff subjected to the identified pollution sources must be treated by the appropriate BM Ps as directed by this SWPPP. In the event that any additional sources of pollution are identified during construction, the person(s) with day-to-day operational control at the site is to add the new source(s) to Table 2.1-A and consult with the SWPPP Preparer to properly address this source and to prevent the discharge of its pollutant through stormwater runoff. Table 2.1-A: Potential Sources of Pollution Source Material or Location* Appropriate Control Measures Chemical Loose soil I As directed by the construction Plans. All areas within the exposed/disturbed during This includes Silt Fence, sediment Sediment Limits of clearing, grubbing and tubes, sediment basins, and sediment grading activities Disturbance traps. Areas where construction Located adjacent to equipment are cleaned, Heavy Metals & each construction Concrete Washout Basin as shown on a.k.a. concrete washout pH entrance the plans. Water encountered during Nutrients & In and around any Direct water into impoundments such trenching Sediment trenching activities. as basins or traps to allow for the sedimentation of the listed pollutants. All areas to be Paving Operations Sediment &Trash paved. Inlet protection. Nutrients, pH, Material Delivery and Sediment, Heavy All areas used as Silt fence and/or sediment dikes Storage Areas Metals, oils & storage areas grease Equipment fueling and Metals, Areas surrounding Provide secondary containments, maintenance areas hydrocarbons, oils fuel tanks locate in upland areas. Repair leaking and greases and broken hoses. Metal oxides, Throughout site, Stoddard primarily in areas of Washwater should be contained and is Paints solvent, talc, building prohibited from being discharged calcium- carbonate, arsenic construction *Area where material/chemical is used on site. 11 C-SWPPP Fulfilled Engineering LLC 2.2 Surface Waters The majority of the stormwater runoff from the proposed construction site outfalls to the southern portion of the site where it discharges into an existing wetlands area associated with a minor tributary while the remainder of the site outfalls towards the existing Triangle Town Boulevard and Town Drive right-of-ways. 2.3 Im .airments and TMDLs SEE NOI APPLICATION —APPENDIX G 2.4 Critical Areas (CZC onl ) N/A II12 C-SWPPP Fulfilled Engineering LLC 3.0 COMPLIANCE REQUIREMENTS 3.1 SWPPP Availability SWPPP will be located on site. 3.2 Pre-Construction Conferences SEE APPENDIX B 3.3 Inspection Requirements 1) Inspection Personnel: a) APPOINTED PERSONNEL, NCDEQ CERTIFIED INSPECTOR 2) Inspection Schedule and Procedures: a) Describe the inspection schedules. i) After construction activities begin, inspections must be conducted at a minimum of at least once every calendar week and must be conducted until final stabilization is reached on all areas of the construction site. b) Describe the general procedures for correcting problems when they are identified. Include responsible staff and timeframes for making corrections. i) Responsible staff: to be determined. Identified problems will be resolved as soon as possible. c) Attach a copy of the inspection report you will use for your site. i) APPENDIX C d) Attach a copy of the Rainfall Log i) APPENDIX D 3.4 Maintenance Requirements 1) Identify problem through inspection. 2) Determine if the problem is a maintenance issue or a design failure issue. (determine if the problem is temporary due to the incomplete installation of the plan BMPs before contacting the SWPPP manager incomplete installations can not be determined to be failing.) 3) Maintenance or repair should be performed as soon as practicable and before the next rain event if at all possible. 4) If the problem is suspected as design failure; a) Do maintenance/repair and install temporary measures as necessary. b) Contact the SWPPP manager. 5) Corrective action log a) See Appendix E 3.5 Record Keeping The following records will be kept onsite and available for inspectors to review: II13 C-SWPPP Fulfilled Engineering LLC 1) Dates of grading, construction activity, and stabilization a) APPENDIX E 2) A copy of the construction general permit a) APPENDIX F 3) The signed and certified NOI form or permit application form a) APPENDIX G 4) A copy of the letter from the EPA/State notifying you of their receipt of your complete NOI/application a) APPENDIX G 5) Inspection reports a) APPENDIX C Dates when major grading activities occur: Description of Activity Date Started Date Completed Dates when construction activities temporarily or permanently cease on a portion of the site Description of Activity Date Started Date Completed 3.6 Final Stabilization SEE SWPPP SOIL STABILIZATION LOG IN APPENDIX E II14 C-SWPPP Fulfilled Engineering LLC APPENDIX A: PROJECT MAPPING II15 set, l ,e'-` v I ''may y t'' ('` I B Tu "o ti' 'J N., 4 S�Pr PROPOSED PROJECT �Ra ,eNit BOUNDARY(APPROX.) � ili _ rZ. it_4" y q ...„... r- ,.. 0, . Q, ,0 ,,,,,,c. or "2r'Qer ... r , .` .r v Ira 4. f 4 Q 1 r Itr_ a. r Ia� a''� Creek 4 V' r € PeW 79 ter' LOCATION MAP Ffulfilled TOWN OF SPENCER 1°°° 2000 TA TRUCK STOP ENGINEERINGSCALE IN FEET Fulfilled Projects. Fulfilling Mission. TOWN OF SPENCER, +/-32.85 ACRES PROJECT NO.22008 NORTH CAROLINA REFERENCE:GOOGLE MAPS F _ r • • r, Y PROPOSED PROJECT - BOUNDARY(APPROX.) - f 'xn ',__ v-''' dp , , i ` 8- . r r • i 11 yi y _ /) i i I i7' ii 1 Jr- ' 1 i • i . AERIAL MAP Flf u If i I led TOWN OF SPENCER 1000 2000 TA TRUCK STOP " ENGINEERINGSCALE IN FEET Fulfilled Projects. Fulfilling Mission. TOWN OF SPENCER, +/-32.85 ACRES PROJECT NO.22008 NORTH CAROLINA REFERENCE:GOOGLE MAPS NV PROPOSED PROJECT BOUNDARY(APPROX.) i-, .1, Iti til r:E3 f''\ • . Goa j • f 1 ,))./If EnB • r,/1 • Rn � EnC • p fit . . .Vi ,:--4 . SOILS MAP f u If i I led TOWN OF SPENCER 0 500 °°° F TA TRUCK STOP " 1 ENGINEERINGSCALE IN FEET Fulfilled Projects. Fulfilling Mission. TOWN OF SPENCER, +/-32.85 ACRES PROJECT NO.22008 NORTH CAROLINA REFERENCE: NRCS WEB SOIL SURVEY i Rowan County Davidson STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM 1 sa0o0o FEET GRANTS CREEK Unincorporated Areas -, JOINS PANEL 5782 °23,aa, Unincorporated�3 Areas LEGEND i fo`�Nam-— 55 9o•24'so' 554mn^^ eo•24'bo 555 1 587 roo FEET 9o°23'da' 1 580000 FEET SPECIAL FLOOD HAZARD AREAS (SFHAs) SUBJECT TO 1 720 ooa FEET .,,, no aoo FEET INUNDATION BY THE 1%ANNUAL CHANCE FLOOD EVENT I - 'L fr The 1%annual chance flood(100-year flood),also known as the base flood,Is the flood that 39530m" 6, i .,¢ �, ZONE X çNOUNT DAME � ZONE A No Base N CO fVT TY ZONE AE BaseFlood oCievaldons de ermineevation d. / ZON E AE k 20NE AH Flood depths of 1 m 3(eat(usualN areas of ponding);Base Flootl Elevations IREpELL r `.c _ DA IDSON '�k VI determined. / Y� -!/ ZONE AO Flood depths of 1 to 3 feet(usually sheet Flow on sloping errs n);average depths determined. For areas of alluvial fan flooding,velocities also �•ao n a ¢ determined. z.°W/�{! iii • ^ ZONE AR Special Flood Hazard Area formerly protected from me 1%annual chance �A �A�� I °ks mrc N en rO� Flood by a flood control system that was subsequently decertified. Zone AR !N CHU'3A.=e 'f indicates that the former flood control system Is being restored to provide s'l 3534633 — r", .,,'63� ry, protection from me l%annual chance or greater flood. okt1 Rn \v._. �� 1 \% cn`,^ 09 •flow ZONE A99 Areas m be protected from 1%annual chance flood by a Federal Flood ^"' S'` _ no4� '„a protection system under construction;no Base Flood Elevations determined. \`FLOODING EFFECTS FROM ///�'// \ sF44 ZONE VE Coastal Flood cone with velocity hazard(wave action);Base Flood Elevations > ROCK determined. I �0 �( aDKw RIVER ^ 1 ��� ��R I°. /AKE •,•, FLOODWAY AREAS IN ZONE AE ZONE•AE• • __ ��i ( The Floodway Is the channel of a stream plus any adjacent floodplain areas that must be kept -L^ ! -r-�-—1 1.____ J r��_.__- _ "� free of encroachment so that the 1%annual chance Flood can be carried without substantial .'1),,,,,,,, - of increases In flood heights. 1 M TGOMERV 0\ I1(11 9 MECKLENBURG CABARRUS - -/ - `\ I '.\ll':lll'I I Illll I.1 Jurisdiction ((ice \ •••••• OTHER FLOOD AREAS r / STANLV 37U2I o ZONE X '�`t J� 6�'.. ZONE AE • ZONE X Areas of 0.20o annual chance food;areas of 1%annual chance flood with �\ / — ) /00 average depths of less than 1 foot or with drainage areas less than 1 square • \. rQ mile;and areas protected by levees from 1%annual chance flood. DATUM INFORMATION �t/„P 1 -- -- 717500FEET OTHER AREAS 'lz ZONE X Areas determinetl to be outsltle the 0 2%errual chance flootlplaln. The projection used in the preparation of the map was the North Caroline State �O s / �. re*�� 'a ZONED Areas in whkh flood haoends are undeterm netl,but lwssible. Plane(GRS80 NE 3200).The horizontal datum was the North American Datum of o�'. e GRS80 ellipsoid. Differences in datum, ellipsoid, projection, or Universal / F 158 K N COASTAL BARRIER RESOURCES SYSTEM(CBRS)AREAS Transverse Mercator zones used in the production of FIRMS for adjacent FA0025 's jurisdictions may result in slight positional differences in map features across I\,-\ jurisdictional boundaries. These differences do not affect the accuracy of this 0 / �Y - ' N* ® b OTHERWISE PROTECTED AREAS(°PAS) FIRM.All coordinates on this map are in U.S.Survey Feet,where ""�- '' CBRS areas and OPAs are normally located within or adjacent to Special Hood Hazard Areas. 1 U.S.Survey Foot=1200/3937 Meters. / / - ,0 - R ` ZONE X Pk annual chance floodplain boundary Flood elevations on this map are referenced to the North American Vertical v�' ill 0.2%annual chance floodplaln boundary Datum of 1988(NAND 88).These flood elevations must be compared to structure y y,. and ground elevations referenced to the same vertical datum An average offset ,�". ., . , ':., • I I-. '-^ ZONE AE FLOODING EFFECTS FROM ZONE AE Floodway boundary 39J2" between NAVD 88 and the National Geodetic Vertical Datum of 1929(NGVD 29) .S•' (EL 636i VADKIN RIVER (et.636) Zone DbouMery has been computed for each North Carolina county.This offset was then applied \-0 . �� �_� CBRS and OPA boundary to the NGVD 29 food elevations that were not revised during the creation of this • - a 3952 statewide format FIRM.The offsets for each county shown on this FIRM panel are �V� 'Il,t7y\'IIil t'OLlntly ° ( .,,,, \ Boundary dividing Special Flood Hazard Area Zones and boundary shown in the vertical datum offset table below.Where a county boundary and a Q- 0* I I 1 l l lli:trl'poriitetl Alt=,s -.f. • 1 3J "z``Cz'4, Elevations, Special Ha Areas different Base Flood floodingsource with unrevised NGVD 29 flood elevations are coincident, an •Q- O ' " .,-' !' -' - ��—Elevations,flood depths or Flood velocities. or 0 3701�1 " "t .. ZONE AE individual offset has been calculated and applied during the creation of this O ' RV 617 1 -��513^^^^ Base Flood Elevation ne and value;elevation In feet* statewide format FIRM. See Section 6.1 of the accompanying Flood Insurance / <7 Q FA0024 5 H , r� Base Flood Elevation value where uniform within zone;elevation in Study report to obtain further information on the conversion of elevations hQ 6 / SP (EL 987) feet* between NAVD 88 and NGVD 29.To obtain current elevation,description,and/or F location information for bench marks shown on this ma O *Referenced to the North American Vertical Datum of 1988 p, please contact the 2 S North Carolina Geodetic Survey Branch the address shown below. You may also o5`azaa �O �'/ _ h Cross secdan line contact the Information Services Branch of the National Geodetic Survey at(301) %O 2 ti f . 713.3242 or visit its website at hllo/Avww rigs nose goy / 2 O �.. • zs 2s hansec[Ilne k U a ,n - n T "• m Geogrephk ccominates referenced to the North American Datum of North Carolina Geodetic Survey County Average Vertical Datum Offset Table O 2 y*. J an ones sx•2xoo 1983(NAD 83) 121 West Jones Street County Vertical Datum°Rustle) _ 2 Q '+�pT Raleigh,NC 27601 DAVIDSON -0.74 —�- • / y ,�1 � 630�J 4275... 1000-meter Universal Transverse Mercator grid ticks,zone 17 (919)733-3836 ROWAN -ore / v` ` ], O G; _ �,,aa�, {$� W.... a,,�4 m 2500-foot grid values:North Carolina State Plane coordinate system http://www.ncgs.state.nc.us Z O Sjp, "Yt `7 J 1 FEET (F1p5ZDNE 3200,State Plane MAD 83 feet) '`F // 'Ibtyn illSpencer "'k`� Z 'y' SA biS-.-,Le rrifi&e. / \ /_ aarroA4t"e.9 Z 1 Z North Carolina Geodetic Survey bench mark(for more Information a o j �/ OT 16 y a BM5510X visit htm//www ncos aK..lrc.ts) Example:NAND 00=NGVD 2B+(-0.74) d 4, Ad "p 1. : / t National Geodetic Survey bench mark(for more Information visit ,,,1.,-,,, o • '`u" �2 N� - z BM55100 htto://www nos noaa.aov) All streams listed in the Flood Hazard Data Table below were studied by detailed - / _; methods using field survey. Other flood hazard date shown on this map y O �I p' f __ // O(n,,,Z0 c,+ / r''z'6 O NGS-58 GPS 2 5 cm Vertcal Consol Mar or Connractar Establsheed may s c` ���\___` Ic)ycn of STcnLp R m :-,L',',')',(,-,:-' BM5510 NCFMP eencn Marl¢) (for ore formasan t have been derived using either a coastal analysis or limited detailed Rverine 'OR° e - \\ I l,OM1ll OlNp�yCIICe ® lotto.//www nrac,44<.w,s analysis. More information on the flooding sources studied by these analyses Is -I Ilalerril()il;dl jlllisdiellt)il s/ I'Xtrakcrrltbrlal Atria,ICII OII contained in the Flood Insurance Study report. . 370216 M 1.5 River Mlle 70216 k • S N ZONE X M 181 1 A0023 0 �j • / 13)11 n Or Spencer I`-�ytrltcl I Nol i II Jurid'®biorl ( Fi ,re Ro))an'iounn 00° ,� UnincolpolalcLlArc<Lt • f 'y ,i),cn O) rUK I IUN OF F /— — IPROPOSED PROJECT caw BOUNDARY (APPROX.) w Ii,,,n or 2<pevcCi " z cf,a /711?I( / �J .-,.,., .;.:.,.tea, TIE EEC=eLT „ (a 4 ' o I I ,� � EB 11_. �{ tar k �, ZONE Xt r. ,, ..r r sE,a GRID NORTH V.'iio le. e"r1 + I MAP SCALE 1"=500'(1:6,000) • ^F \ `IE V,'# [ Fo / li vcn of Sji nL I Zma x. . o,—, wo �eo 1,00v T S/ I vli ii iiiti Plat lull Lllclirni. r� tw o 160 �METERS I� 37021•• lir)1n Of 11,1S1 SI)cnccr s, /I\Ll alcrri1011 ll luri>Lliuinn ..7 /• 370'll I ( w1� • �' �NFr � PANEL 5781K VIo _ Lea z z ;a FIRM �_ I o �' L `n as DRD FLOOD INSURANCE RATE MAP Q Q H. ,P ° I , I®( NORTH CAROLINA °w oL a I l..lro n.d 3 / i ' ,ky. ZONEx rl PANEL 5781 'I(11rn OI Cast Sp ncc N� 1Fr �y I�JIJ LAYOUT) f d a. L (SEE LOCATOR DIAGRAM OR MAP INDEX FOR FIRM PANEL i,, ` CXUratk liar ial.lUusdictloN "O Q ;]()�I I 1 A * 020 CONTAINS: / r COMMUNITY CID No. PANEL SUFFIX : - _ \ r ./ isµ p,201 ill , :,3. �.v - S 4EHH , DAVIDSON COUNTY 370307 5781 K 710 000 FEET ' s `.lf_ j 710 000 FEET ���II EAST SPENCER,TOWN OF 370211 5781 K eo'averr JOINS PANEL 5780 w°24'O0' town of Spencer \BARRIER LN ao seo en°2300 Iltip. ROWAN COUNTY 370351 5781 K 5535.. 1 582 500 FEET 554c5^, p 555°°°"' 5565m^^ Ilnt 1 580 000 FEET Extraterritorial Jurisdiction 1 590 000 FEET SPENCER,TOWN OF 370218 5781 K 370216 1111111 .'le-I NOTES TO USERS _ rr- r This sit is for use i r as subject t the National Flood Insurance Program. It does not Certain areas not in Special Flood Hazard Areas me of re Flo d b good control structures. This n reflects more detailed and up-to-date stream channel configurations than those MAP REPOSITORY P 9 9 P Y P Y P P Refer to listing of Me Repositories on Me index or visit hflp:/Avww.ncflootlmeps.com. necessarily identify all areas subject to flooding,particularly from local drainage sources of small Refer to Section 4.4"Flood Protection Measures"of the Flood Insurance Study report for shown on the previous FIRM for this jurisdiction. The floodplains and floodways that were g p co p .46IATs^ v 0ARxOf size. The community map repository should be consulted for possible updated or additional information on flood control structures in this jurisdiction. transferred from the previous FIRM may have been adjusted to conform to these new stream , .I. 1. l� flood hazard information. channel configurations. As a result,the Flood Profiles and Floodway Data tables in the Flood EFFECTIVE DATE OF FLOOD INSURANCE RATE MAP PANEL §§ / / .j Base map information and geospatial data used to develop this FIRM were obtained from Insurance Study report(which contains authoritative hydraulic data)may reflect stream channel MARCH 18,2009 p-.-al 3 Y �a„,ff¢. 'I' Cooperating Technical State 410/). . To obtain more detailetlnformatonn areas where Base Flood Elevations(BFEs)and/orfloodwaye various organzations, including the participating local community(ies), state and federal distances that differ from what is shown on this mapCD . �.st:" 1-hv,scooFwnTwc Tccrvry cnL anmrve6 Us have been determined,users are encouraged to consult the Flood Profiles,Floodway Data,Limited agencies,and/or other sources. The primary base for this FIRM is aerial imagery acquired by e...m.... F 5Nc sf J Detailed Flood Hazard Data,and/or Summaryof Stillwater Elevations tables contained within the Flood Davidson CountyEFFECTIVE DATE(S)OF REVISION(S)TO THIS PANEL Illllla NMloe to Ueer�aap d Map Number shown below tie an be Bused ove and Rowan County. The time period of collection for the Davidson imagery is Please refer to the separately printed Map Index for re overview map of the county showing the when piadng p Mars;the Community Number shown above Insurance Study(FIS)report that accompanies this FIRM. Users should be aware that BFEs shown 2004.The time period of collection for the Rowan imagery is 2005. Information and geospatial layout of map panels,community map repository addresses,and a Listing of Communities table JUNE 18,2009' should be uses on Insurance applications ror the cuhen on the FIRM represent rounded whole-foot elevations.These BFEs are intended for flood insurance data supplied by the local community(ies)that met FEMA base map specifications were containing National Flood Insurance Program dates for each community as well as a listing of the community. This digital Flood Insurance Rate Map(FIRM)was produced through a unique rating purposes only and should not be used as the sole source of flood elevation information. considered the preferred source for development of the base map. See geospatial metadata for panels on which each community is located. Accordingly,flood elevation data presented in the FIS report should be utilized in conjunction with the the associated digital FIRM for additional information about base map preparation. MAP REVISED MAP NUMBER cooperative partnership between the State of North Carolina and the Federal Il°'" Emergency Management Agency(FEMA). The State of North Carolina has FIRM for purposes of construction and/or floodplain management. If you have questions about this map,or questions concerning the National Flood Insurance Base map features shown on this map,such as corporate limits,are based on the most up-to- Program in general,please call 1-877-FEMA MAP(1-877-336-2627)or visit the FEMA JUNE 16,2009 3710578100K implemented a long term approach of floodplain management to decrease the Boundaries of regulatory floodwaye shown on the FIRM for flooding sources studied by detailed date data available at the time of publication. Changes n the corporate limits may have website at http://www.femeacw.. 'updated flood hazards to reflect seamless statewide mapping r costs associated with flooding.This is demonstrated by the State's commitment to methods were computed at cross sections and interpolated between cross sections. The(roadways occurred since this map was published.Map users should consult the appropriate community For community map revision history prior to statewide mapping,infer to the Community Map History table located In r 1 a+`'« '"� e� map floodplain areas at the local level. As a part of this effort,the state of North were based on hydraulic considerations with regard to requirements of the National Flood Insurance official or website to verify current conditions of jurisdictional boundaries and base map features. An accompanying Flood Insurance Study report,Letter of Map Revision(LOMR)or Letter of Map the Flood Insurance study report for this jurisdiction. ® $ (0Pars Carolina has joined in a Cooperating Technical State agreement with FEMA to Program.Floodway widths and other pertinent floodway data for flooding sources studied by detailed This map may contain roads that were not considered in the hydraulic analysis of streams where Amendment(LOMA)revising portions of this panel,and digital versions of this FIRM may be !oral 3�"°'gg, k produce and maintain this digital FIRM. methods a well as non-encroachment widths for flooding s studied byIlmitetl detailed no new hydraulic model was created Burin the reduction of this statewide format FIRM. available. Visit the North Carolina Flood plain Mapping Program website et To determine R flood insurance ravaueble in this community,contact vpur remn at agent,the North Carolina llllll Y' y i P 9 s o source Y g P a P PP 9 O9 Division of Emergency Management or the National Flood Insurance Prop t the following phone numbers or IM w .o methods are provided in the Flood Insurance Study(FIS)report for this jurisdiction. The FIS report httoJ/www ncfioodmaps.com,or contact the FEMA Map Service Center at 1-800-358-9616 for websnes: axo s also provides instructions for determining a flcodwey using non encroachment widths for flooding information on all related products associated with this FIRM. The FEMA Map Service Center State of North Carolina www.ncfloodmaps.com sources studied by limited detailed methods. may also be reached by Fax at 1-800 358-9620 and its website at http://www.msc Nc Division of Emergency Management National Flood Insurance Program fema.gov.. (919)715-8000 bnoerco Management 1-800-638-6020 hhp//www.fema.gov/business/nfic/ ` ° _Federal Emergency Management Agency J STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM Town of East Spencer Town of Spencer 1 580 000 FEET Extraterritorial Juni diction Extraterritorial Jurisdiction 1590000FEET LEGEND • cc4 v • °°°°°° JOINS PANEL 5781 55 587500 FEET eo"zsoo ss5 ^' SPECIAL FLOOD HAZARD AREAS (SFHAs) SUBJECT TO 370211 e0°24'3p' 370216 502330 1 �� 710000 FEET 770000 FEET •II9 INUNDATION BY THE Pk ANNUAL CHANCE FLOOD 1 3950 A V 1 IF Y • ` I, 1IL NON The 1%annual chance flood(100-year flood),also known as the base flood,Is the flood that I ■■■■■ I� lJ - \ S -~ �I., 3950�" has a 1%chance being waled orexceeded in anygiven year. The Special Flood Hazard of equaled "„ Area is the area subject to flooding the 1%annual chance flood. Areas of Spedal Flood by ■�®■ as°4t 3e t rill C r` � am,° A Hazard include Zones A,AE,AH,A0,AR,A99,V,and VE. The Base Flood Elevation Is the 'Ttotvno�fS once, water-surface elevation of the 1%annual chance flood. j'1 \ ZONE A No Base Flood Elevddon determined. orals. ,, \7 ZONE AE Base Flood Elevations determined :tip \ 7 ,A( p- 20NE AH Flood delHhs of 1 to 3(eat(usualN areas of pending);Base Flood Elevations IREDELL ®■■��� DA IDSON \ / '1 ^ *fl � determined. ��y1 w r ', ZONE AO Flood depths of 1 to 3 feet(usually sheet flow on sloping terrain);average �MME PI rn $ Ai •. " depths determined. For areas of alluvial fan flooding,velocities also ISAINE�MbEIN ■ PORTION OFConn ,a' ��ti` �' • ,t:, '' determined. ,,�{ ■■■■■■■� RU\fall nt,,.,,i� y .i i 1 ZONE AR Special Hood Hazard Area formerly protected from the 1%annual chance `O� �C l Ininc.()-x1raLLd taut �Z { ?t. flood by a flood control system that was subsequently decertified. Zone AR �s�( �A M.......1111. ■■■■■■ ",■� PROPOSED PROJECT I f tor; indicates that the former flood control system Is being restored[o provide 703 I protection from the 1%annual Chance or greater flood. ■ri ■■■PIPU■■■■■L '4w' r ZONE A99 Areas to be protected from 1%annual chance flood by a Federal flood II11®I.I.I.I.I.I.I.I.I.I.I.II�um BOUNDARY (APPROX.) - '.. ZONE X ZONE X protection system under construction;no Base Flood Elevations determined. ■■■■■■■■■■ . :'O` T .1'":`,ittttx l0\4 n ial Fast ,!; / ZONE VE Coastal food zone with velocity hazard(wave action);Base Flood Elevations �' \F a tleterminetl. =..........■-) 2 -1 37021I` �� c� �■■■■■■■■■■■ �b1. mvom 637" a `CIS .... FLOODWAY AREAS IN ZONE AE ___ ■ sp I(_-- D m •° :; \ ry +t P,• The floodway Is the channel of a stream plus any adjacent floodplain areas that must be kept ✓�����--������O 11 Town of East Spencer N� y Rt\\\;111(OUR,5y, y free of encroachment so that the 1%annual chance flood can be carried without substantial 11 ° I.I.M&ITG MERY EXtraterritorial u, v A I inincorporatCd s b _637•_� Increases In flood heights. MEc NBU G / ME 1 Jurisdiction m 37(1351 t ,�„ ir / •••'••'• OTHER FLOOD AREAS CBARR-= Z ZONEX i 370211 m 4 / ■■ `�� °h_ ZONE X Areas of 0.2%annual chance food;areas of 1%annual chance flood with A '„°) _ �_ / •'1. average depths of less than 1 foot or with drainage areas less than 1 square �s j cv / `ti /T j�y� " 0,,,7..,// mile;and areas protected by levees from 1%annual chance flood. l /QQ • �' F x OTHER AREAS DATUM INFORMATION 1 I J '/ I/ ( 707500FEET j ' j° F /// (6`L9 ZONE X Areas determined to be outside the 0 2%annual chance floodplain. The projection used in the preparation of this map was the North Carolina State .// 4Pe ,""/ \ ZONE AE /// 4 / ______ZONE,,,,X:,,, ZONED Areas in which flood hazards are undetermined,but possible. Plane(FIPSZONE 3200).The horizontal datum was the North American Datum of ro 1983,GRS80 ellipsoid.Differences n datum,ellipsoid,projection,or Universal ZONE X ��\� COASTAL BARRIER RESOURCES SYSTEM(CBRS)AREAS Transverse Mercator zones used in the production of FIRMS for adjacent "' jurisdictions may result in slight positional differences in map features across r e6/ \ -\ jurisdictional boundaries.These differences do not affect the accuracy of this 7 / _ i •1/v\ l OTHERWISE PROTECTED AREAS(OPAS) FIRM.All coordinates on this map are in U.S.Survey Feet,where �n - '.- / •\ "ZONE AE 1 U S.Survey Foot=1200/3937 Meters. m • j CBRS areas and DPAs are normally located within or adjacent to Special Flood Hazard Areas. 7 Flood elevations on this map are referenced to the North American Vertical 'i I ZONE X/ '85' +'N,�I k j+v� ( 1%annual chance floodplain boundary 5949°w `�� 0.2%annual chance floodplain boundary Datum of 1988(NAND 88).These flood elevations must be compared to structure 3s°4t'3a' /��� -i and ground elevations referenced to the same vertical datum.An average offset j k �. Ro an` `fit H ZONE X '� A • - Floodway boundary between NAND 88 end the National Geodetic Vertical Datum of 1929(NGVD 29) w °' - has been computed for each North Carolina county.This offset was then appliedAlt / r5," UnInGOrpOr°t d �,'' r w z ZONE X349 lone D boundary to the NGVD 29 flood elevations that were not revised during the creation of this d y: 7 37l)-3 5 1,I O �j., � � CBRS and OPA boundary statewide format FIRM.The offsets for each county shown on this FIRM panel are /�� - z O ` u 1. Boundary dividing Special Flood Hazard Area Zones and boundary shown in the vertical datum offset table below.Where a county boundary and a - w O /• / ,t� I1!-Eleitlh9 Special Flood Hazard Areas of different Base Flood flooding source with unrevised NGVD 29 flood elevations are coincident,an ZONE X % r a yf v' • Bevat ons,flood depthsor Flood veletasr}.individual offset has been calculated and applied during the creation of this //// ,;/ o • '' / �,' .0 -'.-/ :'- ZONE AE ^^^^513^^^-- Base Flood Elevator ire and value;elevation in feet* statewide format FIRM.See Section 6.1 of the accompanying Flood Insurance ZONE X _p t e _� Study report to obtain further information on the conversion of elevations /j. ZONE AE w ,�... 4z7/ EL 987 Base Flood BevdbOn value where uniform within zone;elevation in between NAVD 88 and NGVD 29.To obtain current elevation description,and/or //. q • ' ` Ell_ I ----' -s*..f ° -•�q bV ( ) fit* location infortnelion for bench marks shown on this map please contact the / sp z �� '� ��a, \ �f+� 4. *Referenced to die NorthAm¢rhWn VeCroo Datum of 1988 North Carolina Geodetic Survey at the address shown below.You may also /. 'tiff/// •P/S/�' Cross section line contact the Information Services Branch of the National Geodetic Surveyat 301 •. \' \ f//GH'ROCK LAKE ,. 713-3242,or visit its website at hltgJ/www nos nose gory ( ) ♦ ,erg I ZONE X �/ Ili �`\ , �I O "Il1 lvY1 E11tit till l:IlCCr oz.) •�®�� 23 83 hansec[Ilne North Carolina Geodetic SurveyCount Avers Vertical Datum Offset Table 1' X6ra�'CgCI O 111..I ll l'1ti(I ICtIOn - FII .. ri Geograpak caortlinates referenced to the North American Datum of ��qtr,•p�ay / 97°07'30',32°22'30' Y 9a Town Creek u"�4i"'"4'�" �•+yL' /raj_ "'PPP42754.. 1000-meter Universal Transverse Mercator grid ticks,zone 17 121 West Jones Street County vemaeho-0vm5ortseunl 7Yrburoryl � �6, `ZONE1� �70211.w Raleigh,NC 27601 *'° � (919)733-3836 Town Creek ' `� A;1 .� ` 2500imt odd values:North Carolina State Plane coordinate system tgLg'/Avww, ncgs Slate nc u9 ' --- I 1 477 500 FEET , . v 'R -__ " ZONE AE G� : 1.: (FIP520NE 3200,State PWne NAD 83 feet) 646 ./ r- fillia� -J \ I k,_ �,�-_N / „"y � '-."- _. 111A- \ z BM55 Carolina Geodetic Survey bench mark(for more information Example:NAvoea=NOV020*(-0.75) „NLHEW,SI +�.,. li- ; C , ,n• t / sy \ �" a 10X visit http//www neoc lseI be.ts) •."- - 1, rb' �� .+s�'' N National Geodetic Survey bench mark(for more Information visit �:'• - - r i ' ; ,' BM5510® http.//www nos noaaeov) All streams listed in the Flood Hazard Data Table below were studied by detailed I t1\F'11 of I,dst SpeneeC• ° .4•. / //V'tr �. / ./�/�O NGS-58 GPS 2 5 cm Vertical Control Marks or Contractor-Established methods using field survey.Other flood hazard data shown on this map may d' s"��� e, .1 ' have been derived using either a coastal analysis or limited detailed Riverine "' 370_I I _ x• BM5510 NCFMP Bench Marl¢ (for more information visit SiMkir, .' ` _.:. .. ® bapuwww nmsaare o,s) analysis.More information on the tdyrflooding sources studied by these analyses is a µ •4 •M1.5 River Mlle contained in the Flood Insurance Study report. 4 Flootlw ay Vvitlih(feet) m - `\ \ FLOOD HAZARD DATA TABLE eVPoghrOstanceFrom o I /ff ,.• a' 6ti 1%Annual Chance the Center of Stream to -o p T� hr ONION { s _ 0.0 CRANE CREEK Cross Stream Flood (.._yeao Encroachment Boundary F� l LruNCN ar ,.A v p ,I 11161 ROCK LAKE 6ti1 ° Section Station' Discharge(cfs) water_surface (LooWng Downstream)or q +'^w ' Bevalhon(feet NAND Total Floodw ay Width Rowan County ! _ I fy12,ON an Countyf`aFr' r- r / ' vaoCLeF an.,F LINE CRANE CREEK Unincorporated Areas -- 1.,arrmoorpor.red Areas (c, �'a 276 27,624 12,860 626.3 499/290 370351 uN gry4Eo o " i 2370441 ;',„1,- • �- /i 6 288 28,624 12,860 - 626.8 1,015/166 oN 6`� 35°40 �f1^1Cq• A .'. t,l / // ) }•F L. _301 30,124 9,8)9 627.3 369/718 ro $ I . ��. • _311 31,124 9,819 628.9 127/278 3�eom , 1 ZONE X 1 ;;°A,,ll i � ^,. / § ZONE X�, 326 32,624 9,819 633.3 493/116 P'i:. . .,. -,a-,-''�7 i- �_ ..7,. '�R ,. - ��,� `1> °m _ 354°3s 333 33,300 9,819 634.1 400/192 n/ ( J� �- ,!/ 3948.0" 351 35,124 9,819 638.1 282/63 �, ZONE AE,- i hp:••�' 638 I Y 366 36,624 9,693 640.6 332/120 /' rule // °,,' `=` ,.sue / J` 381 38,124 9,693 643.2 27/446 �k j '- "396 39,624 9,693 646.3 204/168 /` / ZONE AE `/3oT`r,II s`Y 406 40,624 9,693 650.2 252 125 ^1 t ✓/y1�' iit ' * g.,_1,II7, TOWN CREEK )t �/ '. a \ `,,TT q:3, 3,�0� , • �I�II'Ir.. 023 2,300 NA 626.8 765 v.,..o-rrl 057 5,700 NA 632.2 420 //�y _)-`cry;, f N 080 8,000 NA 637.6 375Ilk(' ZONE X/ GRID NORTH 096 9 600 NA 640.8 405 /4-io. MAP SCALE 1"=b00'11:6,000) 'Feet above mouth > s v \ �r "?`t�'. �� �� �� 1,000 roFaer 647 "' 643 t 1eo 0 1m coo METERS itillit ,„„ glk. r 1 ,, I/ N a r zE „_II Rovv all Con,,, *+d N J PANEL 5780J • �UnmwrpNraU c'IL rcas _ r� l a3Il / 1 t 650 ZONE ^,' '{ ' ;,. sf 1 �f ' .� " a FIRM e°:''‘°P ® ] v;y .rlFLOOD INSURANCE RATE MAP • I.nZONE x +, rolr°.__ I""INORTH CAROLINA ®r / n.rl 35° _ R PANEL 5780 '® p r f � (SEE LOCATOR DIAGRAM OR MAP INDEX FOR FIRM PANEL �f 35°40.00" LAYOUT) a.,. .;"., a a ,� U CONTAINS' .'.� -•" ,'� ',h-ram '� .1 ° '',..1 L COMMUNITY CID No. PANEL SUFFIX R i 1: 0n u L , 0�1'JI °fi,MI �` iN ( ''�i'.t00 rll ' EAST SPENCER TOWN OF 370211 5780 J 700 000 FEET - 0 - ' '.'• 700 000 FEET ROWAN COUNTY 370351 5760 J e0°24'30° 80.2,00' JOINS PANEL 5689 90°23'30" e0°29'00' Illll' SPENCER,TOWN OF 370216 578e J 1 580 000 FEET 1 582 500 FEET 554"'^^ 5550ro" 558"'1"590000 FEET Il nr llllp NOTES TO USERS _ Ir.- r This mapis for use in administeringthe National Flood Insurance Program It does notCertain areas not inSpecial Flood Hazard Areas maybeprotected byThis mapreflects more detailed and up-to-date than those MAP REPOSITORY g flood control structures. p stream channel configurations necessarily identify all areas subject to flooding,particularly from local drainage sources of small Refer to Section 4.4"Flood Protection Measures"of the Flood Insurance Study report for shown on the previous FIRM for this jurisdiction. The floodplains and floodways that were Refer to listing Of map Repositories on Map Index or visit hap://wvirv.nciloodmaps.com. CD y°'sodz^ry, 0 eAa,ye size. The community map repository should be consulted for possible updated or additional information on flood control siruclures in this jurisdiction. transferred from the previous FIRM may have been adjusted to conform to these new stream .Y' "bj;., .I. ,N(lltlll it,/.i\: l�T flood hazard information. channel configurations. Asa result,the Flood Profiles and Floodway Data tables in the Flood EFFECTIVE DATE OF FLOOD INSURANCE RATE MAP PANEL CD §§ / ! j J Base map information and geospatial data used to develop this FIRM were obtained from Insurance Study report(which contains authoritative hydraulic data)may reflect stream channel h•-•rl 3 ,e„ ;: I' COO pt l.ItinL I CChniCN1 State y . To obtain more detailetl information n areas where Base Flood Elevations(BFEs)and/or floodwaye various organizations, Including the participating local communhty(ies), state and federal distances that differ from what is shown on this map. JUNE 18,2009CD �q - mtw,sceoFwnTwG TECHNICAL PARTNER vr� have been determined,users are encouraged to consult the Flood Profiles,Floodway Data,Limited agencies,and/or other sources. The primary base for this FIRM is aerial imagery acquired by •v...w... `axe sf o Detailed Flood Hazard Data,and/or Summaryf Stillwater Elevations tables contained within the Flood Rowan Count The time period of collection for the i EFFECTIVE DATE(S)OF REVISION(S)TO THIS PANEL Illlllr NMloe to User The Map Number shown below should be used a y p met is base Information and Please refer to the separately printed Map Index for re overview map of the county showing the wean placing P orders,the Community Number shown above Insurance Study(FIS)report that accompanies this FIRM. Users should be aware that BFEs shown geospatial data supplied by the local community(ies)that met FEMA base map specrficabons layout of map panels,community map repository addresses,and a Listing of Communities table should be used on insurance applications for the swoon on the FIRM represent rounded whole-foot elevations.These BFEs are intended for flood insurance were considered the preferred source for development of the base map. See geospatial containing National Flood Insurance Program dales for each community as well as a listing of the community This digital Flood Insurance Rate Map(FIRM)was produced through a unique rating purposes only and should not be used as the sole source of flood elevation information metadata for the associated digital FIRM for additional information about base map preparation panels on which each community is located. Accordingly,flood elevation data presented in the FIS report should be utilized in conjunction with the EFFECTIVE DATE MAP NUMBER cooperative partnership between the State of North Carolina and the Federal II°" Emergency Management Agency(FEMA). The State of North Carolina has FIRM for purposes of construction and/or floodplain management. Base map features shown on this map,such as corporate limits,are based on the most up-to- If you have questions about this map,or questions concerning the National Flood Insurance date data available at the time of publication Changes in the corporate limits may have Program in general,please call 1-877-FEMA MAP(1-877-336-2627)or visit the FEMA JUNE 16,2009 3710578000J implemented a long term approach of floodplain management to decrease the Boundaries of regulatory floodways shown on the FIRM for flooding sources studied by detailed occurred since this map was published.Map users should consult the appropriate community website at http://www.fema.gov. costs associated with flooding.This is demonstrated by the State's commitment to methods were computed at cross sections and interpolated between cross sections. The floodwys official or website to verify current conditions of jurisdictional boundaries and base map features. r 1 v�r\P,. ma floodplain areas at the local level. As art of this effort,the state of North For •community map reWsion history prior to natewide mapping.refer to the Community Map History table located In CD 4 «r.n„ P p P re based on hydraulic considerations with regard to requirements of the National Flood Insurance This map may contain roads that were not considered in the hydraulic analysis of streams where An accompanying Flood Insurance Study report,Letter of Map Revision(LOMR)or Letter of Map the Flood Insurance study report for this jurisdiction. g Carolina has joined in a Cooperating Technical State agreement with FEMA to Program.Floodway widths and other pertinent floodway data for flooding sources studied by detailed no new hydraulic model was created during the production of this statewide format FIRM. Amendment(LOMA)revising portions of this panel,and digital versions of this FIRM may be m eetem,loe s good insurance la available m this community,comes your insurance a ant the North Carolina !oral 3- k produce and maintain this digital FIRM. methods as well as non-eencroachment widths for floodingsources studied by limited detailed available. Visit the North Carolina Flood lain Mapping Program website ate y g le 11111 "�'. eo, y > 9 P PP 9 09 Division of Emergency Management or the National Flood Insurance Program et the following phone numbers or IllpI methods are provided in the Flood Insurance Study(FIS)report for this jurisdiction. The FIS report http://www.ncfloodmaps.com,or contact the FEMA Map Service Center at 1-800-358-9616 for websnes: also provides instructions for determining a floodway using non-encroachment widths for flooding information on all related products associated with this FIRM. The FEMA Map Service Center '•II State of North Carolina www,ncfloodmaps.com sources studied by limited detailed methods may also be reached by Fax at 1-800-358-9620 and its website at http://www.msc fema.gov. NC Division of Emergency Management National Flood Insurance Program (919)715-8000 http:nwww.nurme°nntrol.nmmnp 1-800-838A620 httpWwww.fema.00vlbusiness'nflN ` 'r _Federal Emergency Management Agency J 1 :I .• - - � #` • , . .� `� _ _ i _«� o' ..1 I . . r I- • . $115 go _ K•. ' PROPOSED PROJEC l ' 4,44.:1 lb ilt BOUNDARY(APPROX.) s. , 4-4b,„ .1 . r . 4 *, ' rillikr; 44 4111 1.46 . 4.114; ' 1/"- 4 r • • / , . . , 4 ... .. A . „.. , , • • . : _ • i . • .i i :Of ' • - . i • 1 . ' `.-• .), t I I 4 . 141,611-A,T.. , Z i k IAA - ' ' 4 ig:c. 11 ' • , • Si ` R r Ira • •• i•1 • •11 4 �j - WETLANDS MAP f u If i I led TOWN OF SPENCER 0 500 °°° F TA TRUCK STOP " 1 ENGINEERINGSCALE IN FEET Fulfilled Projects. Fulfilling Mission. TOWN OF SPENCER, +/-32.85 ACRES PROJECT NO.22008 NORTH CAROLINA REFERENCE:NWI WETLANDS SURVEY "•-..- '\ \,, l.r•-•-•." -..-'.'" \ \ L% NIP �f ‘-'`,—.1 rr t ' ''''s.*'--\./.4„,—\.,..._,,_‘ 4...-/IPAO iTh PROPOSED PROJECT ( r BOUNDARY(APPROX.) b r_ ,/ %‘'\1.t .:::1) \ \ . ? ti I -- 1 f ) ) k i L /7 � � N'1 -• ‘ 1 1 i k . c . ,.. ._,/ ) . , ,,,, t \ -` 0) fi 4. S...*: i .. air \ �. 1 %. "(IP r' .I ran In • • , Li .A.._,./. '. r (fi.1 . „_, r• • '..N.'t1V•4111111.11.1115N.6 N, . ' \/.. 740 \ t‘ P71"..'..11.. \\\:\ 14 ,;), . \INJ 7 / . , ,,, , ,c, . • , ,....,A, :' '''..\-r(f)c) :\ '''' ,, , ', A 1.� TOPOGRAPHIC MAP F fulfilled TOWN OF SPENCER f 0 500 1000 TA TRUCK STOP ENGINEERINGSCALE IN FEET Fulfilled Projects. Fulfilling Mission. TOWN OF SPENCER, +/-32.85 ACRES PROJECT NO.22008 NORTH CAROLINA REFERENCE:USGS US GEOLOGICAL SURVEY SALISBURY QUADRANGLE C-SWPPP Fulfilled Engineering LLC APPENDIX B: INSPECTION LOG AND REPORTS F16 C-SWPPP Fulfilled Pnnineering LLC SWPPP Inspection Log Name of Construction Site Location of Construction Site Date of Inspection Inspector Name Does Inspection Report require maintenance of installed BMPs? ❑ Yes Pi No ❑ Yes ❑ No ❑Yes No ❑Yes flNo ❑Yes No ❑Yes ❑ No Yes ❑ No ❑Yes ❑ No ❑Yes ❑ No ❑Yes ❑ No ❑Yes ❑ No II17 C-SWPPP Fulfiller Pnnineering LLC SWPPP Inspection Log (Continued Date of Inspection Inspector Name Does Inspection Report require maintenance of installed BMPs? ❑Yes ❑ No Yes No ❑ Yes Pi No Yes No Yes No ❑ Yes ❑ No Yes ❑ No ❑ Yes ❑ No Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Yes ❑ No 18 C-SWPPP Fulfilled Engineering LLC APPENDIX C: RAINFALL LOG AND REPORTS F19 C-SW PPP Fulfilled Engineering LLC ro z a) N M ct IO r0 <\ 00 Or '-I N M l0 r0 CO Or O r-I N M .7 0 0 00 Or O r-1 r--1 r-I r-1 r--1 r-1 r-1 r-1 ,1 r-I N N N N N N N N N N a Cb r-I N M l0 r0 <\ 00 Or O '-1 N lO r0 00 Or O r-1 N M lO r0 CO Or O 1.-1 r I r I ri ,1 1.4 ri 1.-1 1.-1 r-I r-I N N N N N N N N N N M cU • O ri N M get lO r0 L, 00 Or O e-1 N M .rt l0 0L's CO Or O Qri N M lO 10 <\ N Or r-Ir-1 r-I r-I r-I NNNNNNNNNN M cU w CD ix n �UU ry O r I N M '1 lO 0 [� 00 Or O r-1 N M R lO 0 [, 00 O, O r I lO O N 00 O Mvs C n M ci1 •0 a I 0 . . U cc p rI N M 'I 10 cC N 00 Cr O r-I N M r lO 00 Or O r-I N M lO r0 L� 00 Or mi. r-I r-1 r-I r-1 ri r-1 ri r-I r-1 r-I NNNNNNNNNN m l . . . ct • w •• a • . ri N M l0 r0 N CO Or O r1 N M Tt l0 r0 C� 00 Or O r I N M V 0 0 [� CO Os O r-I r-1 r-1 r-I r-I r-1 r-I r-1 r-1 r-1 r-I N N N N N N N N N N M M Cb •7 F20 C-SW PPP Fulfilled Engineering LLC c 1.. '-I N elle/ O 00 O O rl N CI tt 1D 'D N CO 0% O r1 N M t7 ID '0 NCO O' O rl r-I 1-1 rl rl rl rl '-I rl r-1 rl N N N N N N N N N N M M •• 49 rg . 4h rl N M 1D O L� 00 CP. cme-i N M .1 LO VD L� CO ON O rl N M .1 1D 4O N 00 Os O r-I rl rl r-1 r-I ri rl rl r-I r-1 N N N N N N N N N N M O Z c5 a O 1-1 N CI Tr W O L' O et' rOi r11 NrI rM1 r1 rD :rD rL�1 WrI rOI O Nr1 NN M N N N N CO N O Cli L m0 g 1 V g a) I 1-+ O rl N M tD ‘D L� N O rl N M lD O L� CO O O n r1 N M Tr 1D 'D C� CO O` ri ri ri rl rl r1 ri rl ri rl cc:.):' N N N N N N N N N M cn 0 UL) � 'C a , N M .1 1D 40 N CO ON O ri N CO of 113 'O N CO O's O ri N Cl '1' 4 t0 N CO 0+ O ri MS 0 r-I ri rl rl ri ri rl rl rl ri N N N N N N N N N N M Cl IX n. O r1 N Clcr 1D VD N N 0' O rI N M K 1D LC N CO ON O ri rl N Cl ,I. 1D 000 O� L„1 ,..1 ,..1 ,..1 ,..1 ,..1 ,..1 ,..1 ,..1 ri N N N N N N N N N N M M i7 F21 C-SWPPP Fulfilled Engineering LLC APPENDIX D: ADDITIONAL SITE LOGS AND RECORDS II22 C-SWPPP Fulfilled Engineering LLC SWPPP Pre-Construction Con fence Attendj,nce Loa- Date &Time Description/Outline and Name of the Presenter of SWPPP and Site Requirements Name Company Signature II23 C-SWPPP Fulfilled Engineering LLC SWPPP Pre-Construction Con er nice Attendance Log ed) Name Company Signature II24 C-SWPPP Fulfilled Engineering LLC SWPPP Contractor & Sub-Contractor Log Name of Construction Site Location of Construction Site Company/Individual Name Work Responsibilities 1.) _ Start Date: Completion Date: 2.) Start Date: Completion Date: 3.) Start Date: Completion Date: 4.) Start Date: Completion Date: 5.) Start Date: Completion Date: 6.) Start Date: Completion Date: 7.) Start Date: Completion Date: 8.) Start Date: Completion Date: 9.) Start Date: Completion Date: 10.) Start Date: Completion Date: r■ 25 C-SWPPP Fulfilled Engineering LLC SWPPP Contractor & Sub-Contractor Log (Continue- di-ll.) Start Date: Completion Date: 12.) Start Date: Completion Date: 13.) Start Date: Completion Date: 14.) Start Date: Completion Date: 15.) Start Date: Completion Date: 16.) Start Date: Completion Date: 17.) Start Date: Completion Date: 18.) Start Date: Completion Date: 19.) Start Date: Completion Date: 20.) Start Date: Completion Date: 21.) Start Date: Completion Date: F26 C-SWPPP Fulfilled Engineering LLC SWPPP Modification Log I Name of Construction Site Location of Construction Site Description of Mo Location of ks Modification n Major n Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: m. ii Location of ype of Modification Description of Modification Modification Major Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: Type of Modification Description of Modification Location of Modification n Major ❑ Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: Type of Modification Description of Modification Location of i 1 Modification ❑ Major Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: L — Location of Modification n Major ❑ Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: 111.1. F27 C-SWPPP Fulfilled Ernineering LLC SWPPP Modification Log (Continued) —M- Name of Construction Site Location of Construction Site Description of Mod Location of Modification n Major n Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: imi ii Location of ype o ' (3.1 ication= Description of Modification Modification Major Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: Type of Modification Description of Modification Location of Modification n Major ❑ Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: ype of Modification � ii Description of Modification Location of Modification ❑ Major Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: L — Location of Modification n Major ❑ Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: F28 C-SWPPP Fulfiller Pnnineering LLC SWPPP Soil Stabilization Log -7= Name of Construction Site Location of Construction Site Type of Stabilization Description of Stabilization Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Completion Date: Additional work proposed for Inspection Frequency this area: for Stabilized Area: ype of Stabilization b. Description of Stabilization Location of Stabilization Final ❑ Temporary Initiate Date: Completion Date: Additional Inspection Frequency work proposed for for Stabilized Area: this area: Type of Stabilization Description of Stabilization Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Com•letion Date: Additional Inspection Frequency work proposed for for Stabilized Area: this area: Type of Stabilization 11 Description of Stabilization Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Completion Date: Additional work proposed for Inspection Frequency this area: for Stabilized Area: ype of Stabilization b. Description of Stabilization Location of Stabilization Final ❑ Temporary Initiate Date: Completion Date: Additional Inspection Frequency work proposed for for Stabilized Area: this area: r■ 29 C-SWPPP Fulfilled Ernineering LLC SWPPP Modification Log (Continued) Name of Construction Site Location of Construction Site Type of Stabilization Description of Stabilization Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Completion Date: Additional work proposed for Inspection Frequency this area: for Stabilized Area: ype of Stabilization b. Description of Stabilization Location of Stabilization Final ❑ Temporary Initiate Date: Completion Date: Additional Inspection Frequency work proposed for for Stabilized Area: this area: Type of Stabilization Description of Stabilization Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Com•letion Date: Additional Inspection Frequency work proposed for for Stabilized Area: this area: Type of Stabilization 11 Description of Stabilization Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Completion Date: Additional work proposed for Inspection Frequency this area: for Stabilized Area: ype of Stabilization b. Description of Stabilization Location of Stabilization Final ❑ Temporary Initiate Date: Completion Date: Additional Inspection Frequency work proposed for for Stabilized Area: this area: r■ 30 C-SWPPP Fulfilled Engineering LLC APPENDIX E: CONSTRUCTION GENERAL PERMITS NCG000000 A copy of the NPDES MS4 Permit for Storm water Discharges from Construction Activities (NCG000000) can be found at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/storm water/stormwater- program/npd es-construction-program F31 C-SWPPP Fulfilled Engineering LLC APPENDIX F: COPY OF NOI AND NPDES APPROVAL F32 o %!O WA4r \' a OGS\` Sahsbury I l 1--I c. /, .. .V 1 iAlk 12 February 23rd, 2024 Mr. Mandip Kaur AGS Salisbury,LLC 12051 Retail Dr. Wake Forest, NC 27587 RE: APPROVAL LETTER—EROSION CONTROL PLAN(EC24.004) PROJECT NAME: TA Truck Stop Site Improvements—EC24.004 LOCATION: 1007 Long Ferry Rd., SW of Lon Ferry and Montclair Dr. intersection TOTAL DISTURBED ACRES: 24.4' p'r'J, LATITUDE: 35°41'45" LONGITUDE: -80°24' 22" Dear Mr. Kaur: This office has reviewed the subject erosion and sedimentation control plan. We find the revised plan submitted on February 23`d, 2024 to be acceptable and hereby issue this Letter of Approval and the following comments: 1. A pre-construction conference is required for this project. Contact this office at least 48 hours in advance. 2. This approval does not authorize off-site land-disturbing activity (borrow or spoil) associated with this project. 3. This approval does not supercede nor negate the need for any applicable development permits or approvals including (ie: planning, subdivision, floodplain,DOT, etc.). Please be advised that Section 18-52 b. of the Rowan County Soil Erosion & Sedimentation Ordinance (RCSESO) states that a copy of the approved Erosion Control Plan be on file at the job site. Also, you should consider this letter as giving the Notice required by G.S. 113A-61(d)& Section 18.53 a. of that same ordinance specifying our right of periodic inspection to ensure compliance with the approved plan. This plan approval shall expire two (2) years following the date of approval if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B.0129. Letter of Approval Mr.Mandip Kaur February 23'd,2024 Page 2 Based on rules established by the North Carolina Department of Environmental Management Land Resources (DEMLR) as of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above mentioned project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Paul Clark at Paul.clark(u,ncdenr.gov. After you submit a complete and correct NOI form, a COC will be emailed to you within three business days. A $120 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Rowan County's Sedimentation Pollution Control Program is performance oriented, requiring protection of the natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Act of 1973 (North Carolina General Statute 113A-51 thru 66), which are set forth in the local ordinance, this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations,and rules pursuant to G.S. 113A-61(bl). Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form which you have provided. You are requested to file an amended form if there is any change in the information included on the form. Your cooperation is appreciated,and we look forward to working with you on this project. Sincerely, Josh Canup,CPESC Environmental Compliance Specialist ec: Steve Blount—Town of Spencer; Dustin B.Johnson—PE, Evan Lusk—PE C-SWPPP Fulfilled Engineering LLC APPENDIX G: STORM DRAINAGE CALCULATIONS REPORT F33 ue ENGINsEERING SITE IMPROVEMENTS FOR TA TRUCK STOP in Town of Spencer, North Carolina STORM DRAINAGE CALCULATIONS Fulfilled Engineering LLC AGS Salisbury, LLC 840 Meeting Street, Suite B2 I West Columbia, SC 29169 12051 Retail Drive P.O. Box 2088 I Lexington, SC 29071 Wake Forest, NC 27587 fulfilledengineering.com North Carolina Firm No. P-2577 March 1, 2024 FE No. 22008 it* 44 * <4 44 # i» 41/4,44 4 i > :4> 44 <4** 4,45), 44 4 44 44 L vc ue ENGINEERING SITE IMPROVEMENTS FOR TA TRUCK STOP In Town of Spencer, North Carolina STORM DRAINAGE CALCULATIONS Fulfilled Engineering LLC AGS Salisbury, LLC 840 Meeting Street, Suite B2 I West Columbia, SC 29169 12051 Retail Drive P.O. Box 2088 I Lexington, SC 29071 Wake Forest, NC 27587 fulfilledengineering.com North Carolina Firm No. P-2577 ; „C A.Rl,,,,, • Wa � SAL March 1, 2024 = 52064 FE No. 22008 3/V2y ,,,'G4GINEO t;' S 1/4B. J ON�So'` it* 44 * <4 44 # i» 41/4,44 4 i > :4> 44 <4** 4,45), 44 4 44 44 L vc Storm Drainage Calculations Fulfilled Engineering LLC TABLE OF CONTENTS 1.0 INTRODUCTION 3 Objective 3 Methodology 3 2.0 PROJECT MAPPING 3 3.0 PRE-DEVELOPMENT CONDITIONS 4 Soil Conditions 4 Vegetation 4 Watersheds 4 4.0 POST-DEVELOPMENT CONDITIONS 5 General System 5 Soil Conditions 5 Vegetation 5 Watersheds 5 5.0 SUMMARY OF RESULTS 6 6.0 CONCLUSIONS 7 APPENDIX A: PROJECT MAPPING 8 APPENDIX B: PRE-DEVELOPMENT 9 APPENDIX C: POST-DEVELOPMENT 13 APPENDIX D: WATER QUALITY 17 APPENDIX E: DURING CONSTRUCTION 20 APPENDIX G: PIPE-SIZING CALCULATIONS 24 F Storm Drainage Calculations Fulfilled Engineering LLC Appendix A PROJECT MAPPING Location Map Aerial Map Soils Map FEMA Flood Map NWI Map Topographic Map Appendix B PRE-DEVELOPMENT Pre-Development Watershed Map Pre-Development Node Diagram Pre-Development Calculations Appendix C POST-DEVELOPMENT Post-Development Watershed Map Post-Development Node Diagram Post-Development Calculations Appendix D WATER QUALITY Water Quality Treatment Calculations (with Forebay Sizing) Total Nitrogen Export Computations Appendix E DURING CONSTRUCTION Sediment Calculations Skimmer Sizing Calculations Appendix F PIPE-SIZING CALCULATIONS Pipe-Sizing Watershed Map Pipe-Sizing Node Diagram Pipe-Sizing Calculations (10-Year Design Storm) F2 Storm Drainage Calculations Fulfilled Engineering LLC 1.0 INTRODUCTION AGS Salisbury, LLC is proposing a TA Truck Stop on an approximately 32.99-acre property that will have approximately 25.1-acres of disturbance as part of the proposed improvements. The proposed TA Truck Stop is currently proposed to have a 20,000-SF C-Store, an 11,100-SF tractor trailer maintenance building, car pumps,truck pumps, 81 regular parking spaces, and 196 tractor trailer spaces.A detailed construction sequence has been included in the construction drawings. The site currently consists of vacant existing residential homes, existing woods and grass in fair condition and existing tributaries. Most of the parcel's topography generally slopes from the northwest to the southeast draining to an existing perennial stream towards the southeastern portion of the property. The project site is located at the intersection of Long Ferry Road and Montclair Drive in the Town of Spencer, Rowan County, North Carolina; see the Site Location Map and Aerial Map in Appendix A. Ob'ective This report summarizes the hydrologic and hydraulic analyses performed by Fulfilled Engineering for the referenced Project Site. The objectives of this report are to demonstrate that adequate drainage infrastructure and Best Management Practices (BMP's) have been proposed to minimize negative downstream impacts and off-site sedimentation. Methodology The NRCS (SCS) Unit Hydrograph method was utilized for the overall design methodology. Autodesk Storm and Sanitary Analysis 2022 was used to model rainfall events, and route hydrographs through storm drainage systems and proposed detention facilities. SCS 24-hour Type II rainfall events with a 0.1- hour time increment were utilized to determine Pre-and Post-Development peak runoff rates. The design storm events were based on rainfall amounts for Rowan County, North Carolina. Procedures found in Technical Release 55 (TR-55) were used for the estimation of runoff and peak discharge rates. 2.0 PROJECT MAPPING The Project Maps prepared for this Project include the Site Location Map, Aerial Map, USGS Map, Soils Map, FEMA Flood Insurance Map and NWA Wetlands Map. Detailed soils information can be found in section 3.1. The FEMA Map illustrates that the Project Site is located in unshaded Zone X, areas determined to be outside of the 0.2% annual chance floodplain. Based on a review of the jurisdictional determination, there are approximately 0.081-acres of wetlands, approximately 286-LF of intermittent streams and approximately 557-LF of a perennial stream located on the project site. 3 Storm Drainage Calculations Fulfilled Engineering LLC 3.0 PRE-DEVELOPMENT CONDITIONS Soil Conditions The Soil Map illustrates the soils located on the Project Site. Table 3.1 summarizes the soils present on the Site and provides their HSG designation. Table 3.1: Project Site Soils Name Acronym HSG Cecil sandy clay loam CeB2 B Cecil sandy clay loam CeC2 C Cecil-Urban land complex CfB B Vance sandy clay loam VnB2 C Rion-Wedowee complex RnC C Mecklenburg clay loam MeB2 C Mecklenburg clay loam MeC2 C Ve.etation On-site vegetation consists of woods and grass in fair condition, existing tributaries and impervious areas from existing roads and rooftops. Watersheds The Pre-Development Watershed Map is available in Appendix B. The following describes the identified watersheds. PRE-101: Pre-Development Watershed PRE-101 drains from high points north and northwest of the subject property towards the southeastern direction towards an area associated with an existing perennial stream, ultimately discharging to an area designated as Outfall 1. PRE-201: Pre-Development Watershed PRE-201 drains from a high point within the property towards the westernmost portion of the property. Stormwater from this watershed ultimately discharges offsite to an area designated as Outfall 2. PRE-301: Pre-Development Watershed PRE-301 drains from a high point within the property and flows toward the southwestern corner of the subject property. Stormwater from this watershed ultimately discharges offsite to an area designated as Outfall 3 southwest of the subject property. II 4 Storm Drainage Calculations Fulfilled Engineering LLC 4.0 POST-DEVELOPMENT CONDITIONS General S stem The proposed stormwater management system will consist of swales, piping, and an on-site retention pond. The proposed retention pond will be utilized as a temporary sediment basin during construction and will be converted to it's permanent configuration upon final stabilization. The Site stormwater drainage plan was evaluated based on regulatory requirements including: • Design Storm Event: 10-year, 24-hour storm event • Water Quality Volume: Sized to treat 1-inch of rainfall runoff from the Site's contributing areas. • Total Nitrogen Export: Goal to achieve a 30 % nitrogen reduction from each controllable and quantifiable source of nitrogen in the basin. Soil Conditions Soil conditions remain unchanged from pre-development conditions. Ve.etation On-site vegetation consists of existing woods and grass in fair condition, existing tributaries, impervious area from existing roads and rooftops, new good grassing and impervious areas associated with new roads, rooftops and parking areas. Watersheds The Post-Development Watershed Map is available in Appendix C. The following describes the identified watersheds. POST-101: Post-Development Watershed POST-101 drains from high points north and northwest of the subject property towards the southeastern direction towards an area associated with an existing perennial stream, ultimately discharging to an area designated as Outfall 1. POST-102: Post-Development Watershed POST-102 drains from the proposed improvements on the subject property in the eastern and southeastern direction and is directed to the proposed retention pond by proposed storm drainage infrastructure. It discharges towards the southeasternmost corner of the subject property, flowing to an area designated as Outfall 1. POST-201: Post-Development Watershed POST-201 drains from a high point within the property towards the westernmost portion of the property. Stormwater from this watershed ultimately discharges offsite to an area designated as Outfall 2. 5 Storm Drainage Calculations Fulfilled Engineering LLC POST-301: Post-Development Watershed WS-201 drains from a high point within the property and flows toward the southwestern corner of the subject property. Stormwater from this watershed ultimately discharges offsite to an area designated as Outfall 3 southwest of the subject property. 5.0 SUMMARY OF RESULTS The following tables display the results for Site's analysis. Table 5.1: Pre/Post-Development Peak Flowrate Summary (Outfall 1) OUTFALL 1 Storm Event Pre-Dev Peak I Post-Dev Peak Flow (cfs) Flow (cfs) 2-year, 24-hour 33.97 27.28 10-year, 24-hour 78.43 70.89 25-year, 24-hour I 106.55 99.98 100-year, 24-hour 146.07 l 138.46 Table 5.2: Pre/Post-Development Peak Flowrate Summary (Outfall 2) OUTFALL 2 Storm Event Pre-Dev Peak Post-Dev Peak Flow (cfs) I Flow (cfs) 2-year, 24-hour 0.52 0.12 10-year, 24-hour I 1.28 0.30 25-year, 24-hour I 1.79 0.41 100-year, 24-hour 2.51 0.56 Table 5.3: Pre/Post-Development Peak Flowrate Summary (Outfall 3) OUTFALL 3 Storm Event Pre-Dev Peak ' Post-Dev Peak Flow (cfs) I Flow (cfs) 2-year, 24-hour I 8.36 8.24 10-year, 24-hour 16.25 16.10 25-year, 24-hour I 20.94 20.79 100-year, 24-hour I 27.37 27.15 6 Storm Drainage Calculations Fulfilled Engineering LLC Table 5.4: Stormwater Pond Performance WET-POND (Top of Dam: 679.00, Weir: 677.00, Em. Spillway: 677.60) Storm Event Water Surface Freeboard Elevation (ft) (ft) 2-year, 24-hour I 675.19 3.81 10-year, 24-hour I 676.38 2.62 ...........................................................................................................:.................................................................................................:....................................................................................................... 25-year, 24-hour I 676.96 2.04 100-year, 24-hour 677.76 1.24 Table 5.5: Sediment Calculations Basin # Skimmer Size (in) WET-POND 6" 6.0 CONCLUSIONS Based on a review of the results associated with the Pre-Development/Post-Development storm drainage calculations, this project will result in the reduction of the peak flow rate from stormwater runoff for all applicable storm events. F7 Storm Drainage Calculations Fulfilled Engineering LLC APPENDIX A: PROJECT MAPPING II 8 set, l ,e'-` v I ''may y t'' ('` I B Tu "o ti' 'J N., 4 S�Pr PROPOSED PROJECT �Ra ,eNit BOUNDARY(APPROX.) � ili _ rZ. it_4" y q ...„... r- ,.. 0, . Q, ,0 ,,,,,,c. or "2r'Qer ... r , .` .r v Ira 4. f 4 Q 1 r Itr_ a. r Ia� a''� Creek 4 V' r € PeW 79 ter' LOCATION MAP Ffulfilled TOWN OF SPENCER 1°°° 2000 TA TRUCK STOP ENGINEERINGSCALE IN FEET Fulfilled Projects. Fulfilling Mission. TOWN OF SPENCER, +/-32.85 ACRES PROJECT NO.22008 NORTH CAROLINA REFERENCE:GOOGLE MAPS F _ r • • r, Y PROPOSED PROJECT - BOUNDARY(APPROX.) - f 'xn ',__ v-''' dp , , i ` 8- . r r • i 11 yi y _ /) i i I i7' ii 1 Jr- ' 1 i • i . AERIAL MAP Flf u If i I led TOWN OF SPENCER 1000 2000 TA TRUCK STOP " ENGINEERINGSCALE IN FEET Fulfilled Projects. Fulfilling Mission. TOWN OF SPENCER, +/-32.85 ACRES PROJECT NO.22008 NORTH CAROLINA REFERENCE:GOOGLE MAPS "•-..- '\ \,, l.r•-•-•." -..-'.'" \ \ L% NIP �f ‘-'`,—.1 rr t ' ''''s.*'--\./.4„,—\.,..._,,_‘ 4...-/IPAO iTh PROPOSED PROJECT ( r BOUNDARY(APPROX.) b r_ ,/ %‘'\1.t .:::1) \ \ . ? ti I -- 1 f ) ) k i L /7 � � N'1 -• ‘ 1 1 i k . c . ,.. ._,/ ) . , ,,,, t \ -` 0) fi 4. S...*: i .. air \ �. 1 %. "(IP r' .I ran In • • , Li .A.._,./. '. r (fi.1 . „_, r• • '..N.'t1V•4111111.11.1115N.6 N, . ' \/.. 740 \ t‘ P71"..'..11.. \\\:\ 14 ,;), . \INJ 7 / . , ,,, , ,c, . • , ,....,A, :' '''..\-r(f)c) :\ '''' ,, , ', A 1.� TOPOGRAPHIC MAP F fulfilled TOWN OF SPENCER f 0 500 1000 TA TRUCK STOP ENGINEERINGSCALE IN FEET Fulfilled Projects. Fulfilling Mission. TOWN OF SPENCER, +/-32.85 ACRES PROJECT NO.22008 NORTH CAROLINA REFERENCE:USGS US GEOLOGICAL SURVEY SALISBURY QUADRANGLE NV PROPOSED PROJECT BOUNDARY(APPROX.) i-, .1, Iti til r:E3 f''\ • . Goa j • f 1 ,))./If EnB • r,/1 • Rn � EnC • p fit . . .Vi ,:--4 . SOILS MAP f u If i I led TOWN OF SPENCER 0 500 °°° F TA TRUCK STOP " 1 ENGINEERINGSCALE IN FEET Fulfilled Projects. Fulfilling Mission. TOWN OF SPENCER, +/-32.85 ACRES PROJECT NO.22008 NORTH CAROLINA REFERENCE: NRCS WEB SOIL SURVEY i Rowan County Davidson STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM 1 sa0o0o FEET GRANTS CREEK Unincorporated Areas -, JOINS PANEL 5782 °23,aa, Unincorporated�3 Areas LEGEND i fo`�Nam-— 55 9o•24'so' 554mn^^ eo•24'bo 555 1 587 roo FEET 9o°23'da' 1 580000 FEET SPECIAL FLOOD HAZARD AREAS (SFHAs) SUBJECT TO 1 720 ooa FEET .,,, no aoo FEET INUNDATION BY THE 1%ANNUAL CHANCE FLOOD EVENT I - 'L fr The 1%annual chance flood(100-year flood),also known as the base flood,Is the flood that 39530m" 6, i .,¢ �, ZONE X çNOUNT DAME � ZONE A No Base N CO fVT TY ZONE AE BaseFlood oCievaldons de ermineevation d. / ZON E AE k 20NE AH Flood depths of 1 m 3(eat(usualN areas of ponding);Base Flootl Elevations IREpELL r `.c _ DA IDSON '�k VI determined. / Y� -!/ ZONE AO Flood depths of 1 to 3 feet(usually sheet Flow on sloping errs n);average depths determined. For areas of alluvial fan flooding,velocities also �•ao n a ¢ determined. z.°W/�{! iii • ^ ZONE AR Special Flood Hazard Area formerly protected from me 1%annual chance �A �A�� I °ks mrc N en rO� Flood by a flood control system that was subsequently decertified. Zone AR !N CHU'3A.=e 'f indicates that the former flood control system Is being restored to provide s'l 3534633 — r", .,,'63� ry, protection from me l%annual chance or greater flood. okt1 Rn \v._. �� 1 \% cn`,^ 09 •flow ZONE A99 Areas m be protected from 1%annual chance flood by a Federal Flood ^"' S'` _ no4� '„a protection system under construction;no Base Flood Elevations determined. \`FLOODING EFFECTS FROM ///�'// \ sF44 ZONE VE Coastal Flood cone with velocity hazard(wave action);Base Flood Elevations > ROCK determined. I �0 �( aDKw RIVER ^ 1 ��� ��R I°. /AKE •,•, FLOODWAY AREAS IN ZONE AE ZONE•AE• • __ ��i ( The Floodway Is the channel of a stream plus any adjacent floodplain areas that must be kept -L^ ! -r-�-—1 1.____ J r��_.__- _ "� free of encroachment so that the 1%annual chance Flood can be carried without substantial .'1),,,,,,,, - of increases In flood heights. 1 M TGOMERV 0\ I1(11 9 MECKLENBURG CABARRUS - -/ - `\ I '.\ll':lll'I I Illll I.1 Jurisdiction ((ice \ •••••• OTHER FLOOD AREAS r / STANLV 37U2I o ZONE X '�`t J� 6�'.. ZONE AE • ZONE X Areas of 0.20o annual chance food;areas of 1%annual chance flood with �\ / — ) /00 average depths of less than 1 foot or with drainage areas less than 1 square • \. rQ mile;and areas protected by levees from 1%annual chance flood. DATUM INFORMATION �t/„P 1 -- -- 717500FEET OTHER AREAS 'lz ZONE X Areas determinetl to be outsltle the 0 2%errual chance flootlplaln. The projection used in the preparation of the map was the North Caroline State �O s / �. re*�� 'a ZONED Areas in whkh flood haoends are undeterm netl,but lwssible. Plane(GRS80 NE 3200).The horizontal datum was the North American Datum of o�'. e GRS80 ellipsoid. Differences in datum, ellipsoid, projection, or Universal / F 158 K N COASTAL BARRIER RESOURCES SYSTEM(CBRS)AREAS Transverse Mercator zones used in the production of FIRMS for adjacent FA0025 's jurisdictions may result in slight positional differences in map features across I\,-\ jurisdictional boundaries. These differences do not affect the accuracy of this 0 / �Y - ' N* ® b OTHERWISE PROTECTED AREAS(°PAS) FIRM.All coordinates on this map are in U.S.Survey Feet,where ""�- '' CBRS areas and OPAs are normally located within or adjacent to Special Hood Hazard Areas. 1 U.S.Survey Foot=1200/3937 Meters. / / - ,0 - R ` ZONE X Pk annual chance floodplain boundary Flood elevations on this map are referenced to the North American Vertical v�' ill 0.2%annual chance floodplaln boundary Datum of 1988(NAND 88).These flood elevations must be compared to structure y y,. and ground elevations referenced to the same vertical datum An average offset ,�". ., . , ':., • I I-. '-^ ZONE AE FLOODING EFFECTS FROM ZONE AE Floodway boundary 39J2" between NAVD 88 and the National Geodetic Vertical Datum of 1929(NGVD 29) .S•' (EL 636i VADKIN RIVER (et.636) Zone DbouMery has been computed for each North Carolina county.This offset was then applied \-0 . �� �_� CBRS and OPA boundary to the NGVD 29 food elevations that were not revised during the creation of this • - a 3952 statewide format FIRM.The offsets for each county shown on this FIRM panel are �V� 'Il,t7y\'IIil t'OLlntly ° ( .,,,, \ Boundary dividing Special Flood Hazard Area Zones and boundary shown in the vertical datum offset table below.Where a county boundary and a Q- 0* I I 1 l l lli:trl'poriitetl Alt=,s -.f. • 1 3J "z``Cz'4, Elevations, Special Ha Areas different Base Flood floodingsource with unrevised NGVD 29 flood elevations are coincident, an •Q- O ' " .,-' !' -' - ��—Elevations,flood depths or Flood velocities. or 0 3701�1 " "t .. ZONE AE individual offset has been calculated and applied during the creation of this O ' RV 617 1 -��513^^^^ Base Flood Elevation ne and value;elevation In feet* statewide format FIRM. See Section 6.1 of the accompanying Flood Insurance / <7 Q FA0024 5 H , r� Base Flood Elevation value where uniform within zone;elevation in Study report to obtain further information on the conversion of elevations hQ 6 / SP (EL 987) feet* between NAVD 88 and NGVD 29.To obtain current elevation,description,and/or F location information for bench marks shown on this ma O *Referenced to the North American Vertical Datum of 1988 p, please contact the 2 S North Carolina Geodetic Survey Branch the address shown below. You may also o5`azaa �O �'/ _ h Cross secdan line contact the Information Services Branch of the National Geodetic Survey at(301) %O 2 ti f . 713.3242 or visit its website at hllo/Avww rigs nose goy / 2 O �.. • zs 2s hansec[Ilne k U a ,n - n T "• m Geogrephk ccominates referenced to the North American Datum of North Carolina Geodetic Survey County Average Vertical Datum Offset Table O 2 y*. J an ones sx•2xoo 1983(NAD 83) 121 West Jones Street County Vertical Datum°Rustle) _ 2 Q '+�pT Raleigh,NC 27601 DAVIDSON -0.74 —�- • / y ,�1 � 630�J 4275... 1000-meter Universal Transverse Mercator grid ticks,zone 17 (919)733-3836 ROWAN -ore / v` ` ], O G; _ �,,aa�, {$� W.... a,,�4 m 2500-foot grid values:North Carolina State Plane coordinate system http://www.ncgs.state.nc.us Z O Sjp, "Yt `7 J 1 FEET (F1p5ZDNE 3200,State Plane MAD 83 feet) '`F // 'Ibtyn illSpencer "'k`� Z 'y' SA biS-.-,Le rrifi&e. / \ /_ aarroA4t"e.9 Z 1 Z North Carolina Geodetic Survey bench mark(for more Information a o j �/ OT 16 y a BM5510X visit htm//www ncos aK..lrc.ts) Example:NAND 00=NGVD 2B+(-0.74) d 4, Ad "p 1. : / t National Geodetic Survey bench mark(for more Information visit ,,,1.,-,,, o • '`u" �2 N� - z BM55100 htto://www nos noaa.aov) All streams listed in the Flood Hazard Data Table below were studied by detailed - / _; methods using field survey. Other flood hazard date shown on this map y O �I p' f __ // O(n,,,Z0 c,+ / r''z'6 O NGS-58 GPS 2 5 cm Vertcal Consol Mar or Connractar Establsheed may s c` ���\___` Ic)ycn of STcnLp R m :-,L',',')',(,-,:-' BM5510 NCFMP eencn Marl¢) (for ore formasan t have been derived using either a coastal analysis or limited detailed Rverine 'OR° e - \\ I l,OM1ll OlNp�yCIICe ® lotto.//www nrac,44<.w,s analysis. More information on the flooding sources studied by these analyses Is -I Ilalerril()il;dl jlllisdiellt)il s/ I'Xtrakcrrltbrlal Atria,ICII OII contained in the Flood Insurance Study report. . 370216 M 1.5 River Mlle 70216 k • S N ZONE X M 181 1 A0023 0 �j • / 13)11 n Or Spencer I`-�ytrltcl I Nol i II Jurid'®biorl ( Fi ,re Ro))an'iounn 00° ,� UnincolpolalcLlArc<Lt • f 'y ,i),cn O) rUK I IUN OF F /— — IPROPOSED PROJECT caw BOUNDARY (APPROX.) w Ii,,,n or 2<pevcCi " z cf,a /711?I( / �J .-,.,., .;.:.,.tea, TIE EEC=eLT „ (a 4 ' o I I ,� � EB 11_. �{ tar k �, ZONE Xt r. ,, ..r r sE,a GRID NORTH V.'iio le. e"r1 + I MAP SCALE 1"=500'(1:6,000) • ^F \ `IE V,'# [ Fo / li vcn of Sji nL I Zma x. . o,—, wo �eo 1,00v T S/ I vli ii iiiti Plat lull Lllclirni. r� tw o 160 �METERS I� 37021•• lir)1n Of 11,1S1 SI)cnccr s, /I\Ll alcrri1011 ll luri>Lliuinn ..7 /• 370'll I ( w1� • �' �NFr � PANEL 5781K VIo _ Lea z z ;a FIRM �_ I o �' L `n as DRD FLOOD INSURANCE RATE MAP Q Q H. ,P ° I , I®( NORTH CAROLINA °w oL a I l..lro n.d 3 / i ' ,ky. ZONEx rl PANEL 5781 'I(11rn OI Cast Sp ncc N� 1Fr �y I�JIJ LAYOUT) f d a. L (SEE LOCATOR DIAGRAM OR MAP INDEX FOR FIRM PANEL i,, ` CXUratk liar ial.lUusdictloN "O Q ;]()�I I 1 A * 020 CONTAINS: / r COMMUNITY CID No. PANEL SUFFIX : - _ \ r ./ isµ p,201 ill , :,3. �.v - S 4EHH , DAVIDSON COUNTY 370307 5781 K 710 000 FEET ' s `.lf_ j 710 000 FEET ���II EAST SPENCER,TOWN OF 370211 5781 K eo'averr JOINS PANEL 5780 w°24'O0' town of Spencer \BARRIER LN ao seo en°2300 Iltip. ROWAN COUNTY 370351 5781 K 5535.. 1 582 500 FEET 554c5^, p 555°°°"' 5565m^^ Ilnt 1 580 000 FEET Extraterritorial Jurisdiction 1 590 000 FEET SPENCER,TOWN OF 370218 5781 K 370216 1111111 .'le-I NOTES TO USERS _ rr- r This sit is for use i r as subject t the National Flood Insurance Program. It does not Certain areas not in Special Flood Hazard Areas me of re Flo d b good control structures. This n reflects more detailed and up-to-date stream channel configurations than those MAP REPOSITORY P 9 9 P Y P Y P P Refer to listing of Me Repositories on Me index or visit hflp:/Avww.ncflootlmeps.com. necessarily identify all areas subject to flooding,particularly from local drainage sources of small Refer to Section 4.4"Flood Protection Measures"of the Flood Insurance Study report for shown on the previous FIRM for this jurisdiction. The floodplains and floodways that were g p co p .46IATs^ v 0ARxOf size. The community map repository should be consulted for possible updated or additional information on flood control structures in this jurisdiction. transferred from the previous FIRM may have been adjusted to conform to these new stream , .I. 1. l� flood hazard information. channel configurations. As a result,the Flood Profiles and Floodway Data tables in the Flood EFFECTIVE DATE OF FLOOD INSURANCE RATE MAP PANEL §§ / / .j Base map information and geospatial data used to develop this FIRM were obtained from Insurance Study report(which contains authoritative hydraulic data)may reflect stream channel MARCH 18,2009 p-.-al 3 Y �a„,ff¢. 'I' Cooperating Technical State 410/). . To obtain more detailetlnformatonn areas where Base Flood Elevations(BFEs)and/orfloodwaye various organzations, including the participating local community(ies), state and federal distances that differ from what is shown on this mapCD . �.st:" 1-hv,scooFwnTwc Tccrvry cnL anmrve6 Us have been determined,users are encouraged to consult the Flood Profiles,Floodway Data,Limited agencies,and/or other sources. The primary base for this FIRM is aerial imagery acquired by e...m.... F 5Nc sf J Detailed Flood Hazard Data,and/or Summaryof Stillwater Elevations tables contained within the Flood Davidson CountyEFFECTIVE DATE(S)OF REVISION(S)TO THIS PANEL Illllla NMloe to Ueer�aap d Map Number shown below tie an be Bused ove and Rowan County. The time period of collection for the Davidson imagery is Please refer to the separately printed Map Index for re overview map of the county showing the when piadng p Mars;the Community Number shown above Insurance Study(FIS)report that accompanies this FIRM. Users should be aware that BFEs shown 2004.The time period of collection for the Rowan imagery is 2005. Information and geospatial layout of map panels,community map repository addresses,and a Listing of Communities table JUNE 18,2009' should be uses on Insurance applications ror the cuhen on the FIRM represent rounded whole-foot elevations.These BFEs are intended for flood insurance data supplied by the local community(ies)that met FEMA base map specifications were containing National Flood Insurance Program dates for each community as well as a listing of the community. This digital Flood Insurance Rate Map(FIRM)was produced through a unique rating purposes only and should not be used as the sole source of flood elevation information. considered the preferred source for development of the base map. See geospatial metadata for panels on which each community is located. Accordingly,flood elevation data presented in the FIS report should be utilized in conjunction with the the associated digital FIRM for additional information about base map preparation. MAP REVISED MAP NUMBER cooperative partnership between the State of North Carolina and the Federal Il°'" Emergency Management Agency(FEMA). The State of North Carolina has FIRM for purposes of construction and/or floodplain management. If you have questions about this map,or questions concerning the National Flood Insurance Base map features shown on this map,such as corporate limits,are based on the most up-to- Program in general,please call 1-877-FEMA MAP(1-877-336-2627)or visit the FEMA JUNE 16,2009 3710578100K implemented a long term approach of floodplain management to decrease the Boundaries of regulatory floodwaye shown on the FIRM for flooding sources studied by detailed date data available at the time of publication. Changes n the corporate limits may have website at http://www.femeacw.. 'updated flood hazards to reflect seamless statewide mapping r costs associated with flooding.This is demonstrated by the State's commitment to methods were computed at cross sections and interpolated between cross sections. The(roadways occurred since this map was published.Map users should consult the appropriate community For community map revision history prior to statewide mapping,infer to the Community Map History table located In r 1 a+`'« '"� e� map floodplain areas at the local level. As a part of this effort,the state of North were based on hydraulic considerations with regard to requirements of the National Flood Insurance official or website to verify current conditions of jurisdictional boundaries and base map features. An accompanying Flood Insurance Study report,Letter of Map Revision(LOMR)or Letter of Map the Flood Insurance study report for this jurisdiction. ® $ (0Pars Carolina has joined in a Cooperating Technical State agreement with FEMA to Program.Floodway widths and other pertinent floodway data for flooding sources studied by detailed This map may contain roads that were not considered in the hydraulic analysis of streams where Amendment(LOMA)revising portions of this panel,and digital versions of this FIRM may be !oral 3�"°'gg, k produce and maintain this digital FIRM. methods a well as non-encroachment widths for flooding s studied byIlmitetl detailed no new hydraulic model was created Burin the reduction of this statewide format FIRM. available. Visit the North Carolina Flood plain Mapping Program website et To determine R flood insurance ravaueble in this community,contact vpur remn at agent,the North Carolina llllll Y' y i P 9 s o source Y g P a P PP 9 O9 Division of Emergency Management or the National Flood Insurance Prop t the following phone numbers or IM w .o methods are provided in the Flood Insurance Study(FIS)report for this jurisdiction. The FIS report httoJ/www ncfioodmaps.com,or contact the FEMA Map Service Center at 1-800-358-9616 for websnes: axo s also provides instructions for determining a flcodwey using non encroachment widths for flooding information on all related products associated with this FIRM. The FEMA Map Service Center State of North Carolina www.ncfloodmaps.com sources studied by limited detailed methods. may also be reached by Fax at 1-800 358-9620 and its website at http://www.msc Nc Division of Emergency Management National Flood Insurance Program fema.gov.. (919)715-8000 bnoerco Management 1-800-638-6020 hhp//www.fema.gov/business/nfic/ ` ° _Federal Emergency Management Agency J STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM Town of East Spencer Town of Spencer 1 580 000 FEET Extraterritorial Juni diction Extraterritorial Jurisdiction 1590000FEET LEGEND • cc4 v • °°°°°° JOINS PANEL 5781 55 587500 FEET eo"zsoo ss5 ^' SPECIAL FLOOD HAZARD AREAS (SFHAs) SUBJECT TO 370211 e0°24'3p' 370216 502330 1 �� 710000 FEET 770000 FEET •II9 INUNDATION BY THE Pk ANNUAL CHANCE FLOOD 1 3950 A V 1 IF Y • ` I, 1IL NON The 1%annual chance flood(100-year flood),also known as the base flood,Is the flood that I ■■■■■ I� lJ - \ S -~ �I., 3950�" has a 1%chance being waled orexceeded in anygiven year. The Special Flood Hazard of equaled "„ Area is the area subject to flooding the 1%annual chance flood. Areas of Spedal Flood by ■�®■ as°4t 3e t rill C r` � am,° A Hazard include Zones A,AE,AH,A0,AR,A99,V,and VE. The Base Flood Elevation Is the 'Ttotvno�fS once, water-surface elevation of the 1%annual chance flood. j'1 \ ZONE A No Base Flood Elevddon determined. orals. ,, \7 ZONE AE Base Flood Elevations determined :tip \ 7 ,A( p- 20NE AH Flood delHhs of 1 to 3(eat(usualN areas of pending);Base Flood Elevations IREDELL ®■■��� DA IDSON \ / '1 ^ *fl � determined. ��y1 w r ', ZONE AO Flood depths of 1 to 3 feet(usually sheet flow on sloping terrain);average �MME PI rn $ Ai •. " depths determined. For areas of alluvial fan flooding,velocities also ISAINE�MbEIN ■ PORTION OFConn ,a' ��ti` �' • ,t:, '' determined. ,,�{ ■■■■■■■� RU\fall nt,,.,,i� y .i i 1 ZONE AR Special Hood Hazard Area formerly protected from the 1%annual chance `O� �C l Ininc.()-x1raLLd taut �Z { ?t. flood by a flood control system that was subsequently decertified. Zone AR �s�( �A M.......1111. ■■■■■■ ",■� PROPOSED PROJECT I f tor; indicates that the former flood control system Is being restored[o provide 703 I protection from the 1%annual Chance or greater flood. ■ri ■■■PIPU■■■■■L '4w' r ZONE A99 Areas to be protected from 1%annual chance flood by a Federal flood II11®I.I.I.I.I.I.I.I.I.I.I.II�um BOUNDARY (APPROX.) - '.. ZONE X ZONE X protection system under construction;no Base Flood Elevations determined. ■■■■■■■■■■ . :'O` T .1'":`,ittttx l0\4 n ial Fast ,!; / ZONE VE Coastal food zone with velocity hazard(wave action);Base Flood Elevations �' \F a tleterminetl. =..........■-) 2 -1 37021I` �� c� �■■■■■■■■■■■ �b1. mvom 637" a `CIS .... FLOODWAY AREAS IN ZONE AE ___ ■ sp I(_-- D m •° :; \ ry +t P,• The floodway Is the channel of a stream plus any adjacent floodplain areas that must be kept ✓�����--������O 11 Town of East Spencer N� y Rt\\\;111(OUR,5y, y free of encroachment so that the 1%annual chance flood can be carried without substantial 11 ° I.I.M&ITG MERY EXtraterritorial u, v A I inincorporatCd s b _637•_� Increases In flood heights. MEc NBU G / ME 1 Jurisdiction m 37(1351 t ,�„ ir / •••'••'• OTHER FLOOD AREAS CBARR-= Z ZONEX i 370211 m 4 / ■■ `�� °h_ ZONE X Areas of 0.2%annual chance food;areas of 1%annual chance flood with A '„°) _ �_ / •'1. average depths of less than 1 foot or with drainage areas less than 1 square �s j cv / `ti /T j�y� " 0,,,7..,// mile;and areas protected by levees from 1%annual chance flood. l /QQ • �' F x OTHER AREAS DATUM INFORMATION 1 I J '/ I/ ( 707500FEET j ' j° F /// (6`L9 ZONE X Areas determined to be outside the 0 2%annual chance floodplain. The projection used in the preparation of this map was the North Carolina State .// 4Pe ,""/ \ ZONE AE /// 4 / ______ZONE,,,,X:,,, ZONED Areas in which flood hazards are undetermined,but possible. Plane(FIPSZONE 3200).The horizontal datum was the North American Datum of ro 1983,GRS80 ellipsoid.Differences n datum,ellipsoid,projection,or Universal ZONE X ��\� COASTAL BARRIER RESOURCES SYSTEM(CBRS)AREAS Transverse Mercator zones used in the production of FIRMS for adjacent "' jurisdictions may result in slight positional differences in map features across r e6/ \ -\ jurisdictional boundaries.These differences do not affect the accuracy of this 7 / _ i •1/v\ l OTHERWISE PROTECTED AREAS(OPAS) FIRM.All coordinates on this map are in U.S.Survey Feet,where �n - '.- / •\ "ZONE AE 1 U S.Survey Foot=1200/3937 Meters. m • j CBRS areas and DPAs are normally located within or adjacent to Special Flood Hazard Areas. 7 Flood elevations on this map are referenced to the North American Vertical 'i I ZONE X/ '85' +'N,�I k j+v� ( 1%annual chance floodplain boundary 5949°w `�� 0.2%annual chance floodplain boundary Datum of 1988(NAND 88).These flood elevations must be compared to structure 3s°4t'3a' /��� -i and ground elevations referenced to the same vertical datum.An average offset j k �. Ro an` `fit H ZONE X '� A • - Floodway boundary between NAND 88 end the National Geodetic Vertical Datum of 1929(NGVD 29) w °' - has been computed for each North Carolina county.This offset was then appliedAlt / r5," UnInGOrpOr°t d �,'' r w z ZONE X349 lone D boundary to the NGVD 29 flood elevations that were not revised during the creation of this d y: 7 37l)-3 5 1,I O �j., � � CBRS and OPA boundary statewide format FIRM.The offsets for each county shown on this FIRM panel are /�� - z O ` u 1. Boundary dividing Special Flood Hazard Area Zones and boundary shown in the vertical datum offset table below.Where a county boundary and a - w O /• / ,t� I1!-Eleitlh9 Special Flood Hazard Areas of different Base Flood flooding source with unrevised NGVD 29 flood elevations are coincident,an ZONE X % r a yf v' • Bevat ons,flood depthsor Flood veletasr}.individual offset has been calculated and applied during the creation of this //// ,;/ o • '' / �,' .0 -'.-/ :'- ZONE AE ^^^^513^^^-- Base Flood Elevator ire and value;elevation in feet* statewide format FIRM.See Section 6.1 of the accompanying Flood Insurance ZONE X _p t e _� Study report to obtain further information on the conversion of elevations /j. ZONE AE w ,�... 4z7/ EL 987 Base Flood BevdbOn value where uniform within zone;elevation in between NAVD 88 and NGVD 29.To obtain current elevation description,and/or //. q • ' ` Ell_ I ----' -s*..f ° -•�q bV ( ) fit* location infortnelion for bench marks shown on this map please contact the / sp z �� '� ��a, \ �f+� 4. *Referenced to die NorthAm¢rhWn VeCroo Datum of 1988 North Carolina Geodetic Survey at the address shown below.You may also /. 'tiff/// •P/S/�' Cross section line contact the Information Services Branch of the National Geodetic Surveyat 301 •. \' \ f//GH'ROCK LAKE ,. 713-3242,or visit its website at hltgJ/www nos nose gory ( ) ♦ ,erg I ZONE X �/ Ili �`\ , �I O "Il1 lvY1 E11tit till l:IlCCr oz.) •�®�� 23 83 hansec[Ilne North Carolina Geodetic SurveyCount Avers Vertical Datum Offset Table 1' X6ra�'CgCI O 111..I ll l'1ti(I ICtIOn - FII .. ri Geograpak caortlinates referenced to the North American Datum of ��qtr,•p�ay / 97°07'30',32°22'30' Y 9a Town Creek u"�4i"'"4'�" �•+yL' /raj_ "'PPP42754.. 1000-meter Universal Transverse Mercator grid ticks,zone 17 121 West Jones Street County vemaeho-0vm5ortseunl 7Yrburoryl � �6, `ZONE1� �70211.w Raleigh,NC 27601 *'° � (919)733-3836 Town Creek ' `� A;1 .� ` 2500imt odd values:North Carolina State Plane coordinate system tgLg'/Avww, ncgs Slate nc u9 ' --- I 1 477 500 FEET , . v 'R -__ " ZONE AE G� : 1.: (FIP520NE 3200,State PWne NAD 83 feet) 646 ./ r- fillia� -J \ I k,_ �,�-_N / „"y � '-."- _. 111A- \ z BM55 Carolina Geodetic Survey bench mark(for more information Example:NAvoea=NOV020*(-0.75) „NLHEW,SI +�.,. li- ; C , ,n• t / sy \ �" a 10X visit http//www neoc lseI be.ts) •."- - 1, rb' �� .+s�'' N National Geodetic Survey bench mark(for more Information visit �:'• - - r i ' ; ,' BM5510® http.//www nos noaaeov) All streams listed in the Flood Hazard Data Table below were studied by detailed I t1\F'11 of I,dst SpeneeC• ° .4•. / //V'tr �. / ./�/�O NGS-58 GPS 2 5 cm Vertical Control Marks or Contractor-Established methods using field survey.Other flood hazard data shown on this map may d' s"��� e, .1 ' have been derived using either a coastal analysis or limited detailed Riverine "' 370_I I _ x• BM5510 NCFMP Bench Marl¢ (for more information visit SiMkir, .' ` _.:. .. ® bapuwww nmsaare o,s) analysis.More information on the tdyrflooding sources studied by these analyses is a µ •4 •M1.5 River Mlle contained in the Flood Insurance Study report. 4 Flootlw ay Vvitlih(feet) m - `\ \ FLOOD HAZARD DATA TABLE eVPoghrOstanceFrom o I /ff ,.• a' 6ti 1%Annual Chance the Center of Stream to -o p T� hr ONION { s _ 0.0 CRANE CREEK Cross Stream Flood (.._yeao Encroachment Boundary F� l LruNCN ar ,.A v p ,I 11161 ROCK LAKE 6ti1 ° Section Station' Discharge(cfs) water_surface (LooWng Downstream)or q +'^w ' Bevalhon(feet NAND Total Floodw ay Width Rowan County ! _ I fy12,ON an Countyf`aFr' r- r / ' vaoCLeF an.,F LINE CRANE CREEK Unincorporated Areas -- 1.,arrmoorpor.red Areas (c, �'a 276 27,624 12,860 626.3 499/290 370351 uN gry4Eo o " i 2370441 ;',„1,- • �- /i 6 288 28,624 12,860 - 626.8 1,015/166 oN 6`� 35°40 �f1^1Cq• A .'. t,l / // ) }•F L. _301 30,124 9,8)9 627.3 369/718 ro $ I . ��. • _311 31,124 9,819 628.9 127/278 3�eom , 1 ZONE X 1 ;;°A,,ll i � ^,. / § ZONE X�, 326 32,624 9,819 633.3 493/116 P'i:. . .,. -,a-,-''�7 i- �_ ..7,. '�R ,. - ��,� `1> °m _ 354°3s 333 33,300 9,819 634.1 400/192 n/ ( J� �- ,!/ 3948.0" 351 35,124 9,819 638.1 282/63 �, ZONE AE,- i hp:••�' 638 I Y 366 36,624 9,693 640.6 332/120 /' rule // °,,' `=` ,.sue / J` 381 38,124 9,693 643.2 27/446 �k j '- "396 39,624 9,693 646.3 204/168 /` / ZONE AE `/3oT`r,II s`Y 406 40,624 9,693 650.2 252 125 ^1 t ✓/y1�' iit ' * g.,_1,II7, TOWN CREEK )t �/ '. a \ `,,TT q:3, 3,�0� , • �I�II'Ir.. 023 2,300 NA 626.8 765 v.,..o-rrl 057 5,700 NA 632.2 420 //�y _)-`cry;, f N 080 8,000 NA 637.6 375Ilk(' ZONE X/ GRID NORTH 096 9 600 NA 640.8 405 /4-io. MAP SCALE 1"=b00'11:6,000) 'Feet above mouth > s v \ �r "?`t�'. �� �� �� 1,000 roFaer 647 "' 643 t 1eo 0 1m coo METERS itillit ,„„ glk. r 1 ,, I/ N a r zE „_II Rovv all Con,,, *+d N J PANEL 5780J • �UnmwrpNraU c'IL rcas _ r� l a3Il / 1 t 650 ZONE ^,' '{ ' ;,. sf 1 �f ' .� " a FIRM e°:''‘°P ® ] v;y .rlFLOOD INSURANCE RATE MAP • I.nZONE x +, rolr°.__ I""INORTH CAROLINA ®r / n.rl 35° _ R PANEL 5780 '® p r f � (SEE LOCATOR DIAGRAM OR MAP INDEX FOR FIRM PANEL �f 35°40.00" LAYOUT) a.,. .;"., a a ,� U CONTAINS' .'.� -•" ,'� ',h-ram '� .1 ° '',..1 L COMMUNITY CID No. PANEL SUFFIX R i 1: 0n u L , 0�1'JI °fi,MI �` iN ( ''�i'.t00 rll ' EAST SPENCER TOWN OF 370211 5780 J 700 000 FEET - 0 - ' '.'• 700 000 FEET ROWAN COUNTY 370351 5760 J e0°24'30° 80.2,00' JOINS PANEL 5689 90°23'30" e0°29'00' Illll' SPENCER,TOWN OF 370216 578e J 1 580 000 FEET 1 582 500 FEET 554"'^^ 5550ro" 558"'1"590000 FEET Il nr llllp NOTES TO USERS _ Ir.- r This mapis for use in administeringthe National Flood Insurance Program It does notCertain areas not inSpecial Flood Hazard Areas maybeprotected byThis mapreflects more detailed and up-to-date than those MAP REPOSITORY g flood control structures. p stream channel configurations necessarily identify all areas subject to flooding,particularly from local drainage sources of small Refer to Section 4.4"Flood Protection Measures"of the Flood Insurance Study report for shown on the previous FIRM for this jurisdiction. The floodplains and floodways that were Refer to listing Of map Repositories on Map Index or visit hap://wvirv.nciloodmaps.com. CD y°'sodz^ry, 0 eAa,ye size. The community map repository should be consulted for possible updated or additional information on flood control siruclures in this jurisdiction. transferred from the previous FIRM may have been adjusted to conform to these new stream .Y' "bj;., .I. ,N(lltlll it,/.i\: l�T flood hazard information. channel configurations. Asa result,the Flood Profiles and Floodway Data tables in the Flood EFFECTIVE DATE OF FLOOD INSURANCE RATE MAP PANEL CD §§ / ! j J Base map information and geospatial data used to develop this FIRM were obtained from Insurance Study report(which contains authoritative hydraulic data)may reflect stream channel h•-•rl 3 ,e„ ;: I' COO pt l.ItinL I CChniCN1 State y . To obtain more detailetl information n areas where Base Flood Elevations(BFEs)and/or floodwaye various organizations, Including the participating local communhty(ies), state and federal distances that differ from what is shown on this map. JUNE 18,2009CD �q - mtw,sceoFwnTwG TECHNICAL PARTNER vr� have been determined,users are encouraged to consult the Flood Profiles,Floodway Data,Limited agencies,and/or other sources. The primary base for this FIRM is aerial imagery acquired by •v...w... `axe sf o Detailed Flood Hazard Data,and/or Summaryf Stillwater Elevations tables contained within the Flood Rowan Count The time period of collection for the i EFFECTIVE DATE(S)OF REVISION(S)TO THIS PANEL Illlllr NMloe to User The Map Number shown below should be used a y p met is base Information and Please refer to the separately printed Map Index for re overview map of the county showing the wean placing P orders,the Community Number shown above Insurance Study(FIS)report that accompanies this FIRM. Users should be aware that BFEs shown geospatial data supplied by the local community(ies)that met FEMA base map specrficabons layout of map panels,community map repository addresses,and a Listing of Communities table should be used on insurance applications for the swoon on the FIRM represent rounded whole-foot elevations.These BFEs are intended for flood insurance were considered the preferred source for development of the base map. See geospatial containing National Flood Insurance Program dales for each community as well as a listing of the community This digital Flood Insurance Rate Map(FIRM)was produced through a unique rating purposes only and should not be used as the sole source of flood elevation information metadata for the associated digital FIRM for additional information about base map preparation panels on which each community is located. Accordingly,flood elevation data presented in the FIS report should be utilized in conjunction with the EFFECTIVE DATE MAP NUMBER cooperative partnership between the State of North Carolina and the Federal II°" Emergency Management Agency(FEMA). The State of North Carolina has FIRM for purposes of construction and/or floodplain management. Base map features shown on this map,such as corporate limits,are based on the most up-to- If you have questions about this map,or questions concerning the National Flood Insurance date data available at the time of publication Changes in the corporate limits may have Program in general,please call 1-877-FEMA MAP(1-877-336-2627)or visit the FEMA JUNE 16,2009 3710578000J implemented a long term approach of floodplain management to decrease the Boundaries of regulatory floodways shown on the FIRM for flooding sources studied by detailed occurred since this map was published.Map users should consult the appropriate community website at http://www.fema.gov. costs associated with flooding.This is demonstrated by the State's commitment to methods were computed at cross sections and interpolated between cross sections. The floodwys official or website to verify current conditions of jurisdictional boundaries and base map features. r 1 v�r\P,. ma floodplain areas at the local level. As art of this effort,the state of North For •community map reWsion history prior to natewide mapping.refer to the Community Map History table located In CD 4 «r.n„ P p P re based on hydraulic considerations with regard to requirements of the National Flood Insurance This map may contain roads that were not considered in the hydraulic analysis of streams where An accompanying Flood Insurance Study report,Letter of Map Revision(LOMR)or Letter of Map the Flood Insurance study report for this jurisdiction. g Carolina has joined in a Cooperating Technical State agreement with FEMA to Program.Floodway widths and other pertinent floodway data for flooding sources studied by detailed no new hydraulic model was created during the production of this statewide format FIRM. Amendment(LOMA)revising portions of this panel,and digital versions of this FIRM may be m eetem,loe s good insurance la available m this community,comes your insurance a ant the North Carolina !oral 3- k produce and maintain this digital FIRM. methods as well as non-eencroachment widths for floodingsources studied by limited detailed available. Visit the North Carolina Flood lain Mapping Program website ate y g le 11111 "�'. eo, y > 9 P PP 9 09 Division of Emergency Management or the National Flood Insurance Program et the following phone numbers or IllpI methods are provided in the Flood Insurance Study(FIS)report for this jurisdiction. The FIS report http://www.ncfloodmaps.com,or contact the FEMA Map Service Center at 1-800-358-9616 for websnes: also provides instructions for determining a floodway using non-encroachment widths for flooding information on all related products associated with this FIRM. The FEMA Map Service Center '•II State of North Carolina www,ncfloodmaps.com sources studied by limited detailed methods may also be reached by Fax at 1-800-358-9620 and its website at http://www.msc fema.gov. NC Division of Emergency Management National Flood Insurance Program (919)715-8000 http:nwww.nurme°nntrol.nmmnp 1-800-838A620 httpWwww.fema.00vlbusiness'nflN ` 'r _Federal Emergency Management Agency J 1 :I .• - - � #` • , . .� `� _ _ i _«� o' ..1 I . . r I- • . $115 go _ K•. ' PROPOSED PROJEC l ' 4,44.:1 lb ilt BOUNDARY(APPROX.) s. , 4-4b,„ .1 . r . 4 *, ' rillikr; 44 4111 1.46 . 4.114; ' 1/"- 4 r • • / , . . , 4 ... .. A . „.. , , • • . : _ • i . • .i i :Of ' • - . i • 1 . ' `.-• .), t I I 4 . 141,611-A,T.. , Z i k IAA - ' ' 4 ig:c. 11 ' • , • Si ` R r Ira • •• i•1 • •11 4 �j - WETLANDS MAP f u If i I led TOWN OF SPENCER 0 500 °°° F TA TRUCK STOP " 1 ENGINEERINGSCALE IN FEET Fulfilled Projects. Fulfilling Mission. TOWN OF SPENCER, +/-32.85 ACRES PROJECT NO.22008 NORTH CAROLINA REFERENCE:NWI WETLANDS SURVEY Storm Drainage Calculations Fulfilled Engineering LLC APPENDIX B: PRE-DEVELOPMENT F9 Storm Drainage Calculations Fulfilled Engineering LLC Pre-Development Watershed Map F10 LEGEND: fI - -zoo EXISTING CONTOUR 7 PROJECT BOUNDARY 0 PRE-DEVELOPMENT WATERSHED AREAS 1 ` , to J I war/ • Z 1.71..,'\ .... I 0 o ci 2 0 1 .: 0 •l, N . J H 0 1 .1, Z •o- .• w o Q '/idllIl.'b".' ' I I O a Z v1 LJ� o1 E:co1 N 1 g 1 uJ C O- TdoOMLJJ Z�ZL� t' �I � V com , , �w � v ri o � m w Y -aJZ° °� In LL Or . 1 io i OUTFACE II . w 2 a 0 w O w J = W W 0 H a j / PRE-DEVELOPMENT WATERSHEDS ,/ WATERSHED AREA[AC.] HYDR.LENGTH[FT.] SLOPE[%] CURVE NUMBER[CN] ., . PRE-101 65.35 3,377 2.66 69 - . ' - PRE-201 0.73 343 3.00 66 PRE-301 6.61 1,258 4.89 77 ,..d Z O J w N > 0_ o a u N Y o D • LL V L.' m 'may, /. / a a J r�� ♦ w Z a VI O Q MPGNFt, 00 = - / DATE:JANUARY 4,2024 SCALE: ,iwitil „...iiiviiforisr-----' / °OP I 100 50 0 100 200 300 PROJECT C 1 I I I I I I NO. OF 3 SCALE IN FEET I� 22008 Storm Drainage Calculations Fulfilled Engineering LLC Pre-Development Node Diagram II11 WrGREW I I I I I I I I OUTFFl1-2 PRE-201 -111 PRE-301 / r / d / / / OUTFOLL-3 CI «RFPLL-1 LI Autodesk Storm and Sanitary Analysis Storm Drainage Calculations Fulfilled Engineering LLC Pre-Development Calculations • 2-year, 24-hour Storm Event (Reduced) • 10-year, 24-hour Storm Event • 25-year, 24-hour Storm Event (Reduced) • 100-year, 24-hour Storm Event (Reduced) II12 Project Description File Name PRE.SPF Project Options Flow Units CFS Elevation Type Elevation Hydrology Method SCS TR-55 Time of Concentration(TOC)Method SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes YES Skip Steady State Analysis Time Periods YES Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent Dry Days 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step 0 00:05:00 days hh:mm:ss Reporting Time Step 0 00:05:00 days hh:mm:ss Routing Time Step 5 seconds Number of Elements Qty Rain Gages 1 Subbasins 3 Nodes 5 Junctions 2 Outfalls 3 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 1 Channels 0 Pipes 1 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 1 Time Series 002-YR Cumulative inches North Carolina Rowan 2.00 3.50 SCS Type II 24-hr Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 PRE-101 65.35 484.00 69.49 3.50 0.98 64.04 34.12 0 00:53:16 2 PRE-201 0.73 484.00 66.04 3.50 0.80 0.59 0.53 0 00:22:06 3 PRE-301 6.61 484.00 76.71 3.50 1.41 9.33 8.36 0 00:28:02 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 NULL-1 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 2 NULL-2 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 3 OUTFALL-1 Outfall 651.20 33.97 651.20 4 OUTFALL-2 Outfall 716.35 0.52 716.35 5 OUTFALL-3 Outfall 663.20 8.36 663.20 Project Description File Name PRE.SPF Project Options Flow Units CFS Elevation Type Elevation Hydrology Method SCS TR-55 Time of Concentration(TOC)Method SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes YES Skip Steady State Analysis Time Periods YES Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent Dry Days 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step 0 00:05:00 days hh:mm:ss Reporting Time Step 0 00:05:00 days hh:mm:ss Routing Time Step 5 seconds Number of Elements Qty Rain Gages 1 Subbasins 3 Nodes 5 Junctions 2 Outfalls 3 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 1 Channels 0 Pipes 1 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 1 Time Series 010-YR Cumulative inches North Carolina Rowan 10.00 5.10 SCS Type II 24-hr Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 PRE-101 65.35 484.00 69.49 5.10 2.07 135.27 78.68 0 00:53:16 2 PRE-201 0.73 484.00 66.04 5.10 1.80 1.31 1.32 0 00:22:06 3 PRE-301 6.61 484.00 76.71 5.10 2.68 17.72 16.27 0 00:28:02 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 NULL-1 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 2 NULL-2 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 3 OUTFALL-1 Outfall 651.20 78.43 651.20 4 OUTFALL-2 Outfall 716.35 1.28 716.35 5 OUTFALL-3 Outfall 663.20 16.25 663.20 Subbasin Hydrology Subbasin:PRE-101 Input Data Area(ac) 65.35 Peak Rate Factor 484 Weighted Curve Number 69.49 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 50-75%grass cover,Fair 11.91 B 69 50-75%grass cover,Fair 3.72 C 79 Urban industrial,72%imp 3.88 B 88 Urban industrial,72%imp 1.56 C 91 Woods,Fair 11.55 C 73 Woods,Fair 20.04 B 60 1 acre lots,20%impervious 4.95 B 68 1/2 acre lots,25%impervious 0.58 3 70 Existing Buildings 0.23 3 98 Existing Pond Surface 0.04 B 98 Existing Roadway 1.36 B 98 Woods&grass combination,Fair 5.53 B 65 Composite Area&Weighted CN 65.35 69.49 Time of Concentration TOC Method:SCS TR-55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^0.8))/((P^0.5)*(Sf^0.4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(Sf^0.5)(unpaved surface) V=20.3282*(Sf^0.5)(paved surface) V=15.0*(Sf^0.5)(grassed waterway surface) V=10.0*(Sf^0.5)(nearly bare&untilled surface) V=9.0*(Sf^0.5)(cultivated straight rows surface) V=7.0*(Sf^0.5)(short grass pasture surface) V=5.0*(Sf^0.5)(woodland surface) V=2.5*(Sf^0.5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(Sf^0.5))/n R =Aq/Wp Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) R =Hydraulic Radius(ft) Aq=Flow Area(ft*) Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n =Manning's roughness Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 1 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.06 0 0 Computed Flow Time(min): 27.09 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 810 485 1982 Slope)%): 3.15 2.56 2.56 Surface Type: Grass pasture Paved Unpaved Velocity(ft/sec): 1.24 3.25 2.58 Computed Flow Time(min): 10.89 2.49 12.8 Total TOC(min) 53.27 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 2.07 Peak Runoff(cfs) 78.68 Weighted Curve Number 69.49 Time of Concentration(days hh:mm:ss) 0 00:53:16 Subbasin:PRE-101 Rainfall Intensity Graph 7.5 7_ 6.5- 6 5.5 5 - 4.5- r c 4 m c 3.5 0! 3 2.5 2 1.5 1 0.5-� - 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 85 80- 75- 70 65- 60 55 50 43 N - 45 c 40 35- 30 25- 20 15- 10- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PRE-201 Input Data Area(ac) 0.73 Peak Rate Factor 484 Weighted Curve Number 66.04 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 50-75%grass cover,Fair 0.49 B 69 Woods,Fair 0.24 B 60 Composite Area&Weighted CN 0.73 66.04 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 3 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 17.46 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 243 0 0 Slope(%): 3 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.87 0 0 Computed Flow Time(min): 4.66 0 0 Total TOC(min) 22.11 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 1.8 Peak Runoff(cfs) 1.32 Weighted Curve Number 66.04 Time of Concentration(days hh:mm:ss) 0 00:22:07 Subbasin:PRE-201 Rainfall Intensity Graph 7.5 7_ 6.5- 6 5.5 5 — 4.5- r c 4 m -c 3.5 0! 3 2.5 2 1.5 1 0.5-� - 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 1.35 1.3- 1.25 1.2 1.15 1.1 1.05 1 0.95 0.9 0.85 0.8 0.75 0.7 00.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PRE-301 Input Data Area(ac) 6.61 Peak Rate Factor 484 Weighted Curve Number 76.71 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 50-75%grass cover,Fair 0.75 B 69 50-75%grass cover,Fair 3.74 C 79 Woods,Fair 0.11 B 60 Woods,Fair 1.75 C 73 Existing Pond Surface 0.26 C 98 Composite Area&Weighted CN 6.61 76.71 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.48 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.12 0 0 Computed Flow Time(min): 13.72 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 776 157 225 Slope(%): 5.48 0.5 5.68 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.17 1.14 3.85 Computed Flow Time(min): 11.05 2.3 0.97 Total TOC(min) 28.04 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 2.68 Peak Runoff(cfs) 16.27 Weighted Curve Number 76.71 Time of Concentration(days hh:mm:ss) 0 00:28:02 Subbasin:PRE-301 Rainfall Intensity Graph 7.5 7_ 6.5- 6 5.5 5 - 4.5- r c 4 m c 3.5 0! 3 2.5 2 1.5 1 0.5-� - 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 18 17- 16- 15 14 13 12 11- 10- Uy . O 9- C 8- 7- 6 5 4 3 2- 1- . AIM 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Project Description File Name PRE.SPF Project Options Flow Units CFS Elevation Type Elevation Hydrology Method SCS TR-55 Time of Concentration(TOC)Method SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes YES Skip Steady State Analysis Time Periods YES Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent Dry Days 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step 0 00:05:00 days hh:mm:ss Reporting Time Step 0 00:05:00 days hh:mm:ss Routing Time Step 5 seconds Number of Elements Qty Rain Gages 1 Subbasins 3 Nodes 5 Junctions 2 Outfalls 3 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 1 Channels 0 Pipes 1 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 1 Time Series 025-YR Cumulative inches North Carolina Rowan 25.00 6.00 SCS Type II 24-hr Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 PRE-101 65.35 484.00 69.49 6.00 2.76 180.24 106.68 0 00:53:16 2 PRE-201 0.73 484.00 66.04 6.00 2.44 1.78 1.84 0 00:22:06 3 PRE-301 6.61 484.00 76.71 6.00 3.45 22.80 20.99 0 00:28:02 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 NULL-1 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 2 NULL-2 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 3 OUTFALL-1 Outfall 651.20 106.55 651.20 4 OUTFALL-2 Outfall 716.35 1.79 716.35 5 OUTFALL-3 Outfall 663.20 20.94 663.20 Project Description File Name PRE.SPF Project Options Flow Units CFS Elevation Type Elevation Hydrology Method SCS TR-55 Time of Concentration(TOC)Method SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes YES Skip Steady State Analysis Time Periods YES Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent Dry Days 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step 0 00:05:00 days hh:mm:ss Reporting Time Step 0 00:05:00 days hh:mm:ss Routing Time Step 5 seconds Number of Elements Qty Rain Gages 1 Subbasins 3 Nodes 5 Junctions 2 Outfalls 3 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 1 Channels 0 Pipes 1 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 1 Time Series 100-YR Cumulative inches North Carolina Rowan 100.00 7.20 SCS Type II 24-hr Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 PRE-101 65.35 484.00 69.49 7.20 3.73 243.82 146.21 0 00:53:16 2 PRE-201 0.73 484.00 66.04 7.20 3.37 2.46 2.55 0 00:22:06 3 PRE-301 6.61 484.00 76.71 7.20 4.51 29.84 27.39 0 00:28:02 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 NULL-1 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 2 NULL-2 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 3 OUTFALL-1 Outfall 651.20 146.07 651.20 4 OUTFALL-2 Outfall 716.35 2.51 716.35 5 OUTFALL-3 Outfall 663.20 27.37 663.20 Storm Drainage Calculations Fulfilled Engineering LLC APPENDIX C: POST-DEVELOPMENT II13 Storm Drainage Calculations Fulfilled Engineering LLC Post-Development Watershed Map II14 LEGEND: ] I J ; \ ) - — —zoo— — EXISTING CONTOUR 1jAi / �( / � ILPROJECT BOUNDARY J 1 _ ____ I / /0IL, POST DEVELOPMENT WATERSHED AREAS J / I / \ 1 ) ) _ �� ��� � . ! I liL � � , ,,�,r,(� ��, ��„,ter°,- / �� / it ):.,,. i L7, . � --( (off o �� ��� J�/�/� / , 4 �� ' /, ),n____ 7 // LT i 7 (r 7 ---- -----/-- -------\-------- ' -'-\__-1- --- -—-—/./ -----77 /7 -- /// / ( ' i r , w p //7///1/(///(7 /(/ /� / / P ST-2 '1 5730732O; / //// // / / i ,//":„ .1 '- . //1 i /, It\ 2 : \ I ( Jp III/ / ___.. .- 730�732=734 �' 7 O- Jl vt 7\ 0 1 / _~ OUTFACE 2 i / ` 1 _ .724- ., � O . .. -\ --:. mr---7 -----0,.."---, it _-------- \ t )//) �--7 )2 / 6 56;...6. .0. '.7c 11110___ '— --, z H ----- -. ---7- ,n/ 7 --r i -, I __ A ,t. .‘. % 4cf.a it\___, '.' ------", /7/0/1,/‘ \ , . . . • , ,,----- --i-- ) __\ ____. _ ,, i A , , \---7 , 7%/ N 1 w .c I \ , ,8 N -. � 1 / d ri, 0 1 / �� o 4l4in4k' / /// 11m 716 x O w V ' / )i‘1 ' 1//// / • : —7,0 0 ,.► i \\ / \ c ‘1.1Z p p ( , \ ) ,,,, _70,___P'• -1 7 NV • 2 2 TI, — 1 I ///// / __I__ \ � I 2. 6�4 I'' 1 -- i .., / 688 sy v+so 702'y98 � j��� ( ,\ _ ,� 0 // , -_,------—_,,,,, ,i-,----— \ 7 _ _,, ...._ „--,- -- 7-(,, ,____________, N., ___---- ) ) s o� _ \3 .1 „ — , \ ,_,..--- -,___ _______________Th\,/// (( s(0(,...,, .. , iiiii, --,.. .......„ ._ J ..........,,, ,,,,„,,, � � e --1--—-—---'-'1 --- ---------_,___7 7 i '------ry \I , Nis __,4- ) 44..„ c_________,„://, 7,//\ , , ___I „(---- N 7 6\ -,, \-NN 7-7— 71,:.'//4' , * . .i)*'II i 4 --I \1/4 \ \------- _._.______ciLIPIFW___ _1/ j /7/1 2 / \ OUTFACE 7I \ —i672 - /J/-" 'i(r( y ___ ------\--\_- ----\ - 6,6,:8, - ___-5----------------- '---/----1--rz:17 /-----i j;, 1/, ) / / 0 V( Z 0- ,----- -' ./ \I . / ----1 ZZ-fjj :_l_i_Zi17}L7/y / / / /i / j . 0 1 (\ --- --- ---it7\- \ -, --- - N___, — ,_. , ,_______,,J -- ____---__ Z---9 ' 7— L:7/—) 7-------,z----":77/ .,,/ ---// / (-------\/ _jL_____yr____/___7:.*_j \,,, 7 7--N --/\_„... .."-\74(;\ \ //-/..---- _./--------f-,, -:"-- a f)1 ; A — -._— -,\ < J >-------- ___L l / / 7 / A Luce ) 7/ f-7/i( /i \ . i- // :----\ -\ \ \ / / I / POST-DEVELOPMENT WATERSHEDS T %i p 1__— `/ 1 I ��' / / / \�1 ^ / —^—( L WATERSHED AREA[AC.] HYDR.LENGTH[FT] SLOPE[%] CURVE NUMBER[CN] / / p ~/ / ------ / ` / ` POST-101 44.00 3,377 2.66 70 / � � \ ^� POST-102 21.96 1,690 3.62 93/' ( ( POST-201 0.1425423666WV/ , �/ POST-301 659 1,258 489 77 ZQJJ � ;V4 ( if( a LA o _______7.________--/ ') L '------,,.__ LA c / // Z Y / a _---/-,-/ ( �j / MPGNEj`NUR1 \\- -r- / / H � �- G/ / (7. ____ .. DATE:JANUARY 4,2024 ,_-__ SCALE: 1 / / , 100 50 0 100 200 300 PROJECT NO. OF 3 SCALE IN FEET I� 22008 Storm Drainage Calculations Fulfilled Engineering LLC Post-Development Node Diagram II15 �yp=CST OUIFALL-2 V-L POSrd01 I d WET-POND POSf301 WEIR(TOP OF SOX) I WEIR-1 WEIR- I L. -0RIF-2'YYO WEIR-2 L• •ILOW-0RIF- I EYSPILLWAY js Ppr25 POND-OUT OUTFALL3 Pipe-24 OUIFALL-1 Autodesk Storm and Sanitary Analysis Storm Drainage Calculations Fulfilled Engineering LLC Post-Development Calculations • 2-year, 24-hour Storm Event (Reduced) • 10-year, 24-hour Storm Event • 25-year, 24-hour Storm Event (Reduced) • 100-year, 24-hour Storm Event (Reduced) II16 Project Description File Name POST(WETPOND).SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)I'Ethod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Time Periods YES Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 5 seconds Number of Elements ety Rain Gages 1 Subbasins 4 Nodes 8 Junctions 4 Outfalls 3 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 12 Channels 1 Pipes 2 Pumps 0 Orifices 4 Wens 5 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 1 Time Series 002-YR Cumulative inches North Carolina Rowan 2.00 3.50 SCS Type ll24-hr Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak lime of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 POST-101 44.00 484.00 70.37 3.50 1.03 45.28 24.48 0 00:53:16 2 POST-102 21.96 484.00 92.72 3.50 2.71 59.45 56.27 0 00:25:19 3 POST-201 0.14 484.00 66.43 3.50 0.82 0.11 0.12 0 00:16:49 4 POST-301 6.59 484.00 76.53 3.50 1.40 9.23 8.27 0 00:28:02 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak MaxHGL Max Mn Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Hooded Hooded Elevation Elevation Attained Depth Attained Hooding Volume Attained Occurrence (ft) (ft) ($) (ft) (ft') (cfs) (8) (8) (ft) (days hh:mm) (ac-in) (min) 1 NULL1 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 2 NULL2 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 3 OS Junction 667.25 679.00 667.25 679.00 0.00 5.51 668.35 0.00 10.65 0 00:00 0.00 0.00 4 POND-OUT Junction 666.00 679.00 666.00 679.00 0.00 5.51 666.12 0.00 12.88 0 00:00 0.00 0.00 5 OUIFALLI Outfall 651.20 27.28 651.32 6 OUTFALL-2 Outfall 716.35 0.12 716.35 7 OUIFALL3 Outfall 663.20 8.24 663.20 8 WET-POND Storage Node 667.25 679.00 671.75 0.00 55.02 675.19 0.00 0.00 Link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity DesignFlow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (m) (cfs) (cfs) (ft/sec) (ft) (min) 1 NULL-PIPE Pipe NULL-1 NULL-2 90901.97 0.00 0.00 0.0000 18.000 0.0150 0.00 0.01 0.00 0.00 0.00 0.00 0.00 Calculated 2 Pipe-25 Pipe OS POND-OUT 93.00 667.25 666.00 1.3400 24.000 0.0130 5.51 26.23 0.21 6.80 0.61 0.30 0.00 Calculated 3 Pipe-24 Channel POND-OUT OUIFALL-1 425.00 666.00 651.20 3.4800 90.000 0.0500 5.51 7358.42 0.00 1.31 0.12 0.02 0.00 4 LOW-ORIF Orifice WET-POND OS 667.25 667.25 11.000 1.43 5 LOW-ORIF-2 Orifice WET-POND OS 667.25 667.25 11.000 1.43 6 LOW-ORIF-3 Orifice WET-POND OS 667.25 667.25 11.000 1.43 7 WQ Orifice WET-POND OS 667.25 667.25 5.000 1.21 8 EM-SPILLWAY Weir WET-POND POND-OUT 667.25 666.00 0.00 9 WEIR(TOP OF BOX) Weir WET-POND OS 667.25 667.25 0.00 10 WEIR-1 Weir WET-POND OS 667.25 667.25 0.00 11 WF7R2 Weir WET-POND OS 667.25 667.25 0.00 12 WEIR3 Weir WET-POND OS 667.25 667.25 0.00 Project Description File Name POST(WETPOND).SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)I'Ethod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Time Periods YES Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 5 seconds Number of Elements ety Rain Gages 1 Subbasins 4 Nodes 8 Junctions 4 Outfalls 3 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 12 Channels 1 Pipes 2 Pumps 0 Orifices 4 Wens 5 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 1 Time Series 010-YR Cumulative inches North Carolina Rowan 10.00 5.10 SCS Type ll24-hr Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak lime of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 POST-101 44.00 484.00 70.37 5.10 2.14 94.20 55.13 0 00:53:16 2 POST-102 21.96 484.00 92.72 5.10 4.27 93.66 86.84 0 00:25:19 3 POST-201 0.14 484.00 66.43 5.10 1.83 0.26 0.30 0 00:16:49 4 POST-301 6.59 484.00 76.53 5.10 2.67 17.56 16.13 0 00:28:02 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak MaxHGL Max Mn Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Hooded Hooded Elevation Elevation Attained Depth Attained Hooding Volume Attained Occurrence (ft) (ft) ($) (ft) (ft') (cfs) (8) (8) (ft) (days hh:mm) (ac-in) (min) 1 NULL1 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 2 NULL2 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 3 OS Junction 667.25 679.00 667.25 679.00 0.00 18.06 671.39 0.00 7.61 0 00:00 0.00 0.00 4 POND-OUT Junction 666.00 679.00 666.00 679.00 0.00 18.06 666.24 0.00 12.76 0 00:00 0.00 0.00 5 OUIFALLI Outfall 651.20 70.89 651.44 6 OUTFALL-2 Outfall 716.35 0.30 716.35 7 OUIFALL3 Outfall 663.20 16.10 663.20 8 WET-POND Storage Node 667.25 679.00 671.75 0.00 84.67 676.38 0.00 0.00 Link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity DesignFlow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 NULL-PIPE Pipe NULL-1 NULL-2 90901.97 0.00 0.00 0.0000 18.000 0.0150 0.00 0.01 0.00 0.00 0.00 0.00 0.00 Calculated 2 Pipe-25 Pipe OS POND-OUT 93.00 667.25 666.00 1.3400 24.000 0.0130 18.06 26.23 0.69 10.00 1.12 0.56 0.00 Calculated 3 Pipe-24 Channel POND-OUT OUIFALL-1 425.00 666.00 651.20 3.4800 90.000 0.0500 18.05 7358.42 0.00 2.08 0.24 0.03 0.00 4 LOW-ORIF Orifice WET-POND OS 667.25 667.25 11.000 3.88 5 LOW-ORIF-2 Orifice WET-POND OS 667.25 667.25 11.000 3.88 6 LOW-ORIF-3 Orifice WET-POND OS 667.25 667.25 11.000 3.88 7 WQ Orifice WET-POND OS 667.25 667.25 5.000 1.41 8 EM-SPILLWAY Weir WET-POND POND-OUT 667.25 666.00 0.00 9 WEIR(TOP OF BOX) Weir WET-POND OS 667.25 667.25 0.00 10 WEIR-1 Weir WET-POND OS 667.25 667.25 1.67 11 WDR2 Weir WET-POND OS 667.25 667.25 1.67 12 WEIR-3 Weir WET-POND OS 667.25 667.25 1.67 Subbas in Hydrology Subbasin:POST-101 Input Data Area(ac) 44 Peak Rate Factor 484 Weighted Curve Number 70.37 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 50-75%grass cover,Fair 1.77 B 69 50-75%grasscover,Fair 1.8 C 79 Urban industrial,72%imp 3.88 B 88 Urban industrial,72%imp 1.56 C 91 Woods,Fair 7.76 C 73 Woods,Fair 14.99 B 60 1 acre lots,20%impervious 3.24 B 68 Existing Buildings 0.23 B 98 Existing Roadway 1.36 B 98 Woods&grass combination,Fair 5.17 B 65 Proposed paved parking&roofs 0.2 B 98 >75%grass cover,Good 0.9 B 61 >75%grass cover,Good 0.56 C 74 Proposed Roadway 0.5 B 98 1/2 acre lots,25%impervious 0.08 B 70 Composite Area&Weighted CN 44 70.37 Time ofConcentration TOC tvithod:SCS TR 55 Sheet Flow Equation: Tc=(0.007*((n*Li)^0.8))/((P^0.5)*(Sf`0.4)) Where: Tc=Time of Concentration(hr) n =Nhnning's roughness Lf=FlowLength(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(Sf0.5)(unpaved surface) V=20.3282*(Sf'0.5)(paved surface) V=15.0*(Sf`0.5)(grassed waterway surface) V=10.0*(Sf`0.5)(nearlybare&untilled surface) V=9.0*(Sf 0.5)(cultivated straight rows surface) V=7.0*(Sf 0.5)(short grass pasture surface) V=5.0*(St„0.5)(woodland surface) V=2.5*(Sf`0.5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(Sf`0.5))/n R=Aq/Wp Tc=(If/Vj/(3600sec/hr) Where: Tc=Time of Concentration(hr) If=Flow Length(ft) R=Hydraulic Radius(ft) Aq=Flow Area(1F) Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Nhnning's roughness Subarea Subarea Subarea Sheet Flow Computations A B C lvhnning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 1 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.06 0 0 Computed Flow Time(min): 27.09 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 810 485 1982 Slope(%): 3.15 2.56 2.56 Surface Type: Grass pasture Paved Unpaved Velocity(ft/sec): 1.24 3.25 2.58 Computed Flow lime(min): 10.89 2.49 12.8 Total TOC(min) 53.27 Subbasin RunoffResults Total Rainfall(in) 5.1 Total Runoff(in) 2.14 Peak Runoff(cfs) 55.13 Weighted Curve Number 70.37 Time of Concentration(days hh:mm:ss) 0 00:53:16 Subbasin:POST-101 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m • 3 2.5 2 1.5 1 0.5 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 58 56 54 52 50 48 46 44 42 40 38 36 _ 34 m 32 — U 30 0 28 c • 26 • 24 22 20 18 16 14 12 10 8 6 4 2 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:POST-102 Input Data Area(ac) 21.96 Peak Rate Factor 484 Weighted Curve Number 92.72 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Proposed paved parking&roofs 2.51 C 98 Proposed paved parking&roofs 14.42 B 98 >75%grass cover,Good 1.76 B 61 >75%grass cover,Good 0.89 C 74 Proposed Pond Surface 1.34 C 98 1/2 acre lots,25%impervious 1.05 B 70 Composite Area&Weighted CN 21.97 92.72 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 4 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow Time(min): 15.56 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 92 1243 255 Slope(%): 13 3.54 0.5 Surface Type: Grass pasture Paved Unpaved Velocity(ft/sec): 2.52 3.82 1.14 Computed Flow Tune(min): 0.61 5.42 3.73 Total TOC(min) 25.32 Subbasin RunoffResults Total Rainfall(in) 5.1 Total Runoff(in) 4.27 PeakRunoff(cfs) 86.84 Weighted Curve Number 92.72 Time of Concentration(days hh:mm:ss) 0 00:25:19 Subbasin:POST-102 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 90 85- - 80- 75 70- 65- 60 55 w 50- o . 45 0 40- 35- 30 25 20- 15 10 5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:POST-201 Input Data Area(ac) 0.14 Peak Rate Factor 484 Weighted Curve Number 66.43 Rain Gage 1D 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 50-75%grass cover,Fair 0.1 B 69 Woods,Fair 0.04 B 60 Composite Area&Weighted CN 0.14 66.43 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow length(ft): 50 0 0 Slope(%): 1.72 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.07 0 0 Computed Flow lime(min): 12.53 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 204 0 0 Slope(%): 2.52 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.79 0 0 Computed Flow Tune(min): 4.3 0 0 Total IOC(min) 16.83 Subbasin RunoffResults Total Rainfall(in) 5.1 Total Runoff(in) 1.83 Peak Runoff(cfs) 0.3 Weighted Curve Number 66.43 lime of Concentration(days hh:mm:ss) 0 00:16:50 Subbasin:POST-201 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - IY 3 2.5 2 1.5 1 0.5 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 0.31 0.3 0.29 0.28 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.2 0.19 0.18 0.17 • 0.16 O 0.15 c � 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 • O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:POST-301 Input Data Area(ac) 6.59 Peak Rate Factor 484 Weighted Curve Number 76.53 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 50-75%grass cover,Fair 0.56 B 69 50-75%grass cover,Fair 3.74 C 79 Woods,Fair 0.09 B 60 Woods,Fair 1.75 C 73 Existing Pond Surface 0.26 C 98 >75%grass cover,Good 0.19 B 61 Composite Area&Weighted CN 6.59 76.53 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.48 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.12 0 0 Computed Flow Time(min): 13.72 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 776 157 225 Slope(%): 5.48 0.5 5.68 Surface Type: Woodland Unpaved Unpaved Velocity(ftlsec): 1.17 1.14 3.85 Computed Flow Tune(min): 11.05 2.3 0.97 Total TOC(min) 28.04 Subbasin RunoffResults Total Rainfall(in) 5.1 Total Runoff(in) 2.67 PeakRunoff(cfs) 16.13 Weighted Curve Number 76.53 Time of Concentration(days hh:mm:ss) 0 00:28:02 Subbasin:POST-301 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 18 17- - 16- • 15 14- 13- 12 11 10 U . 9 O C • 8- 7- 6 5 4- 3 2 1 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe Elevation Offset Elevation Depth Cover (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft') (in) 1 NULL.1 0.00 4.00 4.00 0.00 0.00 4.00 0.00 0.00 0.00 2 NULL.2 0.00 4.00 4.00 0.00 0.00 4.00 0.00 0.00 0.00 3 OS 667.25 679.00 11.75 667.25 0.00 679.00 0.00 0.00 0.00 4 POND-OUr 666.00 679.00 13.00 666.00 0.00 679.00 0.00 0.00 0.00 Junction Results SN Element Peak Peak IvhxHGL MaxHGL Max Mn Average HGL Average HGL Time of Time of Total Total Tune ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth vhxHGL Peak Hooded Flooded Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume Attained Occurrence (cfs) (cfs) ($) (fl) (fl) (II) (ft) (fl) (days hh:mm) (days hh:mm) (ac-in) (min) 1 NULL]. 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0 00:00 0 00:00 0.00 0.00 2 NJLL2 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0 00:00 0 00:00 0.00 0.00 3 OS 18.06 0.00 671.39 4.14 0.00 7.61 667.45 0.20 0 12:44 0 00:00 0.00 0.00 4 POND-OUT 18.06 0.00 666.24 0.24 0.00 12.76 666.02 0.02 0 12:46 0 00:00 0.00 0.00 Channe 1 Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Eadt/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (8) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Pipe-24 425.00 666.00 0.00 651.20 0.00 14.80 3.4800 Trapezoidal 7.500 81.000 0.0500 0.5000 0.5000 0.0000 0.00 No Channel Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Trawl Peak Flow Peak Flow Total Tune Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Pipe-24 18.05 0 12:46 7358.42 0.00 2.08 3.41 0.24 0.03 0.00 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (m) (m) (cfs) 1 NULL PIPE 90901.97 0.00 0.00 0.00 0.00 0.00 0.0000 CIRCULAR 18.000 18.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 2 Pipe-25 93.00 667.25 0.00 666.00 0.00 1.25 1.3400 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Pipe Results SN Element Peak Time of DesignFlow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow Total Time Froude Reported ID Flow PeakFlow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cis) ($/sec) (min) ($) (min) 1 NUILPIPE 0.00 0 00:00 0.01 0.00 0.00 0.00 0.00 0.00 Calculated 2 Pipe-25 18.06 0 12:45 26.23 0.69 10.00 0.16 1.12 0.56 0.00 Calculated Storage Nodes Storage Node:WET-POND Input Data Invert Elevation(It) 667.25 Max(Rim)Elevation(ft) 679 Max(Rim)Offset(ft) 11.75 Initial Water Elevation(ft) 671.75 Initial Water Depth(ft) 4.5 Ponded Area(fP) 0 Evaporation Loss 0 Storage Area Volume Curves Storage Curve:WET-POND Stage Storage Storage Area Volume (ft) (IP) (ft') 0 17731.4226 0 0.75 23716.2067 15542.86 1.75 25690.0166 40245.97 2.75 27718.8964 66950.43 3.75 29802.8462 95711.3 4.75 33166.7722 127196.11 5.75 37312.7556 162435.87 6.75 40807.6177 201496.06 7.75 44110.6921 243955.21 8.75 47498.5108 289759.81 9.75 50978.9143 338998.52 10.75 54551.9027 391763.93 11.75 58217.4759 448148.62 Storage Area Volume Curves Storage Volume(fti 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000 11.5—.i....................... ... ..... __ ....... ___. ...............................i.............. 11.5 11—.................................. ..................................<................................................................................................................................ ......................... 4. ........................ ..... ....................-11 10.5-.i.................................>................................................................................................................................................................................................... ............. ....... ......................... -10.5 10- ................................................................................................._i................................................................_................................_................................. ............... ........ .......................... .-10 8.5— ................................._..................................................................................................._................................................... ......................... .................._............................ ,^8.5 8_........................................................................................................................................................................ ............................ .................................................................................................. g 7.5—......................................................................................................................................................................................... ..........i...................................................................................................-7.5 .................................o.................................o..................................................................o...... ........................i......... ................. ......................... ........................ .............................�7 — .............................................................................................................................. ................................ ................................._............................. ........................ .......................... -6.5 6.5 y 6 • -6 y a) a) a . - a - y5.5—...................................................................;.................................; ..............................;. ................................................................................................p.................................i............................. .Y5.5 co .................................>.................................................................i...... ........................>................................................................................................ ........................ ......................... 4-4.5 . -i i i 3.5-.i......................................................... ......g................ ..................................................................................................................i..................................................................i................................. 3.5 2.5—.................................._..... ........................................................................................._...................................................................................................._..................................................................N-2.5 y_.i...............................-............................ ..a..................................................................<............................................................ ......................... ........................ ......................... -2 1.5-.i................................................... ...........................................:..................................................................:..................................i...................................................................................................-1.5 1_.i...............................o...............................o.................................i.................................o. ........................ ......................... ......................... 4. ........................ ......................... -1 0.5-....... .................... .,................................................................................................................................................................. ......................... ........................ ......................... r0.5 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage Area(fr) — Storage Area —Storage Volume II Storage Node:WET-POND(continued) Outflow Weirs SN Element Weir Flap Crest Crest length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 EMSPIILWAY Trapezoidal No 677.60 10.35 30.00 1.40 3.33 2 WEIR(TOP OF BOX) Rectangular No 677.00 9.75 12.00 1.50 3.33 3 WEIR-1 Rectangular No 675.75 8.50 1.00 1.25 3.33 4 WEIR-2 Rectangular No 675.75 8.50 1.00 1.25 3.33 5 WEIR-3 Rectangular No 675.75 8.50 1.00 1.25 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (m) (ft) 1 IAW--ORIF Side CIRCULAR No 11.00 674.50 0.61 2 IAW-ORIF-2 Side CIRCULAR No 11.00 674.50 0.61 3 LOW-ORIF-3 Side CIRCULAR No 11.00 674.50 0.61 4 WQ Side CIRCULAR No 5.00 671.75 0.61 Output Summary Results Peak Inflow(cfs) 84.67 Peak Lateral Inflow(cfs) 84.67 PeakOutflow(cfs) 18.06 Peak Ffiltration Flow Rate(cfm) 0 Max HGLElevation Attained(ft) 676.38 MaxHGLDepth Attained(ft) 9.13 Average HGLElevation Attained(ft) 672.39 Average HGLDepth Attained(ft) 5.14 Time of MaxHGLOccurrence(days hh:mm) 0 12:44 Total Fxflltration Volume(1000-ft3) 0 Total Flooded Volume(ac-in) 0 Total Time Flooded(min) 0 Total Retention Time(sec) 0 Project Description File Name POST(WETPOND).SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)I'Ethod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Time Periods YES Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 5 seconds Number of Elements ety Rain Gages 1 Subbasins 4 Nodes 8 Junctions 4 Outfalls 3 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 12 Channels 1 Pipes 2 Pumps 0 Orifices 4 Wens 5 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 1 Time Series 025-YR Cumulative inches North Carolina Rowan 25.00 6.00 SCS Type ll24-hr Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 POST-101 44.00 484.00 70.37 6.00 2.84 124.96 74.38 0 00:53:16 2 POST-102 21.96 484.00 92.72 6.00 5.15 113.12 103.89 0 00:25:19 3 POST-201 0.14 484.00 66.43 6.00 2.48 0.35 0.41 0 00:16:49 4 POST-301 6.59 484.00 76.53 6.00 3.43 22.62 20.80 0 00:28:02 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak MaxHGL Max Mn Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Hooded Hooded Elevation Elevation Attained Depth Attained Hooding Volume Attained Occurrence (ft) (ft) ($) (ft) (8') (cfs) (8) (It) (ft) (days hh:mm) (ac-in) (min) 1 NULL1 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 2 NULL2 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 3 OS Junction 667.25 679.00 667.25 679.00 0.00 27.10 675.22 0.00 3.78 0 00:00 0.00 0.00 4 POND-OUT Junction 666.00 679.00 666.00 679.00 0.00 27.10 666.30 0.00 12.70 0 00:00 0.00 0.00 5 OUIFALLI Outfall 651.20 99.98 651.50 6 OUIFALL2 Outfall 716.35 0.41 716.35 7 OUIFALL3 Outfall 663.20 20.79 663.20 8 WET-POND Storage Node 667.25 679.00 671.75 0.00 100.95 676.96 0.00 0.00 Link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity DesignFlow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 NULL-PIPE Pipe NULL-1 NULL-2 90901.97 0.00 0.00 0.0000 18.000 0.0150 0.00 0.01 0.00 0.00 0.00 0.00 0.00 Calculated 2 Pipe-25 Pipe OS POND-OUT 93.00 667.25 666.00 1.3400 24.000 0.0130 27.10 26.23 1.03 14.49 1.15 0.58 0.00>CAPACITY 3 Pipe-24 Channel POND-OUT OUIFALL-1 425.00 666.00 651.20 3.4800 90.000 0.0500 27.10 7358.42 0.00 2.44 0.30 0.04 0.00 4 LOW-ORIF Orifice WET-POND OS 667.25 667.25 11.000 4.51 5 LOW-ORIF-2 Orifice WET-POND OS 667.25 667.25 11.000 4.51 6 LOW-ORIF-3 Orifice WET-POND OS 667.25 667.25 11.000 4.51 7 WQ Orifice WET-POND OS 667.25 667.25 5.000 1.43 8 EMSPILLWAY Weir WET-POND POND-OUT 667.25 666.00 0.00 9 WEIR(TOP OF BOX) Weir WET-POND OS 667.25 667.25 0.00 10 WHIM Weir WET-POND OS 667.25 667.25 4.45 11 WEIR2 Weir WET-POND OS 667.25 667.25 4.45 12 WEIR-3 Weir WE-POND OS 667.25 667.25 4.45 Project Description File Name POST(WETPOND).SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)I'Ethod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Time Periods YES Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 5 seconds Number of Elements ety Rain Gages 1 Subbasins 4 Nodes 8 Junctions 4 Outfalls 3 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 12 Channels 1 Pipes 2 Pumps 0 Orifices 4 Wens 5 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 1 Time Series 100-YR Cumulative inches North Carolina Rowan 100.00 7.20 SCS Type 1124-hr Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 POST-101 44.00 484.00 70.37 7.20 3.83 168.30 101.12 0 00:53:16 2 POST-102 21.96 484.00 92.72 7.20 6.34 139.16 126.19 0 00:25:19 3 POST-201 0.14 484.00 66.43 7.20 3.41 0.48 0.57 0 00:16:49 4 POST-301 6.59 484.00 76.53 7.20 4.49 29.62 27.24 0 00:28:02 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak MaxHGL Max Mn Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Hooded Hooded Elevation Elevation Attained Depth Attained Hooding Volume Attained Occurrence (ft) (ft) ($) (ft) (8') (cfs) (8) (It) (ft) (days hh:mm) (ac-in) (min) 1 NULL1 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 2 NULL2 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 3 OS Junction 667.25 679.00 667.25 679.00 0.00 33.96 677.50 0.00 1.50 0 00:00 0.00 0.00 4 POND-OUT Junction 666.00 679.00 666.00 679.00 0.00 40.20 666.38 0.00 12.62 0 00:00 0.00 0.00 5 OUIFALLI Outfall 651.20 138.46 651.58 6 OUIFALL2 Outfall 716.35 0.56 716.35 7 OUIFALL3 Outfall 663.20 27.15 663.20 8 WET-POND Storage Node 667.25 679.00 671.75 0.00 123.18 677.76 0.00 0.00 Link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity DesignFlow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 NULL-PIPE Pipe NULL-1 NULL-2 90901.97 0.00 0.00 0.0000 18.000 0.0150 0.00 0.01 0.00 0.00 0.00 0.00 0.00 Calculated 2 Pipe-25 Pipe OS POND-OUT 93.00 667.25 666.00 1.3400 24.000 0.0130 33.97 26.23 1.30 17.42 1.19 0.60 0.00>CAPACITY 3 Pipe-24 Channel POND-OUT OUIFALL-1 425.00 666.00 651.20 3.4800 90.000 0.0500 40.14 7358.42 0.01 2.84 0.38 0.05 0.00 4 LOW-ORIF Orifice WET-POND OS 667.25 667.25 11.000 4.52 5 LOW-ORIF-2 Orifice WET-POND OS 667.25 667.25 11.000 4.52 6 LOW-ORIF-3 Orifice WET-POND OS 667.25 667.25 11.000 4.52 7 WQ Orifice WET-POND OS 667.25 667.25 5.000 1.43 8 EMSPILLWAY Weir WET-POND POND-OUT 667.25 666.00 6.25 9 WEIR(TOP OF BOX) Weir WET-POND OS 667.25 667.25 19.64 10 WEIR-1 Weir WET-POND OS 667.25 667.25 5.39 11 WEIR-2 Weir WET-POND OS 667.25 667.25 5.39 12 WEIR3 Weir WE-POND OS 667.25 667.25 5.39 Storm Drainage Calculations Fulfilled Engineering LLC APPENDIX D: WATER QUALITY II17 Storm Drainage Calculations Fulfilled Engineering LLC Water Quality Treatment Calculations (with Forebay Sizing) II18 Project Description File Name POST(WETPOND).SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)I'Ethod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Time Periods YES Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 5 seconds Number of Elements ety Rain Gages 1 Subbasins 4 Nodes 8 Junctions 4 Outfalls 3 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 12 Channels 1 Pipes 2 Pumps 0 Orifices 4 Wens 5 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 1 Time Series 1-IN STORM Cumulative inches North Carolina Rowan 1.00 1.00 SCS Type 1124-hr Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak lime of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 POST-101 44.00 484.00 70.37 1.00 0.01 0.26 0.03 0 00:53:16 2 POST-102 21.96 484.00 92.72 1.00 0.44 9.57 9.21 0 00:25:19 3 POST-201 0.14 484.00 66.43 1.00 0.00 0.00 0.00 0 00:16:49 4 POST-301 6.59 484.00 76.53 1.00 0.04 0.28 0.05 0 00:28:02 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak MaxHGL Max Mn Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Hooded Hooded Elevation Elevation Attained Depth Attained Hooding Volume Attained Occurrence (ft) (ft) ($) (ft) (ft') (cfs) (ft) (8) (ft) (days hh:mm) (ac-in) (min) 1 NULL1 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 2 NULL2 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 3 OS Junction 667.25 679.00 667.25 679.00 0.00 0.44 667.51 0.00 11.49 0 00:00 0.00 0.00 4 POND-OUT Junction 666.00 679.00 666.00 679.00 0.00 0.44 666.03 0.00 12.97 0 00:00 0.00 0.00 5 OUIFALLI Outfall 651.20 0.46 651.23 6 OUTFALL-2 Outfall 716.35 0.00 716.35 7 OUIFALL3 Outfall 663.20 0.05 663.20 8 WET-POND Storage Node 667.25 679.00 671.75 0.00 9.15 672.39 0.00 0.00 Link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity DesignFlow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (m) (cfs) (cfs) (ft/sec) (ft) (min) 1 NULL-PIPE Pipe NULL-1 NULL-2 90901.97 0.00 0.00 0.0000 18.000 0.0150 0.00 0.01 0.00 0.00 0.00 0.00 0.00 Calculated 2 Pipe-25 Pipe OS POND-OUT 93.00 667.25 666.00 1.3400 24.000 0.0130 0.44 26.23 0.02 4.44 0.14 0.07 0.00 Calculated 3 Pipe-24 Channel POND-OUT OUIFALL-1 425.00 666.00 651.20 3.4800 90.000 0.0500 0.44 7358.42 0.00 0.48 0.03 0.00 0.00 4 LOW-ORIF Orifice WET-POND OS 667.25 667.25 11.000 0.00 5 LOW-ORIF-2 Orifice WET-POND OS 667.25 667.25 11.000 0.00 6 LOW-ORIF-3 Orifice WET-POND OS 667.25 667.25 11.000 0.00 7 WQ Orifice WET-POND OS 667.25 667.25 5.000 0.44 8 EM-SPILLWAY Weir WET-POND POND-OUT 667.25 666.00 0.00 9 WEIR(TOP OF BOX) Weir WET-POND OS 667.25 667.25 0.00 10 WFTR 1 Weir WET-POND OS 667.25 667.25 0.00 11 WF7R2 Weir WET-POND OS 667.25 667.25 0.00 12 WEIR3 Weir WET-POND OS 667.25 667.25 0.00 Subbasin:POST-102 Input Data Area(ac) 21.96 Peak Rate Factor 484 Weighted Curve Number 92.72 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Proposed paved parking&roofs 2.51 C 98 Proposed paved parking&roofs 14.42 B 98 >75%grass cover,Good 1.76 B 61 >75%grass cover,Good 0.89 C 74 Proposed Pond Surface 1.34 C 98 1/2 acre lots,25%impervious 1.05 B 70 Composite Area&Weighted CN 21.97 92.72 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 4 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow Time(min): 15.56 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 92 1243 255 Slope(%): 13 3.54 0.5 Surface Type: Grass pasture Paved Unpaved Velocity(ft/sec): 2.52 3.82 1.14 Computed Flow Tune(min): 0.61 5.42 3.73 Total TOC(min) 25.32 Subbasin RunoffResults Total Rainfall(in) 1 Total Runoff(in) 0.44 PeakRunoff(cfs) 9.21 Weighted Curve Number 92.72 Time of Concentration(days hh:mm:ss) 0 00:25:19 Subbasin:POST-102 Rainfall Intensity Graph 1.45_ 1.4 1.35 1.3 1.25_ 1.2 1.15 1.1_ 1.05 1 - 0.95_ 0.9 0.85_ c 0.8 0.75 m 0.7_ 0.65 ce 0.6_ 0.55_ 0.5 0.45_ 0.4 0.35_ 0.3_ 0.25 0.2_- 0.15 - 0.1_ 0.05 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 10 9.5- 9- 8.5- 8 7.5 • 6.5- 6 5.5- o 5 0 4.5 4- 3.5 3- 2.5- 2 1.5 1 0.5 • 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe Elevation Offset Elevation Depth Cover (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft') (in) 1 NULL.1 0.00 4.00 4.00 0.00 0.00 4.00 0.00 0.00 0.00 2 NULL.2 0.00 4.00 4.00 0.00 0.00 4.00 0.00 0.00 0.00 3 OS 667.25 679.00 11.75 667.25 0.00 679.00 0.00 0.00 0.00 4 POND-OUr 666.00 679.00 13.00 666.00 0.00 679.00 0.00 0.00 0.00 Junction Results SN Element Peak Peak IvhxHGL MaxHGL Max Mn Average HGL Average HGL Time of Time of Total Total Tune ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth vhxHGL Peak Hooded Flooded Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume Attained Occurrence (cfs) (cfs) ($) (fl) (fl) (It) (ft) (fl) (days hh:mm) (days hh:mm) (ac-in) (min) 1 NJLL1 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0 00:00 0 00:00 0.00 0.00 2 NJLL2 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0 00:00 0 00:00 0.00 0.00 3 OS 0.44 0.00 667.51 0.26 0.00 11.49 667.31 0.06 0 15:45 0 00:00 0.00 0.00 4 POND-OUT 0.44 0.00 666.03 0.03 0.00 12.97 666.01 0.01 0 15:50 0 00:00 0.00 0.00 Channe 1 Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Eadt/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (8) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Pipe-24 425.00 666.00 0.00 651.20 0.00 14.80 3.4800 Trapezoidal 7.500 81.000 0.0500 0.5000 0.5000 0.0000 0.00 No Channel Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Pipe-24 0.44 0 15:50 7358.42 0.00 0.48 14.76 0.03 0.00 0.00 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (m) (m) (cfs) 1 NULL PIPE 90901.97 0.00 0.00 0.00 0.00 0.00 0.0000 CIRCULAR 18.000 18.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 2 Pipe-25 93.00 667.25 0.00 666.00 0.00 1.25 1.3400 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Pipe Results SNElement Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow PeakFlow Capacity De sign Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) ($/sec) (min) ($) (min) 1 NUILPIPE 0.00 0 00:00 0.01 0.00 0.00 0.00 0.00 0.00 Calculated 2 Pipe-25 0.44 0 15:46 26.23 0.02 4.44 0.35 0.14 0.07 0.00 Calculated Storage Nodes Storage Node:WET-POND Input Data Invert Elevation(It) 667.25 Max(Rim)Elevation(ft) 679 Max(Rim)Offset(ft) 11.75 Initial Water Elevation(ft) 671.75 Initial Water Depth(ft) 4.5 Ponded Area(fP) 0 Evaporation Loss 0 Storage Area Volume Curves Storage Curve:WET-POND Stage Storage Storage Area Volume (ft) (IP) (ft') 0 17731.4226 0 0.75 23716.2067 15542.86 1.75 25690.0166 40245.97 2.75 27718.8964 66950.43 3.75 29802.8462 95711.3 4.75 33166.7722 127196.11 5.75 37312.7556 162435.87 6.75 40807.6177 201496.06 7.75 44110.6921 243955.21 8.75 47498.5108 289759.81 9.75 50978.9143 338998.52 10.75 54551.9027 391763.93 11.75 58217.4759 448148.62 Storage Area Volume Curves Storage Volume(fti 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000 11.5—.i....................... ... ..... __ ....... ___. ...............................i.............. 11.5 11—.................................. ..................................<................................................................................................................................ ......................... 4. ........................ ..... ....................-11 10.5-.i.................................>................................................................................................................................................................................................... ............. ....... ......................... -10.5 10- ................................................................................................._i................................................................_................................_................................. ............... ........ .......................... .-10 8.5— ................................._..................................................................................................._................................................... ......................... .................._............................ ,^8.5 8_........................................................................................................................................................................ ............................ .................................................................................................. g 7.5—......................................................................................................................................................................................... ..........i...................................................................................................-7.5 .................................o.................................o..................................................................o...... ........................i......... ................. ......................... ........................ .............................�7 — .............................................................................................................................. ................................ ................................._............................. ........................ .......................... -6.5 6.5 y 6 • -6 y a) a) a . - a - y5.5—...................................................................;.................................; ..............................;. ................................................................................................p.................................i............................. .Y5.5 co .................................>.................................................................i...... ........................>................................................................................................ ........................ ......................... 4-4.5 . -i i i 3.5-.i......................................................... ......g................ ..................................................................................................................i..................................................................i................................. 3.5 2.5—.................................._..... ........................................................................................._...................................................................................................._..................................................................N-2.5 y_.i...............................-............................ ..a..................................................................<............................................................ ......................... ........................ ......................... -2 1.5-.i................................................... ...........................................:..................................................................:..................................i...................................................................................................-1.5 1_.i...............................o...............................o.................................i.................................o. ........................ ......................... ......................... 4. ........................ ......................... -1 0.5-....... .................... .,................................................................................................................................................................. ......................... ........................ ......................... r0.5 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage Area(fr) — Storage Area —Storage Volume II Storage Node:WET-POND(continued) Outflow Weirs SN Element Weir Flap Crest Crest length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 EMSPIILWAY Trapezoidal No 677.60 10.35 30.00 1.40 3.33 2 WEIR(TOP OF BOX) Rectangular No 677.00 9.75 12.00 1.50 3.33 3 WEIR-1 Rectangular No 675.75 8.50 1.00 1.25 3.33 4 WEIR-2 Rectangular No 675.75 8.50 1.00 1.25 3.33 5 WEIR-3 Rectangular No 675.75 8.50 1.00 1.25 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (m) (ft) 1 IAW--ORIF Side CIRCULAR No 11.00 674.50 0.61 2 IAW-ORIF-2 Side CIRCULAR No 11.00 674.50 0.61 3 LOW-ORIF-3 Side CIRCULAR No 11.00 674.50 0.61 4 WQ Side CIRCULAR No 5.00 671.75 0.61 Output Summary Results Peak Inflow(cfs) 9.15 Peak Lateral Inflow(cfs) 9.15 PeakOutflow(cfs) 0.44 Peak Ffiltration Flow Rate(cfm) 0 Max HGLElevation Attained(ft) 672.39 MaxHGLDepth Attained(ft) 5.14 Average HGLElevation Attained(ft) 671.85 Average HGLDepth Attained(ft) 4.6 Time of MaxHGLOccurrence(days hh:mm) 0 15:46 Total Fxflltration Volume(1000-ft3) 0 Total Flooded Volume(ac-in) 0 Total Time Flooded(min) 0 Total Retention Time(sec) 0 (—Depth:Node-WET-POND(POST(WET POND)2024-02-2916:33:02)) 5.2- 51- 50- 4.9- 0 4.8- 4.7 4.6 45 0 34 51 68 85 102 119 136 1-=' Time(hrs) 1 -inch Storm Dewaters to Less than 1/4" Greater than 4.5' Depth in 103 hrs (112.75 hrs - 9.75 hrs) or 4.29 days WET POND DESIGN CALCULATIONS Project: Site Improvements for Town of Spencer TA Truck Stop Owner: AGS Salisbury, LLC Contact: Mr. Harinder Singh Date: February 29, 2024 Prepared by: Fulfilled Engineering **Use provide 'Wet Pond Stage Storage Details' spreadsheet as a reference/supplement to these calculations Design Volume (DV): DV = temporary pool elev.volume - permanent pool elev.volume Temporary Pool Elev. Volume Vt= 140,939.62 cf Permanent Pool Elev. Volume V= 119,324.91 cf Design Volume (DV) DV= 21,614.71 cf Main Pool Volume (Vmp) (Hydraulic Retention Time Method): Vmp = 0.87 * HRT/TS* DV where: HRT = 14 days Ts = 5 days DV = 21,614.71 Vmp (Required) = 52,653.43 cf Vmp (Provided) = 119,324.91 cf > Vmp (Required) = 52,653.43 cf Main Pool Depth (Davg) (Equation 2-When The Shelf Is Not Submerged): Davg = Vpp/App where: VPP = Volume of Permanent Pool (cf) Vpp = 119,324.91 cf APP = Area of Permanent Pool (sf) App = 32,325.79 sf Main Pool Depth = Davg = 3.69 ft Forebay vs. Main Pool Volume Ratio: Forebay Volume (Approx.) Vf = — 51,224 cf Main Pool Volume (Approx. - At Elev. 677.00) V = 338,998.52 cf Forebay Volume/ Main Pool Volume Vf/V = 15.11% Elev. Depth(ft) Area(ft2) Volume(cf) Pond Bottom(Bottom of Sed.Storage) 667.25 0 17,731.42 - (Top of Sediment Storage/Bottom of Perm.Pool) 667.75 0.5 21,721.28 10,361.91 668 0.75 23,716.21 15,542.86 669 1.75 25,690.02 40,245.97 Imp 52,653.43 670 2.75 27,718.90 66,950.43 HRT(days) 14 671 3.75 29,802.85 95,711.30 TS(days) 5 Top of Permanent Pool Elev./Bottom of Shelf 671.75 4.5 32,325.79 119,324.91 Provided Vmp DV(cf) 21614.71 672 4.75 33,166.77 127,196.11 Factor 0.87 1-inch Storm(Design Storm Volume) 672.39 5.14 34,783.71 140,939.62 673 5.75 37,312.76 162,435.87 674 6.75 40,807.62 201,496.06 675 7.75 44,110.69 243,955.21 DV 21,614.71 676 8.75 47,498.51 289,759.81 1"Storm Volume 140,939.62 Top Weir of Outlet Structure(Main Pool Volume) 677 9.75 50,978.91 338,998.52 Permanent Pool Volume 119,324.91 678 10.75 54,551.90 391,763.93 679 11.75 58,217.48 448,148.62 Davg 3.691322154 Vpp 119,324.91 App 32,325.79 Storm Drainage Calculations Fulfilled Engineering LLC Total Nitrogen Export Computations II19 (1) (2) (3) (4) (5) Exhibit 3-3 Nitrogen Export Reduction Options Type of Land Cover Site TN Export TN Export TN Export Area Coeff. by Land Use From Site (Acres) (lbs/ac/yr) (Ibs/yr) (Ibs/ac/yr) Residential Use Commercial/Industrial Use Permanently preserved undisturbed 9.97 0.6 6.0 open space(forest,unmown meadow) _ If the computed export is less than 6.0 If the computed export is less than 10.0 Permanently preserved managed 6.15 1.2 7.4 lbs/ac/yr,then the owner may either: Ibs/aGyr,then the owner may either: open space(grass,landscaping,etc.) 1. Install BMPs to remove enough nitrogen 1. Install BMPs to remove enough nitrogen to Impervious surfaces(roads,parking to bring the development down to 3.6 bring the development down to 3.6 lbs/ac/yr. lbs/ac/yr. lots,driveways,roofs,paved storage 16.87 21.2 357.6 2. Pay a one-time offset payment of$330/Ib 2. Pay a one-time offset payment of$330/lb areas,etc.) to bring the nitrogen down to the 3.6 to bring the nitrogen down to the 3.6 lbs/ac/yr. lbs/ac/yr. Total 32.99 371.0 3. Do a combination of BMPs and offset 3. Do a combination of BMPs and offset - - - payment to achieve a 3.6 Ibs/aGyr export. payment to achieve a 3.6 lbs/ac/yr export. Average for Site 11.2 If the computed export is greater than 6.0 If the computed export is greater than 10.0 Fee Option $ 82,738.92 lbs/ac/yr, then the owner must use on-site lbs/ac/yr, then the owner must use on-site BMPs to bring the development's export down BMPs to bring the development's export down to 6.0 lbs/ac/yr. Then, the owner may use to 10.0 lbs/ac/yr. Then, the owner may use BMP TN Removal Rate TSS Removal Rates Adjusted Total +Fee one of the three options above to achieve the one of the three options above to achieve the Riparian buffers 30% 80% 7.8 $ 46,159.61 reduction between 6.0 and 3.6 lbs/ac/yr. reduction between 10.0 and 3.6 lbs/ac/yr. Wet detention ponds 25% 85% If in series--> 5.9 $ 24,821.68 Table 3-1 Total Nitrogen and Total Solids Removal Rates by BMP BMP Type TN Removal Rate TSS Removal Rates Vegetated filters w/spreader 25% 35% Wet detention ponds 25% 85% Bioretention facilities 25% 85% Water quality swales 30% 35% Riparian buffers 30% 80% Sand filters 35% 85% Constructed wetlands 40% 85% Storm Drainage Calculations Fulfilled Engineering LLC APPENDIX E: DURING CONSTRUCTION II20 Storm Drainage Calculations Fulfilled Engineering LLC Sediment Calculations II21 SEDIMENT BASIN DESIGN This structure is intended for less than 3 years of use. Structures intended for more than 3 years of use should be desinged as permanent structures. User Input Data Calculated Value Reference Data Designed By: D. Johnson Checked By: Company: Fulfilled Engineering Project Name: TA Truck Stop Project No.: FE#22008 Site Location (City/Town) Town of Spencer Sediment Basin Id. SED-POND Total Drainage Area (acres) 21.96 Step 1. Determine peak flow. Q . for the basin drainage area (Appendix S.03). Q10 (cfs) 76.81 Step 2. Determine any site limitations for the sediment pool elevation.emergency spillway or top of the dam. Minimum pool elevation (ft) 671 .75 Maximum pool elevation (ft) 679.00 Step 3. Deternune basin volumes: • Compute minimum volume required(1 S00 fe acre disturbed). • Specify sediment cleanout level to be marked on riser (one-half the design volume referenced to the top of the riser) and sediment storage area to be cleared after the dam is built. Disturbed acreage (ac) 21.82 Min Volume (ft3) 39276 Sediment cleanout elevation (ft) 674.38 Sediment Storage Area (ft') 58936 Step 4. Determine area and shape of basin: • Check length width ratio (should be 2:1 to 6:1). • Compute the basin surface area at principal spillway elevation_ • Check the ratio of basin surface area to peak inflow rate (should be greater than or equal to 435 ft2/cfs). Employ diversions with additional traps and basins to reduce area drained. Determine barrel capacity required for site conditions(minimum capacity for C. is the 2-year peak nunoff, Q.,. Length/width ratio 2 Is length/width ratio between 2-6? YES, PROCEED Basin surface area @ principal spillway (ft2) 50979 Ratio: basin surface area/Q10 663.70 Is ratio >= 435 ft2/cfs? YES Step 5. Determine the principal spillway discharge capacity. • The combined capacities of the principal and emergency spillways must be at least the 10-year peak flow for the entire watershed of the basin. • The principal spillway is analyzed for three possible limiting flow types: Weir flow, Orifice flow, and Pipe flow. The principal spillway discharge capacity is the smallest of these three flow rates. Discharges through a skinuner should be disregarded during this computation. Weir. orifice and pipe flow may be determined by the following equations: 1. Weir Flow: Q = CLH' where: Q = discharge in cubic feet per second(cfs) C =weir coefficient. use 3.1 for cornigated metal pipe risers. L = circumference of the riser in feet H =head above riser crest in feet Weir coefficient, C 3.33 Riser circumference, L (ft) 12 Head above riser crest, H (ft) 0.16 QW (cfs) 2.56 Orifice Flow: Q = CA(2gH)'== where: O = discharge in cubic feet per second(cfs) C =orifice coefficient. use C = 0.6 for corrugated metal pipe risers. A= cross-sectional area of the riser pipe in square feet g =acceleration due to gravity, 32.2 ft`sec= H =head above riser crest in feet Orifice coefficient, Co 0.616 Riser cross-sectional area, A (ft2) 9 Accleration due to gravity, g (ft/s2) 32.2 Head above riser crest, H (ft) 0.16 Discharge, Qo (cfs) 17.79615364 gh ;. Pipe Flow: 0 = a [1 l +Kr. L where: Q = discharge in cubic feet per second(cfs) a =cross-sectional area of the barrel in square feet g = acceleration due to gravity, 32.2 ftisec2 h =head above the centerline of the outlet end of the barrel Km = coefficient of minor losses. can be assumed to be 1.0 for most principal spillway systems L = barrel length in feet Kr =pipe friction coefficient: _ 5087n2 (See Table 8.°7a for Kr values for d14'3 common size of pipe.) n = Maiming's coefficient of roughness. use n =0.025 for corrugated metal pipe n = 0.015 for reinforced concrete pipe di = inside diameter of the barrel in inches Select riser and barrel dimensions so that the riser has a cross-sectional area at least 1.5 times that of the barrel. Spillway hydraulics are improved by maximizing weir flow and minimizing orifice flow. See Table 8.07b for recommended riser barrel proportions. Barrel diameter (ft) 2.00 Barrel cross-sectional area, a (ft2) 3.14 Accleration due to gravity, g (ft/s2) 32.2 Head above outlet end of barrel, h (ft) 7.96 Minor loss coefficieint, Km 1 .0 Barrel length, L (ft) 68 Mannings coeffienct of roughness, n 0.013 Inside diameter of barrel, d; (in) 24 Pipe friction coefficient, Kp 0.01242 Discharge, Qo (cfs) 42.1744985 RISER Select trail user and barrel dimensions_ Use the weir. orifice and pipe flow equations to determine if the 2-Year peak discharge is passed without activating the emergency spillway. Determine riser size from Figure 8.07b. Check the head and stage requirements. If the design stage is too high. choose larger dimensions and recalculate. As a minimum.set the elevation of the riser at the same elevation as the top of the sediment pool. A riser height 2 to 5 times the barrel diameter is recommended. Select the type of trash guard. Select a dewatering device. If a skimmer is used. refer to the manufacturers dewatering data. or Table 6.64.b_ Step 6. Design antrseep collar. Ensure that antiseep collars are no closer than 2 ft from a pipe joint. Collar must project at least 1.5 ft from the pipe. Indicate watertight connections. Step ". Design antiflotation block. Determine the weight of water displaced by the empty riser. and design a block with buoyant weight 1.1 times the weight of water displaced. Weight of water displaced by the empty riser 84 Buoyant weight 92.4 Step 8. Design outlet. Determine discharge velocity from the barrel. Design outlet protection to assure stable conditions. Riprap placement is usually necessary (Appendix S.06). Discharge velocity, V (ft/s) 13.42 See Appendix 8.06 for riprap sizing, if necessary Step 9. Design emergency spillway. • Determine the required capacity for the emergency spillway as Qe— Q.p—Qc (QF Q2) • From Table'8 07c for Table 8 o7d select the width and depth of the outlet. depending on soil conditions. In general. the wider bottom widths and lower slopes are preferred to minimize exit velocities at supercritical flow • An arrentahle alternative is the ice of the weir Pnuatinn Q = CLH1` Where this option is used. the maximum value of C should be 2.8. L is the bottom width of the spillway at the crest. and H is the depth of flow above the spillway crest in feet. Note: planning's channel equation should not be used to size the spillway crest. However.it should be used to design the outlet channel below the spillway crest. • The total of the emergency and principle spillway capacities must equal or exceed the required 10-vear peak discharge. • Set the elevation of the crest of the emergence spillway a minimum of 1 foot above the crest of the riser. OPTION 1 Q10 76.81 Qp 2.56 Emergency spillway capacity, Qe (cfs) 74.25 Qp + Qe 76.81 Does (Qp + Qe) equal or exceed Q10? YES, PROCEED Step 10. Spillway approach section. Adjust the spillway alignment so that the control section and outlet section are straight. The entrance width should be 1.5 times the width of the control section with a smooth transition to the width of the control section. Approach channel should slope tc•.=:and the reservoir no less than 200. Width of control section (ft) Width of entrance (ft) Slope of approach channel (%) Is width of the entrance section 1.5xcontrol section width? #DIV/0! Is approach channel >/= 2%? NO, REVISE DESIGN Step 11. Spillway control section • Locate the control section in the spillway near where it intersects the extension of the centerline of the dam. • Keep a level area to extend at least 20 ft upstream from the outlet end of the control section. to ensure a straight alignment. • Side slopes should be 3:1. Step 12. Design spillway exit section. • Spillway exit should align with the control section and have the same bottom width and side slopes. • Slope should be sufficient to maintain supercritical flow.but make sure it does not create erosive velocities for site conditions. (Stay within slope ranges in appropriate design tables.) • Extend the exit channel to a point where the water may be released without damage. Step 13. Size the embankment • Set the design elevation of the top of the dam a minimum of 1 ft above the water surface for the design flow in the emergency spillway. • Constructed height should be 10% greater than the design to allow for settlement. • Base top width on the design height. • Set side slopes 2.5:1 or flatter. • Determine depth of cutoff trench from site borings_ It should extend to a stable.tight soil layer(a minimum of 2 ft deep). • Select bonow site—the emergency spillway cut will provide a significant amount of fill. Step 1-I. Erosion control • Locate and design diversions to protect embankment and spillway (Practice Standards and Specifications: 6.20, Temporar: Diversions). • Select surface protection measures to control erosion(Practice Standards and Specifications: 6.10, Temporary Seeding; 6.14, Mulching;and 6.15, Riprap). • Select groundcover for emergency spillway to provide protection for design flow velocity and site conditions. Riprap stone over geotextile fabric may be required in erodible soils or when the spillway is not in undisturbed soils. Step 15. Safety. • Construct a fence and install warning signs as needed. mrPOST-ITI POST-102 OUTFALL-2 POST-N1 1 t SED-POND POST-)Qt WEIR •OF BM EN-SPILLWAY oiry-sguiER Os Pepe-25 POND-OUT OUTFALLa P44.24 OUTFALL-t Autodesk Storm and Sanitary Analysis Project Description File Name DURING CONSTRUCTION.SPF Project Options Flow Units CFS Elevation Type Elevation Hydrology Method SCS TR-55 Time of Concentration(TOC)Method SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes YES Skip Steady State Analysis Time Periods YES Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent Dry Days 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Time Step 0 00:05:00 days hh:mm:ss Reporting Time Step 0 00:05:00 days hh:mm:ss Routing Time Step 5 seconds Number of Elements my Rain Gages 1 Subbasins 4 Nodes 8 Junctions 4 Outfalls 3 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 6 Channels 1 Pipes 2 Pumps 0 Orifices 0 Weirs 2 Outlets 1 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 1 Time Series 010-YR Cumulative inches North Carolina Rowan 10.00 5.10 SCS Type II 24-hr Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 POST-101 44.00 484.00 70.34 5.10 2.14 94.07 55.10 0 00:53:16 2 POST-102 21.96 484.00 86.74 5.10 3.64 79.82 76.81 0 00:25:19 3 POST-201 0.14 484.00 66.43 5.10 1.83 0.26 0.30 0 00:16:49 4 POST-301 6.59 484.00 77.25 5.10 2.73 17.98 16.53 0 00:28:02 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 NULL-1 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 2 NULL-2 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 3 05 Junction 671.75 679.00 671.75 679.00 0.00 4.43 672.41 0.00 6.59 0 00:00 0.00 0.00 4 POND-OUT Junction 668.20 679.00 668.20 679.00 0.00 4.43 668.30 0.00 10.70 0 00:00 0.00 0.00 5 OUTFALL-1 Outfall 651.20 55.45 651.30 6 OUTFALL-2 Outfall 716.35 0.30 716.35 7 OUTFALL-3 Outfall 663.20 16.50 663.20 8 SED-POND Storage Node 671.75 679.00 671.75 0.00 75.37 677.21 0.00 0.00 Link Summary SN Element Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 NULL-PIPE Pipe NULL-1 NULL-2 90901.97 0.00 0.00 0.0000 18.000 0.0150 0.00 0.01 0.00 0.00 0.00 0.00 0.00 Calculated 2 Pipe-25 Pipe OS POND-OUT 68.00 671.75 668.20 5.2200 24.000 0.0130 4.43 51.69 0.09 10.64 0.38 0.19 0.00 Calculated 3 Pipe-24 Channel POND-OUT OUTFALL-1 425.00 668.20 651.20 4.0000 90.000 0.0500 4.43 7886.39 0.00 1.25 0.10 0.01 0.00 4 61N-SKIMMER Outlet SED-POND OS 671.75 671.75 0.60 5 EM-SPILLWAY Weir SED-POND POND-OUT 671.75 668.20 0.00 6 WEIR(TOP OF BOX) Weir SED-POND OS 671.75 671.75 3.83 Subbasin Hydrology Subbasin:POST-101 Input Data Area(ac) 44 Peak Rate Factor 484 Weighted Curve Number 70.34 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 50-75%grass cover,Fair 1.77 B 69 50-75%grass cover,Fair 1.8 C 79 Urban industrial,72%imp 3.88 B 88 Urban industrial,72%imp 1.56 C 91 Woods,Fair 7.76 C 73 Woods,Fair 14.99 B 60 1 acre lots,20%impervious 3.24 B 68 Existing Buildings 0.23 B 98 Existing Roadway 1.36 B 98 Woods&grass combination,Fair 5.17 B 65 Proposed paved parking&roofs 0.1 B 98 >75%grass cover,Good 0.9 B 61 >75%grass cover,Good 0.56 C 74 Proposed Roadway 0.5 B 98 1/2 acre lots,25%impervious 0.08 B 70 Newly graded area 0.1 B 86 Composite Area&Weighted CN 44 70.34 Time of Concentration TOC Method:SCS TR-55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^0.8))/((P^0.5)*(Sf^0.4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(Sf^0.5)(unpaved surface) V=20.3282*(Sf^0.5)(paved surface) V=15.0*(Sf^0.5)(grassed waterway surface) V=10.0*(Sf^0.5)(nearly bare&untilled surface) V=9.0*(Sf^0.5)(cultivated straight rows surface) V=7.0*(Sf^0.5)(short grass pasture surface) V=5.0*(Sf^0.5)(woodland surface) V=2.5*(Sf^0.5)(forest w/heavy litter surface) Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(Sf^0.5))/n R =Aq/Wp Tc=(Lf/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) R =Hydraulic Radius(ft) Aq=Flow Area(ft*) Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n =Manning's roughness Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 1 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.06 0 0 Computed Flow Time(min): 27.09 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 810 485 1982 Slope)%): 3.15 2.56 2.56 Surface Type: Grass pasture Paved Unpaved Velocity(ft/sec): 1.24 3.25 2.58 Computed Flow Time(min): 10.89 2.49 12.8 Total TOC(min) 53.27 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 2.14 Peak Runoff(cfs) 55.1 Weighted Curve Number 70.34 Time of Concentration(days hh:mm:ss) 0 00:53:16 Subbasin:POST-101 Rainfall Intensity Graph 7.5 7_ 6.5- 6 5.5 5 - 4.5- r c 4 m c 3.5 0! 3 2.5 2 1.5 1 0.5-� - O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 58 56 54 a 52 50 48 46 44 42 40 38 36 34 32 U `-' 30 O 28 C C• 26 24 22 20 18 6 14 12 10 8 6 4 2 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:POST-102 Input Data Area(ac) 21.96 Peak Rate Factor 484 Weighted Curve Number 86.74 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Newly graded area 2.51 C 91 Newly graded area 14.42 B 86 Newly graded area 1.76 B 86 Newly graded area 0.89 C 91 Proposed Pond Surface 1.34 C 98 1/2 acre lots,25%impervious 1.05 B 70 Composite Area&Weighted CN 21.97 86.74 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 4 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow Time(min): 15.56 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 92 1243 255 Slope(%): 13 3.54 0.5 Surface Type: Grass pasture Paved Unpaved Velocity(ft/sec): 2.52 3.82 1.14 Computed Flow Time(min): 0.61 5.42 3.73 Total TOC(min) 25.32 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 3.64 Peak Runoff(cfs) 76.81 Weighted Curve Number 86.74 Time of Concentration(days hh:mm:ss) 0 00:25:19 Subbasin:POST-102 Rainfall Intensity Graph 7.5 7_ 6.5- 6 5.5 5 - 4.5- r c 4 m c 3.5 0! 3 2.5 2 1.5 1 0.5 • -� 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 85 80- 75- 70 65- 60 55- 50 N - 45_ c 40 z 35- 30 25- 20 15- 10- 5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:POST-201 Input Data Area(ac) 0.14 Peak Rate Factor 484 Weighted Curve Number 66.43 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 50-75%grass cover,Fair 0.1 B 69 Woods,Fair 0.04 B 60 Composite Area&Weighted CN 0.14 66.43 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 50 0 0 Slope(%): 1.72 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.07 0 0 Computed Flow Time(min): 12.53 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 204 0 0 Slope(%): 2.52 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.79 0 0 Computed Flow Time(min): 4.3 0 0 Total TOC(min) 16.83 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 1.83 Peak Runoff(cfs) 0.3 Weighted Curve Number 66.43 Time of Concentration(days hh:mm:ss) 0 00:16:50 Subbasin:POST-201 Rainfall Intensity Graph 7.5 7_ 6.5- 6 5.5 5 - 4.5- r c 4 m c 3.5 0! 3 2.5 2 1.5 1 0.5 • -� - O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 0.31 0.3 0.29 0.28 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.2 0.19 ,..,0.18 00.17 0.16 o 0.15 S 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:POST-301 Input Data Area(ac) 6.59 Peak Rate Factor 484 Weighted Curve Number 77.25 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 50-75%grass cover,Fair 0.56 B 69 50-75%grass cover,Fair 3.74 C 79 Woods,Fair 0.09 B 60 Woods,Fair 1.75 C 73 Existing Pond Surface 0.26 C 98 Newly graded area 0.19 B 86 Composite Area&Weighted CN 6.59 77.25 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.48 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.12 0 0 Computed Flow Time(min): 13.72 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 776 157 225 Slope(%): 5.48 0.5 5.68 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.17 1.14 3.85 Computed Flow Time(min): 11.05 2.3 0.97 Total TOC(min) 28.04 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 2.73 Peak Runoff(cfs) 16.53 Weighted Curve Number 77.25 Time of Concentration(days hh:mm:ss) 0 00:28:02 Subbasin:POST-301 Rainfall Intensity Graph 7.5 7_ 6.5- 6 5.5 5 - 4.5- r c 4 m c 3.5 0! 3 2.5 2 1.5 1 0.5-� - 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 18 17- 16- 15 14 13 12 11- 10- Uy . O 9- C 8- 7- 6 5 4 3 2- 1- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe Elevation Offset Elevation Depth Cover (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft2) (in) 1 NULL-1 0.00 4.00 4.00 0.00 0.00 4.00 0.00 0.00 0.00 2 NULL-2 0.00 4.00 4.00 0.00 0.00 4.00 0.00 0.00 0.00 3 05 671.75 679.00 7.25 671.75 0.00 679.00 0.00 0.00 0.00 4 POND-OUT 668.20 679.00 10.80 668.20 0.00 679.00 0.00 0.00 0.00 Junction Results SN Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL Time of Time of Total Total Time ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Max HGL Peak Flooded Flooded Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume Attained Occurrence (cfs) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (days hh:mm) (days hh:mm) (ac-in) (min) 1 NULL-1 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0 00:00 0 00:00 0.00 0.00 2 NULL-2 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0 00:00 0 00:00 0.00 0.00 3 OS 4.43 0.00 672.41 0.66 0.00 6.59 671.90 0.15 0 14:07 0 00:00 0.00 0.00 4 POND-OUT 4.43 0.00 668.30 0.10 0.00 10.70 668.22 0.02 0 14:09 0 00:00 0.00 0.00 Channel Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Pipe-24 425.00 668.20 0.00 651.20 0.00 17.00 4.0000 Trapezoidal 7.500 81.000 0.0500 0.5000 0.5000 0.0000 0.00 No Channel Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Pipe-24 4.43 0 14:10 7886.39 0.00 1.25 5.67 0.10 0.01 0.00 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (in) (cfs) 1 NULL-PIPE 90901.97 0.00 0.00 0.00 0.00 0.00 0.0000 CIRCULAR 18.000 18.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 2 Pipe-25 68.00 671.75 0.00 668.20 0.00 3.55 5.2200 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 NULL-PIPE 0.00 0 00:00 0.01 0.00 0.00 0.00 0.00 0.00 Calculated 2 Pipe-25 4.43 0 14:08 51.69 0.09 10.64 0.11 0.38 0.19 0.00 Calculated Storage Nodes Storage Node:SED-POND Input Data Invert Elevation(ft) 671.75 Max(Rim)Elevation(ft) 679 Max(Rim)Offset(ft) 7.25 Initial Water Elevation(ft) 671.75 Initial Water Depth(ft) 0 Ponded Area(ft') 0 Evaporation Loss 0 Storage Area Volume Curves Storage Curve:SED-POND Stage Storage Storage Area Volume (ft) (ft') (ft3) ISED-POND INV.' 0 0 0 0.25 1028.5206 128.57 1.25 22965.7533 12125.71 2.25 40048.1892 43632.68 3.25 44110.6921 85712.12 4.25 47498.5108 131516.72 WEIR ELEV. 5.25 50978.9143 180755.43 6.25 54551.9027 233520.84 TOP OF DAM 7.25 58217.4759 289905.53 Storage Area Volume Curves Storage Volume(ft') 0 50,000 100,000 150,000 200,000 250,000 7.2_ .................................................._�................... .... .................. ............... ........._..........�........._................ ........................_......... .-7.2 7_.i........................................................................................................i....................................................z....................................................i.....................................................i.. .................... ......... _7 6.8-.i........................................................................................................i........................................................................................................i.....................................................i............. ..................... -.6.8 6.6. - 16.6 ....................................................y.........................................................................................................p....................................................i........................................... ................................................—6.4 6.2_.1........................................................................................................i........................................................................................................i.............................. ...................i...................................... —6.2 g_.................................................................................................................................................................................................................................... ................ ...........................6 5.8_.i•........................................................................................................i........................................................................................................i........ ..........................................i...................................... -5.8 5.4-.........................................................................................................i.......................................................................................... ..........i..............................................................................................-5.4 5.2_.i....................................................y....................................................i............................................................................... .....................i.....................................................i......................................._5.2 5_.i........................................................................................................j..................................................................... ................................................................................................................................_5 4.8-.i....................................................a....................................................i........................................................... ..........................................i................................................._i.........................................-4.8 4.4=.i•....................................................s............................................................................................ ..............................................................i........................................ .................................................. -4.4 4.2=.i•....................................................................................................................................... .......................................................................i...................................................i........................................ -4.2 i.................................................................................... ............................................................_4 3.8 ................................................d....................................................i.......... .......................................b....................................................i............................................... ....................................-3.8 &3.6 ....................................................................................................i .....................................................................................................i............................................... .....................................-3.6 OI a N3.4 ..............................................d........................................... ......i........................................................................................................i...................... ....................... .................................... 3.4 N 3.2— _................................................................................. .....................................................................................................................................................................................................................13.2 3_.............................................................................. .............................................................................................................................................. ...............................................................................=3 2.8- .................................................................... ..............................._......................................................................................................_.......................................................................................... —2.8 2.6-................................................................................................................................................................................................................... ........................................................................................:2.6 2.4=.................................................... ...............................................................................................................................................................................................................j........................................ -2.4 2.2- ....._.................................... ..........................................................<................................................................................................. ..;................................................................................................-2.2 .....................i.....................................................i...........................................=2 1.8 ....._.................. i i...........................................-1.8 1.6 ...................................................................................................:............................................ ....:....................................................i.....................................................i........................................ -1.6 1.4 ............................................................................................................... ..........................................................................................................................................................................11.4 1.2 _.___........................................................................................... .............................................................................................i.....................................................i...........................................-1.2 1_....................................................................................... ...................................................................................................................................................................................................................=1 0.8= .................................................... i ...........................................-0.8 • ' i 0.2_...................................................o....................................................i........................................................................................................i.....................................................i........................................ -0.2 ......... ......=0 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage Area(ft') — Storage Area — Storage Volume 1 Storage Node:SED-POND(continued) Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 EM-SPILLWAY Trapezoidal No 677.60 5.85 30.00 1.40 3.33 2 WEIR(TOP OF BOX) Rectangular No 677.00 5.25 12.00 1.50 3.33 Output Summary Results Peak Inflow(cfs) 75.37 Peak Lateral Inflow(cfs) 75.37 Peak Outflow(cfs) 4.43 Peak Exfiltration Flow Rate(cfm) 0 Max HGL Elevation Attained(ft) 677.21 Max HGL Depth Attained(ft) 5.46 Average HGL Elevation Attained(ft) 673.83 Average HGL Depth Attained(ft) 2.08 Time of Max HGL Occurrence(days hh:mm) 0 14:08 Total Exfiltration Volume(1000-ft') 0 Total Flooded Volume(ac-in) 0 Total Time Flooded(min) 0 Total Retention Time(sec) 0 (—Volume:Node-SED-POND(DURING CONSTRUCTION 2024-02-15 08:46:48)) 210000- 200000- 190000 180000- 170000- 160000- 150000- 140000- 130000- t'120000 E 110000 0 100000 1 90000 80000 70000 60000 50000 40000 30000- 20000-1 1 D000- 0 0 17 34 51 68 11_12 119 136 153 Time ihrsa During Construction Dewatering Graph (10yr Storm) = 109 - 8.5 = 100.5 hrs = - 4.2 days Storm Drainage Calculations Fulfilled Engineering LLC Skimmer Sizing Calculations II22 Calculate Skimmer Size Basin Volume in Cubic Feet 180,755 Cu.Ft Skimmer Size 6.0 Inch Days to Drain* 4 Days Orifice Radius 2.8 Inch[es] Orifice Diameter 5.6 Inch[es] *In NC assume 3 days to drain Estimate Volume of Basin Length Width Top of water surface in feet Feet VOLUME 0 Cu. Ft. Bottom dimensions in feet Feet Depth in feet Feet Storm Drainage Calculations Fulfilled Engineering LLC APPENDIX F: PIPE-SIZING CALCULATIONS II23 Storm Drainage Calculations Fulfilled Engineering LLC Pipe-Sizing Watershed Map II24 Ei LEGEND: PIPE SIZING WATERSHEDS I / J - m - - -200- - - EXISTING CONTOUR \ / F PROJECT BOUNDARY WATERSHED AREA[AC.] HYDR.LENGTH[FT.] SLOPE[%] CURVE NUMBER[CN] ,I 1111 / / 0 PIPE SIZING WATERSHED AREAS PS-138 0.58 223 3.72 62 I \ ' I PS-140 0.39 240 4.26 80 -� J /� I1 / PS-141 8.64 1013 2.24 68 /)__ I_ I \, z o � � V PS-143 0.27 125 5.07 76 � � �_ = O z o �� PS-145 0.51 151 4.52 86 �� J �V 4\� �� w o �' \� // PS-147 0.37 173 6.85 92 / J ,� - ���� \// PS-149 039 196 489 78 / 77/-> / / / /_ ���kl* / _ 1� PS-POND 1.76 343 5.22 92 / / / / a / // ��� A -� � \ ) , 2 �i 7 _____/ Z.-- �, ( / / / / / / / Y _ j30e_� 0 0 ,o Z 0 r I 728 101110! 132 illill Qo � / J/ ) / -,... _'.'�A�•CLe �!`\_, 0.GRK e / ;n)___ O' f•c YY N Nto ��� �����- \ , \ ) ( / / OUTFALL 2 �� / � 7y '�_-- 7z4 - - � �� �, '^ ❑� ti ❑� _ 'rI 720 - - -- -718 "V.4. --- !/ lo 1 ),/ / -712 MCI 4411 �� Z {A _ _ Iffigi \ /<- Lu g __-----:z ,-------- \ ii ,\ \\* fIl s w . Z _ 41 - kw 1,, \, co / Z E Z /7- r / LL _i_ J � � _ W w i ‘1111111117 7( \ / WK. I illi' ► . . . �� , 440 AIM / Swow ie.rer ��`- i ApvA1411 , ,__ m h� - ..� _._,..„, , \.„1,, _ ._.,..... . � � e : \ , 4 . 7 \ Iiih,illr / l - R:« '� , . \ , ,, \ A. . 710 1 41 ,_ -- 014. .._ik_:. .7o0 ,0 _ .. / ) i 1 , 694 _NM�11�N / ----- -,- I i'!F/I 6 ----- MIN......1.11120411.7 1,0 , 1 A-4,_, 11313<-..1v#3\ 1 �� \illir 7 I / / 688-�c69�0 !_�� 7 �ti \��- I \V\ j ' e , - \ _ A-RP ....„ c._ , , __ _____c___ ..,, / .......,_ _ / ,,, ,, ,„,„ , .. . :.,,,,,.....,,,, .....,,7--- , -----___-,/, , \ , „.._ . / \ \\, ,.. T. , („.„ 7_ o N % -' ....4 114,,„;.1 ___..., 'I:i 11 14147#1------_,---) -)-9) !i► I /7 , ,h -,. . . CC °� � �� � �� �_ �i ems a Ili „Ay,-�� _ /---- / / A,/� �j �\ ;� // % / \ Z 1. � �� 41---- - � ®� II I �pe� i N \� ®ems• ' �( ���_/ � � w EL `�• _ sea �6�- _` ✓ �� /� i i / / (1-----// / PIPE SIZING WATERSHEDS PIPE SIZING WATERSHEDS a 676`� ---- I / //���-_ // WATERSHED AREA[AC.] HYDR.LENGTH[FT.] SLOPE[%] CURVE NUMBER[CN] WATERSHED AREA[AC.] HYDR.LENGTH[FT.] SLOPE[%] CURVE NUMBER[CN] \ 672 _ -� // V \ -664\ -//j/7//7 �_ 7 I / ��� n PS-104 1.00 378 6.75 87 PS-121 0.80 639 3.29 98 �� / J PS-105 1.00 407 5.90 87 PS-122 0.66 509 3.79 98 � ��//� / // / // / PS-106 0.99 450 5.55 88 PS-123 0.72 592 3.72 98 ���A z LU CC L'7, �� �� �� �� - �� PS 108 0.64 396 4.70 96 PS 125 0.90 617 3.24 98 J / / - i i PS-109 0.47 405 4.01 97 PS-126 0.83 415 3.45 98 a N O 0' / �� /_ /� �/ // / w / / � y j � PS-110 0.90 347 2.20 96 PS-127 0.89 509 3.54 98 o LL j Q �� _�� / // I PS-112 0.25 177 1.17 75 PS-128 0.93 397 3.68 98 a Z a / / _� -� ��/�� PS-113 0.98 337 1.55 91 PS-129 0.16 190 3.68 98 Z I- \ PS-114 0.27 100 1.14 97 P5-130 0.24 190 3.68 98 O Q MPGNEj1CNORt'�/ // / r/ / / \= 11 \ \ PS-115 0.54 207 1.53 85 PS-131 0.78 203 2.82 98 ~ / ���///� / / ) I 1 P5-116 0.21 100 1.36 98 P5-132 0.59 316 4.63 93 © / f __ //// o 7,7 \ / 11 PS-117 0.64 312 6.02 90 PS-133 0.72 255 4.67 81 �_ / / P5-119 0.59 188 7.23 97 P5-134 0.98 377 4,73 78 DATE:JANUARY 4,2024 / // PS-120 0.59 684 3.42 98 PS-135 0.28 211 1.34 80 SCALE: �- =80 C 3 80 40 0 80 160 240 PROJECT SCALE IN FEET 22008 NO. OF 3 Storm Drainage Calculations Fulfilled Engineering LLC Pipe-Sizing Node Diagram II25 PS-149 •SD"' PS-147 SD#48 PieM YO PS145 SWPLE-1 150341 SCR45 PS143 Pipe55 ISDHS ®PS.115 SWALE-2 SDaw Ppe6O PS."7 i SDe15 SWALE3 SDe435DO4 2 Ka SNIP'''. 4 PW1-87 Pa134 PSP'?e" P55 SM14 PS-141 ® SC4335 13 /121 Pipe-q PpN5 sp.. oPS-101 S' - PS-133 Q �/ irI P 32 PSt3t Pye-16'Z 1 5 '- SOett PSt40 SDs32J,,,rS118 D612 1 34 P'Pe''p°pe-40 V P SDNI t ®soero S 0 109 S0e30 I PS-Ppe-49 P , SD829 �SDs28'- 1 1 P15558 PS -P0,l Grp I Fo-u OUTFACE-2 n�® 1214,so. SDe2l r P.F° 5��'PPPP�ppS-'''ee1SS507 I POST-201 50✓R I tP SC+40 --® Ppe 3-k SDe25 pSDf 1 PS-138 50+39 ja SO43233 PS 44 PryE52p 1 Bil Pipeb2 P3' 1213,90451; :50422f Piee-. iPP4-5�3 Pipt59 Pipe-27 SW2'1�De2< r `sN5 ^ PS-POND \SD438 - '-\SDf20 p,58 /_p P4e•28 Ppe-29 SDP SS" WET-POND PipeM3 SDl3l Ppo-ST I ®POST301 �...� LWEIR(T°WEi9--1` I PpeG \wEWEIR3--�jr EM-SPILLWAYSDrt38 Iyf I FALLSM SPpe-25 POND-OUTI 45,72 STREAM-CONNECT I Ppe-l3 OUTFALL-I Autodesk Storm and Sanitary Analysis Storm Drainage Calculations Fulfilled Engineering LLC Pipe-Sizing Calculations II26 Project Description File Name PIPE SIZNG(WECPOND).SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Time Periods YES Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 3 seconds Number of Elements ety Rain Gages 1 Subbasins 41 Nodes 54 Junctions 50 Outfalls 3 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 58 Channels 7 Pipes 42 Pumps 0 Orifices 4 Wens 5 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 1 Time Series 010-YR Cumulative inches North Carolina Rowan 10.00 5.10 SCS Type 1124-hr Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak lime of ID Factor Cure Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 POST-201 0.14 484.00 66.43 5.10 1.83 0.26 0.30 0 00:16:49 2 POST-301 6.59 484.00 76.53 5.10 2.67 17.56 16.13 0 00:28:02 3 PS-101 32.85 484.00 70.41 5.10 2.14 70.43 41.18 0 00:53:16 4 PS-104 1.00 484.00 86.58 5.10 3.62 3.62 5.24 0 00:07:21 5 PS-105 1.00 484.00 87.30 5.10 3.69 3.69 5.07 0 00:09:13 6 PS-106 0.99 484.00 88.02 5.10 3.77 3.73 5.20 0 00:08:34 7 PS-107 0.83 484.00 84.63 5.10 3.42 2.84 3.82 0 00:10:50 8 PS-108 0.64 484.00 95.11 5.10 4.53 2.90 3.73 0 00:09:14 9 PS-109 0.50 484.00 97.26 5.10 4.78 2.39 3.24 0 00:06:00 10 PS-110 0.90 484.00 96.36 5.10 4.67 4.21 5.81 0 00:06:00 11 PS-112 0.44 484.00 75.30 5.10 2.56 1.12 1.74 0 00:06:00 12 PS-113 0.98 484.00 91.20 5.10 4.10 4.02 5.87 0 00:06:00 13 PS-114 0.27 484.00 97.04 5.10 4.75 1.28 1.74 0 00:06:00 14 PS-115 0.54 484.00 84.63 5.10 3.42 1.85 2.80 0 00:06:00 15 PS-116 0.21 484.00 98.00 5.10 4.86 1.02 1.38 0 00:06:00 16 PS-117 0.64 484.00 90.01 5.10 3.97 2.54 2.87 0 00:17:25 17 PS-119 0.59 484.00 97.19 5.10 4.77 2.81 3.82 0 00:06:00 18 PS-120 0.59 484.00 98.00 5.10 4.86 2.87 3.83 0 00:06:00 19 PS-121 0.80 484.00 98.00 5.10 4.86 3.89 5.21 0 00:06:00 20 PS-122 0.66 484.00 98.00 5.10 4.86 3.21 4.29 0 00:06:00 21 PS-123 0.72 484.00 98.00 5.10 4.86 3.50 4.71 0 00:06:00 22 PS-124 0.83 484.00 98.00 5.10 4.86 4.04 5.42 0 00:06:00 23 PS-125 0.90 484.00 98.00 5.10 4.86 4.38 5.88 0 00:06:00 24 PS-126 0.83 484.00 98.00 5.10 4.86 4.04 5.42 0 00:06:00 25 PS-127 0.89 484.00 98.00 5.10 4.86 4.33 5.79 0 00:06:00 26 PS-128 0.93 484.00 98.00 5.10 4.86 4.52 6.04 0 00:06:00 27 PS-129 0.16 484.00 98.00 5.10 4.86 0.78 1.04 0 00:06:00 28 PS-130 0.24 484.00 98.00 5.10 4.86 1.17 1.58 0 00:06:00 29 PS-131 0.78 484.00 98.00 5.10 4.86 3.79 5.08 0 00:06:00 30 PS-132 0.59 484.00 92.95 5.10 4.29 2.53 3.09 0 00:12:27 31 PS-133 0.72 484.00 80.79 5.10 3.05 2.20 3.05 0 00:10:01 32 PS-134 0.98 484.00 78.34 5.10 2.83 2.77 3.38 0 00:15:39 33 PS-135 0.28 484.00 79.50 5.10 2.93 0.82 1.05 0 00:13:50 34 PS-138 0.58 484.00 62.21 5.10 1.52 0.88 0.91 0 00:20:01 35 PS-140 0.39 484.00 80.49 5.10 3.03 1.18 1.60 0 00:10:54 36 PS-141 8.64 484.00 67.94 5.10 1.95 16.81 11.89 0 00:39:42 37 PS-143 0.27 484.00 75.81 5.10 2.60 0.70 0.99 0 00:08:55 38 PS-145 0.51 484.00 86.29 5.10 3.59 1.83 2.51 0 00:09:38 39 PS-147 0.37 484.00 91.51 5.10 4.13 1.53 2.10 0 00:08:19 40 PS-149 0.39 484.00 78.05 5.10 2.80 1.09 1.52 0 00:09:49 41 PS-POND 1.76 484.00 92.27 5.10 4.22 7.42 8.93 0 00:13:37 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak MaxHGL Max Mn Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 NULL-1 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 2 NULL-2 Junction 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0 00:00 0.00 0.00 3 OS Junction 667.25 679.00 667.25 679.00 0.00 18.50 670.97 0.00 8.03 0 00:00 0.00 0.00 4 PON-OUC Junction 666.00 679.00 666.00 679.00 0.00 18.50 666.27 0.00 12.73 0 00:00 0.00 0.00 5 SD/10 Junction 711.16 716.46 711.16 716.46 0.00 20.21 712.18 0.00 4.28 0 00:00 0.00 0.00 6 SD/11 Junction 713.02 719.27 713.02 719.27 0.00 14.85 714.46 0.00 4.81 0 00:00 0.00 0.00 7 SD/12 Junction 713.55 717.24 713.55 717.24 0.00 14.87 715.47 0.00 1.77 0 00:00 0.00 0.00 8 SD/13 Junction 714.50 717.99 714.50 717.99 0.00 13.34 716.27 0.00 1.72 0 00:00 0.00 0.00 9 SD/14 Junction 718.25 721.68 718.25 721.68 0.00 7.65 719.04 0.00 2.64 0 00:00 0.00 0.00 10 SD/15 Junction 719.15 721.90 719.15 721.90 0.00 2.77 719.84 0.00 2.06 0 00:00 0.00 0.00 11 SD/16 Junction 719.01 722.58 719.01 722.58 0.00 3.77 719.84 0.00 2.74 0 00:00 0.00 0.00 12 SD/17 Junction 719.95 722.66 719.95 722.66 0.00 2.81 720.61 0.00 2.05 0 00:00 0.00 0.00 13 SD/19 Junction 675.35 681.18 675.35 681.18 0.00 63.05 678.06 0.00 3.12 0 00:00 0.00 0.00 14 SD/20 Junction 683.90 689.12 683.90 689.12 0.00 59.44 685.70 0.00 3.42 0 00:00 0.00 0.00 15 SD/21 Junction 689.89 692.86 689.89 692.86 0.00 13.91 691.02 0.00 1.84 0 00:00 0.00 0.00 16 SD/22 Junction 690.80 693.76 690.80 693.76 0.00 8.94 692.08 0.00 1.68 0 00:00 0.00 0.00 17 SD/23 Junction 693.25 695.97 693.25 695.97 0.00 4.69 693.92 0.00 2.05 0 00:00 0.00 0.00 18 SD/24 Junction 687.45 693.12 687.45 693.12 0.00 42.21 689.20 0.00 3.92 0 00:00 0.00 0.00 19 SD/25 Junction 699.20 704.19 699.20 704.19 0.00 37.25 700.85 0.00 3.34 0 00:00 0.00 0.00 20 SD/26 Junction 701.63 705.43 701.63 705.43 0.00 11.05 703.30 0.00 2.13 0 00:00 0.00 0.00 21 SD/27 Junction 702.95 705.69 702.95 705.69 0.00 5.77 704.06 0.00 1.63 0 00:00 0.00 0.00 22 SD/28 Junction 710.80 714.28 710.80 714.28 0.00 21.23 711.81 0.00 2.47 0 00:00 0.00 0.00 23 SD/29 Junction 712.58 716.69 712.58 716.69 0.00 16.41 714.14 0.00 2.55 0 00:00 0.00 0.00 24 SD/30 Junction 714.20 716.92 714.20 716.92 0.00 1.57 714.67 0.00 2.25 0 00:00 0.00 0.00 25 SD/31 Junction 716.25 719.60 716.25 719.60 0.00 14.34 717.48 0.00 2.12 0 00:00 0.00 0.00 26 SD/32 Junction 717.25 720.20 717.25 720.20 0.00 6.12 718.30 0.00 1.90 0 00:00 0.00 0.00 27 SD/33 Junction 718.50 721.22 718.50 721.22 0.00 3.03 719.06 0.00 2.16 0 00:00 0.00 0.00 28 SD/34 Junction 718.57 722.27 718.57 722.27 0.00 4.24 719.26 0.00 3.01 0 00:00 0.00 0.00 29 SD/35 Junction 718.90 721.68 718.90 721.68 0.00 1.02 719.37 0.00 2.31 0 00:00 0.00 0.00 30 SD/36 Junction 700.42 711.54 700.42 711.54 0.00 15.93 700.67 0.00 10.87 0 00:00 0.00 0.00 31 513937 Junction 703.36 713.58 703.36 713.58 0.00 15.92 705.57 0.00 8.01 0 00:00 0.00 0.00 32 SD/38 Junction 706.35 709.12 706.35 709.12 0.00 0.89 706.65 0.00 2.47 0 00:00 0.00 0.00 33 SD/39 Junction 707.66 712.07 707.66 712.07 0.00 15.06 708.60 0.00 3.47 0 00:00 0.00 0.00 34 5D94 Junction 675.98 680.68 675.98 680.68 0.00 44.65 678.16 0.00 2.52 0 00:00 0.00 0.00 35 SD/40 Junction 707.77 712.07 707.77 712.07 0.00 1.60 708.61 0.00 3.46 0 00:00 0.00 0.00 36 SD/41 Junction 711.90 715.90 711.90 715.90 0.00 14.02 712.87 0.00 3.03 0 00:00 0.00 0.00 37 SD/42 Junction 713.34 714.90 713.34 714.90 0.00 6.66 713.93 0.00 0.97 0 00:00 0.00 0.00 38 SD/43 Junction 713.66 716.67 713.66 716.67 0.00 6.66 715.23 0.00 1.44 0 00:00 0.00 0.00 39 SD/44 Junction 714.91 716.67 714.91 716.67 0.00 5.75 715.32 0.00 1.35 0 00:00 0.00 0.00 40 SD/45 Junction 715.17 720.43 715.17 720.43 0.00 5.87 716.56 0.00 3.87 0 00:00 0.00 0.00 41 SD/46 Junction 716.75 720.38 716.75 720.38 0.00 3.43 717.19 0.00 3.19 0 00:00 0.00 0.00 42 SD/47 Junction 720.15 723.09 720.15 723.09 0.00 3.45 720.57 0.00 2.52 0 00:00 0.00 0.00 43 SD/48 Junction 725.85 729.59 725.85 729.59 0.00 1.51 726.06 0.00 3.53 0 00:00 0.00 0.00 44 SD/49 Junction 729.50 732.23 729.50 732.23 0.00 1.51 729.82 0.00 2.41 0 00:00 0.00 0.00 45 SD/5 Junction 677.91 682.40 677.91 682.40 0.00 39.79 680.00 0.00 2.40 0 00:00 0.00 0.00 46 SD/6 Junction 683.50 687.69 683.50 687.69 0.00 35.04 684.89 0.00 2.80 0 00:00 0.00 0.00 47 SD/7 Junction 688.68 692.26 688.68 692.26 0.00 30.18 690.31 0.00 1.95 0 00:00 0.00 0.00 48 SD/8 Junction 694.15 697.77 694.15 697.77 0.00 26.69 695.54 0.00 2.23 0 00:00 0.00 0.00 49 SD/9 Junction 704.10 707.83 704.10 707.83 0.00 23.23 705.26 0.00 2.57 0 00:00 0.00 0.00 50 STREAM-CONNECT Junction 662.76 679.00 662.76 679.00 0.00 33.13 663.08 0.00 15.92 0 00:00 0.00 0.00 51 OUIFAIL 1 Outfall 651.20 73.61 651.52 52 OUIFALL.2 Outfall 716.35 0.30 716.35 53 OUIFALL.3 Outfall 663.20 16.11 663.20 54 WET-POND Storage Node 667.25 679.00 671.75 0.00 114.84 676.41 0.00 0.00 Link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total lime Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Eevaton Elevation Ratio 'IotalDepth Ratio (ft) (It) (It) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 NULL-PIPE Pipe NULL-1 NULL-2 90901.97 0.00 0.00 0.0000 18.000 0.0150 0.00 0.01 0.00 0.00 0.00 0.00 0.00 Calculated 2 Pipe-25 Pipe OS POND-OUP 93.00 667.25 666.00 1.3400 24.000 0.0130 18.50 26.23 0.71 10.07 1.13 0.57 0.00 Calculated 3 Pipe-26 Pipe SD#23 SD#22 187.17 693.25 691.00 1.2000 18.000 0.0130 4.70 11.52 0.41 4.43 0.86 0.58 0.00 Calculated 4 Pipe-27 Pipe SDN22 SD#21 61.31 690.80 690.09 1.1600 18.000 0.0130 8.83 11.30 0.78 6.14 1.12 0.76 0.00 Calculated 5 Pipe-28 Pipe SD#21 SD#20 154.91 689.89 684.90 3.2200 18.000 0.0130 13.90 18.85 0.74 10.61 1.02 0.69 0.00 Calculated 6 Pipe-29 Pipe SD#20 513619 166.31 683.90 675.85 4.8400 30.000 0.0130 59.44 90.24 0.66 14.16 1.91 0.80 0.00 Calculated 7 Pipe-31 Pipe SD#4 WET-POND 59.00 675.98 674.04 3.2900 30.000 0.0130 44.65 74.38 0.60 11.88 1.83 0.74 0.00 Calculated 8 Pipe-32 Pipe SD#27 SD#26 183.41 702.95 702.03 0.5000 18.000 0.0130 5.72 7.44 0.77 4.00 1.13 0.78 0.00 Calculated 9 Pipe-33 Pipe SD#26 SD#25 183.42 701.83 699.70 1.1600 18.000 0.0130 10.60 11.32 0.94 6.68 1.24 0.87 0.00 Calculated 10 Pipe-34 Pipe 513625 SD#24 292.34 699.20 687.95 3.8500 24.000 0.0130 37.21 44.38 0.84 14.49 1.47 0.76 0.00 Calculated 11 Pipe-35 Pipe SD#24 SD#20 82.97 687.45 684.10 4.0400 30.000 0.0130 42.21 82.42 0.51 12.37 1.61 0.67 0.00 Calculated 12 Pipe-36 Pipe SD#30 SD#29 184.45 714.20 713.28 0.5000 18.000 0.0130 1.55 7.42 0.21 2.88 0.64 0.43 0.00 Calculated 13 Pipe-37 Pipe 513629 SD#28 183.43 712.58 711.00 0.8600 24.000 0.0130 16.36 21.00 0.78 6.75 1.44 0.72 0.00 Calculated 14 Pipe-38 Pipe 513628 SD#25 312.33 710.80 699.40 3.6500 24.000 0.0130 21.22 43.22 0.49 11.35 1.19 0.61 0.00 Calculated 15 Pipe-39 Pipe SD#33 S13#32 85.00 718.50 717.45 1.2400 18.000 0.0130 3.03 11.67 0.26 3.73 0.70 0.47 0.00 Calculated 16 Pipe-40 Pipe SIk/32 513631 50.00 717.25 716.80 0.9000 18.000 0.0130 6.10 9.97 0.61 5.18 0.94 0.63 0.00 Calculated 17 Pipe-41 Pipe SD#31 SD#29 333.38 716.25 712.78 1.0400 24.000 0.0130 14.31 23.08 0.62 6.67 1.29 0.65 0.00 Calculated 18 Pipe-42 Pipe SD#35 SD#34 24.98 718.90 718.77 0.5200 18.000 0.0130 1.02 7.58 0.13 2.29 0.47 0.32 0.00 Calculated 19 Pipe-43 Pipe SD#34 SD#31 142.91 718.57 716.80 1.2400 18.000 0.0130 4.24 11.69 0.36 5.72 0.67 0.45 0.00 Calculated 20 Pipe-44 Pipe SD#15 SD#14 119.35 719.15 718.55 0.5000 18.000 0.0130 2.73 7.45 0.37 3.65 0.65 0.44 0.00 Calculated 21 Pipe-45 Pipe SD#14 S13#13 146.98 718.25 715.00 2.2100 18.000 0.0130 7.66 15.62 0.49 7.44 0.98 0.68 0.00 Calculated 22 Pipe-46 Pipe SD#13 SD#12 149.60 714.50 713.75 0.5000 24.000 0.0130 13.21 16.02 0.82 4.58 1.65 0.87 0.00 Calculated 23 Pipe-47 Pipe SD#12 SD611 65.68 713.55 713.22 0.5000 24.000 0.0130 14.85 16.04 0.93 5.34 1.60 0.83 0.00 Calculated 24 Pipe-48 Pipe SD#11 SD610 197.03 713.02 711.36 0.8400 24.000 0.0130 14.84 20.76 0.71 6.61 1.31 0.67 0.00 Calculated 25 Pipe-49 Pipe SI3#10 SD#9 138.57 711.16 704.30 4.9500 24.000 0.0130 20.21 50.33 0.40 13.10 0.95 0.49 0.00 Calculated 26 Pipe-50 Pipe SI3#9 SD#8 286.75 704.10 694.35 3.4000 24.000 0.0130 23.24 41.71 0.56 12.14 1.12 0.59 0.00 Calculated 27 Pipe-51 Pipe SD#8 5Dp7 160.88 694.15 688.88 3.2800 24.000 0.0130 26.70 40.94 0.65 11.37 1.37 0.70 0.00 Calculated 28 Pipe-52 Pipe SD#7 SD#6 142.84 688.68 684.00 3.2800 24.000 0.0130 30.17 40.95 0.74 12.34 1.42 0.73 0.00 Calculated 29 Pipe-53 Pipe SD#6 SD#5 165.35 683.50 678.11 3.2600 30.000 0.0130 35.04 74.06 0.47 10.41 1.62 0.65 0.00 Calculated 30 Pipe-54 Pipe 51365 SD#4 55.62 677.91 676.18 3.1100 30.000 0.0130 39.79 72.34 0.55 9.75 2.01 0.81 0.00 Calculated 31 Pipe-55 Pipe SD#17 513616 124.69 719.95 719.21 0.6000 18.000 0.0130 2.80 8.11 0.35 3.93 0.64 0.43 0.00 Calculated 32 Pipe-56 Pipe SD#16 513614 76.38 719.01 718.55 0.6000 18.000 0.0130 3.75 8.15 0.46 4.10 0.77 0.51 0.00 Calculated 33 Pipe-57 Pipe SIki19 WET-POND 70.50 675.35 673.89 2.0700 36.000 0.0130 63.05 95.98 0.66 11.13 2.15 0.75 0.00 Calculated 34 Pipe-58 Pipe SD#41 SD#39 125.32 711.90 707.66 3.3800 24.000 0.0150 14.00 36.06 0.39 9.69 0.94 0.47 0.00 Calculated 35 Pipe-59 Pipe SD#39 SD#37 123.11 707.66 703.51 3.3700 24.000 0.0150 15.05 36.00 0.42 6.96 1.43 0.73 0.00 Calculated 36 Pipe-60 Pipe SD#37 513636 160.19 703.36 700.42 1.8400 24.000 0.0150 15.93 26.56 0.60 9.78 1.12 0.56 0.00 Calculated 37 Pipe-62 Pipe SD840 SD#39 6.28 707.77 707.66 1.7500 15.000 0.0150 1.59 7.41 0.22 2.00 0.87 0.71 0.00 Calculated 38 Pipe-63 Pipe SD#38 SD#37 15.00 706.35 706.00 2.3300 18.000 0.0130 0.89 16.05 0.06 4.16 0.27 0.18 0.00 Calculated 39 Pipe-64 Pipe SD#49 SD#48 110.00 729.50 725.85 3.3200 18.000 0.0130 1.51 19.13 0.08 7.28 0.26 0.17 0.00 Calculated 40 Pipe-65 Pipe SD#47 SD#46 63.00 720.15 716.75 5.4000 18.000 0.0130 3.43 24.40 0.14 8.27 0.43 0.28 0.00 Calculated 41 Pipe-66 Pipe SD#45 SD#44 31.36 715.17 714.91 0.8300 15.000 0.0150 5.75 5.10 1.13 6.66 0.82 0.66 0.00>CAPACITY 42 Pipe-67 Pipe SD#43 513642 31.90 713.66 713.34 1.0000 15.000 0.0150 6.66 5.61 1.19 6.90 0.91 0.73 0.00>CAPACHY 43 Pipe-72 Channel POND-OUP STREAM-CONNECT 136.00 666.00 662.76 2.3800 90.000 0.0500 18.50 6086.27 0.00 1.74 0.29 0.04 0.00 44 Pipe-73 Channel STREAM-CONNECT OUIFALL-1 289.00 662.76 651.20 4.0000 90.000 0.0500 32.49 7886.39 0.00 2.73 0.32 0.04 0.00 45 STREAM Channel SD#36 STRE5M-CONNECT 1735.00 700.42 662.76 2.1700 90.000 0.0500 15.38 4559.59 0.00 1.70 0.28 0.04 0.00 Link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total lime Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio 'IotalDapth Ratio (ft) (ft) (8) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 46 SWALE-1 Channel SD#48 SDk47 162.37 725.85 720.15 3.5100 15.000 0.0300 1.50 53.86 0.03 1.64 0.31 0.25 0.00 47 SWALE-2 Channel SD#46 SDN45 143.29 716.75 715.17 1.1000 15.000 0.0300 3.42 30.19 0.11 0.97 0.84 0.68 0.00 48 SWALE-3 Channel SD#44 50943 30.04 714.91 713.66 4.1600 15.000 0.0300 5.75 58.64 0.10 1.55 0.82 0.66 0.00 49 SWALE-4 Channel S0942 SD/41 110.08 713.34 711.90 1.3100 15.000 0.0300 6.65 32.88 0.20 2.26 0.75 0.61 0.00 50 LOW--ORIF Orifice WET-POND OS 667.25 667.25 11.000 3.92 51 LOW-ORIF-2 Orifice WET-POND OS 667.25 667.25 11.000 3.92 52 LDW-ORIF-3 Orifice WET-POND OS 667.25 667.25 11.000 3.92 53 WQ Orifice WET-POND OS 667.25 667.25 5.000 1.42 54 FM-SPILLWAY Weir WE-POND POND-OUT 667.25 666.00 0.00 55 WEIR(TOP OF BOX) Weir WET-POND OS 667.25 667.25 0.00 56 WElR 1 Weir WET-POND OS 667.25 667.25 1.78 57 WElR2 Weir WE-POND OS 667.25 667.25 1.78 58 WFR3 Weir WECPOND OS 667.25 667.25 1.78 Subbas in Hydrology Subbasin:POST-201 Input Data Area(ac) 0.14 Peak Rate Factor 484 Weighted Curve Number 66.43 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 50-75%grass cover,Fair 0.1 B 69 Woods,Fair 0.04 B 60 Composite Area&Weighted CN 0.14 66.43 Time ofConcentration 'WC Sheet How Equation: Tc=(0.007*((n*If)^0.8))/((P^0.5)*(Sf`0.4)) Where: Tc=Time of Concentration(hr) n =Manning's roughness If=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(Sf`0.5)(unpaved surface) V=20.3282*(Sf`0.5)(paved surface) V=15.0*(Sf`0.5)(grassed waterway surface) V=10.0*(Sf`0.5)(nearlybare&untffied surface) V=9.0*(Sf`0.5)(cultivated straight rows surface) V=7.0*(Sf`0.5)(short grass pasture surface) V=5.0*(Sf`0.5)(woodland surface) V=2.5*(SF 0.5)(forest w/heavy litter surface) Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(It) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(SF 0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc='lime of Concentration(hr) Lf=Flow Length(It) R=Hydraulic Radius(ft) Pq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Manning's roughness Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 50 0 0 Slope(%): 1.72 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.07 0 0 Computed Flow Time(min): 12.53 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 204 0 0 Slope(%): 2.52 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.79 0 0 ComputedFlowlime(min): 4.3 0 0 Total TOC(min) 16.83 Subbasin RunoffResults Total Rainfall(in) 5.1 Total Runoff(in) 1.83 Peak Runoff(cfs) 0.3 Weighted Curve Number 66.43 Time of Concentration(days hh:mm:ss) 0 00:16:50 Subbasin:POST-201 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - IY 3 2.5 2 1.5 1 0.5 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 0.31 0.3 0.29 0.28 0.27 0.26 0.25 0.24 0.23 0.22 0.21 0.2 0.19 0.18 0.17 • 0.16 O 0.15 c � 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 • O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:POST-301 Input Data Area(ac) 6.59 Peak Rate Factor 484 Weighted Curve Number 76.53 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 50-75%grass cover,Fair 0.56 B 69 50-75%grasscover,Fair 3.74 C 79 Woods,Fair 0.09 B 60 Woods,Fair 1.75 C 73 Existing Pond Surface 0.26 C 98 >75%grass cover,Good 0.19 B 61 Composite Area&Weighted CN 6.59 76.53 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.48 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.12 0 0 Computed Flow Time(min): 13.72 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 776 157 225 Slope(%): 5.48 0.5 5.68 Surface Type: Woodland Unpaved Unpaved Velocity(ftlsec): 1.17 1.14 3.85 Computed Flow Tune(min): 11.05 2.3 0.97 Total TOC(min) 28.04 Subbasin RunoffResults Total Rainfall(in) 5.1 Total Runoff(in) 2.67 PeakRunoff(cfs) 16.13 Weighted Curve Number 76.53 Time of Concentration(days hh:mm:ss) 0 00:28:02 Subbasin:POST-301 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 18 17- - 16- • 15 14- 13- 12 11 10 U . 9 O C • 8- 7- 6 5 4- 3 2 1 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-101 Input Data Area(ac) 32.85 Peak Rate Factor 484 Weighted Curve Number 70.41 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 50-75%grass cover,Fair 1.25 B 69 50-75%grasscover,Fair 1.8 C 79 Urban industrial,72%imp 3.88 B 88 Urban industrial,72%imp 1.56 C 91 Woods,Fair 7.76 C 73 Woods,Fair 14.73 B 60 Existing Roadway 0.6 B 98 Proposed paved parking&roofs 0.2 B 98 >75%grass cover,Good 0.51 B 61 >75%grass cover,Good 0.56 C 74 Composite Area&Weighted CN 32.85 70.41 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C lvhnning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 1 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.06 0 0 Computed Flow Time(min): 27.09 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 810 485 1982 Slope(%): 3.15 2.56 2.56 Surface Type: Grass pasture Paved Unpaved Velocity(ft/sec): 1.24 3.25 2.58 Computed FlowTime(min): 10.89 2.49 12.8 Total TOC(min) 53.27 Subbasin RunoffRe sults Total Rainfall(in) 5.1 Total Runoff(in) 2.14 Peak Runoff(cfs) 41.18 Weighted Curve Number 70.41 Time of Concentration(days hh:mm:ss) 0 00:53:16 Subbasin:PS-101 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 44 42- 40- 38 36 34 32 30- 28 26- 24- 22 o . S 20 18 16 14 12 10- 8- 6 4 2- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-104 Input Data Area(ac) 1 Peak Rate Factor 484 Weighted Curve Number 86.58 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 0.14 B 61 >75%grass cover,Good 0.26 C 74 Paved parking&roofs 0.57 C 98 Pavedparking&roofs 0.03 B 98 Composite Area&Weighted CN 1 86.58 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C tvbnning's Roughness: 0.4 0.01 0 Flow Length(ft): 66 34 0 Slope(%): 20 3.95 0 2 yr,24 hr Rainfall(in): 3.5 3.5 0 Velocity(ft/s ec): 0.19 1.64 0 Computed Flow lime(mm 5.86 0.34 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 278 0 0 Slope(%): 3.95 0 0 Surface Type: Paved Unpaved Unpaved Velocity(ft/sec): 4.04 0 0 Computed Flow lime(min): 1.15 0 0 Total lOC(min) 7.35 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 3.62 Peak Runoff(ca) 5.24 Weighted Curve Number 86.58 lime of Concentration(days hh:mm:ss) 0 00:07:21 Subbasin:PS-104 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 5.4 5.2- 5- 4.8- 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 w 3 U 2.8 0 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0. 0.4 2 0. 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-105 Input Data Area(ac) 1 Peak Rate Factor 484 Weighted Curve Number 87.3 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 0.05 C 74 >75%grass cover,Good 0.26 B 61 Paved parking&roofs 0.23 B 98 Pavedparking&roofs 0.47 C 98 Composite Area&Weighted CN 1.01 87.3 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C tvbnning's Roughness: 0.4 0.01 0 Flow Length(ft): 80 20 0 Slope(%): 15 3.67 0 2 yr,24 hr Rainfall(in): 3.5 3.5 0 Velocity(ft/s ec): 0.17 1.43 0 Computed Flow lime(min): 7.67 0.23 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 307 0 0 Slope(%): 3.67 0 0 Surface Type: Paved Unpaved Unpaved Velocity(ft/sec): 3.89 0 0 Computed Flow-rime(min): 1.32 0 0 Total IOC(min) 9.22 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 3.69 Peak Runoff(ca) 5.07 Weighted Curve Number 87.3 lime of Concentration(days hh:mm:ss) 0 00:09:13 Subbasin:PS-105 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - IY 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 5.2 5- 4.8- 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 N 3 U 2.8 2.6 O S 2.4 K 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-106 Input Data Area(ac) 0.99 Peak Rate Factor 484 Weighted Curve Number 88.02 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.07 C 98 >75%grass cover,Good 0.27 B 61 Pavedparking&roofs 0.65 B 98 Composite Area&Weighted CN 0.99 88.02 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0.01 0 Flow Length(ft): 70 30 0 Slope(%): 15.71 3.68 0 2 yr,24 hr Rainfall(in): 3.5 3.5 0 Velocity(ft/sec): 0.17 1.56 0 Computed Flow Time(min): 6.77 0.32 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 350 0 0 Slope(%): 3.68 0 0 Surface Type: Paved Unpaved Unpaved Velocity(ft/sec): 3.9 0 0 Computed Flow Tune(min): 1.5 0 0 Total TOC(min) 8.58 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 3.77 Peak Runoff(cfs) 5.2 Weighted Curve Number 88.02 Time of Concentration(days hh:mm:ss) 0 00:08:35 Subbasin:PS-106 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 5.2 5 I 4.8- 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 N 3 U 2.8 2.6 O S 2.4 K 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-107 Input Data Area(ac) 0.83 Peak Rate Factor 484 Weighted Curve Number 84.63 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 0.3 B 61 Paved parking&roofs 0.53 B 98 Composite Area&Weighted CN 0.83 84.63 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0.01 0 Flow length(ft): 78 22 0 Slope(%): 10.9 3.55 0 2 yr,24 hr Rainfall(in): 3.5 3.5 0 Velocity(ft/sec): 0.15 1.44 0 Computed Flow Time(min): 8.54 0.25 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 372 0 0 Slope(%): 3.55 0 0 Surface Type: Unpaved Unpaved Unpaved Velocity(ft/sec): 3.04 0 0 Computed Flow lune(min): 2.04 0 0 Total IOC(min) 10.84 Subbasin RunoffResults Total Rainfall(in) 5.1 Total Runoff(in) 3.42 Peak Runoff(cfs) 3.82 Weighted Curve Number 84.63 lime of Concentration(days hh:mm:ss) 0 00:10:50 Subbasin:PS-107 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 4.2 4- 3.8- 3.6- 3.4- 3.2 3 2.8 2.6- N 2.4- 2.2 c 2_ 1.8 1.6 1.4 1.2- 1- 0.8 0.6 0.4- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-108 Input Data Area(ac) 0.64 Peak Rate Factor 484 Weighted Curve Number 95.11 Rain Gage 1D 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.59 B 98 >75%grass cover,Good 0.05 B 61 Composite Area&Weighted CN 0.64 95.11 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0.01 0 Flow Length(ft): 65 35 0 Slope(%): 10.15 3.63 0 2 yr,24 hr Rainfall(in): 3.5 3.5 0 Velocity(ft/sec): 0.14 1.6 0 Computed Flow Time(min): 7.6 0.37 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 296 0 0 Slope(%): 3.63 0 0 Surface Type: Paved Unpaved Unpaved Velocity(ft/sec): 3.87 0 0 Computed Flow lune(min): 1.27 0 0 Total'OC(min) 9.24 Subbasin RunoffResults Total Rainfall(in) 5.1 Total Runoff(in) 4.53 Peak Runoff(cfs) 3.73 Weighted Curve Number 95.11 lime of Concentration(days hh:mm:ss) 0 00:09:14 Subbasin:PS-108 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 • 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 3.8 3.6 3.4 3.2- 3- 2.8- - 2.6 2.4- 2.2- m 46 2 2 1.8- K 1.6- 1.4- 1.2 1 0.8 0.6 0.4 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-109 Input Data Area(ac) 0.5 Peak Rate Factor 484 Weighted Curve Number 97.26 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 0.01 13 61 Paved parking&roofs 0.49 13 98 Composite Area&Weighted CN 0.5 97.26 Time ofConcentration User-Defined TOC override(minutes):6.00 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 4.78 PeakRunoff(cfs) 3.24 Weighted Curve Number 97.26 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-109 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 3.6 3.4- - 3.2- • 3 2.8- 2.6- 2.4 2.2 2- U . 1.8 0 c ' • 1.6- 1.4 1.2 1 0.8- 0.6 0.4 0.2 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-110 Input Data Area(ac) 0.9 Peak Rate Factor 484 Weighted Curve Number 96.36 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 0.04 13 61 Paved parking&roofs 0.86 13 98 Composite Area&Weighted CN 0.9 96.36 Time ofConcentration User-Defined TOC override(minutes):6.00 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 4.67 PeakRunoff(cfs) 5.81 Weighted Curve Number 96.36 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-110 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 6.2 6 5.8 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 0 3 S 2.8 2.6 2.4 2.2 2 1.8 1.6 - 1.4 1.2 1 0.8 0.6 0.4 0.2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-112 Input Data Area(ac) 0.44 Peak Rate Factor 484 Weighted Curve Number 75.3 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.17 13 98 >75%grass cover,Good 0.27 B 61 Composite Area&Weighted CN 0.44 75.3 Time ofConcentration User-Defined TOC override(minutes):6 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 2.56 PeakRunoff(cfs) 1.74 Weighted Curve Number 75.3 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-112 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 1.8 1.7- — 1.6- 1.5 1.4- 1.3- 1.2 1.1 w 1- U . w 0.9 O C • 0.8- 0.7 0.6 0.5 0.4- 0.3- 0.2 0.1 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-113 Input Data Area(ac) 0.98 Peak Rate Factor 484 Weighted Curve Number 91.2 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 0.18 13 61 Paved parking&roofs 0.8 13 98 Composite Area&Weighted CN 0.98 91.2 Time ofConcentration User-Defined TOC override(minutes):6 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 4.1 PeakRunoff(cfs) 5.87 Weighted Curve Number 91.2 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-113 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 6.2 6 5.8 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 ow 3.4 3.2 0 3 S 2.8 2.6 2.4 2.2 2 1.8 1.6 - 1.4 1.2 1 0.8 0.6 0.4 0.2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-114 Input Data Area(ac) 0.27 Peak Rate Factor 484 Weighted Curve Number 97.04 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 0.01 13 61 Paved parking&roofs 0.26 13 98 Composite Area&Weighted CN 0.27 97.04 Time ofConcentration User-Defined TOC override(minutes):6 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 4.75 PeakRunoff(cfs) 1.74 Weighted Curve Number 97.04 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-114 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 • O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 1.9 1.8 1.7 1.6- 1.5- 1.4- - 1.3 1.2- 1.1- m 1 • 0.9- • 0.8- 0.7- 0.6 0.5 0.4 0.3 0.2 0.1 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-115 Input Data Area(ac) 0.54 Peak Rate Factor 484 Weighted Curve Number 84.63 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.34 13 98 >75%grass cover,Good 0.18 0 61 1/2 acre lots,25%impervious 0.02 0 70 Composite Area&Weighted CN 0.54 84.63 Time of Concentration User-Defined TOC override(minutes):6 Subbasin RunoffRe sults Total Rainfall(in) 5.1 Total Runoff(in) 3.42 PeakRunoff(cfs) 2.8 Weighted Curve Number 84.63 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-115 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 U 1.5 0 1.4 z 1.3 1.2 1.1 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 . • 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-116 Input Data Area(ac) 0.21 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage lD 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.21 B 98 Composite Area&Weighted CN 0.21 98 Time of Concentration User-Defined TDC override(minutes):6 Subbasin RunoffRe sults Total Rainfall(in) 5.1 Total Runoff(in) 4.86 Peak Runoff(cfs) 1.38 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-116 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - IY 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 1.45 1.4 1.35 1.3 1 25 1.2 1.15 1.1 1.05 1 0.95 0.9 0.85 0.8 U 0.75 0 0.7 c 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-117 Input Data Area(ac) 0.64 Peak Rate Factor 484 Weighted Curve Number 90.01 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 1/2 acre lots,25%impervious 0.11 B 70 Paved parking&roofs 0.48 B 98 >75%grass cover,Good 0.06 B 61 Composite Area&Weighted CN 0.65 90.01 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.3 0 0 Flow Length(ft): 100 0 0 Slope(%): 2 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.31 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 166 12 34 Slope(%): 3.14 2 33.33 Surface Type: Paved ass pastrass pasture Velocity(ft/sec): 3.6 0.99 4.04 Computed Flow Time(min): 0.77 0.2 0.14 Total TOC(min) 17.42 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 3.97 Peak Runoff(cfs) 2.87 Weighted Curve Number 90.01 Time of Concentration(days hh:mm:ss) 0 00:17:25 Subbasin:PS-117 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 3.1 3 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 0 1.5 S 1.4 1.3 1.2 1.1 1 0.9 0.8 - 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-119 Input Data Area(ac) 0.59 Peak Rate Factor 484 Weighted Curve Number 97.19 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.12 13 98 >75%grass cover,Good 0.02 C 74 Paved parking&roofs 0.45 C 98 Composite Area&Weighted CN 0.59 97.19 Time of Concentration User-Defined TOC override(minutes):6 Subbasin RunoffRe sults Total Rainfall(in) 5.1 Total Runoff(in) 4.77 PeakRunoff(cfs) 3.82 Weighted Curve Number 97.19 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-119 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 4 3.8- 3.6- 3.4- 3.2 3 2.8 2.6- 2.4 2.2- o 2 o C 1.8 1.6- 1.4 1.2- 1- 0.8 0.6- 0.4 0.2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-120 Input Data Area(ac) 0.59 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.34 C 98 Paved parking&roofs 0.25 13 98 Composite Area&Weighted CN 0.59 98 Time ofConcentration User-Defined TOC override(minutes):6 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 4.86 PeakRunoff(cfs) 3.83 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-120 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 4.2 4- 3.8- 3.6- 3.4- 3.2 3 2.8 2.6- N 2.4- 2.2 c 2_ 1.8 1.6 1.4 1.2- 1- 0.8 0.6 — 0.4 0.2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-121 Input Data Area(ac) 0.8 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.43 C 98 Paved parking&roofs 0.37 13 98 Composite Area&Weighted CN 0.8 98 Time ofConcentration User-Defined TOC override(minutes):6 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 4.86 PeakRunoff(cfs) 5.21 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-121 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 5.4 5.2- 5 4.8- 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 w 3 U 2.8 0 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-122 Input Data Area(ac) 0.66 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.05 C 98 Paved parking&roofs 0.61 13 98 Composite Area&Weighted CN 0.66 98 Time ofConcentration User-Defined TOC override(minutes):6 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 4.86 Peak Runoff(cfs) 4.29 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-122 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 4.6 4.4 4.2 — 4 3.8- 3.6 3.4 3.2- 3 2.8: — 3 2.6- 2.4 c 2.2 K 2- — 1.8 1.6- 1.4 1.2 1 0.8- — 0.6- 0.4- • 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-123 Input Data Area(ac) 0.72 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.03 C 98 Paved parking&roofs 0.69 13 98 Composite Area&Weighted CN 0.72 98 Time ofConcentration User-Defined TOC override(minutes):6 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 4.86 PeakRunoff(cfs) 4.71 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-123 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - IY 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 5 4.8- 4.6- 4.4 4.2- 4 3.8 3.6 3.4 3.2- 3 w 2.8- 2.6- o 2.4 c K 2.2 2- 1.8- 1.6- 1.4- 1.2 1 0.8- 0.6- 0.4 0.2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-124 Input Data Area(ac) 0.83 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.1 C 98 Paved parking&roofs 0.73 13 98 Composite Area&Weighted CN 0.83 98 Time ofConcentration User-Defined TOC override(minutes):6 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 4.86 PeakRunoff(cfs) 5.42 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-124 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` O 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 • O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 w 3.2 t 3 • 2.8 0 • 2.6 K 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-125 Input Data Area(ac) 0.9 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage lD 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.9 0 98 Composite Area&Weighted CN 0.9 98 Time of Concentration User-Defined TDC override(minutes):6 Subbasin RunoffRe sults Total Rainfall(in) 5.1 Total Runoff(in) 4.86 Peak Runoff(cfs) 5.88 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-125 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 6.2 6 5.8 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 ow 3.4 3.2 0 3 S 2.8 2.6 2.4 2.2 2 1.8 1.6 - 1.4 1.2 1 0.8 0. 0.4 2 0. 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-126 Input Data Area(ac) 0.83 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage lD 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.83 B 98 Composite Area&Weighted CN 0.83 98 Time of Concentration User-Defined TDC override(minutes):6 Subbasin RunoffRe sults Total Rainfall(in) 5.1 Total Runoff(in) 4.86 Peak Runoff(cfs) 5.42 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-126 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` O 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 • O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 w 3.2 t 3 • 2.8 0 • 2.6 K 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-127 Input Data Area(ac) 0.89 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage lD 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.89 B 98 Composite Area&Weighted CN 0.89 98 Time of Concentration User-Defined TDC override(minutes):6 Subbasin RunoffRe sults Total Rainfall(in) 5.1 Total Runoff(in) 4.86 Peak Runoff(cfs) 5.79 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-127 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 6.2 6 5.8 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 ow 3.4 3.2 0 3 S 2.8 2.6 2.4 2.2 2 1.8 1.6 - 1.4 1.2 1 0.8 0.6 0.4 0.2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-128 Input Data Area(ac) 0.93 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage lD 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.93 0 98 Composite Area&Weighted CN 0.93 98 Time of Concentration User-Defined TDC override(minutes):6 Subbasin RunoffRe sults Total Rainfall(in) 5.1 Total Runoff(in) 4.86 Peak Runoff(cfs) 6.04 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-128 Rainfall Intensity Graph 7.5 7 6.5- 6 • 5.5 5- 4.5 s` O 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 7 6.5 6- 5.5 5 4.5- w 4- U w 3.5 0 c K• 3 2.5- 2 1.5 1 0.5 • O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-129 Input Data Area(ac) 0.16 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage lD 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.16 0 98 Composite Area&Weighted CN 0.16 98 Time of Concentration User-Defined TDC override(minutes):6 Subbasin RunoffRe sults Total Rainfall(in) 5.1 Total Runoff(in) 4.86 Peak Runoff(cfs) 1.04 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-129 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - IY 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 1.1 1.05 1- 0.95 0.9 0.85 0.8 0.75- 0.7 0.65- 0.6- w 0.55 o . o 0.5 0.45 0.4- 0.35- 0.3 0.25 0.2- 0.15 0.1- • ,nl 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-130 Input Data Area(ac) 0.24 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage lD 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.24 0 98 Composite Area&Weighted CN 0.24 98 Time of Concentration User-Defined TDC override(minutes):6 Subbasin RunoffRe sults Total Rainfall(in) 5.1 Total Runoff(in) 4.86 Peak Runoff(cfs) 1.58 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-130 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 • 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 1.7 1.6 1.5- 1.4 1.3- 1.2- 1.1 1- -- 0.9- c 0.8 7 0.7 0.6- 0.5 0.4 0.3- 0.2 0.1 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-131 Input Data Area(ac) 0.78 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage lD 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.78 0 98 Composite Area&Weighted CN 0.78 98 Time of Concentration User-Defined TDC override(minutes):6 Subbasin RunoffRe sults Total Rainfall(in) 5.1 Total Runoff(in) 4.86 Peak Runoff(cfs) 5.08 Weighted Curve Number 98 Time of Concentration(days hh:mm:ss) 0 00:06:00 Subbasin:PS-131 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 5.4 5.2- 5 4.8- 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 w 3 U 2.8 0 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0. 0.4 2 0. 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-132 Input Data Area(ac) 0.59 Peak Rate Factor 484 Weighted Curve Number 92.95 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.49 B 98 >75%grass cover,Good 0.02 B 61 1/2 acre lots,25%impervious 0.08 B 70 Composite Area&Weighted CN 0.59 92.95 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.3 0 0 Flow Length(ft): 100 0 0 Slope(%): 5 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.15 0 0 Computed Flow Time(min): 11.31 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 196 20 0 Slope(%): 2.37 25 0 Surface Type: Paved ass paste Unpaved Velocity(ft/sec): 3.13 3.5 0 Computed Flow Tune(min): 1.04 0.1 0 Total TOC(min) 12.45 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 4.29 Peak Runoff(cfs) 3.09 Weighted Curve Number 92.95 Time of Concentration(days hh:mm:ss) 0 00:12:27 Subbasin:PS-132 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 3.4 3.2- 3- 2.8 2.6- 2.4- 2.2 2 — m - 46 1.8- c 1.6 z 1.4 1.2- 1 0.8 0.6- 0.4 0.2 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-133 Input Data Area(ac) 0.72 Peak Rate Factor 484 Weighted Curve Number 80.79 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.3 B 98 >75%grass cover,Good 0.07 B 61 1/2 acre lots,25%impervious 0.35 B 70 Composite Area&Weighted CN 0.72 80.79 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.3 0 0 Flow Length(ft): 50 0 0 Slope(%): 3.09 0 0 2yr,24hr Rainfall cm): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow Time(min): 7.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 75 18 112 Slope(%): 1.2 33.33 3.09 Surface Type: Paved ass pastrass pasture Velocity(ft/sec): 2.23 4.04 1.23 Computed Flow Time(min): 0.56 0.07 1.52 Total TOC(min) 10.02 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 3.05 Peak Runoff(cfs) 3.05 Weighted Curve Number 80.79 Time of Concentration(days hh:mm:ss) 0 00:10:01 Subbasin:PS-133 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - IY 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 3.4 3.2 3- 2.8 2.6- 2.4- 2.2 246 — m 1.8- c 1.6 z 1.4 1.2- 1 0.8 0.6- 0.4 0.2 -.)111/4%."'" • 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-134 Input Data Area(ac) 0.98 Peak Rate Factor 484 Weighted Curve Number 78.34 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 0.15 B 61 Paved parking&roofs 0.34 B 98 1/2 acre lots,25%impervious 0.49 B 70 Composite Area&Weighted CN 0.98 78.34 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.3 0 0 Flow Length(ft): 100 0 0 Slope(%): 3.23 0 0 2yr,24hr Rainfall cm): 3.5 0 0 Velocity(ft/sec): 0.12 0 0 Computed Flow Time(min): 13.47 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 202 55 20 Slope(%): 1.4 3.23 50 Surface Type: Paved ass pastrass pasture Velocity(ft/sec): 2.41 1.26 4.95 Computed Flow Time(min): 1.4 0.73 0.07 Total TOC(min) 15.66 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 2.83 Peak Runoff(cfs) 3.38 Weighted Curve Number 78.34 Time of Concentration(days hh:mm:ss) 0 00:15:40 Subbasin:PS-134 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 O 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 3.6 3.4- - 3.2- 3 2.8- 2.6- 2.4 2.2 m 2- U . w 1.8 0 c • • 1.6- 1.4 1.2 1 0.8- 0.6 0.4 0.2 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-135 Input Data Area(ac) 0.28 Peak Rate Factor 484 Weighted Curve Number 79.5 Rain Gage 1D 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.14 B 98 >75%grass cover,Good 0.14 B 61 Composite Area&Weighted CN 0.28 79.5 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 50 0 0 Slope(%): 1.72 0 0 2yr,24hr Rainfall(m): 3.5 0 0 Velocity(ft/sec): 0.07 0 0 Computed Flow Time(min): 12.53 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 151 10 0 Slope(%): 1.2 1.72 0 Surface Type: Paved ass paste Unpaved Velocity(ft/sec): 2.23 0.92 0 Computed Flow Time(min): 1.13 0.18 0 Total TOC(min) 13.84 Subbasin RunoffResults Total Rainfall(in) 5.1 Total Runoff(in) 2.93 Peak Runoff(cls) 1.05 Weighted Curve Number 79.5 Time of Concentration(days hh:mm:ss) 0 00:13:50 Subbasin:PS-135 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - IY 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 1.1 1.05 1- 0.95 0.9 0.85 0.8 0.75- 0.7 0.65- 4,5 0.6- w 0.55 o . o 0.5 0.45 0.4- 0.35- 0.3 0.25 0.2- 0.15 0.1 0.05 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-138 Input Data Area(ac) 0.58 Peak Rate Factor 484 Weighted Curve Number 62.21 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 0.2 B 61 Woods,Fair 0.26 B 60 50-75%grasscover,Fair 0.12 B 69 Composite Area&Weighted CN 0.58 62.21 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 2.71 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.09 0 0 Computed Flow Time(min): 18.18 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(B): 63 60 0 Slope(%): 2.71 6.47 0 Surface Type: Woodland ass pasty Unpaved Velocity(ft/sec): 0.82 1.78 0 Computed Flow Time(min): 1.28 0.56 0 Total TOC(min) 20.03 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 1.52 Peak Runoff(cfs) 0.91 Weighted Curve Number 62.21 Time of Concentration(days hh:mm:ss) 0 00:20:02 Subbasin:PS-138 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- • 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 0.95 0.9 0.85 0.8- 0.75- 0.7- - 0.65 0.6- 0.55- N 0.5 g 0.45- - z 0.4- 0.35- 0.3 0.25 0.2 0.15 0.1 0.05- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-140 Input Data Area(ac) 0.39 Peak Rate Factor 484 Weighted Curve Number 80.49 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Existing Roadway 0.16 B 98 >75%grass cover,Good 0.02 B 61 50-75%grasscover,Fair 0.21 B 69 Composite Area&Weighted CN 0.39 80.49 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 50 0 0 Slope(%): 4.26 0 0 2yr,24hr Rainfall cm): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 8.72 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 190 0 0 Slope(%): 4.26 0 0 Surface Type: Grass pasture Paved ass pasture Velocity(ft/sec): 1.44 0 0 Computed Flow Time(min): 2.2 0 0 Total TOC(min) 10.91 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 3.03 Peak Runoff(cfs) 1.6 Weighted Curve Number 80.49 Time of Concentration(days hh:mm:ss) 0 00:10:55 Subbasin:PS-140 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 • 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 1.7 1.6 1.5- 1.4 1.3- 1.2- 1.1 1- -- 0.9- c 0.8 7 0.7 0.6- 0.5 0.4 0.3- 0.2 0.1- J� . . . . . . . . . . . . . . . . . 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-141 Input Data Area(ac) 8.64 Peak Rate Factor 484 Weighted Curve Number 67.94 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods&grass combination,Fair 5.17 B 65 Existing Buildings 0.23 B 98 Proposed Roadway 0.13 B 98 Existing Roadway 0.14 B 98 1 acre lots,20%impervious 2.97 B 68 Composite Area&Weighted CN 8.64 67.94 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 1 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Uelocity(ft/sec): 0.06 0 0 Computed Flow Tune(min): 27.09 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 510 145 258 Slope(%): 2.96 1 1.99 Surface Type: Grass pasture Paved ass pasture Velocity($/sec): 1.2 2.03 0.99 Computed Flow Tune(min): 7.08 1.19 4.34 Total TOC(min) 39.71 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 1.95 Peak Runoff(cfs) 11.89 Weighted Curve Number 67.94 Time of Concentration(days hh:mm:ss) 0 00:39:43 Subbasin:PS-141 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m 3 2.5 2 1.5 1 0.5 • 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 12.5 12- 11.5- 11 10.5- 10 9.5 9 8.5 8- 7.5 77 15- 6.5- o 6 c K 5.5 5- 4.5- 4- 3.5 3 2.5 2- 1.5- 1_0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-143 Input Data Area(ac) 0.27 Peak Rate Factor 484 Weighted Curve Number 75.81 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 0.06 B 61 Existing Roadway 0.05 B 98 Proposed Roadway 0.03 B 98 50-75%grasscover,Fair 0.13 B 69 Composite Area&Weighted CN 0.27 75.81 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 50 0 0 Slope(%): 5.07 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 8.13 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 75 0 0 Slope(%): 5.07 0 0 Surface Type: Grass pasture Unpaved Unpaved Velocity($/sec): 1.58 0 0 Computed Flow Tune(min): 0.79 0 0 Total TOC(min) 8.92 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 2.6 Peak Runoff(cfs) 0.99 Weighted Curve Number 75.81 Time of Concentration(days hh:mm:ss) 0 00:08:55 Subbasin:PS-143 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - IY 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 1.05 1- 0.95- 0.9- 0.85- 0.8 0.75 0.7 0.65- w 0.6- 0.55 0.5 K 0.45 0.4 0.35 0.3- 0.25- 0.2- 0.15 0.1 0.05 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-145 Input Data Area(ac) 0.51 Peak Rate Factor 484 Weighted Curve Number 86.29 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Existing Roadway 0.17 B 98 Proposed Roadway 0.16 B 98 >75%grass cover,Good 0.09 B 61 1 acre lots,20%impervious 0.03 B 68 50-75%grass cover,Fair 0.06 B 69 Composite Area&Weighted CN 0.51 86.29 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 50 0 0 Slope(%): 4.52 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Uelocity(ft/sec): 0.1 0 0 Computed Flow Tune(min): 8.51 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 101 0 0 Slope(%): 4.52 0 0 Surface Type: Grass pasture Unpaved Unpaved Velocity($/sec): 1.49 0 0 Computed Flow Time(min): 1.13 0 0 Total TOC(min) 9.64 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 3.59 Peak Runoff(cfs) 2.51 Weighted Curve Number 86.29 Time of Concentration(days hh:mm:ss) 0 00:09:38 Subbasin:PS-145 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 2.6 2.5: 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 m 1.5 U 1.4 • 1.3 0 z 1.2 K 1.1 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 • O 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-147 Input Data Area(ac) 0.37 Peak Rate Factor 484 Weighted Curve Number 91.51 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Existing Roadway 0.13 B 98 Proposed Roadway 0.16 B 98 1 acre lots,20%impervious 0.08 B 68 Composite Area&Weighted CN 0.37 91.51 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 50 0 0 Slope(%): 6.85 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.12 0 0 Computed Flow Time(min): 7.21 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 123 0 0 Slope(%): 6.85 0 0 Surface Type: Grass pasture Unpaved Unpaved Velocity(ft/sec): 1.83 0 0 Computed Flow Tune(min): 1.12 0 0 Total TOC(min) 8.33 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 4.13 Peak Runoff(cfs) 2.1 Weighted Curve Number 91.51 Time of Concentration(days hh:mm:ss) 0 00:08:20 Subbasin:PS-147 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 2.1 2- 1.9- 1.8- 1.7- 1.6 1.5 1.4 1.3- N 1.2- 1.1 o 1 0.9 0.8 0.7 0.6- 0.5- 0.4 0.3 0.20.1 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-149 Input Data Area(ac) 0.39 Peak Rate Factor 484 Weighted Curve Number 78.05 Rain Gage ID 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number 1 acre lots,20%impervious 0.16 B 68 Existing Roadway 0.11 B 98 1/2 acre lots,25%impervious 0.08 B 70 >75%grass cover,Good 0.02 B 61 Proposed Roadway 0.02 B 98 Composite Area&Weighted CN 0.39 78.05 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 50 0 0 Slope(%): 4.89 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Uelocity(ft/sec): 0.1 0 0 Computed Flow Tune(min): 8.25 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 146 0 0 Slope(%): 4.89 0 0 Surface Type: Grass pasture Unpaved Unpaved Velocity($/sec): 1.55 0 0 Computed Flow Tune(min): 1.57 0 0 Total TOC(min) 9.82 Subbasin RunoffResults Total Rainfall(in) 5.1 Total Runoff(in) 2.8 Peak Runoff(cfs) 1.52 Weighted Curve Number 78.05 Time of Concentration(days hh:mm:ss) 0 00:09:49 Subbasin:PS-149 Rainfall Intensity Graph 7.5 7 6.5- 6 5.5 5- 4.5 s` c 4 m c 3.5 m - C 3 2.5 2 1.5 1 0.5 • 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 1.7 1.6 1.5- 1.4 1.3- 1.2- 1.1 1- -- 0.9- c 0.8 7 0.7 0.6- 0.5 0.4 0.3 0.2 0.1 • 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Subbasin:PS-POND Input Data Area(ac) 1.76 Peak Rate Factor 484 Weighted Curve Number 92.27 Rain Gage lD 1 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 0.42 C 74 Proposed Pond Surface 1.34 C 98 Composite Area&Weighted CN 1.76 92.27 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.4 0 0 Flow Length(ft): 100 0 0 Slope(%): 10.69 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.16 0 0 Computed Flow Time(min): 10.5 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 59 184 0 Slope(%): 10.69 0.5 0 Surface Type: Grass pasture Unpaved Unpaved Velocity(ft/sec): 2.29 1.14 0 Computed Flow Time(min): 0.43 2.69 0 Total TOC(min) 13.62 Subbasin Runoff Results Total Rainfall(in) 5.1 Total Runoff(in) 4.22 Peak Runoff(c1s) 8.93 Weighted Curve Number 92.27 Time of Concentration(days hh:mm:ss) 0 00:13:37 Subbasin:PS-POND Rainfall Intensity Graph 7.5 7 6.5- 6 • 5.5 5- 4.5 s` c 4 m c 3.5 m - IY 3 2.5 2 1.5 1 0.5 • 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Runoff Hydrograph 9.5 9 8.5 8- 7.5- 7- — 6.5- 6- — 5.5- m 5 4.5- K 4- 3.5- 3 2.5 2 1.5 • 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Time(hrs) Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe Elevation Offset Elevation Depth Cover (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft') (in) 1 NULL.1 0.00 4.00 4.00 0.00 0.00 4.00 0.00 0.00 0.00 2 NULL.2 0.00 4.00 4.00 0.00 0.00 4.00 0.00 0.00 0.00 3 OS 667.25 679.00 11.75 667.25 0.00 679.00 0.00 0.00 0.00 4 POND-OUP 666.00 679.00 13.00 666.00 0.00 679.00 0.00 0.00 0.00 5 SD#10 711.16 716.46 5.30 711.16 0.00 716.46 0.00 0.00 0.00 6 SD#11 713.02 719.27 6.25 713.02 0.00 719.27 0.00 0.00 0.00 7 SD#12 713.55 717.24 3.69 713.55 0.00 717.24 0.00 0.00 0.00 8 SD#13 714.50 717.99 3.49 714.50 0.00 717.99 0.00 0.00 0.00 9 SD#14 718.25 721.68 3.43 718.25 0.00 721.68 0.00 0.00 0.00 10 SD#15 719.15 721.90 2.75 719.15 0.00 721.90 0.00 0.00 0.00 11513916 719.01 722.58 3.57 719.01 0.00 722.58 0.00 0.00 0.00 12 513 917 719.95 722.66 2.71 719.95 0.00 722.66 0.00 0.00 0.00 13 513919 675.35 681.18 5.83 675.35 0.00 681.18 0.00 0.00 0.00 14 SDN20 683.90 689.12 5.22 683.90 0.00 689.12 0.00 0.00 0.00 15 513921 689.89 692.86 2.97 689.89 0.00 692.86 0.00 0.00 0.00 16 513922 690.80 693.76 2.96 690.80 0.00 693.76 0.00 0.00 0.00 17 SDH23 693.25 695.97 2.72 693.25 0.00 695.97 0.00 0.00 0.00 18 513924 687.45 693.12 5.67 687.45 0.00 693.12 0.00 0.00 0.00 19 S13925 699.20 704.19 4.99 699.20 0.00 704.19 0.00 0.00 0.00 20 SD#26 701.63 705.43 3.80 701.63 0.00 705.43 0.00 0.00 0.00 21 S13927 702.95 705.69 2.74 702.95 0.00 705.69 0.00 0.00 0.00 22 513928 710.80 714.28 3.48 710.80 0.00 714.28 0.00 0.00 0.00 23 513929 712.58 716.69 4.11 712.58 0.00 716.69 0.00 0.00 0.00 24 SD#30 714.20 716.92 2.72 714.20 0.00 716.92 0.00 0.00 0.00 25 SD#31 716.25 719.60 3.35 716.25 0.00 719.60 0.00 0.00 0.00 26 SD#32 717.25 720.20 2.95 717.25 0.00 720.20 0.00 0.00 0.00 27 513133 718.50 721.22 2.72 718.50 0.00 721.22 0.00 0.00 0.00 28 517934 718.57 722.27 3.70 718.57 0.00 722.27 0.00 0.00 0.00 29 5DN35 718.90 721.68 2.78 718.90 0.00 721.68 0.00 0.00 0.00 30 SD#36 700.42 711.54 11.12 700.42 0.00 711.54 0.00 0.00 0.00 31 513937 703.36 713.58 10.22 703.36 0.00 713.58 0.00 0.00 0.00 32 513938 706.35 709.12 2.77 706.35 0.00 709.12 0.00 0.00 0.00 33 513939 707.66 712.07 4.41 707.66 0.00 712.07 0.00 0.00 0.00 34 51394 675.98 680.68 4.70 675.98 0.00 680.68 0.00 0.00 0.00 35 SDN40 707.77 712.07 4.30 707.77 0.00 712.07 0.00 0.00 0.00 36 513941 711.90 715.90 4.00 711.90 0.00 715.90 0.00 0.00 0.00 37 513942 713.34 714.90 1.56 713.34 0.00 714.90 0.00 0.00 0.00 38 513943 713.66 716.67 3.01 713.66 0.00 716.67 0.00 0.00 0.00 39 S13944 714.91 716.67 1.76 714.91 0.00 716.67 0.00 0.00 0.00 40 SD#45 715.17 720.43 5.26 715.17 0.00 720.43 0.00 0.00 0.00 41 SD#46 716.75 720.38 3.63 716.75 0.00 720.38 0.00 0.00 0.00 42 513947 720.15 723.09 2.94 720.15 0.00 723.09 0.00 0.00 0.00 43 513948 725.85 729.59 3.74 725.85 0.00 729.59 0.00 0.00 0.00 44 513949 729.50 732.23 2.73 729.50 0.00 732.23 0.00 0.00 0.00 45 SD#5 677.91 682.40 4.49 677.91 0.00 682.40 0.00 0.00 0.00 46 SD#6 683.50 687.69 4.19 683.50 0.00 687.69 0.00 0.00 0.00 47 SD#7 688.68 692.26 3.58 688.68 0.00 692.26 0.00 0.00 0.00 48 51398 694.15 697.77 3.62 694.15 0.00 697.77 0.00 0.00 0.00 49 51399 704.10 707.83 3.73 704.10 0.00 707.83 0.00 0.00 0.00 50 STREAM-CONNECT 662.76 679.00 16.24 662.76 0.00 679.00 0.00 0.00 0.00 Junction Results SN Element Peak Peak MaxHGL MaxHGL Max Mn Average HGL Average HGL Tune of Time of Total Total Tune ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth MaxHGL Peak Flooded Flooded Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume Attained Occurrence (cfs) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (days hh:mm) (days hh:mm) (ac-in) (min) 1 NULL-1 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0 00:00 0 00:00 0.00 0.00 2 NULL-2 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0 00:00 0 00:00 0.00 0.00 3 OS 18.50 0.00 670.97 3.72 0.00 8.03 667.45 0.20 0 12:26 0 00:00 0.00 0.00 4 POND-OUT 18.50 0.00 666.27 0.27 0.00 12.73 666.02 0.02 0 12:26 0 00:00 0.00 0.00 5 SD#10 20.21 5.77 712.18 1.02 0.00 4.28 711.18 0.02 0 12:01 0 00:00 0.00 0.00 6 SD#11 14.85 0.00 714.46 1.44 0.00 4.81 713.05 0.03 0 12:01 0 00:00 0.00 0.00 7 SD#12 14.87 1.70 715.47 1.92 0.00 1.77 713.59 0.04 0 12:01 0 00:00 0.00 0.00 8 SD#13 13.34 5.83 716.27 1.77 0.00 1.72 714.54 0.04 0 12:01 0 00:00 0.00 0.00 9 SD#14 7.65 1.73 719.04 0.79 0.00 2.64 718.27 0.02 0 12:00 0 00:00 0.00 0.00 10 513 915 2.77 2.77 719.84 0.69 0.00 2.06 719.17 0.02 0 12:00 0 00:00 0.00 0.00 11 513916 3.77 1.37 719.84 0.83 0.00 2.74 719.03 0.02 0 12:05 0 00:00 0.00 0.00 12 SD#17 2.81 2.81 720.61 0.66 0.00 2.05 719.97 0.02 0 12:10 0 00:00 0.00 0.00 13 SD919 63.05 3.80 678.06 2.71 0.00 3.12 675.41 0.06 0 12:01 0 00:00 0.00 0.00 14 SDN20 59.44 3.81 685.70 1.80 0.00 3.42 683.94 0.04 0 12:01 0 00:00 0.00 0.00 15 513921 13.91 5.18 691.02 1.13 0.00 1.84 689.92 0.03 0 12:00 0 00:00 0.00 0.00 16 513922 8.94 4.27 692.08 1.28 0.00 1.68 690.83 0.03 0 12:00 0 00:00 0.00 0.00 17 513923 4.69 4.69 693.92 0.67 0.00 2.05 693.27 0.02 0 12:00 0 00:00 0.00 0.00 18 SD924 42.21 5.40 689.20 1.75 0.00 3.92 687.49 0.04 0 12:01 0 00:00 0.00 0.00 19 S13925 37.25 5.85 700.85 1.65 0.00 3.34 699.24 0.04 0 12:02 0 00:00 0.00 0.00 20 SD#26 11.05 5.40 703.30 1.67 0.00 2.13 701.86 0.23 0 12:01 0 00:00 0.00 0.00 21 S11927 5.77 5.77 704.06 1.11 0.00 1.63 702.98 0.03 0 12:00 0 00:00 0.00 0.00 22 S11928 21.23 6.02 711.81 1.01 0.00 2.47 710.83 0.03 0 12:05 0 00:00 0.00 0.00 23 SD#29 16.41 1.04 714.14 1.56 0.00 2.55 712.62 0.04 0 12:05 0 00:00 0.00 0.00 24 SD#30 1.57 1.57 714.67 0.47 0.00 2.25 714.21 0.01 0 12:00 0 00:00 0.00 0.00 25 S13#31 14.34 5.06 717.48 1.23 0.00 2.12 716.28 0.03 0 12:05 0 00:00 0.00 0.00 26 SD#32 6.12 3.09 718.30 1.05 0.00 1.90 717.27 0.02 0 12:05 0 00:00 0.00 0.00 27 SDN33 3.03 3.03 719.06 0.56 0.00 2.16 718.51 0.01 0 12:05 0 00:00 0.00 0.00 28 513934 4.24 3.26 719.26 0.69 0.00 3.01 718.59 0.02 0 12:10 0 00:00 0.00 0.00 29 513935 1.02 1.02 719.37 0.47 0.00 2.31 718.91 0.01 0 12:05 0 00:00 0.00 0.00 30 SD#36 15.93 0.00 700.67 0.25 0.00 10.87 700.43 0.01 0 12:16 0 00:00 0.00 0.00 31 513937 15.92 0.00 705.57 2.21 0.00 8.01 703.41 0.05 0 12:12 0 00:00 0.00 0.00 32 SD938 0.89 0.89 706.65 0.30 0.00 2.47 706.36 0.01 0 12:10 0 00:00 0.00 0.00 33 SD939 15.06 0.00 708.60 0.94 0.00 3.47 707.69 0.03 0 12:15 0 00:00 0.00 0.00 34 SD94 44.65 5.01 678.16 2.18 0.00 2.52 676.02 0.04 0 12:03 0 00:00 0.00 0.00 35 SDN40 1.60 1.60 708.61 0.84 0.00 3.46 707.79 0.02 0 12:07 0 00:00 0.00 0.00 36 SD941 14.02 11.78 712.87 0.97 0.00 3.03 711.93 0.03 0 12:11 0 00:00 0.00 0.00 37 513942 6.66 0.00 713.93 0.59 0.00 0.97 713.35 0.01 0 12:06 0 00:00 0.00 0.00 38 SD#43 6.66 0.98 715.23 1.57 0.00 1.44 713.69 0.03 0 12:05 0 00:00 0.00 0.00 39 S13944 5.75 0.00 715.32 0.41 0.00 1.35 714.92 0.01 0 12:06 0 00:00 0.00 0.00 40 S13945 5.87 2.47 716.56 1.39 0.00 3.87 715.20 0.03 0 12:05 0 00:00 0.00 0.00 41 S13946 3.43 0.00 717.19 0.44 0.00 3.19 716.76 0.01 0 12:05 0 00:00 0.00 0.00 42 S13947 3.45 1.96 720.57 0.42 0.00 2.52 720.16 0.01 0 12:05 0 00:00 0.00 0.00 43 SD#48 1.51 0.00 726.06 0.21 0.00 3.53 725.85 0.00 0 12:05 0 00:00 0.00 0.00 44 S11949 1.51 1.51 729.82 0.32 0.00 2.41 729.51 0.01 0 12:05 0 00:00 0.00 0.00 45 SD 5 39.79 4.92 680.00 2.09 0.00 2.40 677.95 0.04 0 12:03 0 00:00 0.00 0.00 46 S1396 35.04 4.94 684.89 1.39 0.00 2.80 683.53 0.03 0 12:02 0 00:00 0.00 0.00 47 SD#7 30.18 3.81 690.31 1.63 0.00 1.95 688.71 0.03 0 12:02 0 00:00 0.00 0.00 48 SD98 26.69 3.58 695.54 1.39 0.00 2.23 694.18 0.03 0 12:02 0 00:00 0.00 0.00 49 SD#9 23.23 3.22 705.26 1.16 0.00 2.57 704.13 0.03 0 12:01 0 00:00 0.00 0.00 50 STREAM-CONNECT 33.13 0.00 663.08 0.32 0.00 15.92 662.78 0.02 0 12:28 0 00:00 0.00 0.00 Channe 1 Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cft) 1 Pipe-72 136.00 666.00 0.00 662.76 0.00 3.24 2.3800 Trapezoidal 7.500 81.000 0.0500 0.5000 0.5000 0.0000 0.00 No 2 Pipe-73 289.00 662.76 0.00 651.20 0.00 11.56 4.0000 Trapezoidal 7.500 81.000 0.0500 0.5000 0.5000 0.0000 0.00 No 3 STREAM 1735.00 700.42 0.00 662.76 0.00 37.66 2.1700 Trapezoidal 7.500 51.000 0.0500 0.5000 0.5000 0.0000 0.00 No 4 SWALE-1 162.37 725.85 0.00 720.15 0.00 5.70 3.5100 lapezoidal 1.250 9.500 0.0300 0.5000 0.5000 0.0000 0.00 No 5 SWAIE2 143.29 716.75 0.00 715.17 0.00 1.58 1.1000'Iapezoidal 1.250 9.500 0.0300 0.5000 0.5000 0.0000 0.00 No 6 SWAIE3 30.04 714.91 0.00 713.66 0.00 1.25 4.1600 Trapezoidal 1.250 9.500 0.0300 0.5000 0.5000 0.0000 0.00 No 7 SWALE-4 110.08 713.34 0.00 711.90 0.00 1.44 1.3100 Trapezoidal 1.250 9.500 0.0300 0.5000 0.5000 0.0000 0.00 No Channel Results SNElement Peak Time of DesignFlow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow TotalTime Froude Reported ID Flow PeakFlow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Pipe-72 18.50 0 12:26 6086.27 0.00 1.74 1.30 0.29 0.04 0.00 2 Pipe-73 32.49 0 12:28 7886.39 0.00 2.73 1.76 0.32 0.04 0.00 3 STREAM 15.38 0 12:16 4559.59 0.00 1.70 17.01 0.28 0.04 0.00 4 SWALE1 1.50 0 12:05 53.86 0.03 1.64 1.65 0.31 0.25 0.00 5 SWALE2 3.42 0 12:05 30.19 0.11 0.97 2.46 0.84 0.68 0.00 6 SWALE3 5.75 0 12:06 58.64 0.10 1.55 0.32 0.82 0.66 0.00 7 SWALE-4 6.65 0 12:06 32.88 0.20 2.26 0.81 0.75 0.61 0.00 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Ivlanning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) N (in) (in) (cfs) 1 NULLPIPE 90901.97 0.00 0.00 0.00 0.00 0.00 0.0000 CIRCULAR 18.000 18.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 2 Pipe-25 93.00 667.25 0.00 666.00 0.00 1.25 1.3400 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 3 Pipe-26 187.17 693.25 0.00 691.00 0.20 2.25 1.2000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 4 Pipe-27 61.31 690.80 0.00 690.09 0.20 0.71 1.1600 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 5 Pipe-28 154.91 689.89 0.00 684.90 1.00 4.99 3.2200 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 6 Pipe-29 166.31 683.90 0.00 675.85 0.50 8.05 4.8400 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 7 Pipe-31 59.00 675.98 0.00 674.04 6.79 1.94 3.2900 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 8 Pipe-32 183.41 702.95 0.00 702.03 0.40 0.92 0.5000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 9 Pipe-33 183.42 701.83 0.20 699.70 0.50 2.13 1.1600 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 10 Pipe-34 292.34 699.20 0.00 687.95 0.50 11.25 3.8500 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 11 Pipe-35 82.97 687.45 0.00 684.10 0.20 3.35 4.0400 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 12 Pipe-36 184.45 714.20 0.00 713.28 0.70 0.92 0.5000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 13 Pipe-37 183.43 712.58 0.00 711.00 0.20 1.58 0.8600 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 14 Pipe-38 312.33 710.80 0.00 699.40 0.20 11.40 3.6500 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 15 Pipe-39 85.00 718.50 0.00 717.45 0.20 1.05 1.2400 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 16 Pipe-40 50.00 717.25 0.00 716.80 0.55 0.45 0.9000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 17 Pipe-41 333.38 716.25 0.00 712.78 0.20 3.47 1.0400 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 18 Pipe-42 24.98 718.90 0.00 718.77 0.20 0.13 0.5200 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 19 Pipe-43 142.91 718.57 0.00 716.80 0.55 1.77 1.2400 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 20 Pipe-44 119.35 719.15 0.00 718.55 0.30 0.60 0.5000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 21 Pipe-45 146.98 718.25 0.00 715.00 0.50 3.25 2.2100 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 22 Pipe-46 149.60 714.50 0.00 713.75 0.20 0.75 0.5000 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 23 Pipe-47 65.68 713.55 0.00 713.22 0.20 0.33 0.5000 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 24 Pipe-48 197.03 713.02 0.00 711.36 0.20 1.66 0.8400 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 25 Pipe-49 138.57 711.16 0.00 704.30 0.20 6.86 4.9500 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 26 Pipe-50 286.75 704.10 0.00 694.35 0.20 9.75 3.4000 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 27 Pipe-51 160.88 694.15 0.00 688.88 0.20 5.27 3.2800 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 28 Pipe-52 142.84 688.68 0.00 684.00 0.50 4.68 3.2800 CIRCULAR 24.000 24.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 29 Pipe-53 165.35 683.50 0.00 678.11 0.20 5.39 3.2600 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 30 Pipe-54 55.62 677.91 0.00 676.18 0.20 1.73 3.1100 CIRCULAR 30.000 30.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 31 Pipe-55 124.69 719.95 0.00 719.21 0.20 0.74 0.6000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 32 Pipe-56 76.38 719.01 0.00 718.55 0.30 0.46 0.6000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 33 Pipe-57 70.50 675.35 0.00 673.89 6.64 1.46 2.0700 CIRCULAR 36.000 36.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 34 Pipe-58 125.32 711.90 0.00 707.66 0.00 4.24 3.3800 CIRCULAR 24.000 24.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 35 Pipe-59 123.11 707.66 0.00 703.51 0.15 4.15 3.3700 CIRCULAR 24.000 24.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 36 Pipe-60 160.19 703.36 0.00 700.42 0.00 2.94 1.8400 CIRCULAR 24.000 24.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 37 Pipe-62 6.28 707.77 0.00 707.66 0.00 0.11 1.7500 CIRCULAR 15.000 15.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 38 Pipe-63 15.00 706.35 0.00 706.00 2.64 0.35 2.3300 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 39 Pipe-64 110.00 729.50 0.00 725.85 0.00 3.65 3.3200 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 40 Pipe-65 63.00 720.15 0.00 716.75 0.00 3.40 5.4000 CIRCULAR 18.000 18.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 41 Pipe-66 31.36 715.17 0.00 714.91 0.00 0.26 0.8300 CIRCULAR 15.000 15.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 42 Pipe-67 31.90 713.66 0.00 713.34 0.00 0.32 1.0000 CIRCULAR 15.000 15.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 Pipe Results SN Element Peak Time of DesignFlow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow TotalTime Froude Reported ID Flow PeakFlow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio TotalDepth Ratio (cfss) (days hh:mm) (cfs) ($/sec) (min) ($) (min) 1 NDLL.PIPE 0.00 0 00:00 0.01 0.00 0.00 0.00 0.00 0.00 Calculated 2 Pipe-25 18.50 0 12:26 26.23 0.71 10.07 0.15 1.13 0.57 0.00 Calculated 3 Pipe-26 4.70 0 12:00 11.52 0.41 4.43 0.70 0.86 0.58 0.00 Calculated 4 Pipe-27 8.83 0 12:00 11.30 0.78 6.14 0.17 1.12 0.76 0.00 Calculated 5 Pipe-28 13.90 0 12:00 18.85 0.74 10.61 0.24 1.02 0.69 0.00 Calculated 6 Pipe-29 59.44 0 12:01 90.24 0.66 14.16 0.20 1.91 0.80 0.00 Calculated 7 Pipe-31 44.65 0 12:03 74.38 0.60 11.88 0.08 1.83 0.74 0.00 Calculated 8 Pipe-32 5.72 0 12:00 7.44 0.77 4.00 0.76 1.13 0.78 0.00 Calculated 9 Pipe-33 10.60 0 12:01 11.32 0.94 6.68 0.46 1.24 0.87 0.00 Calculated 10 Pipe-34 37.21 0 12:02 44.38 0.84 14.49 0.34 1.47 0.76 0.00 Calculated 11 Pipe-35 42.21 0 12:01 82.42 0.51 12.37 0.11 1.61 0.67 0.00 Calculated 12 Pipe-36 1.55 0 12:00 7.42 0.21 2.88 1.07 0.64 0.43 0.00 Calculated 13 Pipe-37 16.36 0 12:05 21.00 0.78 6.75 0.45 1.44 0.72 0.00 Calculated 14 Pipe-38 21.22 0 12:02 43.22 0.49 11.35 0.46 1.19 0.61 0.00 Calculated 15 Pipe-39 3.03 0 12:05 11.67 0.26 3.73 0.38 0.70 0.47 0.00 Calculated 16 Pipe-40 6.10 0 12:05 9.97 0.61 5.18 0.16 0.94 0.63 0.00 Calculated 17 Pipe-41 14.31 0 12:05 23.08 0.62 6.67 0.83 1.29 0.65 0.00 Calculated 18 Pipe-42 1.02 0 12:05 7.58 0.13 2.29 0.18 0.47 0.32 0.00 Calculated 19 Pipe-43 4.24 0 12:10 11.69 0.36 5.72 0.42 0.67 0.45 0.00 Calculated 20 Pipe-44 2.73 0 12:00 7.45 0.37 3.65 0.54 0.65 0.44 0.00 Calculated 21 Pipe-45 7.66 0 12:01 15.62 0.49 7.44 0.33 0.98 0.68 0.00 Calculated 22 Pipe-46 13.21 0 12:01 16.02 0.82 4.58 0.54 1.65 0.87 0.00 Calculated 23 Pipe-47 14.85 0 12:01 16.04 0.93 5.34 0.20 1.60 0.83 0.00 Calculated 24 Pipe-48 14.84 0 12:02 20.76 0.71 6.61 0.50 1.31 0.67 0.00 Calculated 25 Pipe-49 20.21 0 12:01 50.33 0.40 13.10 0.18 0.95 0.49 0.00 Calculated 26 Pipe-50 23.24 0 12:01 41.71 0.56 12.14 0.39 1.12 0.59 0.00 Calculated 27 Pipe-51 26.70 0 12:02 40.94 0.65 11.37 0.24 1.37 0.70 0.00 Calculated 28 Pipe-52 30.17 0 12:02 40.95 0.74 12.34 0.19 1.42 0.73 0.00 Calculated 29 Pipe-53 35.04 0 12:02 74.06 0.47 10.41 0.26 1.62 0.65 0.00 Calculated 30 Pipe-54 39.79 0 12:03 72.34 0.55 9.75 0.10 2.01 0.81 0.00 Calculated 31 Pipe-55 2.80 0 12:10 8.11 0.35 3.93 0.53 0.64 0.43 0.00 Calculated 32 Pipe-56 3.75 0 12:05 8.15 0.46 4.10 0.31 0.77 0.51 0.00 Calculated 33 Pipe-57 63.05 0 12:01 95.98 0.66 11.13 0.11 2.15 0.75 0.00 Calculated 34 Pipe-58 14.00 0 12:11 36.06 0.39 9.69 0.22 0.94 0.47 0.00 Calculated 35 Pipe-59 15.05 0 12:11 36.00 0.42 6.96 0.29 1.43 0.73 0.00 Calculated 36 Pipe-60 15.93 0 12:12 26.56 0.60 9.78 0.27 1.12 0.56 0.00 Calculated 37 Pipe-62 1.59 0 12:05 7.41 0.22 2.00 0.05 0.87 0.71 0.00 Calculated 38 Pipe-63 0.89 0 12:10 16.05 0.06 4.16 0.06 0.27 0.18 0.00 Calculated 39 Pipe-64 1.51 0 12:05 19.13 0.08 7.28 0.25 0.26 0.17 0.00 Calculated 40 Pipe-65 3.43 0 12:05 24.40 0.14 8.27 0.13 0.43 0.28 0.00 Calculated 41 Pipe-66 5.75 0 12:06 5.10 1.13 6.66 0.08 0.82 0.66 0.00 >CAPACITY 42 Pipe-67 6.66 0 12:05 5.61 1.19 6.90 0.08 0.91 0.73 0.00 >CAPACITY Storage Nodes Storage Node:WET-POND Input Data Invert Elevation(It) 667.25 Max(Rim)Elevation(ft) 679 Max(Rim)Offset(ft) 11.75 Initial Water Elevation(ft) 671.75 Initial Water Depth(ft) 4.5 Ponded Area(fP) 0 Evaporation Loss 0 Storage Area Volume Curves Storage Curve:WET-POND Stage Storage Storage Area Volume (ft) (IP) (ft') 0 17731.4226 0 0.75 23716.2067 15542.86 1.75 25690.0166 40245.97 2.75 27718.8964 66950.43 3.75 29802.8462 95711.3 4.75 33166.7722 127196.11 5.75 37312.7556 162435.87 6.75 40807.6177 201496.06 7.75 44110.6921 243955.21 8.75 47498.5108 289759.81 9.75 50978.9143 338998.52 10.75 54551.9027 391763.93 11.75 58217.4759 448148.62 Storage Area Volume Curves Storage Volume(fti 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000 11.5—.i....................... ... ..... __ ....... ___. ...............................i.............. 11.5 11—.................................. ..................................<................................................................................................................................ ......................... 4. ........................ ..... ....................-11 10.5-.i.................................>................................................................................................................................................................................................... ............. ....... ......................... -10.5 10- ................................................................................................._i................................................................_................................_................................. ............... ........ .......................... .-10 8.5— ................................._..................................................................................................._................................................... ......................... .................._............................ ,^8.5 8_........................................................................................................................................................................ ............................ .................................................................................................. g 7.5—......................................................................................................................................................................................... ..........i...................................................................................................-7.5 .................................o.................................o..................................................................o...... ........................i......... ................. ......................... ........................ .............................�7 — .............................................................................................................................. ................................ ................................._............................. ........................ .......................... -6.5 6.5 y 6 • -6 y a) a) a . - a - y5.5—...................................................................;.................................; ..............................;. ................................................................................................p.................................i............................. .Y5.5 co .................................>.................................................................i...... ........................>................................................................................................ ........................ ......................... 4-4.5 . -i i i 3.5-.i......................................................... ......g................ ..................................................................................................................i..................................................................i................................. 3.5 2.5—.................................._..... ........................................................................................._...................................................................................................._..................................................................N-2.5 y_.i...............................-............................ ..a..................................................................<............................................................ ......................... ........................ ......................... -2 1.5-.i................................................... ...........................................:..................................................................:..................................i...................................................................................................-1.5 1_.i...............................o...............................o.................................i.................................o. ........................ ......................... ......................... 4. ........................ ......................... -1 0.5-....... .................... .,................................................................................................................................................................. ......................... ........................ ......................... r0.5 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage Area(fr) — Storage Area —Storage Volume II Storage Node:WET-POND(continued) Outflow Weirs SN Element Weir Flap Crest Crest length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 EMSPIILWAY Trapezoidal No 677.60 10.35 30.00 1.40 3.33 2 WEIR(TOP OF BOX) Rectangular No 677.00 9.75 12.00 1.50 3.33 3 WEIR-1 Rectangular No 675.75 8.50 1.00 1.25 3.33 4 WEIR-2 Rectangular No 675.75 8.50 1.00 1.25 3.33 5 WEIR-3 Rectangular No 675.75 8.50 1.00 1.25 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (m) (ft) 1 IAW--ORIF Side CIRCULAR No 11.00 674.50 0.61 2 IAW-ORIF-2 Side CIRCULAR No 11.00 674.50 0.61 3 LOW-ORIF-3 Side CIRCULAR No 11.00 674.50 0.61 4 WQ Side CIRCULAR No 5.00 671.75 0.61 Output Summary Results Peak Inflow(cfs) 114.84 Peak Lateral Inflow(cfs) 8.86 PeakOutflow(cfs) 18.5 Peak Ffiltration Flow Rate(cfm) 0 Max HGLElevation Attained(ft) 676.41 MaxHGLDepth Attained(ft) 9.16 Average HGLElevation Attained(ft) 672.42 Average HGLDepth Attained(ft) 5.17 Time of MaxHGLOccurrence(days hh:mm) 0 12:25 Total Fxflltration Volume(1000-ft3) 0 Total Flooded Volume(ac-in) 0 Total Time Flooded(min) 0 Total Retention Time(sec) 0 C-SWPPP Fulfilled Engineering LLC APPENDIX H: CONSTRUCTION PHASE PLANS II27 l I X 00 0 0 La' 10:052 081 IREN00D.K 052 a D BF£EZOR1 l OB I\a Q I II 11 I ^ Z L' 0 1 O ww ,Z) 1 i 1i 1 2F,L I ; I I I L/I O --' - MAGNEc a 88 O I0:052 092 1 II LLI -- NEVER MOOR£ I - © N u a .I'MOORE O 9, LM(1191-64 1 i o " LA u -- w ' I ° I I 11 /NDUSIRI/ ❑• S I /1 I---X DEiM• d f ° 1\ Q 4 FwI PARCEL 1D:052 OB4 'O-/I ,, • • 1- LINDA ANN PITMAN ,^ Elk _ o DEED BOOK 1239-940 I zi PARCEL ID:052084 II al LINDA ANN PITMAN 11 I DEED BOOK 159-940 ' 1. . 5 ' -.' ,X"/ / .YC j > / �X /' ' A '• <—,----- ZONING C-4150-85 CLrMERCIAL/DISTRICT) \ \ , '.r''Y�'� �0 i i ee m°a'—oo ^—oa-^-o- �2 - ^tio-/ 1l // ( j 1 _//// '// / ,/ j/ Io\ I 1 / / B �y \ PARCEL ID:0522 160 I X / 4 / / / 1 i 1 i ' - MM \ RavaLD W.RICE N N ' ' ,/ ~// I� / I I/ i - _v` DEED BOOM]29Z9 1 1 \ 5 O M / r. / / I I I / II ZQVINO: C-BS I 1 \ ` L!1 Ol M ' i/Zi /i/ \ p i l 1 1 1 1 0-85 COMMERCIAL asmrcT) I p M. N N i vv ;e0,7�.V . .(�l • 1 I l I 1 i I' I vv `v v T 1v MML-LI C In w / 1' 1 I. \ \ 1 / I I I I = / I !0 • LJJ Z o20 I/- z E X o6" t - / 1 1 / / / 1 - - _ eoW \ l r 1 1 1 / i ' -- \ \ �- ' \ 14- k o y+ / / I I 1 I \ \ L 11 1 _ It �U / / I 1 \ - . II a ' / I - / I I I I I I I \ \ \\ \ \ \ (� 'or M 3 \ 1 1 if 1 I / I I a r 9 ` �W m� / 1 I \ o I - • ' J sr. p O- • In = �1 / 1 / \ \ \ 1 1 \ ,` ' \ I Ll / \ \ i I a" // '' ! 11 \I \I 1 1 11 --II:- - \ ` - h 1 1 \\ \\ 11 I /'i O 11 \ \ LOD --LOD �/Ili",____ ��\ \ `., /- 1�,i 11I i � i iii � I 1 \ \ � ____ _ LOD _ LQp `� ��OD\� i,-:::D-7:,,-::'-,,'-::: \ ' 11::_ii: / / / I �'1 \ �� -� _ � \\\ _� _ Ate, Yi '�,\�.rz,,,, ,1..„3„:::::_, 1I I / / / b 1 \ \\ 1 \_ Yid14.44/ \ K, / 1 1 7.��/��T ' I—1 - _ I— �\�- _ OZJI "' L��; III 1 _/ \\1 _QHW O-OH I / /AH�' / r / O E 4. • E^ _ _ - �. _ w \ OHE / bHE }a OHE' T �i\i 'S$ `�u' � 9,...." IT i• — — /— _ \ — _ \ OREe _ _016 Fly - Ol urleo_ I VaJI. f �:�/ / r 1 � 11 vd 3/V24 �':,c------------------- / / / \A '\ \ // i -'i'; \ \ _ /�\ //'ts T 1 ' lei ..„.<;_,::: ill _ \ \ - - '% / i i/�/' \ \ \\ \ ' l lC 1 is ifil . . „ • • a -A 11 •\ \ //C/,�lj \ - -- - _ --- ==�, \ `-- - ;_ /ii1- / 1 I / 1 / I� \ /,, 1 F• /e", Sr iL • ---: ''2.= - - - _, / // d l I/I / 1 1 ▪ - _-- _- l l l I I 1 I 1 1 .r,o. \/• 6gB - - / / .'j///j, l \ \ -ac �, i . -- '_-�\/1 / // , >I I/I 1 \. � N.� . _ \ \ I '-'I Q O , i\„--,, , ,,,„_... - 1-', �_. PARCEL ID:052 091'/ ' 4. 1, TWEE&STREET ASSOCIATED LLC PARCEL 1D:052 090 �� .'' ` 0 -_41r-A;e41 ,•••••''0__-- ___ I DEED BOOK 920-SOT ,- -- -_____�`` ` \ I ZVY/NG C-PS(/-PT COMMERCIAL DISTRICT) MAR DEED BOOK CRESS✓R ---- BOOK 981-931 //`' ,•, '-�----�� El -+7 ) `1 ZONING:C-85 0-85 COMMERCIAL DISTRICT) i,jam/ --_ OH / I / �S ''// - -1 PARCEL ID:0.6i090,/ � /� i MARHCRESS ENDER , I I \.15\\/ ---- DEED BOON 961-9J1 / j r l .0' ---- ZONING C-&5(I-B5 / l l ' // O' 4,,E// ' �__- COIdM£RCIAL DISIRIC7J V / i�I /\¢ 0 / L =\ �. 55/c3o\ w a u �*tti vfee/ v — V O / /' LS . a (n } THESE PLANS AND DETAILS ARE INTENDED TO SHOW MINIMUM REQUIREMENTS.MEASURES,AND METHODS L' TO RESTRICT RUNOFF AND CONTROL EROSION.ADDITIONAL MEASURES MAY BE NECESSARY.THE _IT,, N u 0 m CONTRACTORS AND ANY SUBCONTRACTORS SHALL BE AWARE THAT UNKNOWN CONDITIONS OR p L.L 0 1/) UNFORESEEN OCCURRENCES MAY REQUIRE IMMEDIATE ACTION TO PROTECT THE SITE AND DOWNSTREAM a O a PROPERTIES.NOTIFY THE DESIGN ENGINEER IMMEDIATELY IF SUCH A CONDITION OR OCCURRENCE IS KNOWN TO EXIST OR ARISE FIELD DETERMINED TEMPORARY DIVERSIONS BERMS AND/OR DITCHES SHALL BE Z I- a Q N CONSTRUCTED,WHERE NECESSARY,TO PROTECT AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT LADEN RUNOFF TO APPROPRIATE TREATMENT AREAS OR STABLE OUTLETS.THE CONTRACTOR Q � SHALL CONFIRM POSITIVE DRAINAGE TO PROPOSED DRAINAGE STRUCTURES TO ENSURE THAT PONDING DOES NOT OCCUR THIS PERTAINS TO PAVED AND UNPAVED AREAS SLOPES TO STRUCTURES SHALL NOT BE O I- Q EXTREME AND SHALL BE SUITABLE FOR THE INTENDED USE STORM DRAINAGE PIPES SHALL HAVE A MINIMUM F- OF ONE FOOT OF COVER LEGEND: CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNDERGROUND - — -200— — — EXISTING CONTOUR UTILITIES(HORIZONTAL&VERTICAL)PRIOR TO CONSTRUCTION (INCLUDING BUT NOT LIMITED TO:GAS LINES,WATER LINES,SEWER LINES, -o0000-BOO-0.0o.o.o.0- PROPOSED INITIAL CONTOURS ELECTRICAL AND TELECOMMUNICATION LINES,AND FIBER OPTIC CABLES). EXISTING PROPERTY LINES DATE:JANUARY 4,2024 North 8�w SF SILT FENCE Carolina \� LOD LIMITS OF DISTURBANCE SCALE: �'Y�}Lr," ���-.= GRAVEL CONSTRUCTION EXIT ' -80 C 11 WWMFAC8ROB9 \ '�d`7� 1�ti.a�-3. 1SC" '" UNLESS STATED OTHERWISE IN CONTRACT WITH OWNER,THE PROJECT BOUNDARY 80 40 0 80 160 240 PROJECT CONTRACTOR SHALL INCLUDE ANY UTILITY RELOCATION COSTS IN HIS —:o— s.-- PROPOSED STORM DRAINAGE I I I I I I I NO. ORIGINAL AGREEMENT WITH THE OWNER SCALE IN FEET 22008 OF 39 PARCEL ID:052084 I I i LINDA ANN PITMAN i II I J m w w o❑ Z DEED BOOK 1239-940 / O ZONING: C-QS (I-85 41MERCL9L-0YSTRICT) \ \ O F '1 —� \ \\ \ � '\ MAGNEFIC NORi. vm l Z ; 11 w F i l l - >2B ''o \\ I ICI I I Z `n in F Z % / \ 1 1 11 j1 0 ww g O ; \ ) PARCEL 1D:052 160 z ULe, cc ' RONALD W. RICE i i ` I \\ > o 8 — IMELDA G. RICE I X a ce a LL i \ < DEED BOOK 722-979 i I h I \\ N V.ao 0 m \J ZONING: C-85 fNII \� U (1-85 COMMERCIAL DISTRICT) i ^"I 1 (\ z LLyLI - \\• \\\ 1\ 1 I \\ ~ Q N • O W �� • \ \ \ II I LLI I iii O `` \\ \\ / I!I / 11 i W ILL w I Q 4 Q -V 1 E 11 1 I/' I A y 9 , 1 1 - \ T cc __ _J a� �I \ 0., UNi N In ----- -z r' G /\ \ OZ,ni . ��W z O 4- CO'6 _ xc ill ljj' Li I - x ,-1-,// vi a �v I 1, • 1 ,,. 1 N oy o - _L_-i:, . / ,.- - i `I 11 mrz •Q Iv co a i W m t F \ 11 III O ,' \\ / ,1 1 cu Z 4 ��''INITIAL PHASE LIMITS __-- -- ` `, \\ \\\ '+) ''1 I 1 1 1 OF CONSTRUCTION(TYR)/ \ \ N0 I 1 II II B.T ) LOD LOD LOD L�R 'LOD LBO- - ___�-I %i 11 yI Ll in .; — COD �� LOD LOG LOD LOD 10D LODE LOD r\ I I __ i' // ``\`\ 1 I \ _.____GRAVEL CONSTRUCTION 51 74, lt `,���r� \\ /r\I II 1 ,,,_,__i_i_i..r. _ \ENTRAN _ -a0 001 9Q] 1 _ \ / / ```/// ---- CONCRET WASHOUT W5PERIMETET - // \\ * 11 '�� "'.�O'- . ___________'' /a°lL -__''I // I \\\ SILT TYR)(ADETERMINEDLLIN FIELD •I 1\1\\` `\�' 11 E U w _- d_ -�_`- -y__ — / — _ n_� —i— �- -- -- - aol am} FE —nrn \ �] -I ��\, 1 �I, II — ` \ \ 1 dOo' 3/V24 ��' L'// \\ \ 1 \ o 1\ -1 I 1 ,�M OJT §, `OHE'.\ \dH€. ``OIL______ - E___. _O0E- ' OHE - O!i€-__ '' OHE C7/�_____Q'IE------.--O OHS OHE - OHE _� OHE�_ _ —()HIE I I I \ I --__PROPOSED' PORARY DIVESION O c / / \ _ _H 1 I \ """"` Nss ISWALE TO: USED AS NECGSSARV (^� _ I L.1 1 `\I- l -- __ DURINGICONSTRU ION AFTER PROPOSED ----__-3'—/-"- ---- —' -- — Y-- -T- — -L —' -- -� _I \ ` \ ` I _ ___ - --' ``LACED AND'BEFORE FiffAL STORM ,-'�- / 1 \\ - DRAINAGE INFRA;IR UREIIS INSTALLED // / / I Il / II vvv .- I// / / i� I I I i 1 1 I I N I o \ Z / / CONTRACTOR TO ENSURE lI / /�O �I I \ w/ I' Z POSITIVE DRAINAGE FROM /�/ �L Q/ / H ; O d O "-___ -- , ^/ START OF DIVERSION SWALE -'- --__, /\ 'B. / i / / / 1 II I A I I ~ VOID / / "/ �' ' BASINOPOSEO SEDIMENT,'' \\ I/ / I/ / ' I O \\ ` 11-t till 1� �- J N J____ ,L,, LOD --_ ^Ac \\ DO`^p,,LE-Row `___---- ', ', 'J/ii/ / l/ / / / / I 1 I OQ , O d Z , , - ; \ SILTIF�NCE(TYP.) /�' -/�''-/�''/,'',.,/i I , / / / / / I \ i� START ak RY 41 LEGEND: _r _ \ \\ \_--_-_--- -_ y_ /i/,/ / / I 1 l I I I II DIVERSON SWALLEE((AS NEEDED % OI\ I j it \I -200— EXISTING CONTOUR L.L �FSF -• V SF - \• \\\ \`---------------- _.ter - / ' I / j l / II DURING CONSTRUCTION) / Off' m 1 II I I N - -o.o.o.0.o-BOO-o.o.o.o.o.o- PROPOSED INITIAL CONTOURS CO \\ \ �� l l / I I / I \ OHE _ I I — EXISTING PROPERTY LINES V -_--___ \ ----------- - -7___ -''--,, / I / l 1 I ' I l \ O SF SILT FENCE Iy \` \ / / _' -'_ / I► I I ~ 11 1 j" % LOD LIMITS OF DISTURBANCE _ / I1 \ GRAVEL CONSTRUCTION I I I I \1.51 \ ENTRANCE(TYPJ I 11 kkk I I cc .`1�ffl jpiamEt�-i GRAVEL CONSTRUCTION EXIT VT I TEND OFXINGLE-RO Io OI I I I W V PROJECT BOUNDARY " 1 T F \ �- -- U 1 z O W -_ piLTDOU E/STARS 0 ml I I I d -1 —ro— so PROPOSED STORM DRAINAGE N 1_ \`^�\ / (FENCE[rvPJ \' i�'� f0 \\\ i �I xyl LLI ~ } THESE PLANS AND DETAILS ARE INTENDED TO SHOW MINIMUM REQUIREMENTS,MEASURES,AND METHODS __-__�� � / 1 ; / -� �� '' ,�D 4 \\ / 1 I 1 a a O sc TO RESTRICT RUNOFF AND CONTROL EROSION.ADDITIONAL MEASURES MAY BE NECESSARY.THE \\ / `>� \ 1 o \\ ` -'\ I w N Y 0 CONTRACTORS AND ANY SUBCONTRACTORS SHALL BE AWARE THAT UNKNOWN CONDITIONS OR --- \\\ \\ o co,„ l\ ` 1---- ^\\ \ \ I o LL v . m OCCURRENCES MAY REQUIRE IMMEDIATE ACTION TO PROTECT THE SITE AND DOWNSTREAM \\\ \\ \ A\ 1 \ ! _ \\\ \ // \` / I a I a 0 = '1- UNFORESEEN J PROPERTIES.NOTIFY THE DESIGN ENGINEER IMMEDIATELY IF SUCH A CONDITION OR OCCURRENCE IS KNOWN - \\( \ \ \ I \ • ` \ I I Ce a Q TO EXIST OR ARISE.FIELD DETERMINED TEMPORARY DIVERSIONS BERMS AND/OR DITCHES SHALL BE \�\\ I \ \ I \\ • , ., - \ �_ \\/ / / Ln CONSTRUCTED,WHERE NECESSARY,TO PROTECT AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT \\\ ' i \\\ j\\\ 1 I \I `\ I\ I1 1 \\\ _ �����--- \ / J11 �I Z I- N , SEDIMENT LADEN RUNOFF TO APPROPRIATE TREATMENT AREAS OR STABLE OUTLETS.THE CONTRACTOR \ \ I I I \ 1 \ \\\\,1� 11 �� , I \ SHALL CONFIRM POSITIVE DRAINAGE TO PROPOSED DRAINAGE STRUCTURES TO ENSURE THAT PONDING / T j' \`"` \\\ 1 1 \ I ` \ ��, L2 l\ DOES NOT OCCUR THIS PERTAINS TO PAVED AND UNPAVED AREAS SLOPES TO STRUCTURES SHALL NOT BE -_'^--- / \\ • / 55 RBIRE EXTREME AND SHALL BE SUITABLE FOR THE INTENDED USE.STORM DRAINAGE PIPES SHALL HAVE A MINIMUM i� '>,ij/ / \I / ,// I\\ II\ I\ \\ \I I\ \I r• :1111::11:4-I:trillEli - O - - / ' I `4 a OF ONE FOOT OF COVER \?@ '/�/ / ---" > \I\ \ \ I I `� I _- --- / /'/ / I \\ \ ST'ARTOF IENGLE-^ - _--- --- 1 /�\ `.-1 ' \ ` \\ \ \ SILT FENC ,PJ �/ � -CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNDERGROUND /y% \ / / ��� \ \ 'y,�, I / UTILITIES(HORIZONTAL&VERTICAL)PRIOR TO CONSTRUCTION -\ / ,, ��\\`��\�\ \\ \\ \I// \\ i MINI-CLATRDR100'PUBLICRIGHT OF AY35 MPH /(INCLUDING BUT NOT LIMITED TO:GAS LINES,WATER LINES,SEWER LINES, ' -"ELECTRICAL AND TELECOMMUNICATION LINES,AND FIBER OPTIC CABLES). ,' `�' `� ` � - ,LE - •� ROfECT REFERENCE N0.1-2571 CPS FBA O. ) I • ' __- -- , / / , -- a2 DATE JANUARY 4,2024 North • ',' Carolinas _ j � _ 8. ° PARCEL ID:052 090 I r=ao 1 www.ncenore MARVIN ALEXANDER CRESS JR / / ' \- - - si { \ C 1 2 UNLESS STATED OTHERWISE IN CONTRACT WITH OWNER,THE p / /> --- --- --_ ,�— �I \ 0 1 I 40 20 0 40 80 120 PROJECT CONTRACTOR SHALL INCLUDE ANY UTILITY UWITN RELOCATION COSTS IN HIS DEED BOOK 951-931 - / 1 'jam' �S E ° -'- - OHE -� ��! �,' I\ II I I I I I I I NO. ZONING: C-85 (1-85 COMMERCIAL DISTRICT) / 1 Ti —ONE off - \ SCALE IN FEET 22008 °F 39 /./i ,' / 1 I 'F HE j z moo 0 /---- _ , ; / ; / a a 1 i _ X X X X X ,'i`' i X / X �' i X I X i 1 X / x` l Z a • / II / 7/ / / i i i / I a MAGNETIC NORT. N _� �/ o / ^ -o I I— — z !09 I0 i O o'�' ^a '\ Io c't 0 z a © ' ^//// /END OESINGLE-ROW ' TART OF TEMP9'RARV / I o\I \\ O ww / ( 'DIVERSION SWALE(AS NEEDED// I I I I Z l'l' \ i'/ . /' &LT FENCE(TVP,j DURING CONSTRUCTION) / II II I O O Fs, u o j :::// i/ i l/ , I F 'w"w / % / I i i l r w zI /17\ill �.i i' /i/ \\ \ 0S. I II I r I` Wa Na \,.• ./ / %/ \\\ \\ \ am \ 00\I / 1`, O l i i I l i N m I 9 I r / �f , '/, /.� I \\ O S N. ///J'\�\ I\ 1 I I I I i I Si "3LI W — �ROPOSED TEMPORARY DIVERSION\ \�,/ \\ \\ II I I I l a 07 I SWALE TO BE USED AS NECESSARY \ • /' I \ 1 r r I I I / p OT Z N ' / I/ DURINO CONSTRUCTION AFTER PROPOSED 1 \ \ \ I I l I I I o LV Ln LU _ II FILL IS LACED AND BEFORE FINAL STORM ///��� \ \ / I I r N O N U 1 DRAINA iE INFRASTRUCTURE IS INSTALLED / / \` j I I I / I I / K ❑• Z I 1---- N \ , r I I I % OBI^V) - \ I l r l , i I r d '� • o o I`/ OOl 1 1 rI I OSUYI-- / _ `'D 11 , i Z w �I QpUOEO / i i • \ \ II i i i I i i i / I v a �p�mW I ' lr 1 I ' it 11 I N ° _ ° J Z p i `--- / / i I / ; i I W2 i 1 , / I , 1 11 1 it I i v, vv >-ZOZ / / i I 1 'I I i I (� LLI / I I / 1 1 I I I MOO N I I i i i° /' / I 1 �1 1 I I \ 1 I II j I Z . \ I SINGLE-R`JW / I ' / I I 1 ^ n n \ I SILT FENCE(TYP.) 1 I /// I I O M I \ I I Ir i ' i III II 1 . N N M \\ F \ I ; I / / ''\ I I 1 1 —L-L I C 0- / / / ; I • 0 2 o \` o 1 1 I ° , \• i i 1 11 11 \ w z O O _ �� / / I I v\ , U' X 1 I, \ 1 IIMZ Q a \\\\ 11 II i i r \ \ 1'� 11 ` L� ii k Li 1 1 1 1 '\ I 1 `\ — vi O O I I 1 1 1 I (....9 n +� C 0�1 ``` ____\ 1 11 / I N l \\\\ \ \\\\ I I II II I `l V O CO M I I 1 1 I \ \ \ \ 1 1 1 1 \ - L. O \ ___ \I 1 1 1 \\ \ \ \ 11 1 1 I II �Z .O O N l0 \\I 1 I 1 I r \\ \ \ \ 1 I I I \ l_l k / I i O o \ ` \ \ I I I 1 \ d t 0O 0 \\ I\ II % O \ y \ \ I I LJJ i" m W i_ vv Iv I i ' ' vI II i \I v 1 i I II vv - -(� p Q \ \ II / \\ 1 1 I I INITIAL\PHASE LIMITS \\ \ I\ \\ \\ --------- ~ \\ \\ 1 \ / II I OF CONSTRUCTION(TVP.)\ \\ \\ \ -_ I \-' I • I, i i / / • / LOD \ LOD\ \ LOD CLOD LOD LOD LO LO LO LOD / I I / / / / i :9<\; ___-- �I I ` �\ \ III \1 I I l i / � '1 I \\ \ \\ _ END OF TEMPORARY - Q� --- _ p % g1�ER$IOy$WALE(A$ EEDED l ' I 1 \ - 4O1 -40T -¢ w N / / / '/ % % DUIXING CONSTIZ,I,IICTION) / / ' 1 I \\ \ • --- -_ ;5 W N m {II ' / i/ %/ i i 1 'L T 1 + — r — — �\— — — —_,--='- ��' — - °,d0 3/V24 S'�, OHE L E ' OHE /,�?' OHk' /OHE / C�11OID OHEe / /OHE i I I I \\ ° /OHE/ �OH -'- s. •.M O. /'- /__ / SF �/ II .E'`� / o/ 11 \ ,Q` OHE ��,`-/ % Fes.'' `OHE §\ ,,,,,,,„ • / / / �, O N 0 ~ / 1 / \ BAFFLE FENCE \ i \ / / / / 1,,,,,-,W / 11 O / vv (TVP)(,3) v vvv A v i i / / / OCCV h co I U / I \I i', \ •\ \\ \\ \ \ • 6 w VI Q Cv W 01 2 / 1 ' \ 672.36 \\ \ •\ ° Z o U N 0_ \I ?� \ 30'WIDE \ • \673.44x \ \ O d Z V) II \ �', EMERGENCY \\ \ p Q y I\ \ !�: SPILLWAY \\ \ \ \\f • J W J O SINGLE-ROW \ •\ % Q VI LV CY O Q \\'SILT FENCE(TYP.)\ \\ / / \ W Z • I I 6"SKIMMER W/\• \\ \ �\ ° LQe • / / / _ •01 \\` .D Q p ' 5"HEAD(5.6"DIA. \ 673.7 0 - / / / LEGEND: (n O \ \\ I' �` _, / / "-ORIFICE) •\\ / R+A• N \\\��� N. \ \ FORERAV DAM �^�\ _- -200 — EXISTING CONTOUR --, ' \,.\ \ \\ �6n.00 \ `� uC'✓ -o 0000-BOO 000000- PROPOSED INITIAL CONTOURS 'DO NOT FOLLOW ORITJCE \ \ •\ \ \\ `\ ` • �'� ..:L 'j am F A D NOTZRECHEDULE DURING• \\ \\ .674.•• 80 • OF191.'5/• \ •\ / ' / /-'� _y S — — EXISTING PROPERTY LINES , NITIAL ANDINLERMEDIATE • \\\\ • \\ I • 5 - ' SF SILT FENCE TRUCTION.INSTALL WHEN �\ \ \ \ AL L � � T \\` - / /I/ 7 C WERT/NG TO PERMANENT \ \ j/ / / 1 --� LOD LIMITS OF DISTURBANCE ET PONGCONFIGURATIOT, ,671.7 \ \ - \ •74.2x \ �_ \ \ •_ ._.�/ / /� I�Ir I�1� i UTLET STRULTITRE DURING \\�� FOREBAV\ I\ am OOQ \ OOT am - ♦• / / /// cc a �j����j4��.♦` -y e 0 GRAVEL CONSTRUCTION EXIT CST OTHLUCTIOMSIHQULD 694___ END OFDOUBLE-ROW / , / / / // Z W V CONSIST EIR AND ASKIMMER:`^ �\ ', PROPOSED TEMPORTBV DIVERSION -__,SIT FENCE(TVP.) R / / 0 d J PROTECT BOUNDARY OPWEIRANHIRASHRACK 1 �� ' ' U ,R I c0\ SWALE TO BE USED AS NECESSARY --SEE INTERMEDIATE CONSTRUCTION PI♦A�{ / / F O —,9— m-- PROPOSED STORM DRAINAGE N \\ \\\` �, DURING ZONSTRUCTION AFTER PROPOSED 'PLAN FOR DETAILS BETWEEN CONSTRUCTION / / / i/ r i I Q Z }\ �SILT FENCE RO,CR� \ \ \ FILL IS PLACETR D BEFORE FINAL STORM W OUTLET(TVP.) `, END OT TEMPORARY OF DIVERSION SWALE&CONSTRUCTION OF VI tO THESE PLANS AND DETAILS ARE INTENDED TO SHOW MINIMUM REQUIREMENTS,MEASURES,AND METHODS • _ \\ 674'\\ \•".'-' \ \`_\��\ DIVERSION ARA.'A$NEEDED DRAINAGE INF UCTURE IS INSTALLE�\�`-_ ��51TE RETAINING WALL(S)AND SLOPES z CL TO RESTRICT RUNOFF AND CONTROL EROSION.ADDITIONAL MEASURES MAY BE NECESSARY.THE \ ��\ \ \ \ 67360"� / N DURING CONSTRUCTION), \� _ w V) Y O m CONTRACTORS AND ANY SUBCONTRACTORS SHALL BE AWARE THAT UNKNOWN CONDITIONS OR •: \``� \ \ ��" _ / \\666 CONTRACTOR TO ENSURE POSITIVE DRAINAGE - F- -' Li_ V . (/) UNFORESEEN OCCURRENCES MAY REQUIRE IMMEDIATE ACTION TO PROTECT THE SITE AND DOWNSTREAM Li,4 \ _ ^-, TEMPORARY EARTHEN PLUNGE {ROM START OF DIVERSION SWALEl6-, Z 9 O = a PROPERTIES.NOTIFY THE DESIGN ENGINEER IMMEDIATELY IF SUCH A CONDITION OR OCCURRENCE IS KNOWN \\` . ���� � \� <_ 6 O'\ POZIDDUAING CONSTRUCTION. PROPOSED SEDIMENT BASIN 0 Q TO EXIST OR ARISE.FIELD DETERMINED TEMPORARY DIVERSIONS BERMS AND/OR DITCHES SHALL BE \ :&:_•__Ii\Ntsii, \ _ '6�6�\��� $EX/ME _-' -��_/ O FOUNGE POOL,SDETAIL EN V Z ~ N CONSTRUCTED,WHERE NECESSARY,TO PROTECT AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT ` \ {CLEANOUT ELEK 50%OF�� TOa -� IZ SEDIMENT LADEN RUNOFF TO APPROPRIATE TREATMENT AREAS OR STABLE OUTLETS.THE CONTRACTOR \\``�EMPORARV EARTHEN • '6j2\ • .•;�.tili �F _OF'OAM=6Zg�-_`` / �- -_- - O Q 1.9 SHALL CONFIRM POSITIVE DRAINAGE TO PROPOSED DRAINAGE STRUCTURES TO ENSURE THAT PONDING PLUNGE POOL DURING_.` • — _, _ DOES NOT OCCUR THIS PERTAINS TO PAVED AND UNPAVED AREAS.SLOPES TO STRUCTURES SHALL NOT BE CONSTRI)LTION.FOR SIZING, `� \ .• �I 001 MO" • //'' W O Q EXTREME AND SHALL BE SUITABLE FOR THE INTENDED USE.STORM DRAINAGE PIPES SHALL MAW A MINIMUM \ • SEE EARTHEN PLUNGE R�68 - • �- - / N OF ONE FOOT OF COVER \ \\ \`\ POOL DETAIL -_-__- \ \ \ SILT FNCE(6L.) ` VrSILT FENCE(TVPJ __ CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNDERGROUND _ ------ _ F- UTILITIES(HORIZONTAL&VERTICAL)PRIOR TO CONSTRUCTION - -` , �_ - - U.S (INCLUDING BUT NOT LIMITED TO:GAS LINES,WATER LINES,SEWER LINES, - l `\\ ` - - --, `� - W I ELECTRICAL AND TELECOMMUNICATION LINES,AND FIBER OPTIC CABLES). 1r \ i -:..-- - -���`` �` ------------- -- _ ---- N DATE:JANUARY 4,2024 North --\ \ --/ i ' LW/1 SCALE: Carolina PARCEL ID:052 091 1"=40' www.ncen.oro�� TWELFTH STREET ASSOCIATED LLC UNLESS STATED OTHERWISE IN CONTRACT WITH OWNER,THE DEED BOOK 920-587 40 20 0 40 80 120 PROJECT C1 3 CONTRACTOR SHALL INCLUDE ANY UTILITY RELOCATION COSTS IN HIS ZONING: C-85 (I-85 COMMERCIAL DISTRICT) 1 I I 1 •fNO. OF 39 ORIGINAL AGREEMENT WITH THE OWNER. SCALE IN FEET 22008 moo La' PARCEL ID:051 OBi KAREN D.OTT DEED BOOK 0.51 DBt / 4 I' I N m / ,I I1 Z rn r O 0 ELT, MAGNETIC NGRT♦ 11�J II - 222 I9 LI O�� I II 11 , 1=0 0 '1 Lu a w © MICHA'EL ROCER MOORE O 1 - N O Q DEEDABODY 119 64 m 0 z> z .1 I ; .v a III a0 LA PARCEL aas2 1]8 IZZ MicwAci aocEa MoaaE ELIZABETH MOORSO GEED BOOM 1391-377O1 I'9, T � Z NDUS I Q / /�l D Io ,3/ . II . -. LINDA ANN PITMAN I DEED BOOK 1229-840 PARCEL I0:052084 I / DEED BOOK J°9-910 / x / A ' x,' ' 'X ' ' • , \ Nc c-: I-es ze e14Talc __ \ \__ __ .11111 � •it r I� "—ate—o° -ti—o°-o- — — - — .yo- � �.�\--- l�! �� i ir ' `'I w O I W / ' __/, e m 0 2 n nOl ❑Ol _-� t' --\ '-„ "lJ`J.:,,,, 3' ' 1 1 11 Z ./ /.,•/� -�.Ol/, 001 -00�� -/ = / ''/'/ \\ .• e. •Ol i r: PARCEL ALD W.SRICEO ' v I L tn F�/ ,-/ /' i/�� / ,I / _/ / , 1/ , ,/ � 1 —4 , 1 DEED BIMELROOK 72 79 1 1 Lfl H ' \ ' / / / ' / ZONING: C-BS IA{ \ N IIIM/ / ` l I I /� III ' /, �W a I -T.: t1:2- ab �� / i �.o I ' I I / I I 1\ d ---- :N[7:1 \ \ p�t�l�' V '0 ro m � �b /\ I ----`-----�' i / "� O 1 I I 11 1 1 ' I 1 >\ \\ \\ 0� _ ��y�,9�° \ �`\� h�`\ 0 v `�moI \ / + ��✓► _.. _� \ \ "'m--vf��,.Somho Bt_�';;:.:r:.v;^:� /\ W d t m 2 N T*. \\�`/ wi IIi i iIII \`\ �� I/ 1 1'1 1`, s • __- --;:- ■ \\ '\\\\\`\ \,a. .,O/ ®®''---- III I h ye in Li; 3 �` FL 'it J / / '�t�3i �F�,IE!'�S`f.� �1�' �_��_ � �H'I�4/0"41.0 ,''' ,' 1 _______ ______ ►�__ 1'1:78-- 1 •`?r y�•1 tkel l'All I I / 1°. ��1 V t7 OH i ,, AHE.' , / • E 1 /i• •� • • o _ - T 1�er. .� .. f ..p�f \ i -1 ^11 :-,0 '''M' 4 ; I r '_</' /' = •`• I. • , /••Fl,/•_ .-• ��1,—..:_____t_...,_ .-:._.:-_,--);*\—H..„____ /_ ,:`,,6 �11 !/"11111,^.� i,l l �• ''d0� 3/V24 J,°:c 727 . ritirreVerereArf. ,,fpyriproreriproriprivel.::- \ -} \ f i ",„„ /, ly://' ..",'-'--- 1 •i".----7PiiIN'N'\A . s.s‘i W . J \., ' - /' ,;. ,i \ ,,,,,,,,,,,,,,,,,,s' • • C:" ,� �� - y 0 1 `�r_______ o TA tip--e.,* JJJ / Iy/r I _ ____ _ • 11 1 a 1 \ \� �\ \\\ I 1 •` \ 3 -694-_ _ i''_ / /� ,'3// / 1 _� _________-__ • \ 1 1 1 w W Y \ I I �• � I' �\ q J ` ` - — •D 'I I/\1 11-_ '4 :i _ `�L\, , 11 I '\n\\ L'\ 0\1\ • ;`��` � IS�p�T�� %/1�� D L.. ` ----� ' -- ---_ --- — ---' 1 =-_ x� i, / i i / �-- '--'1' / � `\ L, \\ \ \ ='S/.T. \! - cc C— J ' _ -' __ / / % - '_ _ _ - --- =` \ `\ • . I�/ (n ` PARCEL 1&051091 __ TWELFTH D STREET ASSOCIATED uC PARCEL lNDER 090 '� _-------- __-- �— 0 DEED BOOK 910-58] �_�'------- \ U MARWN D BOOK CRESS JR '/ ZONING C-65(I-B5 COMMERCIAL DISTRICT) GEED BOOK COMMERCIAL _ ,' _�� ��_�-- HE/ —+Th 1 \ 11 / ZONING:C-85(l-B5 COMMERCIAL GIS7RlC7) "/j' '` --_ 1 � '''/' s"� - _-1 PARCfC l0:0Y[090 i / / � 'nti � _ __--� MARHN ALEXANOER ' \L'= __ _ CRESS At , / I - 4/ • 1',,ry,'`, // __ - _ OEEO BO01(981-9J1 ' j f 1-1 ,l' Z0.NING C-B5(I-B5 / 1 / // 2L�G/ / /�____ _ COIdM£RCIAL DISIRICIJ V , I�' cc �C _ tll Z } THESE PLANS AND DETAILS ARE INTENDED TO SHOW MINIMUM REQUIREMENTS,MEASURES,AND METHODS a TO RESTRICT RUNOFF AND CONTROL EROSION.ADDITIONAL MEASURES MAY BE NECESSARY.THE Li?, N Y 0 m CONTRACTORS AND ANY SUBCONTRACTORS SHALL BE AWARE THAT UNKNOWN CONDITIONS OR p LL U L (/) UNFORESEEN OCCURRENCES MAY REQUIRE IMMEDIATE ACTION TO PROTECT THE SITE AND DOWNSTREAM O a PROPERTIES.NOTIFY THE DESIGN ENGINEER IMMEDIATELY IF SUCH A CONDITION OR OCCURRENCE IS KNOWN a TO EXIST OR ARISE FIELD DETERMINED TEMPORARY DIVERSIONS BERMS AND/OR DITCHES SHALL BE Z I- a Q VT CONSTRUCTED,WHERE NECESSARY,TO PROTECT AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT LADEN RUNOFF TO APPROPRIATE TREATMENT AREAS OR STABLE OUTLETS.THE CONTRACTOR Q L.\^ SHALL CONFIRM POSITIVE DRAINAGE TO PROPOSED DRAINAGE STRUCTURES TO ENSURE THAT PONDING DOES NOT OCCUR THIS PERTAINS TO PAVED AND UNPAVED AREAS SLOPES TO STRUCTURES SHALL NOT BE LEGEND: 0 I- Q EXTREME AND SHALL BE SUITABLE FOR THE INTENDED USE STORM DRAINAGE PIPES SHALL HAVE A MINIMUM 200 EXISTING CONTOUR OF ONE FOOT OF COVER CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNDERGROUND 200 PROPOSED CONTOURS UTILITIES(HORIZONTAL&VERTICAL)PRIOR TO CONSTRUCTION - EXISTING PROPERTY LINES (INCLUDING BUT NOT LIMITED TO:GAS LINES,WATER LINES,SEWER LINES, ELECTRICAL AND TELECOMMUNICATION LINES,AND FIBER OPTIC CABLES). SF SILT FENCE DATE:JANUARY 4,2024 North 8 LOD LIMITS OF DISTURBANCE Carolina,*\ w �•M+ .. GRAVEL CONSTRUCTION EXIT SCALE: PROJECT BOUNDARY 80 ^/� w WWMFAC811.OB9 N- - (\v 14 :o �:o-- PROPOSED STORM DRAINAGE UNLESS STATED OTHERWISE IN CONTRACT WITH OWNER,THE rlINLET PROTECTION 80 40 0 80 160 240 PROJECT CONTRACTOR SHALL INCLUDE ANY UTILITY RELOCATION COSTS IN HIS L-I I I I I I I I NO. ORIGINAL AGREEMENT WITH THE OWNER OF 39 SCALE IN FEET 22008 PARCEL ID:052084 1 i LINDA ANN PITMAN m iI III tI1 moo - DEED BOOK 1239-940 / 'I I o,› ZO ZONING: C-\g5 1-85 CO MERCI' &I'STRICT) \\ w — 0Ol E• .• E-1 �F �� �� • • MAGNETIC p F 1 �VPWYV-1 r Z G v 1 '' Z / / / . ` am 1 ) 1 I 1 1 O ELT, g O / ,` I.a�� PARCEL ID:052 160 ) i lI z 2 2 a V i ----__ .OOl RONALD W. RICE i i ` I \\ w -F°o 0 a PO / = IMELDA G. RICE I r o • a�w �F (1 w l� �� �* I DEED BOOK 722 979 i I X N "^o 0 ZONING: C-85 III ^�NQ S ° 4 m -T �•� ,\` (1-85 COMMERCIAL DISTRICT) W /// I I' - \\ \_-- \ 1 1j I \ ? y v� o to R \ _ _LaJ== ' i ul f7 _ \ \\ • \\ \--- 1 %m • I ,LLJ ‘. \ \ , . - 11 III 1111WIIMIftwiminiliPOrq I I f‘'? DC E--- .-, O ' T. O VI \ \ ‘: s,, \ li ,s.__, NSW ------ \ \ \ I i 11 ,-;),A • lin \\ I -hg'm-7.,--i: ;:..':'. ,,/\ \ ' _____ r-- --; IN I 1 ET OTERI - \ I I f -_ ____ Cl I . I R OTl � .CS O 11 I l T - Ir 1 M. N. N 4--- _ \ 1 \ /, ', 4)' : Q \ � -' 46 ®® _ i R \ \ 1 _ - ®_■ ■ e ■ ■ ■ : ■ ■ Fri 1 �I sue°• s --�' \ .. (\ \ - /2d\ - -. r7711 IIIJ{'-�'�� \ - `1 // \\�� . -�I 11 4J a N^ y milli .------------ --I I �\\ QI\ --120. ---_LAM» ®^ , /1 11 O I , ilito , \ = s I °AID - - - \ � t 'Noy,: / --I 1 1 L LL - - - \\\ \\ _ 6'''/'' - GRAVELCONSTRUCTION '-•\\ \�r 1 1 i� - ENTRANCE P. — ' 'r' - -`\ / I I _..„,,A-------- \" ., ;--_, I ,�i - A 11 11 "�. L / r\I 1 1 F oi. "/e' ,`•',;, •• \\ /' / ' --, -- '1 `\ \�,1 �:Miti �, \\\ / r\\ III _ ��yt16 y'" \ / \ ,>� \ • I /I - -\ /1 r \ 11 1 =G 4. i '.r Q: ---- ---__-_ --_ -_`\\� % I \\ Olk — �I,4. III al /`I^ � L� \-I I r \I11 I\ ;Y Oa N 4,�2;= , — ",=\ / -- \ 11�1 IIL •?zilnll_jN�E �� I !1 \ s _ /I I\ —I— \ ��` -� } 1 T • 1 rl ' d 3/V24 OJ. OHE- --dHE. - - __ OryE___- e • -\ OEf€_ _ _ OHE,%O I'�___p}1E �16` e 0 r. OHE / 0�., ®�'� • O1.H ®�� I•,•a L.k i I II ,rrrrr�r, \ — T — — — — _ -----1 I/ PROPOSED RETAINING`�SQLL lit� rra ' / I /T `\ _ ' II Li \\ \I / - —I (SEE SHEETS CO.C22&C3J �' r __ - _- _�I! % I 11 --O I _I \ `� .' w� i / 'FOR MORE DETAILS)._- /` I // l r - I - I I , \ \-� � 1-% -�.P \\1 /.Ps /, , �___-___ / •. . rr. •�1 • ETER I\ I I r \ Z / / / SILT�NCE(rvPJ(AC�lAL LAYOUT :: :: \\\ � -- ' il M1s INLLTI < / ® `, \, / / / DRERf�N IN FIELD \ '� r /\ I•\ O \\ '�j�, \\ PROTECTION I . � ��]I �► / / / ) O P \ ,-:...... ` \ - - \\ \ / - 0�\ a� CI—will.11111111111111 / / /i IN / / / III m N CC 1-1- f/ ✓ 2 , . 1\ / 0 / ♦s Q ° / rt �1m " \ I =� // Hgill 0 '3/40 sc � ; � O 1 �� tI .. c F - . FS \\ Do LE-Row �. n /// `00 I • ' i 1 0 I _, .\` c o_ Z \ SILT FENCE(TYR) _ -' //, //�// , 41 Y\ I� cc LEGEND: O - �{' ,/ �/ / / ;� I /' ��h w \ \ / / / / I COf�$TRUCTION•RASE LIMITB O / / \ 1 —200— EXISTING CONTOUR - - - - -�," - / \ \\ \\ _-- - - % i l j j I , I I ,OF CONST'UCTION iP.)—� / OrI \ I , I I \\ Z J 200 PROPOSED CONTOURS _ \ \\ \ ` am- (25.1 1- O r — / i W �LSF V A A ` / I % j I�i% / /l I II 25. G) II I �\ EXISTING PROPERTY LINES , / / \ \\ \ - _--' '::,?/_/ I / / I ' I I 1 GRAVEL OH. • I , SF SILT FENCE ` l II \ '' , ,, \-___ - - / / / / I I j l I \ CONSTRUCTION 1 I `�\ __________J- _,'-'--- �' ' / / / I l S ENTRANCE(TYP.) \ , I • m V LOD LIMITS OF DISTURBANCE _ / / il�ies� asw_. GRAVEL CONSTRUCTION EXIT Ly,I 1 _______________ ___________ ��i / _- __ __ / / I I I I i 1 / I I � I I / / // / I I I I I 1 1 I PROJECT BOUNDARY cc = 1_ y____________________________________ __ '' - I l l / / I I I I I '� 1 I jl I N / --_-_ -` I / % l / / I / I �ILTDFENF EI/START° `1� OI II I , j W a V —��—��� PROPOSED STORM DRAINAGE W /�--- ---- --------__ ',ice_- - / / 1 _ S J r7 W ,�' _____ ______ _________________ .- _-`�I / / / I I DOU LE-ROW SILT // \\ '-' ___-\ Ort' I I I r /-,1 I Z Q J rl INLET PROTECTION N ,____ -- % I I I FENCE(rvPJ \\ i ,n I -I ' Z / _____ --- i 1' '1 w THESE PLANS AND DETAILS ARE INTENDED TO SHOW MINIMUM REQUIREMENTS,MEASURES,AND METHODS --��- - --z=- _�'�� �� / - I I I -r 1���1�11 OOj \\ I I I r I' CL O TO RESTRICT RUNOFF AND CONTROL EROSION. EL ADDITIONAL MEASURES MAY BE NECESSARY.THE / - 1 ��� _ I OCI U N Y o / CONTRACTORS AND ANY SUBCONTRACTORS SHALL BE AWARE THAT UNKNOWN CONDITIONS OR '-- __ ,' ', _ -�-' -- \ \ \ m I r\ l\\ \ - ) I O I r I p L.L V � OCCURRENCES MAY REQUIRE IMMEDIATE ACTION TO PROTECT THE SITE AND DOWNSTREAM '-' _. , `\\ \\ \ / \ \ \\ \)` •`�,, \\\ \\ / I I a I a 'I- UNFORESEEN PROPERTIES.NOTIFY THE DESIGN ENGINEER IMMEDIATELY IF SUCH A CONDITION OR OCCURRENCE IS KNOWN --___ _ - - --- - - '1 / \ \ \ \ 1 �S, \ \ // I , 0I Q TO EXIST OR ARISE.FIELD DETERMINED TEMPORARY DIVERSIONS BERMS AND/OR DITCHES SHALL BE •_----' i%�? `��\ \ \ \\ \ I \ • 1 �C�, �- \ / 0 Z I— '^ Ill CONSTRUCTED,WHERE NECESSARY,TO PROTECT AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT __ ' \\ , -=' I I \ \ II \ / '`� � - HFW '0 \ / LODUl�I i / SEDIMENT LADEN RUNOFF TO APPROPRIATE TREATMENT AREAS OR STABLE OUTLETS.THE CONTRACTOR -- ' ,'//// / ' ,'' '' --- `\ 1 I \ \ \ \ - SHALL CONFIRM POSITIVE DRAINAGE TO PROPOSED DRAINAGE STRUCTURES TO ENSURE THAT PONDING ���//� i ,"' , , ___ \ 1 1 \ \ \ \ 111117114:14t*A-11g411111.1-:-' -, LZ• RRRR � \ �DOES NOT OCCUR THIS PERTAINS TO PAVED AND UNPAVED AREAS SLOPES TO STRUCTURES SHALL NOT BE _1 '//z'i// / / "' si' —- ,— \\\I // / �1 ii____,S'yk\RTOF\SINGLE OW \\/ - ' I `L ~ a EXTREME AND SHALL BE SUITABLE FOR THE INTENDED USE.STORM DRAINAGE PIPES SHALL HAVE A MINIMUM \ / 'L "� UIWI-'�\0 //.�/// / // ,/ - / \ SILT\FENCE(TVP.) \ /OF ONE FOOT OF COVER v - / \ \ ` \CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNDERGROUND /'%'�Cl / ' -- / /� _ \ \ \ \ 4• <GI4r1 I /UTILITIES(HORIZONTAL Bt VERTICAL)PRIORTO CONSTRUCTION ���i V' __ _ _ ;00','r \- \ �\ _w. —'• ROJECTREPFRENCE NO.1-ZS]1 CP SH •I5J IELECTRICAL AND TELECOMMUNICATION LINES,AND FIBER OPTIC CABLES). " --______1 `� \ - - 1 North 8 -' - —.7 \/ 2• ______ ________________ j DATE.JANUARY024 4 2 / - I SCALE: Carolina PARCEL ID:052 090 / / ' - --------------- r=ao ENWW.ncen.ors MARVIN ALEXANDER CRESS JR /% \- '----------- ---- - ` �� {\\ { C15 UNLESS STATED OTHERWISE IN CONTRACT WITH OWNER,THE p - / // '' ''� ____-__ ,�— �� \ O I I 4O 2O 0 40 80 120 PROJECT CONTRACTOR SHALL INCLUDE AGREEMENTANY UTILITY RELOCATION L OWNER COSTS IN HIS DEED BOOK 951—931 /'/'ii /� E ,O OHE � �,! ,'' \\ II I I I I I I I NO. ZONING: C-85 (1-85 COMMERCIAL DISTRICT) / - T—OWE OH I ,HE/ SCALE IN FEET 22008 OF 39 i Z moo 0 a I �i _X-�'X X X X fK X / X )' i/ X it Xi 11 X 1 X`.C L ` \� Z i % / / / , I j II �L _ .. , a MAGNETIC NORT. II /T i �/ • / bv'b b°•'. '\bG nE /'\,° n� n i' n' /;: n %Tb/ 0 Z `n in ce po / ..../ // / '/ / /END OF'SINGLE-ROW / / // 1 IIm o\I --GO/ I- am—T urn 1 urn / GM— ce O Z © ' %// OD/ '// 8RT FENCE(TYPW/ / y,/�C)OT( I amm I 0 7 O 2 2 kII // / SF E OOII/ ;//OOl / I :. ; // w a o O Naa / i fTP/ , f 'Hlr /H1PAV„f„ 0. \\ \ / I w ;'-'7:- ,0 nQ(r - \ \ \ 1NI / / 1 / z Lu ill?. __ i / •\ yp \ \ 11 % I 1 I / / I I l I N . / 1/ 1[ -/ / 1 ` , \ ( / 1 / I 1 / I111 II / /Ilmil1I / / T 1 /„, i Y(n / / � / / \\\\ \11 1 i i i i i 1" / 1 Q 4 • , F w J p UO . \ 1 I / / / / I / /m 1 I / N 0 El .LE U Ii: i / / I / I // FWAW i I 1 \ I i I \ \ .J > N I l I1 1 1 I I I\ \ 0 11 1 f z \\\\ 1 SINGLE-ROW /1 // '•T,k _�1_ • 111 \ 11 \ I `� \\\ \ \ ���// ^tLi n\ SILT FENCE(TYP.) 0✓ _/ II —y_ 0) L/1 uN M ` ` \ I Ftji' C rn�° i %b i - 1141*7 \"! r'!"!IIDP !- "---cc-- IINLETPRpTECTION 1• / 11M---'\ I 11 I ( \‘‘, \ \\ \ 1 1 j 1 \ I - J P. 0 3 I I \ \ \ 1 .. 1 R .\1 / I I I \ \ \ \ • \ I 1 L t O O m \ \ i i ,' / -\ / \ \ 7: / \1 ) \ 1 I / / CONSTRUCTION PHASELIMITS/ �''1\ \ \ I LJ- / 11 / / / O�CONSTRUCTIO PJ �� \ \ I in\ ` __ __ ,___.)-Ail, 64 ' -A _ ______ 4, ,. 1 _ _ to.a. ,/.. \_ .... __,,,, _ _,3 tro% ilhtlIlli"IIIIIIII'' .. \ _ __, J /OHE : // OHE /�j' OHk'/ /OHE / OHE / OHE I / ��' f M O. F ,/ ,,,_ '/ %/ SF Cl' I �Q, OH /OH/ OHF� OHE s ,,����,„ .:7 :: • / z ,/,/ :----i ---/- '---. 'Th- '3.- ' �F / /f ,// /// ////- //. 411`11111111* \ NN\‘‘ r -, , , / „,v-- ..., \ \‘‘ ,- , ....... : : „/ , ,, \ . . ... \ _, / , , Dr., _, / , , . \ \ . LI- / 1 / \\ BAFFLE FENCE \ \ \ `�1 ' / / ,' \\�,` `\ \\ \,,// _..., .....00,1, fr U \T 30'WIDE \ \ \ \ '/ / / , / / / I \ \ 0 ^I V1 1 \,,,,,: • ` EMERGENCY \ \\ \ \ _ \ • .__-�'�� // / / ''((/'/ ill l / (// / \ \\ \ d O[Li)0 \ • LV• SPILLWAY \\ \ ` / PROPOSED A:A INGA'vALL/ / I / / 1 \ \ \\\`\\�. ` J (,I SINGLE-ROW IJy \ \`yNLET PROTECTION / / / I I 1 \\ \\\ �\ El VI Li ct U Q \\SILT FENCE(T1'P.) \`y\\ \\ (TVPJ / (SEE SHEETS t ,C22/&C35' / / / / \\ \ _3yvsv` Q U co Li d \\ \ \\�\ \ ,�. \ / i FOR -A RE FJETA145) / / /i sv��`m\ _��_ W .o���o�T,n o��,o-=o moo.So ME v,o �� .. _� 2 a ��Wz V , \ �' LEGEND: 6"SKIMMER W/\ , , ' LLF killr1:1 —200— EXISTING CONTOUR (Qi)p O \ 6"HEAD(5.6"DIA. • \ \\ \ `� • / _ _ z \ bRIEICE)(TVP.) \ FOREBAV DAM ` �\ \\I / / //200 PROPOSED CONTOURS N �\ \ \ • d6n.00 \\ / / / `lik — — EXISTING PROPERTY LINES \ \\\�'. i \ \ \ *��� ` SF SILT FENCE \DO NaT OLLOW ORIFICE 1 ' LOD LIMITS OF DISTURBANCE A NOTCH SCHEDULE DURING \\ \\`\\ \\\ \ Atm: \�\ -® -\ \\\\ �® / / YS / $_ 'INITIAL AND INTERMEDIATE 1T 1sT1�Y.S .aMa -- GRAVEL CONSTRUCTION EXIT C NSTRUCTION INSTALL WHEN \\ \\\ \ /:,,........,.,), � 1 I ' . ONVERTINGLO PERMANENT •\" \ \ D `��` // Ir`I PROJECT BOUNDARY T POND CONFIGITRATION. `` FOREBAV` l\ LOD LOD LOD LOD END OFPOl3BCE-ROW•• / / Z ce ce V —:v—�sv-- PROPOSED STORM DRAINAGE OUTL[1 STRUCTURE DURNNG v� \ _'-694____ _---_- m, i , r, STRUCTION-SHOULD CONSIST I HILT FENCE P.) / i/ / I O d J L J INLET PROTECTION ORILY,OF A SKIMMER„TOP WEIR 3- \Q r \�52\ ,,..-----SILT FENCE ROCK OUTLET,AS NEEDED, I J AND TRA6NRACKO \\\\`\ , --� TO CONTROL SEDIMENT BETWEEN / Q W O THESE PLANS AND DETAILS ARE INTENDED TO SHOW MINIMUM REQUIREMENTS,MEASURES,AND METHODS \ \`\ ` \`� \`690, DIVERSION STBALE AND RETAINING a O '$ILT FENCE ROCK \_� _ WALL&SLOPE CONSTRUCTION AT Z Cn Y D TO RESTRICT RUNOFF AND CONTROL EROSION,ADDITIONAL MEASURES MAY BE NECESSARY,THE �� \` \\\ \\\Milliona // \ - NATURAL LOW POINT "' 3wmCONTRACTORS AND ANY SUBCONTRACTORS SHALL BE AWARE THAT UNKNOWN CONDITIONS OR �0L1T\ET(TVP.J��. ,.,:" .�6 F L.L U �, I^UNFORESEEN OCCURRENCES MAY REQUIRE IMMEDIATE ACTION TO PROTECT THE SITE AND DOWNSTREAM \I.,.- >\\\ \ W��� LEMPORARV EARTHEN PLUNGE Bg.` Z aO ¢�PROPERTIES,NOTIFY THE DESIGN ENGINEER IMMEDIATELY IF SUCH A CONDITION OR OCCURRENCE IS KNOWN \�� ��\ ‘� \ POZI�BURBy6 CONSTRUCTION. \ 0 ¢ TO E%ISi OR ARISE.FIELD DETERMINED TEMPORARY DIVERSIONS BERMS AND/OR DITCHES SHALL BE \ '�A\ \" SE°IME FOR SIZING,SEEEEARTHEN _ U NCONSTRUCTED,WHERE NECESSARY,TO PROTECT AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT ` ` — — _ >,-_� \,.. cc PLUNGE POOL DETAIL.., ZSEDIMENT LADEN RUNOFF TO APPROPRIATE TREATMENT AREAS OR STABLE OUTLETS.THE CONTRACTOR `\\EMPORARYEARTHEN {CLEANOUT ELEK 50%OFF_• F -_ __ Ce SHALL CONFIRM POSITIVE DRAINAGE TO PROPOSED DRAINAGE STRUCTURES TO ENSURE THAT PONDING \\ PNJNGE POOL DURING ::: ,�R � `W —-���� / \ 0 Q DOES NOT OCCUR THIS PERTAINS TO PAVED AND UNPAVED AREAS SLOPES TO STRUCTURES SHALL NOT BE CONSTRIh.TION.FOR SIZING, � OD r.,_ Ii 0 ¢ EXTREME AND SHALL BE SUITABLE FOR THE INTENDED USE.STORM DRAINAGE PIPES SHALL HAW A MINIMUM SEE EARTHEN PLUNGE -_____ �• STAZRTOF'S)N6LbROW LO OF ONE FOOT OF COVER \ \`\ POOL CLETAIL SILT FENCE(TYP.) V CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNDERGROUND _ - --____ \D ---- _ F UTILITIES(HORIZONTAL&VERTICAL)PRIOR TO CONSTRUCTION � _ - 1.1.1 (INCLUDING BUT NOT LIMITED TO:GAS LINES,WATER LINES,SEWER LINES, c _ - - `cc 1'1-1 ELECTRICAL AND TELECOMMUNICATION LINES,AND FIBER OPTIC CABLES). 1 1� ����,_��' ` � \ \��� \��� \``� ___------- -� LA DATE JANUARY 4,2024 North�1 1 I 1-:I - _ -� W I'^\ 1\ I ---'r l, : / LW/) SCALE: Caro 1 ina PARCEL ID:052 091 =40 C 16 www.ncellorg TWELFTH STREET ASSOCIATED LLC UNLESS STATED OTHERWISE IN CONTRACT WITH OWNER,THE DEED BOOK 920-587 40 20 0 40 80 120 PROJECT CONTRACTOR SHALL INCLUDE ANY UTILITY RELOCATION COSTS IN HIS ZONING: C-85 (1-85 COMMERCIAL DISTRICT) 1 1 1 1 1 ( 1 ND' ORIGINAL AGREEMENT WITH THE OWNER OF 39 SCALE IN FEET 22008 12 X Me °�oo ili PARCEL I0'052 081 KAREN D.SEMI, , ,./ j DEED BOOK 051 OBI j '' `� :11 Zffi F O ww I z 2 2 IIMAGNETCNORTce-fiji w MICNAEL ROGER MOOR£ G) PI _ © N u ELIZABETN MOORS OF 0EE0 BODY 119f-64 m L] F I w n `z I r�i:8213... p0 �� ti � �u M,CHA L,R RIM JDoaE ELIZABETH MOORE p DEED BOOK 1.1-377 )r w J ( Z o a NDUS / a j I f 1K 11 � fO 1 I\�I I� ZwI PARCEL I0:052 OB9 •• VmLINDA ANNPITMANII o Q ZDEEO BOOK 12J8- o PARCEL ID 052089 I I LINDA ANN PITMAN •ilI ti , I DEED BOOR i 39 940 ___--\ ' - X / .YCYwT�,X �' �'. kC .JL `. zaNiNc c es f \ \ �„v-,M'� r r I� /( `\ / �- b°'b b°'b ��� 1R n o 2 AO �� I........................................ l ) 1 1 1 1.1 \\ w \�\ \ '//' i' ___.•I / / -]O6•:iLM]% _ W.♦__.rS ' f 2 O ,I I Z Z I' \ \\\ % % ' /' / • / / I / /./ / ,— I-•Ir /• / // _ __ / cirtii.045"."."....7...160I _I I v ii N ' // //i'///�/ / _� I \ • �O, l I _\�_, -� .♦ •11 L CE I�• / / '/� i AC£ I I �—/ R\ ^nOJ2-9J9 \ �/ O M \' / / • /�/'/� ' . , / l -- '/" 1♦♦ GC85 lily \ LJ_ Lfl O1 M/T. %/� '//� / / \/ L\ N . ,1 r I ,I �/ ' I / / I l (l- EALOISIRICTJ + nl N eW i \\ \ a I i I / / I / i Al. m i _ 72q� \\ \ : ,riii \\ Ind MM C ''AFw♦.=.maxI \\ I l ! I \ _ i_ \ :: �;� a`�I/'' uJ z oR "^ i o ;:y i I i i / / it I - I -- 41444. i y� 5.•' : �Si L..;+"rt 1 \_ z E X r !li'l rO �olm� /% � /' /'' I S6LI \ \m ( Ili I1 I ii --_ 6s - --__- .\/rx \ \I — o<bee� �� I \ rs `!I IF1 \I � ' - l e N , ,,,N. - ®� .\ T,..‘„ ........_,_ ___ ...., 4 I Ii �. a) z aI_ ~ \`` \' wi II I it /` �j///// I� I \ . \ �� �D �\ 1 \... ��I / `\ r�� i I \\ ` IN `� \ l ,1 : i \\> \\ \\\ m III $ II N 'iy >.\ �,'`,,m\`\\ o 6 �__— -,e~--- - - \` _Inn `\ , \_' ' :`�- -®T_ y ; w, 21 LE i �a / 1 I 1 1 \ \ \ \ \ �1. I+ \\ \ \\\ 9\ e �/ f G/ ,ate / I 1 1\ \\ \ \ `\ �'�II f —4 I t-,t \'I \\ 20 c//% I• - _ ® �I. - i /A .. I i1 1 /I i i i1 i b ba° � �e ft,- -- - ���� - -�v vv ,_ __TVG 1� -,v��`v �_� �' '�,w-.�L•`r; .1f41,0_ - — —/>= " i.!',Li-AT _/- J_I—l^� ._ _ 6 1-696 ` 700. J02_ 709_� I06_ J08 -_J10 _JT2 - _-714 - - _ l / / �19 ' \ \j I I\ i •• 1 =1' w z O OH / IK'JHF�'' / OWE o r V •� �692 2�,� \ _ _ - - _ 1� k _ .n N c i /••I_ /I /10 .a 68• /690 ire — • o - �. _ O. /' m •^6 - T 't i.1�1/— �� 1 �2� \_, l•—.1 nl�i � �5$ � 29 / n.� ............................... 8 ____—_ _— ___\— ` i — - // �7 j t i, . � .� *-li ;�dOd 3/V24 J�'�, roye-A:di:97 vierryvi-frirv4 0 p 7-7 ,�`� �x D t.41,11,-.1t1"4:!::II:AL 7-` 77°' :i ' ' - aN / \ Iliri , / 7 /,/'i�18\ \ \ -ter- / / / \ II / ���I , / II \oo' a q \m • 9 N. 0 `�: a, _'.,".�,•��`�.�♦ �`.. �� _ �o-6'' //' .•fir •u, iiti:..t.::::::::::: trt. -. �L�n,••. •� 1 I v 1 Il lia d • \',,, L .S.; "R GLL O �. to.. _ _ a4 '♦; ''' .+•♦' .: L:I i \, o i Q Q 1::---,--4!11 . ::;:::::6::_L - / �, I Z 2 ___ �.� - '•o.•o✓.�,.'♦"• - _ - �... ::: :eG9a`o //�//ri i i I I _ v,,-,� I I' I I i ,,, o I I I Li d - _____ • �I :; o ;L.r. .6,2 I i I :i........„..„.. li ',LE,.• J �\ - •a♦�O +♦::♦♦♦O;u r -' //, /l I l I J _ \ I / 1 I I ! \ vsi J _\ .�'���,...................... ..................................... '♦• 4♦;.♦;y;H: .� .i'!s 'ae -,-,, i i i�\ Il _ _ \/� ' '1r'1 1 / I ! __"'\\\ ____ I - Q O \\ �\\ o ' ; a p. _....• -.: ` .• I's ---' '. ems;////\ \ \ --- _-,/ - \ i I \ \ °, i( cc I- I ,CEL ID:052 090 / �/ ''_ `__-\`\O \ �— 0 DEED BOOK 92o se] I rH \ — 200/00 C-85(I 85 COMMERCIAL LNSIRICn MAR✓IN ALEXANDER CRESS JR - -----_ - DEED BOOK 981-931 - //'' .�� �_.- L �/ - � i \II ZONING.:C-85 0-85 COMMERCIAL DISTRICT) '� /' q^`'� _ OH +,.. I ' ''/' s"0 -'__/PARCEL IO:OY[090 i/ / ,\,' ",, __-_____ MARHN ALEKANDER LI /I f II( • __ ZONING C-B5(/-B5 / L�,�D i / COIAMERCIAL DI51RIC1J V / ,/ THESE PLANS AND DETAILS ARE INTENDED TO SHOW MINIMUM REQUIREMENTS.MEASURES,AND METHODS a LL TO RESTRICT RUNOFF AND CONTROL EROSION.ADDITIONAL MEASURES MAY BE NECESSARY.THE w Ln Y a cc, CONTRACTORS AND ANY SUBCONTRACTORS SHALL BE AWARE THAT UNKNOWN CONDITIONS OR p Ly U N UNFORESEEN OCCURRENCES MAY REQUIRE IMMEDIATE ACTION TO PROTECT THE SITE AND DOWNSTREAM O a PROPERTIES.NOTIFY THE DESIGN ENGINEER IMMEDIATELY IF SUCH A CONDITION OR OCCURRENCE IS KNOWN a I- U Q TO EXIST OR ARISE.FIELD DETERMINED TEMPORARY DIVERSIONS BERMS AND/OR DITCHES SHALL BE Z N CONSTRUCTED,WHERE NECESSARY,TO PROTECT AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT LADEN RUNOFF TO APPROPRIATE TREATMENT AREAS OR STABLE OUTLETS.THE CONTRACTOR Q VI SHALL CONFIRM POSITIVE DRAINAGE TO PROPOSED DRAINAGE STRUCTURES TO ENSURE THAT PONDING DOES NOT OCCUR THIS PERTAINS TO PAVED AND UNPAVED AREAS.SLOPES TO STRUCTURES SHALL NOT BE 0 I- Q EXTREME AND SHALL BE SUITABLE FOR THE INTENDED USE.STORM DRAINAGE PIPES SHALL HAVE A MINIMUM I- OF ONE FOOT OF COVER CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNDERGROUND LEGEND: UTILITIES(HORIZONTAL&VERTICAL)PRIOR TO CONSTRUCTION (INCLUDING BUT NOT LIMITED TO:GAS LINES,WATER LINES,SEWER LINES, 200 EXISTING CONTOUR ELECTRICAL AND TELECOMMUNICATION LINES,AND FIBER OPTIC CABLES). 'C: PROPOSED CONTOUR DATE:JANUARY 4,2024 No_rth 8 EXISTING PROPERTY LINE C a ro l i n a w —s° PROPOSED PARCEL LINE SCALE: —�s°-- PROPOSED STORM DRAIN 1 80 WWWAC811.Ot9 _I UNLESS STATED OTHERWISE IN CONTRACT WITH OWNER,THE SLOPE STABILIZATION 80 40 0 80 160 240 PROJECT CONTRACTOR SHALL INCLUDE ANY UTILITY RELOCATION COSTS IN HIS PROJECT BOUNDARY I I I I I I I NO. ORIGINAL AGREEMENT WITH THE OWNER SCALE IN FEET 22008 OF 39 PARCEL ID:052084 i i LINDA ANN PITMAN mo II J I\ moo - DEED BOOK 1239-940 frwZOZONING: C 5 (l 85 CO MERCl94d3YS7RICT \ __ .iA�*1 N, E7IC NORT• Y„ - _ - MANoi- .031.Ea. r � rr ram moo_..sir r� rirac_m� a s 5�r-\ \ I'-;•'-. �ar9o_oa_ ice ` w�ir � •EaA • 1 it \ * G ���.../ '� ram 1 - o ' _ ,, 3z \ __o 1 1 F c, /\ ,• '2B SLOPE STABILIZATION 3\ �•"-•-� 1 I ^1 • Z arse A .-�lr1� •• \ 0 •GA i••' �• � ••� ��-rr���►r�• v+==_-• =•• p• N••r•`I PARCEL ID:052 160 I `\ o�� a ce 1 mAka�E�• iAst--Is 1.•01r liall.•�C�N• I RONALD W. RICE i I - w a o o •� IMELDA G. RICE a , �• •1 DEED BOOK 722-979 i X "^oo 1 F;1 ZONING: C 85 ^NO o U 1 1 • (1-85 COMMERCIAL DISTRICT) '\ f, RF WI / , �• •' \\\ \ II I`I\ y F p W \\ - -_-' ' I N �`�__ .\ \\ / .) \\ '\ ��li j y ::,l \ tn - -- 6"VJ. \ \ is `A • - !• r� e l I\ • • o z • R__ \ inO , - a Q o �I \` `r - --'- R I \\ -\ \ I �41� \\ VI • �I Ih - �I (L l l l •••� _I \\I �z L �sP ..so��,.so• a:s ' 1 1 1 1` \ 3 e \ `- ------- !1 I i�R`\ `�'~ — r:I`v. z 9 z 6"SS 6"SS \ \� — 3 1 �� - a ' • -'d kg _ m 0=W Z O�w e `\\ =I \ \\\ \\\\ \/4 _l•.�,� �`� /h -.�\ III 7 z 11 • ' (/IFF (Ci ,,,'1,:tori! f41.• ii : 1 \ -0 0 d-:-i Z \\- \ \\ J m --=' 0 _ �I / / I I 1 z 4 W- .\ \\ --/ W j i �1 .1 `I \ \ \\-----______,_____,, ` \ ' .1.1.1, ` , , i----'--_ __,----,_, , �I \ // /I I�-+I'll Li_ fa 7. _ 4 tidiee - - ___ _ \ >Iz f—. , \\ / 1 I -' v/1 �es NII \ •\ \\ / \ „I 4yteb y'" 714 --'iG- 6 W 6 W 6 W \ �W J 6„ \ . :- \\\a o' 11 �N'I __,\ • __Al \\ II -PV- w z O_ __ i / I \ ,e� 1 1 1 iD I 1\ *LA m _ II L } i— —OD —� I • �. ;T______ -OHE-_ •- - OHE OLB€ OHE /2j T'_ Sq]iE Lam � a` OH I•�.. �Ii IIPOr4iiiir VV ----411,--; ie ile o.\ ., N, ,,lir 0 I L.) 0 2'- N /// i�•r ��fir 6 r / / ® l 1 Ai I ll \ Z erg o ~ / GpAB11jL ♦I Q sozo��.,so �� ICE / / / �.` I l I Inl z - MIL o Pl, �- o N I •i• ir -1:\ ` - ,-, ` ✓�ly / _ 1 /�^g I o \\ I J In VIII, � ggJ a z _ •I O'er I IN oarvso_w»-ram„0 ••••• • • •W+ ii ` 1, 1ss / o III a Z •r it oav 101001 •• • ••ipv' \ A -, I'N I 1� Y\\''1 LL A ' O u alvo G_��retrGalvoa�iemoT.ios0-- \\ \ / l / 1 r i ;'��g I, \\\ i F, o `i \I `\p 4 •3sw- .• r- = • 4 I ON _- LEGEND: O i•�m�rw tea_ , 6 Cl••�•, , W6B- -'/`o„ \\ \ '- �''�/ � i i $,,,,-,'--,,- a of-200 i / II1PROPOSEDCR - / / ,\ ----------- -" � I1 _II � I 1I ' PROPOSED PARCEL LINE M I I 1 1I I 1 \PROPOSED STORM DRAIN \EciI I Off. \/ 9 Oj 1 i ce • II I W V W s J ' �- /� 1 ~-� J•SLOPE STABILIZATION - __ `_ ' 1�/ " \� II i 1 1 1 ��►1' \ \\ / til I Z I- PROJECT BOUNDARY -- __------__ b \1/ I r I I 1 � \ I � g // _ /i �\ / I / I 1 1 J 1 I �' \•• m I„\ \ I , WVI O THESE PLANS AND DETAILS ARE INTENDED TO SHOW MINIMUM REQUIREMENTS.MEASURES,AND METHODS `/ / -- i I\ I II \ o\ `•• \I \ - i I ~ I. N �/ - TO RESTRICT RUNOFF AND CONTROL EROSION.ADDITIONAL MEASURES MAY BE NECESSARY.THE // '. \ / I \. \\ �`', \ -- /-` --\ , w 0 CO CONTRACTORS AND ANY SUBCONTRACTORS SHALL BE AWARE THAT UNKNOWN CONDITIONS OR _ i' ----- /' \ / o `O • '�\ \\ I Ly V a' {/) V UNFORESEEN OCCURRENCES MAY REQUIRE IMMEDIATE ACTION TO PROTECT THE SITE AND DOWNSTREAM '-' - i �' \\ - I \ \ '\ I SLOE STABILIZATION co A ) \ 'i1.t,' _ \ - \\ / I ' 1 a = a (T PROPERTIES.NOTIFY THE DESIGN ENGINEER IMMEDIATELY IF SUCH A CONDITION OR OCCURRENCE IS KNOWN --______ i' i /_-> / i' ,' -------------- V I/ // / \I\ I I , \I \ I \\ R) O \i•� \\ \ �,\' ,� O� \\ \ ,� I L 0 y O TO EXIST OR ARISE.FIELD DETERMINED TEMPORARY DIVERSIONS BERMS AND/OR DITCHES SHALL BE _----' \ \ / ' /�'� \ \ \ 1 ♦ ,_ - `� /_ / O CONSTRUCTED,WHERE NECESSARY,TO PROTECT AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT __ - \\` i _ //' \I \ II 1 \I I \I \\ \\ :�1 T!Y\���..\ •1fj: ����� \\/ I / tiI >Z VI SEDIMENT LADEN RUNOFF TO APPROPRIATE TREATMENT AREAS OR STABLE OUTLETS.THE CONTRACTOR _ - - \� I I I 1 \ \ \ I \\\ V. IH0v�s _-__ $ I • \ > Q DOESLNOTNOC OCCUR THISFIRM PERTVE AINSA TOE PAVED AND TO SUNPAED VEVEID AREAS.SLOPES TONAGE STRUCTURES TSSTTRUC STRUCTURES SHAL ENSURE THAT L NOT BE _1 'NDING '//iL�////j// / '� —- �S\\I ' ' \�\\ \I \I \\ \I ,����L _ �' ��2/ �� '' - -LS O ~ Q EXTREME AND SHALL BE SUITABLE FOR THE INTENDED USE.STORM DRAINAGE PIPES SHALL HAVE A MINIMUM _ J, /,/j// / // / / /' ---' I / \ l \ \ \ \ \/,:-.1114111:11-11-' ���G•. ------ -' �� LROF ONE FOOT OF COVER !'^\�O _--' '/// i / - _ I / � \ \ \ \ \ �2�'� ______ � -' F -__ \""� - i CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNDERGROUND /` / / _ �� \ 'UTILITIES(HORIZONTAL&VERTICAL)PRIOR TO CONSTRUCTION >- \ `�Y��''b - / // f T/ / �' .- - / . -----`-- , I \\ \ . `\ 0 •��LSD �NTC.'.R DR I(�'PUBLICRIGHT OF WAY II/ / rie (INCLUDING BUT NOT LIMITED TO:GAS LINES,WATER LINES,SEWER LINES, -�- "- / / s= / /' `--/ ,- \ \ \-\_ 10. ROJE(-T REFERENCE NO,1-ZSII CP SHEET NO.ISJ I ELECTRICAL AND TELECOMMUNICATION LINES,AND FIBER OPTIC CABLES). ...../ / . s_ �- -__-_-__ �__� -_ •,� North 8� �� /r/ _--__ ______ -----------______ \ I DATE.JANUARY024 4 2 -- / • , - I SCALE: Carolina PARCEL ID:052 090 I r=ao www.ncen.ore MARVIN ALEXANDER CRESS JR ' '/ --------- ___- \\` C18 UNLESS STATED OTHERWISE IN CONTRACT WITH OWNER,THE p p-/ -I / //'/':' /'� E / '' ''-____ _ __ _• it ����I \ \ I 40 20 0 40 80 120 PROJECT 1 (•J CONTRACTOR OSHALL RDINAL INCLUDE AGREEMENT WITH RELOCATION OWNER COSTS IN HIS DEED BOOK 9(J I-93l - //�/.ii "O OHE OBE�,� /' '\\ '\I I NO. OF 39 ZONING: C-85 (1-85 COMMERCIAL DISTRICT) l OHE _ SCALE IN FEET 22008 / //./i .' - \ / \ \ J 'E HE Lp i z moo 0 P a a , i _ X-f=X X X X / // X / X I i/ X it X �`,C 7 i Z aMAGNETIC NORT. I / \ N -b �' / ^' Z _ / \\ / / bq bP 1� /o /1p Z 77 022 N / aoT am _ A`._ L. ror / o0,1�� " ir , i i , F o�� i ' / / / i�I��' I , i/ i / // w a i� i/ // ♦j♦ i i it i i/ / Lel w a� z / kk ti _________/ __ ' N ♦��' \ 1\ 1, i m i i l i 1 i I� o NO'`P,- k 2(\I k ' [ ��U / 'I v ' ij,♦�♦I ` v v 1 / 1I J / / / I i r[ z ml i / i A♦♦♦� i f� i f i a ppj^I in - - - ♦.' , Io I 1 / i l i I I / i l l �--- sia: ❑ ~QUO~ / / . /' ��:� ♦S 1 ° I // 1 I h /O> 1I / / / / / I / / / �' LLw W �m� I / p /�_�• I1 / 1 / / I I / I o _ oz U p ° Cj♦♦♦' 10 ^1 I 1 __ - ' �1 / LD yile � 11 II \ \ \ / / I 1 1 I I �zJD . \ V m IT __ I1 OW I .Y sv / W N \. \,_ \ \/ m , I �� r l / 1 1 \LLO `\ o SLOPE STABILIZATION I % / j I1 11 `\ ` ``\ • wOrE ��` \\ \__-_' , I I (TVP.) I )♦:� / ,� I, I I I \ ``` - - \``\ z l.D \ I I • / 1 1 \ L 2 \ II I I ;� /�\ 1 1 1 11 \ \ LL x ``` ----^ -_-\ 11 I,I , 1 (1 `.\ \\ `\\ P 1\ 1, , 11 i 1, I _ v 0 :3, - \I I I i / 1 ♦♦♦� `\ `\ \ m \\ 11 I I 11 11 - �Z •Q a :0". I 'I \ I ! , I It♦ `\ ` \\ \ a I , 1, N 1 m mIIM i v •�j) I o y o p \ IV I ‘,0* I 1 I I V , 1 , I W 11110‘ 4 ---. i 11 ��I v vv vv ` ` Ll_ / I • Air s I I / / / / / / / _II 3-------------r ? 4ar‘ 1 I 11 // % // ;/ �// /' /��O O sa xa so��=� � ��' • � �1 VA40414.A.�.� 1 ;p {r ...d, / / sow ):.. .. i .:._ / / / I / I 1 _ - - -Q _ 3. Val 04 T/— /�/ / / l / / // 69q I \ 7pO ] ]06 708 7T0--^ %5 O N W=2 / ' / / //- t ~ —1 O T 1— 696 + • �02 - ' `_ '`'d d 3/V24 —OHE 1 E i OHE / OW'' / i/ i/ / l l i i 69Z j , \\ _ — — `:DM OS,: / /�' // /OHE / OHE OHE 1 E .'!. E / ..I a a.E \ / / / / / / -., a ,e - - - — — — — /� — — —/—/—/ dC� ®�•� O�/> I �6� / I / I OH _-,/OH OHF� OHE ,������„ ✓� I 688 690 / 011 o ® / ®i / / ,000.001001000.0.0010. -- ♦♦♦ ♦ ♦ ♦♦ . 10 ♦ ♦♦♦w. I\ `\ Z ..i �I/ / ti ♦1,0,11♦♦ ♦♦♦♦�♦♦♦1♦ .01 . \ ` /lliirr 1,4 p 1'c\HJ LI ce / < 0♦60000♦, ♦♦j♦♦�♦♦♦♦� / i / i i 6. d\ a -. � ♦0 \ 1 \ z o i ' / i /• • \` \ \; ' \� ♦ ♦ � - / / imi i \ \o U N ♦ � !♦_ \ LV ct U Q ITN 1 0♦♦00:40 TEMPORARY SEDIMENT BASIN TO BE ss\ `tOt�.:t♦�V• \" \ ` `. \ \ %/ % /% %/ %/ / %/ \ .����xs\` .! Q .\ �` _♦♦�♦♦:, CONVERTEDY.p PERMANENT POST \\ 0400141140 noLL \m� so°so��sao� ��xa so\\ za so z.zo xa s•�� .� �:. �/ _ z.so� \ \ `\ z = sKzp ` . %♦♦ ♦ CONSTRUCTION WET'P�OND CONFIGURATION \ � ♦ Tza so \zo �s,� _ \ d p N ♦♦ ♦♦♦♦♦♦♦♦♦\ TEMPO\�IARY EARTHEN PLUNG\� 4141111141114♦ � \i' / / / :101:11totett04007:—.00.0.;111164:::"."� 1♦♦ ♦♦ ♦- LEGEND: ♦ ♦♦♦♦♦0 `\ POOLS\TO BE REPLACED WITH �N ♦♦♦♦♦♦ ♦♦r♦► '��♦.� ♦N ♦ ♦!`♦ ♦:♦♦♦♦♦♦; PERMANBNT RIP-RAP VELOCITY ♦��w1♦♦:♦♦♦♦♦♦�♦` / ♦♦♦♦♦♦♦ ♦ �— -200 EXISTING CONTOUR 00 ♦.1111 ♦* BREAKERS A+'\PIPE OUTLETS UPON `♦♦♦�:�,,♦♦♦♦♦♦♦♦♦♦♦ / / ♦♦♦♦♦♦♦♦ � .♦ =.♦♦A--.����•�� .♦ ♦♦ ♦♦ \ • FINAL\SITE STABILIZATION ,♦.♦,� ♦ ♦♦ ♦ ♦ ® , ® ® ®_ _ ' PROPOSED CONTOUR ♦♦♦\ 0♦♦♦♦♦ ♦♦� \\\ ♦♦♦♦♦.♦♦•♦♦��♦♦♦� \ ♦ �♦ EXISTING PROPERTY LINE o.. ; ♦...:.:5.♦.`. \ \ ����:�♦♦ ♦♦♦♦♦♦♦ \ �� S�'i=' �4� - �-_►� �_�a���- y 1♦ ♦ ♦♦ • ♦♦ A ♦♦ ♦♦ • ♦ 9 ♦. Gam'♦_ ate♦ ♦mow=�� ► ♦�.����__ cc PROPOSEDPARCELUW \' 0. �000,� ♦ 160♦♦♦♦♦�� `\ ♦; ♦. ♦♦ ,: ®♦♦®♦♦♦♦♦♦♦♦i. '♦���♦ -���w..1��♦����V�♦i����G♦��:in��►����� 'mot :� sn . za SLOPEPROPOSTABILIZASED TION IN -��♦♦♦♦'�‘., ♦®♦♦♦♦♦♦r♦�♦♦♦♦,> ��♦♦•♦ ♦♦�, :♦♦C♦♦♦•••••• SLOPE STABILIZATION-` _ 694- -_- O VLLI Oci_ J ......................e. PROJECT BOUNDARY 0110•IO♦�,�\`;110.0 •��♦♦1010�♦Wit�11 �♦��♦ ♦��♦♦ OW. ��♦��♦♦♦♦♦♦110.-'• •�00101,0 ♦ WV OYP.) .\6 \., \92\ / LLJ VI a' THESE PLANS AND DETAILS ARE INTENDED i0 SHOW MINIMUM REQUIREMENTS,MEASURES,AND METHODS :11 ♦♦♦♦♦♦♦♦\ ♦ ♦♦♦♦♦ ♦ ♦♦♦ ♦♦ ♦♦ ® ♦♦♦�-N�a ♦♦ ♦♦♦♦♦♦ ♦♦11f ♦♦� 96' __ aCONTRACTORS TO RESTRICT RANDF ANV SUBF AND OONTRARORSNTROL OHALL BEN. I AWARE THAT UNKNOWN CONDITONAL MEASURES MAY BE MIONS OR RY.THE \ 03♦♦♦♦♦♦�♦♦ �•,, ♦®♦ ��♦♦ ��♦--�® ♦��♦♦�ITE AND DOWNSTREAM • •♦� •��♦•♦��♦♦♦♦♦♦� ♦�♦ � ♦•� ��6 ---- ~ L LLV {m/1 PROPERTIEi NOTIYRTHEDESIGN ENG NERENCES MAY IER IMMEDIATELY FSUCHACONDITION ORE IMMEDIATE ACTION TO PROTECT ERSOCCUR ENCE IS KNOWN .`o` •1•S���f�♦�S,♦` -♦ •���`� ♦ ♦�e�♦.--���5♦♦♦!—��♦♦����� , ���j \`-- 8g` /- Q aUNFORESE Q Q TO EXIST OR ARISE.FIELD DETERMINED TEMPORARY DIVERSIONS BERMS AND/OR DITCHES SHALL BE • \\\ ♦♦♦♦♦♦♦♦ �' - ���♦�_ ♦�♦�♦ ♦♦♦�,♦.♦' ♦♦ ♦♦ I �♦ ♦� _sg \ L..J a tri CONSTRUCTED,WHERE NECESSARY,TO PROTECT AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT ` \�. \N\ �`♦♦�♦♦♦♦♦S♦♦♦�� _�♦-������♦f�®♦ ti�_ ♦�• 6` Z ~ N SHASEDILLENT CONFRMNPOSITNE DRAINAGE TO APPROPRIATE PROPOSED DRAINAGE STRUCTURES OUTLETS. TO ENSURE THAT CONTRACTOR PONDING \`\� TPOOLSTBE EARTHEN REPLACED I �� \`'Da 0♦♦♦♦ ♦��Q♦�♦♦♦_♦♦���Aj♦� /_/• •,� \\\ DOES NOT OCCUR THIS PERTAINS TO PAVED AND UNPAVED AREAS SLOPES TO STRUCTURES SHALL NOT BE .PERMANEN RIP-RAP VELOCITY `. ♦♦♦ ♦♦®♦♦♦♦�♦ ♦ ♦ . `pD'\� LOD -`- •D -684 GE O O ~ ¢ EXTREME AND SHALL BE SUITABLE FOR THE INTENDED USE.STORM DRAINAGE PIPES SHALL HAVE A MINIMUM �� BREAERS AT PIPBOUJLETS UPON `-----_�`�♦" - ♦♦♦♦♦♦000 �0���.\\ ___ CO I- OF ONE FOOT OF COVER . \FINAL SITE STABIUZALON \ ao;'-♦ ♦`♦♦♦♦♦�y.0� i . - -- --_ U CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UNDERGROUND _ - s. _ _ (- UTILITIES(HORIZONTAL&VERTICAL)PRIOR TO CONSTRUCTION �_ _ - \ w (INCLUDING BUT NOT LIMITED TO:GAS LINES,WATER LINES,SEWER LINES, --_ - - `� W ELECTRICAL AND TELECOMMUNICATION LINES,AND FIBER OPTIC CABLES). .. �. -__--____ North 81 r _- / -`` ` ` �` �— J n DATE JANUARY 4,2024 W I"v 1v I- -I i Vwi SCALE: Carolina _ - PARCEL 1D:052 091 40 C19 www.ncen.grg TWELFTH STREET ASSOCIATED LLC UNLESS STATED OTHERWISE IN CONTRACT WITH OWNER,THE DEED BOOK 920-587 40 20 0 40 80 120 PROJECT CONTRACTOR SHALL INCLUDE ANY UTILITY RELOCATION COSTS IN HIS ZONING: C-85 (1-85 COMMERCIAL DISTRICT) 1 I I I I 4 •fNo' OF 39 ORIGINAL AGREEMENT WITH THE OWNER SCALE IN FEET 22008 VARIES VARIES SEE NOTE#2 DOUBLE CHECK VALVE ASSEMBLY (DCVA) DOUBLE CHECK VALVE ASSEMBLY (DCVA) COPPERSETTER FOR 2" FLANGED METER VALVE Box >ww AS nIRECTE➢ AS DIRECTED • (3" - 10") INDOOR (3/4" - 2") INDOOR COVER moo I I T PAVEMENTS ,,......,,. ,�-� PUMPER NOZZLE %1/ /0 TO FACE STREET , - - aTCATE scum w e, ,r.`M IMII AT 90° ,,.o" wm a DOUBLE CHECK r xr Txe cm rMi r,..,;.,, C �� Not 'a s sHln or valve n aea vulvE n 1H'x lH'x 6 18'x18'x6° ^III' SEE \vA vmvE P s Imo' COVER CDNC PAD DEEP CONCRETE I�i a,aoE". II I ' %��/�/�/�///%� STAN➢AR➢ VALVE HDX Ji��ll :q�rl: VALVE Box N ; / y ➢ TACTFLow� ` fa Z ■■B M ■� r0P SECTION z Le, • \ 11 FToox am xax vuW rs r�M TAMPED BACKFILL �I L>LI a el 8 VALVE BOX \ll2 CU.YIl(MIN: sec xmc a Z. + tY N a a o A� No.67 STONE _ LµxoErxxaPMO rl o2 SEE DETAIL i■ 1 ., �� l� °5"> y OTHER SOLID r DUCTILE IRON M.J. W-4 1■ aTuo�xme sxxaur lacuuuwom. �_ -` BRICKS DR �• S TEE W/6'BRANCH ■ - ELEVATION SUPPORTce zOR °HYDRANT TEE VALVE6 GATE Y .J ^ " °"IX.w ELEVATION VIEW I,.LweP. Na _ �USE. UNDER BUD F i e �� • ADDITIONAL Q N o _�6° DI PIPE -- Ewa ° ■��• COPPER AU FVALVE OR E%BOXES • - c�m ��' TENSIONS LA I 111111 MII��I =�1I TIDE0111• '`r -� I'I— ' Mr.' MIN • •�• •f• \ T-" .III FOw�t w ..... CORPORATION SLIP-ON SOIL Ili ,WATER MAIN, �i�\\i`/�\i,\\j� PIPE GASKET , o .,�.".,. ".�-nn.osxme is H wLr REmMMexoeo ,�x. - --i'.. .. °ir.•'�.• ... 3 PROVIDE RETAINER GLAND a. �x xrG 01111 )10IIIIIIII-=b1?� ,Low �\ • �z'COPPER >�• VALVE O 0 Z E C i•0 o•r. ••. [L FOR EACH MECHANICAL NOTES: n °��°�"°"""'�"°� Nx�.av mmum 4' L ReRD.xLY �'" \ I CYfiC JOINT FITTING (TEE, VALVE, BEND) PLAN P V� v�rx s'OF WASHED STOry W • •S a • O T- BOLTS I.DCVA MUST CONFORM TO SALISBURY-ROWAN UT1 TES SPECIFICATIONS. MCOMAEN°e WATER MAIN \ 4 _ _ `STANDAR➢VALVE TAMPED BACKFILL Z W TAPPING SADDLE BOX BOTTOM V M RACKET OW ASSFMRI Y MIDST RE INSTN I FD BEFORE SERVICE I IMF IS CO R PIPES. ��PLAN wV EW SECTION w 2( XCEPT AS AUTHORIZED BY THE WATER PIIRVTYORI WATER LINE MUST BF EXPOSED FOR INSPECTION n n n� o _ o z RETAINER GLAND ,L FROM METER TO BACKFLOW PREVENTER I DCVTES:A 1.BY-PASS INCLUDES A BALL VALVE WITH PADLOCK WINGS. INSTALLATION h (MEGA-LUGS OR SNIP _• 11� 1.DcvA MUST CONFORM TO SALISBURY-ROWAN ummes SPECIFICATIONS FOR 3.SALISBURY-ROWAN APPROVED DCVA INCLUDES SHUT OFF VALVES R AND N2 AS PART OF THE ASSEMBLY. S 3/4 -2' 2.BRACE PIPE EYELETS ARE STANDARD-BRACE PIPE NOV INCLUDED. RINGS ONLY) FOR NO 9JBSDNTIONS SHALL BE PERMITTED. 2.EBACKFLOW PSSEMBLYNMOSTERF INSTAII ED BEFORE SERVICE I INN IS C.ONNFCTFD TO ANY OTHER PIPES EXEMPT AS. , DUCTILE IRON PIPE 0 4.TEST COCK g1 SHALL BE UPSTREAM OF SHUT OFF VALVE y1 AND IS PART OF THE APPROVED ASSEMBLY. AIUTHOORI 2D BY THE WATER PURVEYOR 1 WATER UNE MUST BE EXPOSED FOR INSPECTION FROM METER TO BACKFLOW 3.INLET IS COPPER TUBE PACK JOINT EXTENSION 5.SUPPORT OF 3--10-DCVA SHALL BE DESIGNED BY OWNER. 3.SALISBURY-ROWAN APPROVED DCVA INCLUDES SHUT OFF VALVES#1 AND/2 AS PART OF THE ASSEMBLY. 4.OUTLET IS FEMALE IRON PIPE THREADS. �� ®SEE CURRENT APPROVED PRODUCT NO SUBSTITUTIONS SHALL BE PERMITTED. Q MANUFACTURERS SHEET FOR B.ISALISBURY-ROWANDOORINSTALAn0NASHAEL BE PERMITTED I A ASHES WHERE ADEQUATE SPACE Is NOT AVAILABLE OUTSIDE. 4.TEST COCK IKS/1 SHALL BE UPSTREAM OF SHUT DFF VALVE yt AND IS PART OF THE ASSEMBLY. 5.OUTLET SIDE ALL ALSO HAVE 2"X24"BRASS NIPPLE AND A 2"HAMMOND 606 GATE z 'In ALL VALVE.METER BOX SHALL BE THE SAME AS USED FOR 1"METER. Lt 5.INDOORPREEVVEINON DDEVIIICCENSS NOT LONLY AVAILABLE POUTSIIDE.SALISBURY-ROWAN SBUURRY ROWANAUDRW ES WILL REVIEW ON A CASE BY In APPROVED TYPES (APPENDIX 'A') I0u REVIEW O CASE BY MAIN BASIS. BE u - vI THE �— c P\ 0 Am J.ALL PIPE 3'-10"SHALL BE DIP FROM THE TAP AT THE MAIN To 5'PAST SHUT OFF VALVE M2 CASE BASIS. 6.SEE CURRENT APPROVED PRODUCT MANUFACTURERS SHEET FOR /A��A// C e RESTRAINED JOINTS SHALL BE MN MEGA LUG RESTRAINTS OR APPROVED EQUAL. 6.SUPPORT OF BACKFLOW PREVENRON ASSEMBLY SHALL BE DESIGNED BY OWNER AS REQUIRED. APPROVED TYPES.(APPENDIX"A") m.LJ L N N M DATE, OCTOBER 17, 2006DATE, FEBRUARY 3,2009 DATED JANUARYI,1991 CITY OF SALISBURY,N,C, STANDARD DETAIL DATE, JANUARY 1,1991 GJ R CITY OF SALISBURY,N.C. STANDARD DETAIL CITY OF SALISBURY,NC. STANDARD DETAIL DATE, FEBRUARY 3,2009 CITY OF SALISBURY,N.C. STANDARD DETAIL AMENDED! JULY 19,2022 CITY OF SALISBURY, N.C. STANDARD DETAIL AMENDED, MAY 19,2009 —w C Q I^°U AMENDED, MAY 19, 2009 AMENDED JULY 19,2022 WATER SYSTEMS NOT TO SCALE 6Z Di WATER SYSTEMS NOT TO SCALE STANDARD DETAIL BACK FLOW PREVENTION NOT TO SCALE STANDARD DETAIL BACKFLOW PREVENTION NOT TO SCALE WATER SYSTEMS NOT TO SCALE 0=1'1"I = Z O co 3" - 10" DCVA INDOOR STANDARD BF-10 3/4" - 2" DCVA INDOOR STANDARD BF-5 2 " METER CONNECTION STANDARD W-10 VALVE BOX INSTALLATION STANDARD W-5 F_ FIRE HYDRANT STANDARD w-3 Ihim Z zQ B' 24' _9• Li �c L` o NOTES: 9' BOLT FRAME TO MANHOLE - 1 1 !� A/j a DEVICE BOX OR VAULT 1, MINIMUM THICKNESS FOR PIPE SEE NOTE #tSTEELFBORTSTAINLESS + F—&COVER V V Do m u STANDARD FRAME ,� SIZES a' AND SMALLER IS 1', 7 5/a' _ O °p ry MINIMUM THICKNESS FOR PIPE - BUTYL MASTIC BETWEEN �� '- a N Lo 3/4'METER 13°%24'X1a'➢EEP 7 3/8" cn5 MANHOLE AND FRAME&COVER 1•TO 2'METER 17'x30•xla•DEEP UN➢ISTURBE➢ SIZE 12' OR LARGER IS 2', k Tn MIN, MODIFIED DRAWING PRE-CAST RINGS 11Mt m O EARTH THE ENGINEER SHALL SPECIFY _ MAXIMUM OF 11 1/2° W 2' - \ / THE THICKNESS & WIDTH FOR THE THRUST �E INCLUDING BUTYL MASTIC. -p O d:i ♦ / CONCRETE THRUST BLOCK SCHEDULE / \ W PIPE COLLAR, BUT IT MUST MEET THE O \ cu Z a 1- METER BOX SIZES (APPROX.)FOR. A H C \ W CLASS A SIZE 90(TEE) 45' HEN021/2 111/4 MINIMUM THICKNESS NOTED HERE. ` A PRE-CAST BARREL 3000 PSI SECTIONS)2,3,6 3/4'METER 13' 24' 18' 5. pr.:". CONCRETE INCHES H L H L H L HI_ �� 4 FT.SECTIONS O 2H 75' 1L, 44,1 � �� - 4' LG' 30' 1.0' 25 1,0' LS' 10' 1,0' �4 'P� in 1'TO 2'METER 17' 30' 18' IA \� 6' 2,0' 40' IS' 35' 1,0' 30' 10' 15' MINIMUM 3000 PSI r BUTYL RUBBER >N L.L 1, 11 11 , SEALS 18.. 10' 30' 6.5' 25' 50' 20' 4,0' 1,0' 3,0' CONCRETE, 11 11 - BENCH II 11 WATER D =� £ WALL MONOLITHIC BASE ¢ II 11 WRAP OUTSIDE MANHOLE SECTION METER BOXES x FOR DESIGN PRESSURE=200 PSI SPLIT MEGA-LUG I 6 l/a° > SEAMS(JOINTS)WITH MIN. TYPICAL SECTION SIZE SCHEDULE CONCRETE INVERT DR • II 11 8'WIDE BUTYL TAPE PRECAST INVERTS TEE OR BEND III 61/2' III ��.��•'; PLACE ON MINIMUM OF • 4Wl.h, : �FAy B I TRENCH BOTTOM il's 9 1/2' ili A e'COMPACTED srONE 1 �, z o=; / 'I ELEVATION I �i �,• "A SEE NOTE as ®'''' :s"o <, 2- 0.75'+1• il ._ I 7 5/16' ► OS'INSIDE DIAMETER MANHOLES ,MANHOLE NHOLES :~d,a 3//24 - TOP VIEW C 1/2 L 1/2 L \ ti I 1 N i / SHALL HAVE 5'THICK MALLS v 'p'1'P MANHOLE TO CONFORM WITH O J`'' REMDVALE M I 'ss➢IN `o z 3000 PSI 3100 PS[ �C TYPICAL CONCRETE UNDISTURBED MATERIAL TRENCH •1`,U 1 5 1/4' i j ,y ����� A SHALL Hav 4'INSIDE e 6E THICK WALLS SECTION z�ALL JOINTS SHALL LATEST REVISION %,M O PIPE ENTRY £ CONCRETE CONCRETE t" THRUST COLLAR. MIN. I 1 Ic; 3,STEPSATOMBE4 AREAlia FOF 12 INTO I ° CONC.SUPPORT DR DuV PER CITY STAND L CONFORM """,,,,,,,,,,,,"` (MINIMUM) ♦ ¢ ASTM C47H OR 43, , _ ■ ■ / \ PLASTIC SHORT SIDE VIEW 125� LNG SIDE VIEW WIDTH MIN. ¢ \ 5 3/8 / COMPACTED 867 STONE STANDARDS. UNDISTURBED UNDISTURBED I � 5 3/4 � UNDER EACH PIPE �� EARTH EARTH j :5 UNDISTURBED SUIL. 1 -' --- 4,BUTYL RUBBER SEALANT TD MEET '� / < Z 7' FEDERAL SPECIFICATION(GSA-MSS) _ RESTRAINED JOINT PIPE \ g. RUBBER BOOT Ao. MAY BE USED IN PLACE CAST IN BASE _ sae'mA,M.H.,PIPES e•-ta° OF THRUST COLLAR. THE SECTION A-A SECTION Lai \ 1 6D ➢Ia M.H,PIPES zD-3D" J NOTES I I I ° o' CL ¢ q: - \. 6.MANHOLES WITH A DEPTH OF 10'DR FOOTAGE OF PIPE/NUMBER OF .J ` e ` GREATER MUST BE G'➢IAMETER Q /' JOINTS TO BE RESTRAINED " 7.ALL MANHOLES ARE REQUIRED TO I- 3/4°METER BOX-SEE CURRENT APPROVED PRODUCT MANUFACTURERS SHEET FOR % � �` I / JOINTS SHALL BE SPECIFIED BY I 8' APPROVED TYPES(APPENDIX A) // \ % EARTH THE DESIGN ENGINEER a 1/2" NOTE BE VACUUM TESTED. W $y Z MANHOLES MUST NOT HAVE T—F H NO LATERALS OR CORES IN 0 1"&2'METER BOX-SEE CURRENT APPROVED PRODUCT MANUFACTURERS SHEET FDR .N g NOTED ANY LARGE CHIPPED AREAS, MANHOLE CONE SECTION, APPRB WED TYPES(APPENDIX A) SHALL BE AS DESIGNED BY K 'J ( 10 1/4' BROKEN AREAS,CRACKS,DR EXPOSED GIr7_ FLOOR HARDENER Z I f JJf SEE CURRENT APPROVED PRODUCT REINFORCEMENT,OR OTHER DEFECTS, A ..7%. ON BENCH WALLS w AN ENGINEER ( / 0 LL 0 PLAN - TEE PLAN - BEND MANUFACTURERS SHEET FOR APPROVED DEFECTIVE MANHOLES WILL NOT A (. &INVERT-MIN. TYPES (APPENDIX A) BE ACCEPTED, PLAN vz"THICKNESS N H 0 #5 REBAR REINFORCING CITY OF SALISBURY, N.C. STANDARD ➢ETAIL DATE, MAY 19, 2009 .�. CITY OF SALISBURY,N.C. STANDARD DETAIL DATE, JANUARY 1,1991 CITY OF SALISBURY, N.C. STANDARD ➢ETAIL DATED JANUARY 1, 1991 AMENDED JULY 19, 2022 ce CITY OF SALISBURY, N,C. STANDARD DETAIL DATE: MAY 19, 2009 AMENDED JULY 19, 2022 CITY OF SALISBURY,NC, STANDARD DETAIL DATE; OCTOBER 17, 2006 SEWER SYSTEMS NOT TO SCALE (- WATER SYSTEMS NOT TO SCALE WATER SYSTEMS NOT TO SCALE WATER SYSTEMS NOT TO SCALE WATER SYSTEMS NOT TO SCALE PRECAST MANHOLE STANDARD SS-1 In Z METER BUXES AND VAULTS STANDARD W-9A THRUST BLOCKING STANDARD W-1 THRUST COLLAR STANDARD W-2 VALVE BOX STANDARD W-4 0 OUTDOOR IN-GROUND GREASE INTERCEPTORG D=E'MINIMUM DIA STONES 3:1 SIDE SLOPE 111 INLET GROUND LEVEL OUTLET 'flail 3 �,4410:01B'� ,•�/b t20'MIN- { t20'MIN,y O PLACE WHEEL STOP j-I OF TOTAL LENGTH OF INTERCEPTOR-�� 40"FROM END OF CONSTRUCTION SPECIFICATIONS: �I,e,,C / � PARKING STALL 1. PREPARE THE SUBGRADE FOR THE PLUNGE A A 0-& 1 POOL TO THE REQUIRED LINES AND GRADES �1 II��BII FLARED END GROUTED / � �,, 9'MIN. 1 �,xw J 3'DIA. O •. CIA.+0.4'L FLOW FROM r ► -I COMPACT ANY FILL REQUIRED IN THE B SECTION RIP-RAP �• KITCHEN + LIQUID LEVEL LIQUID LEVEL 4 1 - TO SEWER SUBGRADE TO DENSITY OF APPROXIMATELY -� JO•C •d•Oo O O OD o040 OC O LLOWPA6"WIDEKINGCHIGH SILT FENCE(TVP.) THAERIAL. SURROUNDING UNDISTURBED E=d 2E p �. DO L°v O v O d GREASE;-.,"1,.?.(;()o p GREASE YELLOW PLASTIC PARKING CURB USE MATERIAL. O cc o.o.00 o0 1•0 �, SANITARY TEE .� • SANITARY TEE GLOBAL ENGINEODEL ER'S OR AN �1 \�_�, !� W a MATS OF ENGINEER'S APPROVED EQUAL DISTURBANCE(TVPJ / 2 KEEP NOUTLET FREE OFN LINE, DEROSIONE,AND R REMOVED SECTION.OSS / �B�'�aIv.�4, LJ V O RIDDLE 25%BE THE DISTANCE FROM BOTTOM -BAFFLE WALL ACCUMULATED SEDIMENT AND DEBRIS.AFTER Z OF TANK TO WATER LINE. } TYP,EO%OF WATER DEPTH ISOMETRIC WHEEL STOP DETAIL HIGH FLOWS INSPRST FOR SCOUR.MAKE 12" 10'MIN. W VI OLL (Y T1 a� N.T.S. NECESSARY REPAIRS IMMEDIATELY. PLAN VIEW 1.F CL y 'I I �_- �O SLOPE AS PUN NOTES:THE CULVERT ERT DIMENSIONS: ;� 0 V g m Tr �' 1. TYPE I:PLUNGE POOL IS DEPRESSED 1/2 THE HEIGHT OF p� GRADING SHOWN ON 4j THE CULVERT RISE. F p 0 � 2' Ce I. d I RNI HEO a Q OE SETTLED SOLIDS/ + 'fr6(, Si -C=(3xd)+(6xF) T�1 1F 'Y.u 7 'SS�'u♦",\X� Z I- L^ _ v00 y,�" -6=(2xe)+(6xF) 4 12• Q h7 MUTES __ SIDE VIEW a R F WHERE is' I T 0 ~ Q MI S GEOTEXTILE FABRIC t CO ALL GREASE INTERCEPTORS SHALL CONFORM TO CHAPTER 10,SEC.1003 AN THE NC PLUMBING CODE AND SHALL BE DESIGNED AND 10 / -d=THE CULVERT DIAMETER OR OOLWIDTH IN FAN IN FEET I -1.5' J 12„ ID - INTERCEPTOR ACCURDIR6 TO THE LATEST PUBLICATIONS IFI OF ASTM CIHIG STANDARD SPECIFICATION FOR PRECAST CONCRETE GREASE s -C=THE PLUNGE POOL WIDTH!IN FEE SECTION A-A I`INTERCEPTOR TANKS OR ASTM F2649 STANDARD SPECIFICATION FOR HIGH DENSITY POLED BYLTHE DIRECTOR. GREASE INTERCEPTOR TANKS 4 DOUBLE ROW OF -C=THE PLUNGE DIAMETERLENGHT ORS FEET TEMPORARY EARTHEN PLUNGE POOL(TYPE EXCEPT FIR THE FOLLOWING REQUIREMENTS OR OTHER DESIGNS SPECIFICALLY APPROVED BY THE DIRECTOR, / -E=THE CULVERT DIAMETER SPAN IN FEET EQUAL SILT FENCE(AS NOTE: (2)ALL GREASE INTERCEPTORS MUST MEET THE REQUIREMENTS AS OUTLINED IN THE UNIFORM CONSTRUCTION STANDARDS MANUAL I / TO d N.T.S. DIRECTED PER PLANS) DURING CONSTRUCTION,PROVIDE A"PLUNGE POOL"AT FOG CONTROL PROGRAM'MINIMUM DESIGN AND STRUCTURAL CRITERIA FOR THE EXTERIOR GREASE INTERCEPTORS', IE^T.�11. -3E=THE PLUNGE POOL BOTTOM LENGTH IN FEET TEMPORARYEARTHEN PLUNGE POOL(TYPE N DIMENSIONS (3)ALL GREASE INTERCEPTORS SHALL BE SIZED ACCORDING TO THE REQUIREMENTS AS OUTLINED IN THE UNIFORM CONSTRUCTION STANDARDS MANUAL. -2E=THE PLUNGE POOL BOTTOM WIDTH IN FEET - PIPES SD THE PIPE OUTLET FOR PIPES DISCHARGING INTO A BASIN. -F=PLUNGE POOL DEPTH IN FEET d(FOR TYPE 1) ,.-SDa3&SDu2-50AT PIPES SD.18 PLUNGE POOL"SHALL BE A MINIMUM OF 2'DEEP X 2D DATE:JANUARY 4,2024 (4)TRAFFIC-RATE➢TANKS REQUIRED WHEN LOCATED IN TRAFFIC AREAS. a _d 2.5-FT 3-FT WIDE 2D LONG.RIP RAP VELOCITY BREAKERS AT THE (5)GREASE INTERCEPTOR SHALL BE LOCATED SO AS TO BE ACCESSIBLE FOR CLEANING. LIMITS OF DISTURBANCE AND SILT 3. MAINTAIN LINE,GRADE,AND CROSS SECTION.KEEP F 125-ET 1.5-FT BASIN INLETS ARE TO BE INSTALLED AFTER SITE IS 80% NOTE (6)INLET AND OUTLET SANITARY TEES SHOULD BE OPEN AT TOP TO ALLOW VENTING. URN 01W curTIS SAONV MWTOP RADIO TxE STABILIZED. SCALE: FENCE SPACING DETAIL OUTLET FREE OF EROSION.REMOVED ACCUMULATED (7)ANY VARIANCE FROM THIS DETAIL MUST HAVE PRIOR APPROVAL FROM THE CITY OF SALISHURY, MBTATEHI ENTSOESErnMN UCT1ON AAR SEDIMENT AND DEBRIS.AFTER HIGH FLOWSIMMEDIATELY. C 15-FT 18-E NTSCAROLINA C 3 6 N.T.S. (8)TANK LENGTH SHALL BE GREATER THAN TANK WIDTH. NS FOR GHWAY MOO FOR SCOUR.MAKE NECESSARY REPAIRS B 12.5-FT DEC1- CITY OF SALISBURY,N,C, STANDARD DETAIL DATE: APRIL 7,2009 EDITION. °A EN NOTE: E 25-FT 3-FT PROJECT 1. SEE SILT FENCE DETAIL IN POLLUTION PREVENTION RIP RAP VELOCITY BREAKER NOT TO.SCALE BARRIER TYPE DETAILS FOR SPECIFIC INSTALLATION INSTRUCTIONS 2E 5-FT 6-FT N.T.S. NO. OF 39 STANDARD SS-aA SEWER SYSTEMS CREASE INTERCEPTOR CURB&GUTTER 22008 N y 3E 75-FT 9-FT TWO I'DIA.HOLES FOR eI - / PUBLIC PRIVATE Z J UNSEALED MANHOLES °.i o LATERALS SHALL NET TYLER 6855 SERIES O-p �� P 10°-TOP SECTION BE LOCATED ]N DRIVEWAYS, L 1 WALKWAYS, OR SIDEWALKS r5 1/4' DROP LID1110 ~ PAVEMENT OR EE'WE-� k1R aGROUND f DETAIL 1 ���� 00 a 18'SQ.x6° 0 1l,Fo TOP OF COVER �' �� l8'MIN. CONC.PAD j O T. O C MINIMUM AVERAGE WEIGHT eth b `A �� • p o0. a 3° (.1: i O r Z F 5'MAX. DEPTH No,67 STONE L COVER 120 lbs, //�� WWW a UNLESS ADDITIONALll FRAME 190 lbs. 1° _ 84 z UNIT 310 lbs. IJr DEPTH IS REQUIRED TO BEND-...,..." I O 2 2 SERVE THE PARCEL w a u u --S FIRST BEND 5' SEE NOTE 4 MINIMUM SLOPE 2% MIf� A A OC6aao wooBOTTOM OF COVERSlr....LN100 ‘V‘I'‘\VII\iiiiLF" � � O��I Lw z ADO O. TYPE III BEDDING A t •- C% PWG-FUTURE SERVICE CONNECTION NOTES. 12' R-...- 'A _ ' m DIMENSIONS MAY VARY PLAN V ,-� 4' DIP DR PVC 4°PVC - SCHEDULE 40 OR SLIGHTLY,BUT MANHOLE BOLT HOLE .,a' Si- a � Z �� 4'DUCTILE IRON PIPE RING AND COVER ARE _ '�r LATERAL CONNECTION TO HE INTERCHANGEABLE (ON 45) NO TRANSITIONS BETWEEN WITH DIMENSIONS SHOWN o MATERIALS PLAN VIEW OF TREE PROTECTION aw WYE OR SADDLE _ _ x K ❑� - `^ - 2. HEAVY DUTY 76 CAST IRON, 251' .. ,- /1 u Q WYE SADDLE AVAILABLE FROM As1m aea6 cLASS 35 zap• 4"-H- / ONE FOOT FOR EACH INCH \ MUST BE USA MADE S OF TRUNK DIAMETER OR CITY(CONTECH OR EQUAL) Q' 4 F CONTECH PFSP&PFTP QUH 5'TO 8'WALL '� 1LA - 2 1/2 12 HEIGHT OF TREE- w NOTES. 3. SEALED MANHOLES SHALL Z I- m WHICHEVER IS GREATER I j BE PROVIDED W/GASKETS r , - Q a 1,THE FULL LENGTH OF THE SERVICE DITCH SHALL BE COMPACTED IN 6' LAYERS AND A MINIMUM OF 4 U • • _ 0 a 3'MINIMUM WIDTH IWITH MECHANICAL TAMP,TO 95% STANDARD PROCTOR BOLT DOWNS TWO BOLTS SHALL BE CITY EF SALISBURY PATTERN }8 THE CITY SHALL MAKE TAPS ON EXISTING LINES LOCKING BELTS AND TWO "' A. 6'OF THE HEX-HEAD TYPE 3J' Tr %{•' iI 3,BENDS 1/16, 1/8, 1/4 AS REQUIRED STAINLESS STEEL BOLTS SECTION A-A NO DISTURBANCE OF ANY KIND TREE PROTECTION BARRIERS TO BE ALLOWED WITHIN TREE PROTECTION 4 FIRST BEND SHALL OCCUR BEHIND BACK OF CURB UNLESS SPECIFICALLY 2z ■ CURRENTCITY `/ 2X4 MIN.STANDARDS AND EITHER IX4 I AF EJI 4. SEEOF a SALISBURY WATER&SEWER 24 H EW R a APPROVED BY THE UTILITIES ENGINEERING MANAGER �' !' RAILS 3 PER 5®E OR ORANGE ._ J +..... ... APPROVED PRODUCT �7 Z SAFETY FENCING AROUND PERIMETER3 In S�ALL LATERALS Al'60' OR LONGER SHALL BE 6'. Y MANUFACTURER'S SHEET FOR - +•. APPROVED TYPES-LOCATEDin 6,NO MATERIAL TRANSITIONS (LATERAL&STACK MUST BE ALL PVC OR ALL DIP) IN APPENDIX'A'OF THE \ I. p�•"�"�..� CITY OF SALISBURY UNIFORM Lo cn M z -. 7,WYES ONLY, ND TEES.SADDLES MAY ONLY BE USED ON EXISTING SEWER LINES. CONSTRUCTION STANDARDS SECTIHN A-A -� NOTES 0 N N 7. REMOVE ALL TREE PROTECTION BARRIERS UPON COMPLETION OF PROJECT. m IWig. DATE: MAY 19, 2009 CITY OF SALISBURY,N.C. STANDARD DETAIL SATE' JANUARY 1, 1991 W a U R s TREE PROTECTION OPLANS O FGRIHH�NING PLANS AND/OR INDICATE LOCATIONS OPALLL CITY OF SALISBURY, N.C. STANDARD DETAIL AMENDED, JULY 19,2022 CITY OF SALISBURY,N.C. STANDARD DETAIL DATE: OCTOBER 17,2006 NOT TO SCALE MM O Z BE -I II-I I1 -III- III-iNOT To SCALE SEWER SYSTEMS L,IJ = o LL PROTECTED. J NOT TO SCALE SEWER SYSTEMS NOT TO SCALE SEWER SYSTEMS �� Z O�, o I-III- 1-I I1- - MANHOLE COVER STANDARD SS-6 PLASTIC MANHOLE STEP STANDARD SS-7 �Z E z Q Z -I�I-111- ITI- TAP & STUB-DOT STANDARD SS-5 o NDTES: LL ii '- SLOPE TOP OF 1.MANHOLE BASE SHALL HE 4000 P.S.I. - VI O ti' E CONCRETE PLACED ON UNDISTURBED BUTYL MASTIC BETWEEN MANHOLE FRAME TO BE - CONCRETE BASE +4° C 01 i REVISIONS 6'TOWARD EARTH AND MAY BE PLACED AGAINST MANHOLE AND FRAME&COVERI BOLTED DOWN WITH ~ NO DATE BY COMMENT TROUGH SHAPED BANKS IN LIEU OF FERNS, WITH FOUR STAINLESS _ 4'_4" OJ Oy �O N TOWN of TREE PROTECTION BARRIER STD. A A 2 ALL MASONRY MORTAR SHALL BE STEEL BOLTS 2Z .o x SPENCER, NC 5.01 dir&TISM PORTLAND CEMENT 13 MIX RUBBER BOOT - OM` / PRE-CAST RINGSt 2'-2" yI"I"I CI- m 3,CARE MUST BE TAKEN TO FORMA PVC OR DIP Lam' SMOOTH FINISH TROUGH FROM MAXIMUM OF 11 1/2' O O o ENTRANCE PIPES TO EXIT PIPE, INCLUDING BUTYL MASTIC. -. CUT 2 45° GROUT OUTSIDE (8',10'OR 12') cu Z 4 i �-__-; AND IN CURVED MANHOLES THE TROUGH MUST BE A SMOOTH J CIRCULAR ARC TANGENT TO THE 10d 10'4P 10W 10'<P INSIDE WALLS OF THE PIPES 12"ETIPANSION JOINT--( 12'F7�ANBION JOINT AT THEIR ENDS. 11 O O0° LL \\\`r IF+5�� A TEE OQ 0 _ 4,PROTECTIVE WALL FOR OUTSIDE DROP O OD O FILL VOID BELOW SHALL BE A MINIMUM OF 8'MASONRY. �"\,QO OO J `D O _ PIPE W/No 67 PLAN MANHOLE FRAME TE BE 5,THE SLOPE OF THE OUTSIDE DROP Op0Op WASHED STONE BELTED DOWN WITH TROUGH SHALL BE 1/4"PER FOOT. 90°BEND p 5'-0'FOR PIPES � """""'., OVER 18',4'40'FOR WITH FOUR STAINLESS Q _ '' a : /> H 8'&SMALLER PIPES STEEL BELTS 6 MANHOLE TO CONFORM WITH ASTM C478 )O STAINLESS STEEL ' L 19 AND PRECAST MANHOLE STD, O _ STRAPS 3'O/C (�y*,.\ STANDARD FRAME 7,RAMSET MASONRY TIES EVERY 12 INCHES 8°COMPACTED MINIMUM 4 .4, y y &COVER ON OUTSIDE DROP. STONE ) STRAPS =¢,'n w z B.MANHOLES WITH A DEPTH OF 10.0' -U 1 ' . FRAME ' WRAP OUTSIDE MAN BE 5'DIAMETER. 6' 5'DIAMETER 6'- f- =5 O N "' ;OR GREATER SHALL _ _ 3'-0" BUTYL MASTIC PRE-CAST RINGS 9. HOLE SEAMS %~d'°' 3/V2M ��< ROOVE JOINT BETWEEN y MAXIMUM OF 11 1/2' (JOINTS)WITH MIN,8'WIDE BUTYL TAPE. 3000#CONCRETE WITH#4 BARS O A SECTION ,� oJ.' ACE OF CURB PLAN INCLUDING BUTYL MASTIC, il NOTES: AT 6"EACH WAY.ALL STEEL BARS 1.INSIDE DROPS TO BE USED FOR SHALL BE PLACED 1 1/2"CLEAR FROM "n,,,,,,,,,o"°' AND COVER y CONE PIPE 12'AND SMALLER SEE GENERAL NOTE#3 DIP AYE qb4 A BOTTOM OF SLAB. 2,MINIMUM MANHOLE ` D.I.P. 1 gtl' Y b. DIAMETER IS 5' FINISHED I + GRADE ,II` STRAIGHT WALL �I_ yy D VARIES(441.MIN.) * SEE NOTE BELOW .I.P. w • '� I DROPOPPO PIPE. BE 4 ; F. ��oB�••~8�Y'R�' -� ,DROPS REQUIRED WHERE INVERT IN 6" 6" "" .' + 1LOCATED TI 2'OR MORE ABOVE INVERT OUT 16„ T �1'd" [GROOVE JOINT I2"A" fig" I :•:. o RUBBER BOOTS MANHOLE STEP512"7 I ➢.I P. 3 EE H 5'-7"VARIABLE j4"pER FEET I 6• RISER���' ____4 SIZE HAS HAINT LINERME DEEPER EEP ' I J w 7' SLOPE 1 d'�" . .... +R _ - 5'MANHOLE]➢[MENSIONSIONRL ASTM CO478 O u f Q y S 4'D ♦ �� :d ,CGS- CONFORM T PAVEMENT ' a• o• • Na.67 STONE 6,NO LATERALS OR CORES OR T I I- I I q • " e - -•• UNDER PIPE IN CONE SECTION EQUIVALENT) } W b "IF"A IS GREATER THAN S'ADDITIONAL GROOVE JOHT - NOTE: I SHALL BE REQUIRED AT I2"A" d i c _ MANHOLES MUST NOT HAVE 7,WRAP OUTSIDE MANHOLE SEAMS MINIMUM 18" Q `H "•,•' 1 • • 1- ANY LARGE CHIPPED AREAS, WITH MIN,8'WIDE BUTYL TAPE MAXIMUM 24" 1�8" t3" m1- A - A - - - 4'INSIDE DIAMETER MANHOLES BROKEN AREAS,CRACKS,OR EXPOSED G •AIA 8.5'INSIDE➢IAMETER MANHOLES g" z SHALL HAVE 5'THICK WALLS REINFORCEMENT,OR OTHER DEFECTS, A`aa 4:' SHALL HAVE 6'THICK WALLS 0 u_ 5'INSIDE DIAMETER MANHOLES DEFECTIVE MANHOLES WILL NOT O SECTION A-A SECTIHN A sA SHALL HAVE 6'THICK WALLS 6"CONCRETE OR 8" x BE ACCEPTE➢, TWO 12.THICK PIECES BITUMINOUS FIBER REQUIRED PLAN CONCRETE BRICK lJ IF SUBBASE IS CONCRETE. MUST BE SEALED WITH CITY OF SALISBURY,N.C. STANDARD DETAIL DATE: MAY 19, 2009 DATE, MAY 19,2009 APPROVED JOINT SEALER AMENDED' JULY 19,2022 CITY OF SALISBURY,N.C. STANDARD DETAIL AMENDED:JULY 19,2022 #4 BARS OAT ON EACH WAY.WITH Ce SEWER SYSTEMS NEW CONSTRUCTION NOT To SCALE SEWER SYSTEMS NOT TO SCALE I- GENERALNOTES: STANDARD SS-3 PRECAST M,H, WITH INSIDE DROP STANDARD SS-2 GENERAL NOTES: VI PRECAST I/H, W/ OUTSIDE DROPZ 1. FOR 18"-24"ID PIPES USE 3'X 3'BOX Z 1. AGROOVE JOINT 1'DEEPNMTH 113"RADII SHALL BE REQUIRED IN THE CONCRETE 2. FOR PIPES OVER 24"ID MAKE LENGTH&WIDTH OF C.B= 0 SIDEWALK AT5'INTERVALS.ONE 12.EXPANSION JOINT WILL BE REQUIRED AT 40' ATTACH FILTER FABRIC TO POST GENERAL NOTES: OD OF PIPE+6"EA.SIDE V INTERVALS.A 12"EXPANSION JOINT WILL BE REQUIRED WHERE THE SIDEWALK JOINS - WITH HEAVY DUTY PLASTIC TIES 3. TOP FRAME AS MANUFACTURED BY U.S.FOUNDRY;TOP:1258BD ANY RIGID STRI1Cilll1E. SPACED A MAXIMUM OF 6"APART 1. UNIFORMLY GRADE A FRAME:U5F1258BD OR ENGINEER'S APPROVED EQUAL 2. ALL CONCRETE TO REORBS P.S.I.COMPRESSIVE STRENGTH. . SHALLOW DEPRESSION 4. ALL CATCH BASINS MUST HAVE A 3'X 3'FINISHED OPENING 3 APPROACHING THE INLET. 3. SEE STANDARD FOR DETAIL OF EXPANSION JOINT AND GROOVE JOINT. _ 4. SEE STANDARD FORDETAILOFDRIVEWAY, - - 19-GAUGE 2. DRIVE STEEL POSTS INTO THE JUNCTION BOX DETAIL HARDWARE GROUND SURROUNDING THE 5. MONOLITHIC CURB AND SIDEWALK TO BE CONSTRUCTED ONLY WI-EN _ 00000\ CLOTH WITH INLET.SPACE POSTS EVENLY N.T.S. APPROVED SY THE APPROPRIATE PUBLIC WORKS ENGINEER 1/4"MESH AROUND THE PERIMETER OF THE OPENINGS INLET,A MAXIMUM OF4 FEET 2' APART. cc REVISIONS NO DATE BY COMMENT 16"MIN. 'L 3. SURROUND THE POSTS WITH WIRE V , J TOWN OF MONOLITHIC CURB AND SIDEWALK STD. 4'MAXIMUM MESH HARDWARE CLOTH.SECURE Z 0 SPENCER, NC 3.02 - SPACING THE WIRE MESH TO THE STEEL W H } 2-FOOT FLAP OF FILTERED POSTS AT THE TOP,MIDDLE,AND BOTTOM.PLACING A 2-FOOT LAP NNRO SU(tFPPG CL U1 p (= WIRE MESH WATER OF THE WIRE MESH UNDER THE pUS1-1C�Pp0 w N Y m (RECOMMENDED) GRAVEL FOR ANCHORING IS __ �� - 9 O U a Ln RECOMMENDED. ,�""��%, a Q 4. PLACE CLEAN GRAVEL(#57 SLOPE --i �\ Z I- � 1.25 Ib./L.F.STEEL POST STONE)ON A 2:1 SLOPE WITH A /�\. �'''�-- Q V, HEIGHT OF 16 INCHES AROUND 4�,7� � I- THE WIRE AND SMOOTH TO AN S� \ / O Q #57 WASHED STONE _ / (- EVEN GRADE. BULLDOZER TREADS CREATE GROOVES PERPENDICULAR TO i �' 5. ONCE THE CONTRIBUTING DRAINAGE •O •2•2������0 THE SLOPE.THE SLOPE FACE SHOULD NOT BE BACK-BLADED -:.-----...-:-.."-------;-----,..5---...."---:-.."---.-..-"i •�T ",E AREA HAS BEEN STABILIZED,REMOVE DURING THE FINAL GRADING OPERATION. --,=- ----:'i ii i�� :* 0E ACCUMULATED SEDIMENT,AND i!i-i ii •� • ESTABLISH FINAL GRADING i-Z.-. "�iii •• Oa _ DATE JANUARY 4,2024 19-GAUGE •i N ELEVATIONS. HARDWARE •- •• 6. THE CLEANOUT DEPTH \//�//���//// / SCALE: CLOTH WITH 0• ---=--- �� OF THE SEGMENT IS AT FINAL GRADING/SEEDBED PREPARATION ` NTS /�) 1/4" �_� OPENINGS :• . •:• ••�0 33%OF THE FENCE NGHT .T.S. S HARDWARE CLOTH AND GRAVEL INLETI PROTECTION NO. ✓ PROJECT N.T.S. 22008 OF 39 2"-ASPHALTIC SURFACE �,.•,.:,.. . '/ // // COURSE , : .••._ r.• • + . .. .:' r� Date. Page: >JJ 2.5"-ASPHALTIC BINDER r� 7 "' "-ASPHALTIC SURFACE COURSE : •.:`. '.�9"-4,000 P51 a MIN 00 0 0 COURSE � �� '-2" .• CONCRETE O O O �8"-CRUSHED AGGREGATE BASE `� `� �-C -CRUSHED AGGREGATE e e c SILT FENCE G /T f7 10"-CRUSHED AGGREGATE Hi HiI I I I III I I I I-I COURSE(CABC) I /1 I I 0 111 I BASE COURSE(CABC) I-III-III-III-III-III-III-III_ - J�1�11?"-�II1 (IIIII�I I I-=f1TI��I�I I I-1 I BASE COURSE(CABC) .,......:.,.,:.:,.. - O O O O ITS'I I I 12"COMPACTED -I I I-I I I-I I I-I I I-I I I-I I I-I I I-I 12"COMPACTED SUBGRADE H - - - - - III 12"COMPACTED 0 0 0 0 a -III -III - III - -III-III-III-III-III-III-III- FLOW 0 0 0 0 FLOW EI� EI� =III=III=III= SUBGRADE ���II-I ���II���I ���II��I ���II= 1II-IIIEII-III IIIII II-III SUBGRADE • 0 O O O FLEXIBLE PAVEMENT SECTION o 0 0 0�� p ww FLEXIBLE PAVEMENT SECTION (STORE PARKING) RIGID PAVEMENT SECTIONABOVE THE TOP OF o 0 0 0 41/2"x11 2" o2 2 Le, (DRIVE AREAS) (HEAVY USE DRIVE AREAS) w "E°a'°rvE OPENINGS8 N.T.S. N.T.S. w 'E.' 1.PAVEMENT SECTION AS RECOMMENDED IN THE GEOTECHNICAL INVESTIGATION REPORT DATED 1.PAVEMENT SECTION AS RECOMMENDED IN THE GEOTECHNICAL INVESTIGATION REPORT DATED N.T.S. ` _ N 0 O STEEL FENCE POST Ow 9 AUGUST 17,2022 PERFORMED BY GEO-SYSTEMS DESIGN&TESTING,INC.FOR MR.HARRY SINGH. AUGUST 17,2022 PERFORMED BY GEO-SYSTEMS DESIGN&TESTING,INC.FOR MR.HARRY SINGH. 1.PAVEMENT SECTION AS RECOMMENDED IN THE GEOTECHNICAL INVESTIGATION REPORT DATED �.... PLAN o u,✓, AUGUST 17,2022 PERFORMED BY GEO-SYSTEMS DESIGN&TESTING,INC.FOR MR.HARRY SINGH. WIRE FENCE\ FRONT VIEW \F FILTER W">' ' PLUGGED MAINTEANCE ORIFICE SCHEDULE HARDWARE CLOTH \\ �� z (WI REMOVABLE PLUG) ORIFICE SCHEDULE USE FRAME DIA. NUMBER DIA. NUMBER FILTER 0,67 t ELEV. OF HOLES OF HOLES ELEV. OF HOLES OF HOLES NOTCH SCHEDULE wnsHED STONE °��� o CLOTH IN TRENCH SET MAX 2,PART 36 USF 4138-6218(24"X36") p a 66].]5 4" 1 6]1.]5 5" 1 NUMBER 100-VR STORM 8 ~GROUND INTO sou H FROM U.S.FOUNDRY ELEV. SIZE =677.76 OR APPROVED EQUAL LTER FABRIC OF NOTCHES GROUND 6]450 11 0' 3 .q�/q3••g•••/92 y O z 675.75 v(D.1.z5'(H) 3 25-YR STORM 28"0oa�6x NOTES:. Hardware cloth and gravel should overlay the silt fence at least 12 Inches. =676.96 III-III n`b o°4Y8yo°0� 2.Stone outlets should be placed on low elevation areas of silt fence and EA„ � /�� "M 10'-0" SEE PERER WALL RATION CHERFORATED RISER � �'/ j 1♦A111� O TOP OF DAM=6]9.00 SEE PERFORATION SCHEDULE -SEE GENERAL NOTES PRO REFERENCES SHEET FOR BMP FOREBAY TEMPORARY ;(MAX) 0SR�0�0 0"° based on field conditions. % I_I- I I MAINTENANCE PROCEDURES AND SCHEDULE TOP DAM 10-YR STORM 1� III ° SRO o`b $ '3 . o • h O _T ITI-1 IN TOP=677.00 =676.36 4` /// `\ MAINTENANCE: 1 CEMENT ► ' u. Z o EMERGENCY IN 1••`�IEF' CE / \ 1. Per NCG-01,inspect 000¢tof lest once week and after each 11nC11 2 MORTAR MIX ' / J u SPILLWAY=67760 I-1 II I-I I I-I 3(MAD WEIR=677.00 � _- / or greater rainfall event.Complete 053 required repairs immediately. _ �y•L���B �NLET PIPE nn°H EC CLOTH FILTEa Far3elcwR rvc�F Freshen stone when sediment accumulation exceeds 6 inches.Keep 6RAND 36"SQUARE % O' 1- 2 -III -III-xFFFFFFFFF �: mesh free of debris to provide adequate flow. j GENERAL NOTES: Z N 3(MAXd 2.Remove sediment when half of stone outlet is Covered. MINIMUM' 1.FOR 18"-24"ID PIPES USE 3'X3'BOXbd F- III- -III -I I Ir aY SECTION VIEW 3.Replace stone as needed to facilitate de-watering. _/ 2.FOR PIPES OVER 24"ID MAKE V • III-I III 6MAX.SLOPE I N Q - I_-I I _ SHELF(6:1 MAX.SLOPE) LENGTH&WIDTH OF C.B=OD OF o - o I -III PERMANENT '✓ PIPE+6"EA.SIDE FES II I COMPAICTED _ % '/ ILIAI IMPERVIOUS I IIIIIII EW �M III- nFv POOL �'`�R°^a^°'Q°'r' SILT FENCE OUTLET / 8"BRICK 1"STORM=672.39 III-III FOREBAV OR PRECAST WQ ORIFICE=671.75 I-III-III III RIP RAP VELOCITY BREAKER CONCRETE 3 III I-I I / 41 1 O - I_ PLUGGED ORIFICE FOR DEWATERING III-III-I III (TO KEEP FROM CONSTANT s z t z PURPOSES ONLY FOR MAINTENANCE BE INSTALLED �� / N w VELOCITY �1111111111111 _ IS STABILIZED AND t \\\ \\. \ mI N RIP KE I' U I_ /•.\�\\\\// VI z FOREBAY IS REMOVED) II O .. i G I� _ _ _ _11 d � CONCRETE FOOTING .- rn M BREAKER -•-�. _ �1�1 '1 IIIIII-III-III-III (Z 1� ,\,\s.ml SECTION NI N 5 _ 93 OF 24 RCP-III- III-III-III-III- POND BOTTOM AT IIII= U _ iL_-,■ -III-III-III I I CO 1 34% INV=667.25 POND BOTTOM AT OUTLET=667.25 POND BOTTOM AT FOREBAY ENTRANCE ,z�� 18"THICK CONCRETE FOOTER ANCHOR RISER INTO TOE OF FOREBAY =667.50 NORTH FD° __-% ! c.A.,..z \\\\o;�-\-\ -� a WIDTH=RISER DIAMETER+2.-0" CONCRETE FOOTING SLOPE=667.75 AMERICAN / % �� - !�•✓i<. GRATE TOP w O ZMO INV=66600 ANTI-SEEPCOLLAR(TYP.) GREEN / i CATCH BASIN DETAIL �� � z O°� WET POND POST CONSTRUCTION / / - LD X EROSION CONTROL Products N.T.S. I Z/ Q POND CONFIGURATION Guaranteed SOLUTIONS / ... z L.L �L� A p N.T.S. ® _ _-_ EXTEND 9 GAUGE WIRE TO BASIN SIDE - W O 14640 _ --v vi a 0, - '\ ".\ DRAPOR INSTALL T-POST TO ANCHOR BAFFLE V�LLEIN 4TESAY 41 TH STRAND AND SECUREMAUREIWIAL H OVER WIRE +, V © TO SIDE OF BASIN AND SECURE TO lJ �. M r''1 STRAND AND WITH PLASTIC q ^..°mO _ CLEANOUT STAKE O VERTICAL POST N ��EE TIES AT POST AND ON WIRE EVERY 12" O Y O / SOP=50%STORAGE / a N fDA HEIGHT T RA f S S O G O WATER ENTRY UNIT WITH Z U x 3 M AREA HEIGHT TRASHSCREEN co -. 5 O -I d glIMt TEMPORARY m 4'-0"MAXIMUM LJJ O FOREBAY .At=O - 1A I _ O --el L TOP=6]7.00 NOTES: I I 3EE INNER WALL RCP PERFORATED RISER I.-Li- TOP 1 � 00" Z ANCHOR AS NEEDED FOR El ' - All CTS(RFCP's),INCLUDING ANY NECESSARY�APPUCATIO�N���oI � OF DAM=679.00 SEE PERFORATION SCHEDULE '•SEEGENERALNOTES&REFERENCES SHEET FOR BMP 3(MA%) 1 •D0000D 1• ` _ z >�I�_.J>� z BEGIN ATTHEUP-SE TOP OF THE SLOPE N BY ANCHORITHE TRENCH.HE ANCHOR THE RECP'5WITHAPWOFSCM)wSTAKESCHWRHATELY APPROXIMATELY PARTIN THE BOTTOM ADEQUATE STABILIZATION OS MAINTENANCE PROCEDURES AND SCHEDULE _ I (MAX) ' r J o 0 0❑ 00000000 0 000000000 0 0❑.",�'�\ - I a�n BEYOND THE COMPACT TETRENHAFTFRCHORTHERECP'z WITH ROW STAPLES/STAKES APPROXIMATELY CM)PORTION OF 9 GAUGE MINIMUM HIGH /0000 00000000 00000000000•� �_ IT �L I� I , TRENCH.BACKFILL AND COMPACT THE TRENCH AFTERSTAPLING.APPLY SEED TO COMPARED SOIL AND FOLD REMAINING t2"(30 CM)PORTION OF RECP'z BACK OVER TENSION WIRE STRAND p EMERGENCY ❑2 �!' FOREBAY e�-II ' 5.6"DIA.ORIFICE OPENING OF THE RECP'sMPAREO SOILGEOURE RECP5 OVER coM000TRE SOILWITH AROW OF STAPLES/STARE55POCEE APPROXIMATELY tz•(3a CM)APART ACROSS THE WIDTH SHALL BE SECURED TO POST 3'-0" pp00D 0000000❑ 000000000�'-II = SPILLWAY=6]7.60 -III-III-I ;(MAX) WEIR=6]7.00 BAFFLE ��- g ni �I+ INSIDE THE HORIZONTAL 3 ROLL THE RECP'z(A)DOWN OR HORIZONTALLY ACROSS THE SLOPE.RECP'z WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE ALL RECP's MUST BE MINIMUM \ LL �1 -�.yr '1E - TUBE WITH A CONSTANT SECURELY FASTENED TO SOIL SURFACE By PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE.wHFN USING THE DOT TO 00 00000000 .0000000_-II. 3 MAX. -III III- BAFFLE�` I MI - .T HYDRAULIC HEAD 6" M,STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. SUPPORT BAFFLEAL 00 00000000 000000� BAFFLE ( ) �11�-1_ SKIMMER WITH S"HEAD 4 THETEDGES OF PAw.LLEL RECvs MUST aE STAPLED WITH APPROXIMATELY z"-5"(5<M-125 CM)0v[Ruv DEPENDING ON RECv's TYPE. ���...JJJ000 00000000 (0 DOD Dig= MATERIAL 1� III -III BAFFLE�` r , HAM - •r� 5. CONSECUTIVERECP's SPLICED DOWNTHESLOPE MUST BE PLACED END OVER END(SHINGLE SNLE)WITH AN APPROXIMATE 3.(].S CM)OVERLAP.STAPLE THROUGH _ _ _ aD_• ❑DDODOD❑ .DDD_ _ E� OVERLAPPED AREA,APPROXIMATELY 12"(30 CM)APART ACROSS ENTIRE RECP's WIDTH.NOTE'IN LOOSE SOIL CONDRIONS,THE USE OF STAPLE OR STAKE LENGTHS ��� - _ L ' EMI RV I IIE�II L SCHEDULE40PVCPIPE II, I I.- .II II' -II- III- PROVIDE I I GREATER THAN 6'(15 CM)MAY BE NECESSARY TO PROPERLY SECURE THE RECP's RECTA(= r I liar OS IICIIR II `,a,,,r Errrrrrr,,,,, FES I-II COMPACTED III I (BARREL OR ARM) • '' El I- IMPERVIOUS �V II`I STEEL POST(2' `; I-llI CORE III- ,JEE II II •II IC RIP RAP VELOCITY BREAKER BAFFLE MATERIAL SECURE BOTTOM OF BAFFLE TO -III ����� • _ 1 I III (TO KEEP FROM CONSTANT • GROUND WITH 12"STAPLES AT 12" ,% -III- -III I--m 1:=I M FLEXIBLE HOSE EROSION CONTROL MATTING INSTALLATION DETAIL MAXIMUM SPACING LI O�) ya y S DISTURBANCE,IT SHALL - W O% III- II_I E-. HOLE FORE"SKIMMER BE INSTALLED WHEN SITE = EARTHEN EMBANKMENT NTS' MATERIALS: 11 GAUGE -Q rn w• z 0.5%MINIMUM SLOPE FLOAT USE MATTING OF 100%COCONUT FIBER COIR TWINE WOVEN DO NOT SPLICE THE FABRIC,BUT USE A CONTINUOUS -U _ oa_I ANCHOR RISER INTO IS STABILIZED AND = LANDSCAPE _ u. NN TO OUTFACE STRUCTURE ( ) _ CONCRETE FOOTING FOREBAY IS REMOVED) _ INTO HIGH STRENGTH MATRIX.(ALTERNATE MATERIAL MAY BE PIECE ACROSS THE BASIN STAPLE 'S O "' 2; RIP RA II- 18"THICK CONCRETE FOOTER � i MAXIMUM HEIGHT OF FLOAT WHEN NO OTHER STORM %~d;. 3/V24 A`� Ir •;�I-I�v WATER DISCHARGE OPENINGS EXIST(MAJOR STORM SUBSTITUTED IF CONTRACTOR RECEIVES PRIOR APPROVAL FROM ; O J�VELOCITY � ; WIDTH=RISER DIAMETER L.2'-0" 11=l� TRASH EVENT) THE GOVERNING AUTHORITY) STEEL POST SHOULD BE APPROXIMATELY 1-3/8"WIDE MEASURED '. �,.` BREAKER TOP VIEW - -.•L RACK ``"•. ' _IL PARALLEL TO THE FENCE,AND HAVEA MINIMUM WEIGHT 1.25 '":,,,rr rr r,,, 93'OF 24"RCP ` K Ib/linear foot @1.34% INV=66725 ' m••••• •• •••••••.E. PVC VENT PIPE PVC VENT PIPE THICKNESS=0.30 1NCH MINIMUM =, I WEIR ELEV. MINIMUM WIDTH=6.5 FEET OPEN =6n.00 FLOAT BAFFLE FENCE DETAIL AREA=50%MAXIMUM wv=66aoo ` DURING CONSTRUCTION SEDIMENT BASIN , i N.rs. ANTI-SEEP COLLAR(TVP.) N.T.S 36"X 36"INNER ♦ 4/1=iM IEEEEEE� a� Killi% ♦ WALL CONCRETE _LLB L�IL� OUTLET PIPE 'Il RISER ��`�J 1. SET POSTS AND EXCAVATE A 4"WIDE 2. TIE FENCING TO 1.251b./L.F.STEEL POST ��� FLEXIBLE HOSE MUST BE �r TOP OF TOP OF ^ T. SECURELY FASTENED TO THE '` X 8"DEEP TRENCH UPSLOPE ALONG WITH HEAVY DUTY PLASTIC VI POND DAM 3 TOP OF FOREBAY POND DAM Il =1-[ WATER QUALITY DISCHARGE . THE LINE OF POSTS DAM=677.00 WATER ENTRY UNIT =679.00 MAX. =679.-1 OPENING `�� * L=1.4X DEPTH TO THE 4"X4"WELDED I RIP RAP 2:1 SIDE SLOPE III I IL I END VIEW R1� ` e OVERFLOW MINIMUM LENGTH WIRE FENCE OUTLET OF FOREBAY DAM , . �QYtT APPLIES 18-24 111 h 1 Y� POST SPACING 11,111111111111111111C � . DIRT 1:15IDE DIRT -I ,Tu. j .■IIIIII\����� 6'MAX.W/O WIRE - ■� 1RRRREIi I�IjRGBEEBR 0 4z 4- ,/��/\ ....--�/� I•.= DAM• - FILTER SLOPE-FABRIC MAXIMUM -DAM fII�II SIDE VIEW: II(•IIIIIIIRAILBLE OSE II1II11 AR;�OR II ARM) �I� 10'MAX.W/WIRE FLOW �._G■Ni !�,,LL��I i-oli ulll ll w O LL iff• !^^/i'//^/\^ '•DO NOT FOLLOW ORIFICE AND NOTCH SCHEDULE _I MAINTAIN DEPRESSION TO MINIMIZE CHANCE „1SjyI N I- O 1j""""IInNIIIIIIIIIIIIIIIIIIiiiiiI ^�^ DURING CONSTRUCTION.ALL ORIFICES AND -III-III-III-I III-III-III III-I -1 1-III-I I - OF SKIMMER BECOMING STUCK 8�� V v � � NOTCHES SHALL BE ADDED WHEN CONVERTING TO BOTTOM OF BASIN ;'WIDE �� PERMANENT POST CONSTRUCTION WET POND G"SKIMMER DISCHARGE SYSTEM WITH OUTLET STRUCTURE CONFIGURATION MINIMUM 1"(25mm)LETTERING CC N.T.S. (4)1"[25mm]DIA. (RECESSED FLUSH) ` 4" FOREBAY DAM DETAIL SKIMMER SHALL BE MANUFACTURED BY VENT HOLES I- I� 'I NOTCH SCHEDULE N.T.$ W.FAIRCLOTH&SON,VEDEQURANENGINEER'S 18"MIN. GRASSED APPROVED EQUAL Z STABILIZATION ELEV SIZE NUMBER OF NOTCHES _^Q 3.ATTACH THE FILTER FABRIC TO THE 4.BACKFILL AND COMPACT THE 30'WIDE BOTTOM C' qs (2)OPEN PICKHOLES U r I 675.75 1'(L)x 1.25'(H) 3 TOP OF DAM QJ TF TVP SEE DETAIL ® gag HIRE FENCE E TRENCH. EXCAVATED EXTEND IT INTO EXCAVATED SOIL. 0 3 1 1 3 -679.00- ` IRONEAST JORDAN WORKS , ORIFICE SCHEDULE SPILLWAY ELEVATION=677.60 - II O O r 1 1/2"[38mm] O ELEV SIZE NUMBER I ill I S/ EDGES SHALL BE TAPERED 1 O O � OF HOLES I I I ti OUT TOWARDS ROAD TO O - IN CUT SECTIOI LLlrrcllnl O• 4 51 -..�` ' NON-TRAFFIC 671.75 NJQ) 5" 1 FP MUD ON THE EDGESI OF ,l • - 674.50 11" 3 SJ� PJ a(�•.,r'' / O 0 T O O CONTRACTOR TO VERIFY THAT Pp-9 Cp•O THE ENTIRE SPILLWAY IS"LEVEL' J QJ6�v. /J Y'rv,.( 1ti •4( '�hyjcc PERMANENT POOL AT THE DESIGN ELEVATION / '• v .,rl- r•}. # �' MUM Fee� �1, V-1860-1 W d ELEV.:671.75 lT 4d{� 4-7,0 V*. • , 41860066 ` U O et HOLE FOR 6"SKIMMER DURING CONSTRUCTION/5" EMERGENCY SPILLWAY DETAIL /• •' ' V j -a. /-,- TO s'�' , MO/DAY/YR NOTE: LLI ~ } 4011110011111. ORIFICE POST CONSTRUCTION 20'R .�a y,,•.J, Ul 2 C' N.T.S. USE A SYNTHETIC FILTER FABRIC AS APPROVED BY D.H.E.C. CL PLUGGED MAINTENANCE ORIFICE `V f :.; ,Irt Y- -. V1 U 02 SCHEDULE ITH REMOVABLE PLUG y !• - 1"(25mm)LETTERING O (� CO J TOP OF 1"REBAR=ELEVATION OF MAINTAIN 6"MINIMUM THICKNESS(ADD AS ^� *} ",;y. TOP VIEW (RECESSED FLUSH) BOTTOM VIEW EXTENSION OF FABRIC AND a LL a N ELEV SIZE NUMBER •!> •.-,� .•17.14:4� O - OF HOLES MAXIMUM SEDIMENT BUILD-UP(50%OF NECESSARY DURING CONSTRUCTION) .. =<�`,`�, „ EXTENSION OF FABRIC AND WIRE INTO V TRENCH: Ce t Q C m _:; .��, WIRE INTO THE TRENCH: SEDIMENT STORAGE AREA HEIGHT) 2.: ll� N 667.25 4" 1 SEDIMENT POND SHALL BE AVERAGE STONE DIAMETER '•. •, SIP'• \''' 23 3/4"[603mm] - FILTER FABRIC Z ~ !n CLEANED OUT AND POND ' �` - FILTER FABRIC 18"CO DIA.LAR(ROUND REBAR SQUARE)CONCRETE OF 2 TO 3 INCHES 1.� 2A 3/��FLLL" 2"[51mm]PIP. Q l7 ' BOTTOM REESTABLISHED BACK COLLAR AROUND 2 3/1r56mm] 24"RCP TO DESIGN REQUIREMENTS(TO 5/8"[16mm] [19 ] 4" 14" Q IOUTLET PIPE CONCRETE COLLAR AT THIS 1.2+/-CU.FT.OF CONCRETE FLUSH WITH UNDERLINING NON-WOVEN ����� 11--I \ LOCATION) POND BOTTOM(TO ESTABLISH LIMITS OF GEOTEXTILE FABRIC �� �� 8 n- WIffill1Wl8PLUGGED 4"ORIFICE AT POND BOTTOM ONLY SEDIMENT REMOVAL AT THAT LOCATION) ' III W INTENDED TO BE USED DURING ENTIRE POND OPEN PICKNOLE DETAIL DEWATERING FOR MAINTENANCE PURPOSES. I NOTES: COVER SECTION USE AN EAST JORDAN IRON PLUG SHALL BE REMOVABLE AND CLOSED OFF BY 9. COMPACTED SOIL BACKFILL MIN.8"THICK LAYER DATE:JANUARY 4,2024 / MIN. [51mm] WORKS V 1860-1 HEAVY DUTY BACKFILL OF GRAVEL ' DEFAULT DURING AND AFTER CONSTRUCTION. I 1.INSTALL A CULVERT PIPE ACROSS THE ENTRANCE WHEN NEEDED TO PROVIDE POSITIVE DRAINAGE. CASTING OR AN ENGINEER'S L. II=11=1 1.-11.-R APPROVED EQUAL NOTES: SCALE: WET POND BOTTOM ELEV.:667.25 A II=II.' BI IMIL E=E 2.WHENEVER POSSIBLE DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE STONE PAD TO A STORM DRAINAGE LID AND COVER NTS /^� -=1[=11:;[[FI[P SEDIMENT TRAP,BASIN OR OTHER SEDIMENT TRAPPING STRUCTURE. N.T.S. AST JORDAN IRON WORKS, 1.THE CLEAN OUT DEPTH OF THE SEDIMENT IS AT 33%OF THE FENCE HEIGHT. 6" INC.P.O.BOX 439 EAST 2.THERE SHALL BE 3'SEPARATION BETWEEN DOUBLE ROW SILT FENCE WHEN A SECOND ROW IS POST-CONSTRUCTION WET POND OUTLET MIN. DETAIL PROVIDED BY LEXINGTON JORDAN,MI.49727 NEEDED. PROJECT SEDIMENT STAKE DETAIL GRAVEL CONSTRUCTION EXIT COUNTY PUBLIC WORKS DEPARTMENT 1-800-874-4100 FAX TEMPORARY SILT FENCE NO. STRUCTURE CONFIGURATION 231-536-4458 OF 39 N.T.S. N.T.S N.T.S. N.T.S. 22008 EI GENERAL NOTES: m o 1. A GROOVE JOINT 1"DEEP WITH 1/8"RADII SHALL BE REQUIRED ^: �,..j.. IN THE CONCRETE SIDEWALK AT 5'INTERVALS. ONE 1)2" ACCESSIBLE PARKING REQUIREMENTS J ; ..;<•; SIGNAGE 1_---____.... ACCESSIBLE ROUTE EXPANSION JOINT WILL BE REQUIRED AT 45'INTERVALS NOT TO ® ® ® ® ® (SEE NOTES) MINIMUM NUMBER MINIMUM NUMBER OF �•.ti'.','�a.•. EXCEED 50'AND MATCHING EXPANSION/CONSTRUCTION JOINT IN TOTAL PARKIN SPACES j OF ACCESSIBLE SPACES ACCESSIBLE SPACES REQUIRED 4" ADJACENT CURB.A SEALED 1/2"EXPANSION JOINT WILL BE PRDV� SPACES REQUIRED TO BE VAN ACCESSIBLE SEE STD.NO / % 0 w w REQUIRED WHERE THE SIDEWALK JOINS ANY RIGID STRUCTURE. 50.09 FOR j / Z s TO , , DETAILS / O 2 2 ' i 1 . 2. SIDEWALK AT DRIVEWAY ENTRANCES TO BE 8"THICK. !� J j Lu a_���....tl;�,.:.: 28TOW 2 1 �' maaa3. WIDTH OF SIDEWALK ONALL STREETS SHALL BEA MINIMUM OF S. 51 T075 3 7 00L Cl� o 4. CONCRETE COMPRESSIVE STRENGTH SHALL BE 5600 PSI.IN 28 DAYS. 7BT0100 4 1 8' 8' 5' B' 5' B' 1 '2�, z GROOVE JOINT IN SIDEWALK 5. ZONING CONDITIONS MAY REQUIRE ADDITIONAL WIDTH SIDEWALKS 101 TO 150 5 1 — ,ACCEVAN ASIBLE ¢N a WHICH SHALL SUPERSEDE THESE STANDARD DIMENSIONS SHOWN. 151 T0200 8 1 SPACE 0%m O 201 T0300 7 I ONE OUT OF EVERY EIGHT(8k1CCESSIBLE SPACES,BUT NOT LESS THAN ONE,IS REQUIRED TO BE VAN ACCESSIBLE Siw 1/8"RADIUs \\. f It sm roaao s 1PARKING SPACE PAVEMENT MARKINGSZaPROPOSED CURB&GUTTER 40,7060082PLANTER I •:. • IY EF 1 IN EVERYB Zo STRIP 501 ro 1000 2%CF TOTAL QwACCESSIBLE SPACES ". :, •' + -,. 11B'701H' 4'CONCRETE SIDEWALK O O, e a . , ,, '' CONCRETE SIDEWALK WITH PLANTER STRIP 1oB,AND OVER 20 I000 FOR ,INEVERYB 1 ♦ � Q F EACH 1000VER,000 ACCESSIBLE SPACES RESERVED 4 'i' I ACCESSIBLE R� PhRbNG MUTCD PARKING h •❑.k _ ❑a Q i SECTION 4.12(5)OFTFIEAMERICANS WITH DISABILITIES ACT(ADS) R7-1 �' SEE 4.1.2,(5)(tl)FOR MEDICAL CAME FACILITIES 72"x18' MUTCD 1@'EXPANSION JOINT olsneLeo RESERVED R7Aa •• NOTES: PARKING PsaF�oFw 12'x1 B" MUTCD LOADING �0 JOINT FILLER 1. ALL,2'x18'ACCESSIBLE SIGNS(R7-8a&R7-1)SHALL BE MOUNTED AT 7 FEET R78a C' FROM GRADE TO BOTTOM EDGE OF SIGN FACE(MUTCD).MOUNTING HEIGHT 12• g CAN BE REDUCED TO 5 FEET IF PLACED IN AN AREA BETWEEN SIDEWALK AND 12'x1e' ONLY z •N a :' BUILDING FACE IN WHICH PEDESTRIANS ARE NOT EXPECTED TO USE. ` • �aeaeaea/ _ V ^ N TRANSVERSE EXPANSION PROPOSED CURB&GUTTER6 2 rn m a REFER TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES,(MUTCD) R7�o REQUIRED ACCESSIBLE MAXIMUM U.S.DEPARTMENT OF TRANSPORTATION AND NORTH CAROUNA 12'5' N N,� JOINT IN SIDEWALK RESERVED PARKING SIGN PENALTYal DEPARTMENT OF TRANSPORTATION SUPPLEMENT. $250 LU C a `^T o PROPOSED 4"CONCRETE SIDEWALK .— a IF REQUIRED AT LOADING SIBLE ROUTE IIZONEA ISREDD SIDEWALK AREA,THEN RAMPS ARE EA. MAXIMUM , . 0_w ' Z O2g DETAILS SHOWING EXPANSION JOINTS PENALTY R7-BD �z i S 250 1259" L.l_ Q FOR CONCRETE SIDEWALK A �!—F1 vi °c l REVISIONS RENSIONS �v V g m 2 TOWN OF STD. NO DATE BY COMMENT TOWN OF ACCESSIBLE PARKING STD. NO DATE BY COMMENT aJ oN Z 'oiJx� FENCER, NC CONCRETE SIDEWALK 3.01 ` SPENCER, NC AND SIGNAGE 2.11 �w a m� -p 0 O-1 X GJ Z aI:Li_ In U- LL ' W 2 m- :mod oa 3N24 /�c 's;C317 QJ VI J Q I— W CI zS w O LL VO D IY I— v.) Z 0 V ce UJ LL1 a J U O _1w > a o a u 1./1Y 0 m La' Li V . VI O a Z I— a Q In O ~ a (— DATE:JANUARY 4,2024 SCALE: NTS PROJECT C39 NO. OF 39 22008