Loading...
HomeMy WebLinkAboutSW8140906_As-Built - Certification_20240220 (15) Post-Construction Stormwater Management Permit No. SW8 140906 AS-BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. Check here if this is a partial certification. Section/phase/SCM#? Sand Filter#2 _ Check here if this is part of a Fast Track As-built Package Submittal. Printed Name Rodney Newton Signature el 0 yt.«." h-- 1, k.,n (�G beJ I , a Notary Public in the State of �17Yth CCL-4"/..)/Vi✓1 a., County of W , do hereby certify that P-0(,LV)PLd 0. /Jo e7 o J personally appeared before me this "]I day of - h ru ami, ,20 and acknowledge the due execution of this as-built certification. ,{$ Q B ;,,,,, ...\-\O� on . Witness my hand and official seal :F�5 '`� OTARY '" ,o N t PU BL\O I - My commission expires. (L4r1U 2f 2-0 14, /• ✓an Zp2;' •em s NCAC_Iwo) ",wn„ -Ni.A A_ DEED.RESTRiCTIONS t.BUA RECORDS _..- , 1- The deed restrictions and protective covenants have been recorded Y or N and contain the necessary language to ensure that the project is N/A maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants Y or N N/A has been provided to the Division. 3. Records which track the BUA on each lot are being kept. (See Note Y or N 1) N/A 13- - __ ;,, 1. The SCMs are accessible for inspection, maintenance and repair. Yor or N 2. The access is a minimum of 10 feet wide. N3. The access extends to the nearest public right-of-way. or N C. IFASi ►--" 1. The SCMs and the components of the runoff collection/conveyance Y or N N/A system are located in recorded drainage easements. 2. A copy of the recorded plat(s)is provided. Y or N N/A D. SINGCEVIIIIINAESIDEWIPiLLOW4Witt felie What Y or N N/A 1 have am SCi i 'Ai ioTorriiic --- -._• 1. The specific location of the SCM on the lot. Y or N N/A 2. A typical detail for the SCM. Y or N N/A 3. A note that the SCM is required to meet stormwater regulations and- that the lot owner is subject to enforcement action as set forth in Y or, N/A NCGS 143 Article 21 if the SCM is removed, relocated or altered without prior approval. l ' E. OPERATION AND MAINTENANCEAGREI3MEN1 COO—'N 1. The O&M Agreement is referenced on the final recorded plat. Y or N N/A 2. The O&M Agreement is recorded with the Register of Deeds and Y or N N/A appears in the chain of title. F. Of A E-LAN-- evo[ds e - being kept in a known set bran for each SCM and are avaiaiiie far Q or N r+ewra*. .77:~ �-- .�- L (Y or N Page 1 of 8 Post-Construction Stormwater Management Permit No. SW8 140906 Note 1-Acceptable records include ARC approvals, as-built surveys, and county tax records. Provide an explanation for every requirement that was not met, and for every "N/A" below. Attach additional sheets as needed. This is a state-owned, military property. Deed restrictions do not apply and they are exempt from recording maintenance and access easements. There is a signed Operations and Maintenance agreement, but they are exempt from recording it. Page 2 of 8