Loading...
HomeMy WebLinkAboutSW6131201_Supplement-EZ Form_20240229 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION I 1 Project Name i Rooms to Go Building and Parking Expansion 2 Project Area(ac) rz~_ 136.04 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? _ High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: • 11 I Infiltration System 12 Bioretention Cell 13 Wet Pond 2 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater HarvestingjRWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION t 27 Name and Title: Ed Sconfienza PE,Senior Engineer 28 Organization: The Site Group 29 Street address: 1111 Oberlin Rd. 30 City,State,Zip: ( Raleigh,NC 27605 31 IPhone number(s): 919-835-4787x236 —t 32 jEmail: eda@}thesitegroup.net Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer „ ` R� °" End F a e�. g f3 � 6� 2- L9 �� ry xp Signature of Designer • • - ' . \ZA 's Z / z -z/ &Ca Z / ��' ' Sea! Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 I If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 I If so,number of low density drainage areas 0 l Is all/part of this project subject to previous rule 5 (versions? Yes FORMS LOADED DRAINAGE AREA INFORMATION _.17 "`4. 1 2 1 4 Type of SCM Nth 5 Total BUA from project(sq ft) 1521301 sf 2197863 sf 6 1995 rules —I SL 2006-246 2008 rules 1222752 sf 1902834 sf 2017 rules 298549 sf 295029 sf New BUA on subdivided lots(subject to 7 permitting)(sq ft) 1995 rules ( 1 SL 2006-246 2008 rules I 2017 rules New BUA not on subdivided lots(subject to 8 permitting)(sf) 1995 rules I { SL 2006-246 2008 rules _ 2017 rules 298529 sf 1 295029 sf 9 Offsite-total area(sq ft) 1 I 1995 rules SL 2006-246 ! # ! 2008 rules 49684 sf 5306 2017 rules 10 Offsite BUA(sq ft) 1995 rules SL 2006-246 2008 rules — 4032 sf I 3901 sf 4� 2017 rules 11 Design storm(inches) 1995 rules SL 2006-246 2008 rules 1 in I 1 in 2017 rules 1 in 1 in i 12 Breakdown of new BUA: _ -Parking(sq ft) 132493 sf 1 124674 sf -Sidewalk(sq ft) _ -Roof(sq ft) 166056 sf----r 170355 sf -Roadway(sq ft) ! j -Future(sq ft) i -Other,please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots(sq ft) 1 _ New infiltrating permeable pavement not on 14 subdivided lots(sq ft) i p Existing BUA that will remain(not subject to 15 permitting)(sq ft) 1222752 sf 1902834 sf 16 Existing BUA that is already permitted(sq ft) 1 1222752 sf 1902834 sf 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 25% { 37% 019 Design volume of SCM(cu ft) 120188 cf ( 174334 cf 20 Calculation method for design volume ; SA/DA SA/DA AD } ONAL INFORMATION Please use this space to provide any additional 21 information about the drainage area(s): WET POND 1 iDrainage area number 1 1 I 2 2 Minimum required treatment volume(cu ft) 120188 cf 174334 cf NERAL MOO FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes imp Is the SCM located away from contaminated soils? l Yes Yes gni What are the side slopes of the SCM(H:V)? 3:1 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered r side slopes? V No No 7 Are the inlets,outlets,and receiving stream protected from erosion (10-year Storm)? ` Yes Yes Is there an overflow or bypass for inflow volume in excess of the 8 desi.n volume? Yes Yes 9 What is the method for dewaterin.the SCM for maintenance? Pump(preferred) ; Pum. •referred) 1.13 If applicable,will the SCM be cleaned out after construction? Yes Yes 1111 Does the maintenance access comply with General MDC(8)? Yes Yes Does the drainage easement comply with General MDC(9)? Yes Yes If the SCM is on a single family lot,does(will?)the plat comply with N/A N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes WET FOND MDC FROMb2F1.Yfl53. .., 18'Sizing method used ' SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth(bottom of sediment 169.50 176.50 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 173.50 177.50 mg Elevation of the bottom of the vegetated shelf(fmsi) 176.50 180.50 MEI Elevation of the permanent pool(fmsi) 177.00 181.00 24 Elevation of the top of the vegetated shelf(fmsi) 177.50 181.50 I i ®Elevation of the temporary pool(fmsi) 178.30 182.30 I 26 Surface area of the main permanent pool(square feet) 92584 112882 27 Volume of the main permanent pool(cubic feet) 292708 cf 341941 of 28 Average depth of the main pool(feet) 3.16 ft 3 03 ft 29lAverage depth equation used Equation 2 Equation 2 30 If using equation 3,main pool perimeter(feet) 31 If using equation 3,width of submerged veg.shelf(feet) 32 Volume of the forebay(cubic feet) 61175 cf 53307 cf 33 Is this 15-20%of the volume in the main pool? No Yes 34�Clean-out depth for forebay(inches) 12 in 12 in 35 Design volume of SCM(cu ft) I 165259 cf 203431 cf 36 Is the outlet an orifice or a weir? Weir Weir 37 If orifice,orifice diameter(inches) I 38 If weir,weir height(inches) 16 in 16 in 39 If weir,weir length(inches) 18 in 20 in ~m 40 Drawdown time for the temporary pool(days) 0.78 0.86 4w4 Are the inlet(s)and outlet located in a manner that avoids short- I 41 circuiting? Yes Yes 42 Are berms or baffles provided to improve the flow path? No No 43 Depth of forebay at entrance(inches) 42 in 54 in 44 Depth of forebay at exit(inches) 42 in 54 in 45 Does water flow out of the forebay in a non-erosive manner? Yes Yes 46 Width of the vegetated shelf(feet) 10 ft 10 ft 47 Slope of vegetated shelf(H:V) 10:1 10:1 Does the orifice drawdown from below the top surface of the 48 permanent pool? No No Does the pond minimize impacts to the receiving channel from the 1- 49 yr 24-hr storm? Yes Yes Are fountains proposed?(If Y,please provide documentation that 50 MDC(9)is met_) No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non-clumping turf grass? - Yes Yes 53 Species of turf that will be used on the dam and embankment Centipede Grass Centipede Grass 54i Has a planting flan been rovided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION j Please use this space to provide any additional information about theme 55_ !wet pond(s): Wet Pond 3 9:43 AM 2/22/2024