Loading...
HomeMy WebLinkAboutNCC240587_Site Plan or Location Map_20240301 _ _ _ - - \\���� \ �,`I ) MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION W. -� \ `\ \ \�\\�\ General-All measure• s will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum. The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control \ \\\ \ - C measures. If lot construction dictates,measures will be relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible. Silt fences and gravel construction entrances will be maintained as suggested in the erosion control \ manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. o��~ �o ) \\ \ Niravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it rd // �CT1 �. ( out as necessary. Immediately remove all objectionable materials spilled,washed,or tracked onto public roadways. d'� e s:6 \ PS - Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.My repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.My sediment deposits that build up against the fence should be cf s- \ I� t \ \ \ I removed and disposed of properly to insure that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. �b '` e'°� ' \ \1 + ) / Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to q, nit° \/ 11 1 f]y close,since this could inhibit adequate growth and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. o • I / // Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are ,� / / \1 m I I V germinating properly. Any bare areas should be repaired, and reseeded as soon as possible. If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a • I (I permanent grass. 9 Wattles-Wattles shall be inspected after significant rainfall events.Rills orgullies u slo a of the wattle and anyundercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the I / / I I I S I CO / - P 9 P P 9 P P P P Y _. I I / / / »I • / // wattles functional freeboard height.Removed sediment shall es deposited within the project in such a way that the sediment is not subject to erosion fe wind or water. SITE ®,$ S' I ( I / I I I /O / Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it V \\`K /I J ,i5 // becomes clogged with sediment.Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. MONTROgg ROAD 9R-1215 v 1 6 OArLDWdp ,� �� \\ �� \ I J I_,r..._,..-, /� ,-- VX, RO SR-Ixl4 ' \ 1 1 I D II x - ���// // �O° I VI 10 w \ °// // CONSTRUCTION SCHEDULE 9 I \ I 1 - / 3?§�/ / f obtain ce necessary permits Sanv and plea approvals.erasion any,c Sediment control(E&gc)prime the a Certinvate of Coverage S 1 (CDC)must be obtained before any land disnubing activities occur.A copy of the MSC permit,Ne COC and a bard copy of the DATE: PAGE: $' \ 1I \ ` 1 \ , // / 3a/� plan must be kep[on site,preferebly inaDermi66ox,and accessible during inspxtion. �"� \ ` 1 \ --- 0 _ _ 33� �-- Z Install gravel construction entrances first,then silt fences,reinforced silt fence \ / outlets and wattles. .�' 0 5� q, \ 3 2/ 3.Finish clearing and grubbing any necessary areas on Me lots m they are started. Ill JL_ / 4.Begin lot grading and excavation activities "A" 'B' "C" / 5.Begin or continue with house construction activities. �p� p- / 6.FinrsM1 all rou gradin8 and noun wnatruction. 1 q P p �y n 0 I \\ ` __/ �� ].Inamll driveways,walks end Patios. 1( Il ti yS0 - a 6 / 8.Bagln Me gadin6 o[Im areas 1( ✓L R Q T T ✓l ✓� Cr) 2S x ( \ \ /33 i \ 9.Final grassing,mulching andstabilizing f I this will' I the installation of sod on the lot.15e silt fence will H z x 4 S B \ placeItn I sodded grassing stabilized and takes hold. :11:It f . Jl .1:: . HOUSE OUS) HOUSE a / \ 10 Thew shall d self-inspections fed d sedan G OUB Dntrol measures and complete Me following ' z __ comb d If f fo d h DEMLR websne r \/_ / CONSTRUCTION hops//www.deq. & holA- gy Iandlendresources/ erprognMnpdesconsweuonprogram. �.. .a �) 3 � typ,ttvco sit-']0 \ '' - x=y-x.,.�� LIMITS , Twelve to f mplere' p f sn Il be pep and available f inspection at all times It is recommendeda Y yA« copy be keptp box. fGS 3 4.dwgn G.S. 3 $ CAC 04A.0101 through 15A AY .RO,WAY .RO AY Y O AY 'RDA A 4 VICINITY MAP; ; \ s,aGDS fG P aYo• der; dCGdI00pNpDB6f G by a atpnwey aepenemendmaya d 4L �DRaNLT� EDFD�R, Y Ngtes RD.r 34 within 24 hwrs ofvery rat• tof greater Mevlinch.Any needed repairs sM1 ll be made immedatelYmmanmin measures as LEGEND 1.If needed.Tree Protection fencing should be installed along the buffer zone,wetland N.T.S. . :-.�,�.J. SILT FE E S; 3� designed.All ESC measures shall be maintained as specified in the constmnion details on this plan.A min gauge shell be irsstelled boundary and/or around protected trees,proWding a radius of at least 1.25 feet for each I ITYP WATTLEJ at tM1eD j f 'rig. N Inch of trunk diameter. �CONSTRUCTIO �F _ 121nspa' dfrlal acceptance 1 .Wh N p jcomplete).pmnitrrrr shall concoct DEMLRro close out the.SC 2.Install Silt Fence on the low elevator sties of each lot Install Silt Fence outlets shown on /ENTRANCE jj - 4 REINFORCED plan. Re informs the p of the p j I S re impxtion report,...Mee shell visit schematic/diagram and field adjusted if necessary,for placement at low points.If lots are / I ..lt•f? '-^' _ SILT FENCE •deq.uc govMCGOI to submit welecenric Notice of cermmetion(e-rvOT).ASl00 annual general permit fee will be merged FLOW DIRECTION contiguous and have different land owners or builders.each lot should have individual Silt 14 SILT FENCE OUTLET SILT FENCE guous an / II / (ryP) �` writ the a-NOT has been filled out. Fences. / �- � 35 / A SLTsnrcc FENCE OUTLET N MO 3InstallrequiredSiltF N' 10f t fproperty l t ensure there is no conflict with / TILE p / curs INLET CEIIIM septicsystem.It'theresponsibility of the builder...Sure the'nstallatlon of sediment / Y A CURB NLET AlieCant does t impact ih septic system and repair ) CONST'.CTIO ` WA E d At least Construction Entrance/Exit' binstalled per lot ENT'.-1 CE ,0_1` . REINFORCED / A"SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 5 Waste bins and other dedicated fomanagingb'Id building al waste shall be at GROUND STABILIZATION /---- / 13/ "^-r/ SILT FENCE / 3A 54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN cad 50 eat away from storm drain tilers or nags ditches ante teen be show the ��-,,,bbA LT FENCE- OUTLET EXCEL SPREADSHEET. no other alternative exists.If this separation cannot be achieved,these areas must be SITE AREA STABILIZATION �'" / • 35J`�(TYP.) • AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND contained behind Silt Fence. EXCEPTIONS / / / S.Inlets downstream of disturbances should be rotectetl'streets should be swept when DESCRIPTION TIME FRAME / I • �a' / SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE I5A NCAC 04B. p P PERIMETER DIKES, 7DAYS NONE / WATTLE yl; / / EACHMATESTHAR....DOCUMENTATIONSHALL BEACCOMPLISHEDBV INITIALINGAND DATING red iIs forromihe construction activity is present. R INFORCED EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND ..WC{nWronmental.jpeg 7.Defy Is for S'It Fence 5h Fence Outlets Constructor Entrances and other measures are SWALE L DITCHES B / SEDIMENTATION CONTROL PLAN OR BY COMPLETING,DATING AND SIGNING AN INSPECTION provided on additional sheets.Erosion and WITH sediment control details are not drawn to scale. IIIIN SLOPES / r }fur'. .� ILT FENCE` / Fecrr-Tivcl.a Te 11'12/2020 TYPICAL LOT LAYOUT WITH CURB AND GUTTER CONSTR ON OUTLE REPORT THAT LISTS EACH MEASURE,PRACTICE OR DEVICE SHOWN ON THE APPROVED HIGH QUALITY 7 DAYS NONE I LI TS EROSION AND SEDIMENTATION CONTROL PLAN." WATER ZONESMiii, 37 / / (HQW) - , 1/ `/ rc SLOPES STEEPER 7 DAYS IF SLOPES ARE 10. ■ THAN 3:1 OR LESS IN LENGTH AND ARE NOT 1\ STEEPER THAN 2:1, \ \\\ 14 DAYS ARE \ \ ALLOWED // Ihx \ SODDING SLOPES 3:1 OR 14 DAYS 7 DAYS FOR I I �f I � \ \ FLATTER SLOPES GREATER I \ 1 DATE: PAGE: THAN 50'IN LENGTH MINI _ALL OTHER AREAS 14 DAYS NONE(EXCEPT FOR ) 34D �\ \ \ \ I rootcaferv4,zr,warHs00 NOT LE1VE SPACES. /WITH SLOPES PERIMETERS AND -so- \FLATTER THAN 4.1 HQW ZONES) )--) / /j` \ IM�� coos um f=itirf ���P• I40/�� 1 \ \ Mail« Qpa / �'Smin mew w a^eDATE: an sawwanly S eNoy, PAGE: / / I' I I \ \ raATcxaocoaaacnv. aQJ I I I � TO�'FL W .I .I Ism / 1 / s�r]]71O?y _� IL_ II' II baaubsbtutstl kr % �seer oN I1 eebeyond the ra / 1. /I� a min. t a *v .Tl Nkea ";r .' tar ry1/111111111111"111 7 /�" III Qrare ripreprepriAlpiprordprorozysiv y) SECTION - m fecal toots.fine I CONSTRUCTION tti� b a; 1 15I7 sa LIMITS ( 5(1(:- .S" s red be ow �o ggex s4p•x soc.attle" s around the ere Dame /shoutti he turn.slightly up..to / SILT--NCE -"^• / / wrmrxesol TUTTO APSs°soo°NE°um sE oo Lr wWEEKS SET ee rx as THE MOWER x3 eauneA reere ! e>p silt uwanitl erg. J '' /(TYR) i� / / / - III O. inch x 2 inch cross section Would be ddven CONSTRUCTION)ef 6 REINFORCED-,,,,,,I, t CONSTRUCTION ax APPEARANCE OF GOOD SOD Consimction: Maintenance: 11) uJvertically slur.through the center..silt MITS _ w.SILT FENCE 1.Clear the entrance and exit area of all vegetation,roots and other objectionable 1.Per NCG-01 inspect at least week and after each inch or ATTLyE c ENTRANCE properly greater ranfall make an required M OUTLET , / / / matenal and d grade t y req p immediately. ' 4,...-- / 2.Place the gravel to the specific grade and dimensions shown on the plans and 2Maintain ih gravel pad i a tl[ b prevent mud or red ment Wood Mulch or Compost ground 4 Mn.Trench into tee apawtl'na4 rich / r. 1 3uLa��-"''-- I / / / xpaspxr. r' smooth It from leaving the construction This may require periodic SILT FENCE `•••aT�------ "+ / 3Provlde drainage to car t [oasetl sediment trap other suitable outlet to dress with 2' hstone. S. nceni wtren f- 4.Use °textileabdes In orderr to Ira .611l Pf the foundation In locations 3 mediate9 UNTRENCHEO NSTALLANON on ppaveme el heavy / P - / / Dorm tle prove tY o y remove all objectionable materials spilled,washed or roc m ) •,REINFORCED • • / ve ,:.ac subj.to seepage or high water taNe. tracked onto public roadways. rmr..,mu..am.w.em,.ae,.,s.:ewa»....a,w.�. roc -N fits �1 CONSTRUCTI 7� / / ISOMETRIC VIEW / .. ATTLE_-~SILT FEN E (ENTRANCE 44/ 3� / / osxesmoruar MAIN -/ ......a w ni SILTFEN a •<' m CONSTRUCTION ENTRANCE/EXIT COMPOST SO emALat°wR.,s1. nta Remove ro Much or compostneed. allow-for g..fllo any aebns as CONSTRUCTION Oo3 for Umrewned Socks grey TO Se wapwrsw, eron tx nm team ze m, sslron x, stwekrwame mud °rep erne rewJgeam w. (NP') --- LIMITS/ �cb Prots tsd °®°^" trro^^' " ^^ '° taro ' ° ' rum _ _ ,3B_7 �4 ocemo- a " N w 2/ eo o General Erosion Control Notes shcet now-. s yygTgLE SILT FENCE /SILT FENC / O, Work Area f"•"° ���• 1�`m" �" ' " 'tml '„gym'; OUTLETI 45 5� / 0 Only the areas shown shall be disturbed. ma.eaem jearmi., i4awi°vmml Ws=1mi°m"M,a1 n'<nA°ma1 4S. Silt sock...ties shall be ins..until land _ _� WATTLE / 2 All disturbed areas shall be grassed and e 4-wSILT FENCE f ill�• REINFORCED / / 2 mulched as soon as possible and maintained disturbance is compete and the area above re has been per eery stabza -\ (ryP)3 egf;fj FT SILT FENCE/ / until pemanent cover is established. REINFORCED O ,: •UTL / SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION Wq�Lc. slLunET 0 4�sp cE r rye / s J / Ai / SIL NCE 4 7rc -, T11CCE i / (TYP) if: UZ -_`suv--�� 4r 326/ / \'tRr 2 REINFOR 0 ". CONSTRUCTION -EINFORCED/ DATE: cee tare Fence Filter Fe. PAGE: WATTLE SILTF NCE ENTRANCE- CONSTRU�TJON S> FENCE ------ in a Max.smneam so-engm tshe ere0 _L� ENTRANCE- ,..-- / �LI RS --- OUTLE j / / Wire Backfi trench ,---- •- ! - / end Compact NSTRUCTI SILT FENC t �2 s'ee sMax.Eery sire gr abacw fenc lvmre Fence Steel Poe thoroughly •\ITS ECED , •e NSTRUCTION/ / / EI�7BANC� / DATE: PAGE: 110 SILT FENCE / J toxa• / -'m WATTLE OUTLET- / ' �_ '_ i / / 4MIN. e HI SILT FENCE PAGE 1 of 2 Wire tifies � . 3 / / f a1 28 _ / j -- / - - / i + • TOTAL DISTURBED ACREAGE:5.0E ACRES / �� 7.--- 7---- .----" i / LOT EROSION CONTROL PLAN CON RU TIO / _.......- /------ 1 NrF cep =en°e�o-e^am 1 E N / / / / TOPSILTFENCE LOTS 1-6, 34-36&45-47 \ 1 / / / THEWASHEDST HIDDEN 1. C sediment Demermmeneem strength strength synth... CROSS SECTION VIEW / / 2.E h height Mmesedment fence does not exceed 24"fiches above the ground. h f c( (/ / / / _ - may impound volumes of water cause 3.Construct the filter.. m°slme \ •SILTF •E E i // [ ` / / sr F VALLEY WIRE FENCE ry�securely fasten one ntercmh sufficient. at afsupport proll cut to the ost with 4;e. m oat ` ( ) `\ / 4.S rim gl mesh fastened and h .Extend chance )� C NSTRUCTION \ / / HARDWARE CLOTH FRONT VIEW FOR side of the fence post.Wire or plastic zip.should have a ammo min SO pound imum pathe wire mesh supportto the bottom of thetranch.Fas.n the w. t err gh ualae driven cinch or greater...fences least anyeequce sweepirsimm after eamt \ S` 47 LIMITS ( / �FIL n a re fence is s. FILTER OF.7 6 E aerre strength brp m6Nmp� p °.snmrega rewire es enpp«tsn�shoo.. Ram inf aeffective, Haanment ecessary m mwde��a°e" WA TLE °\� R NCED \ \ \ ( WASHEDSTONE : 1 rSEELFEN I� CLOTHANDIN TRERDWARENCH DREAM FINDERS ,, SILT FE a•10 fasten.e tsrfabeedlre�yawetewre°rPNafiexlpfi�ehomdh.veaminimamm��and�eilepressure on , Ca7•0 DOYLEY \ �/ 8�: I 3'FILTER ON NTDDLIDaRDDN HOMES, LLC storage during �x^l4c 5';5'.:2 NOTES: ch approx1r.ely4 inches wide and 8lnWea deep along the proposed line of the posh and ale Take care to avoid undermining metsnw O W �; fAf�, \ (1 �_/ I 1.Hardware cloth and graavvel should overlay the silt fence at least 12 a \T 8 1 Some'+.+ Inches. Wen 7. along me bottom and side of me trench. after the contributing �t1/It(]�J 3A 1 \ / ' °'°10. 1 2.Stone outlets should be d on low elevation areas of stir fence QUEWHIFFLE TOWNSHIP HOKE COUNTY 9.BecekfiNN tryfrom onhwnn mil pieced over me filter fabric end comp..Th°lags compaction of be°kmlla drainage area has naafi propeanter. 4.Remove all fencing materials rly0.Wba sediment \ \ . / ac:•:I pone and based on field conditions. silt fenoe \ 1_ 14 4 3: ) / I MAINTENANCE: SCALE:1"=100' JANUARY 2024 p.DnwtNdfil. bnetneamN \ \ / MAINTENANCE: ECLOTH NLTERFAFUPPERENGHF1.Per NCG-01,inspect ncndat lest once a week and after each 1 Inch or GRAPHIC SCALE critical ,.tine„lel.iwe / / greeter rainfall event Complete any required repairs immediately. 100 0 50 iW 200 400 SILT FENCE \� \ //� ( SECTION 2.Kepmshen shfee of d sediment accumulationadequate flow. 6ruches. J 3 Keep mesh free of debris to provide atlequate flow. 4.Remove sediment when half of stone outlet is covered. \ \`\\\\ -�WC-Enu mmitel.jpeg 5.Replace stone as needed to facilitate de-watering. ( IN FEET ) 1 SILT FENCE OUTLET 1 inch = 100 ft \ ���_,�` MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 \ PHONE(910)484-5191 FAX(910)484-0388 LICENSE#F-0106 LUST SAVED:1/22/2024 4:56 PM LAST PLOTTED:1423/2024 g:01 AM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\H 4 H CONSTRUCTORS\24-136]-02HIDDENVALLEY-EC\PUMS\EC-LOTS 1-6.34-36 c 45-areaG