HomeMy WebLinkAboutSW8140906_As-Built - Certification_20240220 (10) Post-Construction Stormwater Management Permit No SW8 140906 AS-BUILT DESIGNER'S CERTIFICATION FOR SAND FILTER PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1056, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS-BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Sand Filter 2 Check here if this is part of a Fast-Track As-Built Package Submittal per .1044(3). g Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided Printed Name Frank Slinsky Signature //inn 41i NC Registration Number d 3 3 6/ 2- Date 2 / 5 /2.d ay Consultant's Mailing Address: SEAL: \\S•1tIli ii/// Il Y.�N RCS ,/, 5410 Trinity Road Suite 102 ` 0 •OFESSj� I' �L City/State/ZIP Raleigh/NC/27607 . :Q. SEAL -' : 033612 • = Phone Number 919-866-4505 1 � p ;ciyGtN��;•���\�• Consultant's Email address: /� /SiSItN� ��� frank.slinsky@timmons.com O Circle N if the as-built value differs from the Plan/permit. If N is circled, provide an explanation on page 2 OO N/E = not evaluated (provide explanation on page 2) TN/A = not applicable to this project or SCM This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 - Consultant's Cep(MDC _1056) ®As-butt OWE ®N/A !_ Two-chamber system — - --1. Does the Sand Filter include a Sediment chamber and a O or N Sand chamber? 2. The storage volume in each chamber is equivalent. 0 or N 3. The incoming stormwater is evenly distributed across the Q or N surface of the sand. 1. The volume of water stored in the sediment chamber and on top of the sand in the sand chamber is at least 0.75 times the QY or N treatment volume. 2. The elevation of the bypass device is set at or above the 0 or N ponding depth associated with the storage volume. 3. The ponding depth above the sand surface is six feet or less. or N C. Sand ,t Pra+~do n t stiwr 1. Does the sand media meet ASTM C33 or equivalent? or N 2. The depth of the sand media is consistent with the approved O or N plans and specs and is a minimum of 18" 3. The depth of the sand media over the underdrain is consistent with the approved plans and specs and is a 0 or N minimum of 12 inches. 4. The sand media provides a minimum drawdown of two O or N inches per hour at the sand surface. 5 Open-bottom design —the minimum separation to the SHWT at the lowest point of the sand filter is consistent with the Y or N N/A approved plans and specs and is a minimum of 2 feet. Page 5of8 Post-Construction Stormwater Management Permit No. SW8 140906 6. Closed -bottom design —The minimum separation to the SHWT at the lowest point of the sand filter is consistent with Y or QN the approved plans and is a minimum of 1 foot. 7. At least one capped clean-out pipe has been provided at the Vt. or N low point of each underdrain. Provide an explanation for every MDC that was not met, or for every deviation from the permitted condition below: Open Bottom Design: N/A, Sand Filter is closed bottom design Separation to SHWT: As permitted, the Sand Filter has anti-flotation protection and it is a closed system that cannot drain the water table. Page 6 of 8