Loading...
HomeMy WebLinkAboutNCG030440 DMR SWSTORMWATER DISC MONITORI GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE NO. NCG,03 >7 /VO FACILITY NAME-17^ke-f5te-cl ir-r,4,,- P&A �L�t�k 1A J1 - PERSON COLLECTING SAMPLES CERTIFIED LABORATORY P&4�,C--�Aj, Lab # Lab # Part A: Specific Monitoring Requirements RECEIVED ARGE ALL (SDO) G REPORT MAY 0 7 2015 SAMPLES COLLECTED DURING CALEN )lq :3MV_ jn 1 110 'terW (This monitoring report is due at the Division h, 0 dY�L the date the facility receives the s results from the laboratory.) � COUNTY0 - - PHONENO.(qqj PLEASE SIGN ON THE REVERSE 4 Outfall `DM6 "1 00,400 ."No, Saq)P1q•Co11qcted,- Wak$V�ipefided-Solids . X. e Oil and;.ie-A in ard, uni' -Totgt,,T 6.'c;Orga moldill-yr-, a Hics, Sil Benchmark 0 7 1 L ,100r'--rWithiji, 3 -Al Note: If You report a sampled value in excess of the benchmark value, or outside the benchmark range for PH, You must implement Tier I or Tier 2 responses. See General Permit text. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons onew motor oil per month? (if Yes, complete Part 13) f yes Part B: Vehicle Maintenance onitoring Rel, t Activi gipgg s outfall' 0.0 "100400'. ;and, Grease Total A;i i -Oil -Oil Usage I aVera ze nual. JS _gal/mo- en 'An 0mark a rd,units," :ffi,:' . ... ... ........... . . Tote: If you report a sampled value in excess of the benchmark value, or outside the benchmarkran hmark - See General Permit text. ge for PH, You must implement Tier I or Tier 2 responses. STORM EVENT CHARACTERISTICS: Mail Original and one copy to: Date ZI-9-15-(first event sampled) # Division of Water Quality TotalEventPrecipitation (inches): Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): _ SWU-245-102107 Page 1 of 2 W Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metai finishinj use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the'definiti6n as found in 40 CFR 469.12; for electronic crystal manufacture use the definition" as found in 40 CFR 469.22; and' for cathode ray tube manufaciure use the definition found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) (� Title (Print title) (Sig (Date) "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility lees and imprisonment for knowing violations." Q�) �l (Si re f Permittee) (Da e) S WU-245-102107