Loading...
HomeMy WebLinkAboutNCC240374_Site Plan or Location Map_20240213[DocuSign Envelope ID:43A15CDC-3AB2-437F-8D71-F93201B32D37 FINAL APPROVAL • DATE:1/3/2024 cCIIM PROJECT NUMBER:LDCP-2023-00430 - THIS PLAN APPROVAL DOES NOT INCLUDE CHARLOTTE WATER.FOR ALL -336-5499 CHARLOTTE.AO TLE ERNGCONS OrnOrv°eEenNG AT'L T a 07N1 PA r0R90 ���.� LAND DEVELOPMENT ysv/°eie1oorn�euoo ALL ��INCLUDE COMMERCIAL ZONING. T mot* ,omPammin�� � BUILDING MECKLENBURG COTS UNTY none ND ZONING APPROVALS P ENFORCEMENT.CAN BE OBTAINED AT CALL crAA AT Inc �► igna I' �..w � SITE DATA �� ���ia ARVMin .40� TOTAL PROPERTY ACREAGE: 16.84 ACRES � �� t' DUKE DISTURBED ACREAGE: 2.0 ACRES 4 DEVELOPED AREA: 0.28 ACRESwit', ZONING: R-3 UNDISTURBED OPEN SPACE: • JURISDICTION: CITY OF CHARLOTTE � �� „,, PROJECT W y, ��. , PIN# 11121101 40,1"7-1„.„ �� �� ADDRESS: 12101 ROCKY RIVER CHURCH RD � CHARLOTTE,Y NC 28215 LOCATION � � RIVER BASIN: ROCKY RIVER ENERGY® WATERSHED: MCKEE ��� STREAM NAME: FIRST ORDER UNNAMED TRIBUTARY IIIC CAROL ! NAS 10 NORTH cPc SOUTH CAROLINA STATE MAP PROJECT NARRATIVE UNION EMC DEL STATION THE PROPOSED UNION EMC DEL STATION PROJECT IS LOCATED IN MECKLENBURG COUNTY, NORTH CAROLINA.THE PROJECT INCLUDES THE ADDITION OF A WASHED STONE PAD AND A AN EXISTING IN FENCE SURROUNDING THE PROPOSED PAD.THERE WILL ALSO BE AN EXTENSION OF MECKLENBURG COUNTY N O RT IH CAROLINA AN EXISTING DITCH ON SITE.THE PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT OF WAY.THE DISTURBED AREA IS 1.84 ACRES.THE PRIOR USE OF THE SITE IS TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT CHANGE THE EXISTING LAND 5 USE.PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR SHEET LIST. TO COMPLETION OF CONSTRUCTION.AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES, LATITUDE. 3 5° 13' 58.2011 COVER SHEET 44965054SDV01 WHENEVER POSSIBLE.EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING GENERAL NOTES 44965054SDV02 USE ONLY BY NCDEQ.THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN JANUARY LONGITUDE. 80° 3 81 04.77�� NCG01 44965054SDV03 2024 AND BE COMPLETED IN JANUARY 2025. NCGO1 44965054SDV04 Q EXISTING CONDITION AND DEMOLITION PLAN 44965054SDV05 ERALL SITE PLAN 44965054SDV06 SITE PLAN 44965054SDV07 TE DETAILS 44965054SDV08 LANDSCAPE PLAN 44965054SDV09 4`,-,-,_�'� Qe LANDSCAPE DETAILS 44965054SDV10 PH.1 EROSION&SEDIMENT CONTROL PLAN 44965054ERC01 '- �. PH.2 EROSION&SEDIMENT CONTROL PLAN 44965054ERCO2 ` ® BMP SUMMARY OSION CONTROL DETAILS INFO ggg65054ERC04 ��{� EROSION CONTROL DETAILS 44965054ERC05 GENERAL NOTES / 1N pe 20,°1 Salk "\ �/Q� DING PLAN 44965054GRA01 °a4 'I 4` AA\ PH.1 DRAINAGE AREA PLAN 44965054DRA01 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND ARE NO GN1p tN FOR REFERENCE ONLY.THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. N6 PH.2 DRAINAGE AREA PLAN 44965054DRA01 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES.TOPOGRAPHIC SURVEY PROVIDED BY DUKE ENERGY DATED OCTOBER 21,2021.AERIAL PHOTOGRAPHY WAS I OBTAINED FROM STATE AGENCIES. I 1 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE MIGRATORY BIRD HOTLINE CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL, s I EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY € SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT 1 g OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. I' _ 11 I BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR ' ? 1 CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. 1 1 lipli SHALL NOT DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE - w :. "'K.1:"''.,.^`,^'\`"s '•��•�" :".-::... CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 ENERGY. 5. PROJECT IS LOCATED IN THE ROCKY RIVER BASIN. THE PROJECT IS SUBJECT TO STATE-REGULATED " :c-''' .:..-:�-t .1'"``;•,;.•,;.. <<'-. BUFFER REQUIREMENTS. I x .• 44' 7Is SPILL REPORTING HOTLINE 6. SEE SHEET SDV-02 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING f Ij LIN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS SCHEDULE. I -x� '- ] ::, REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER 7. STREAMS EXTEND BEYOND THE RIGHT-OF-WAY.APPROPRIATE BRIDGING AND MATTING OF THESE 7 '��j#t��}� \ _I - , REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF N �n I t �; SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS THE RIGHT-OF-WAY. 6 :Y • . 1 DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF hI 1 41 `, , i.-••'.I,,, �-,„•,.;. .,. , .+ `1 THE DUKE ENERGY SPILL REPORTING HOTLINES AT: 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY !u. C :. x , d ` :-y__°._, ;_ .,.-:�'.;;• '.' CAROLINAS&MIDWEST:800.527.3853 PERMITTING PRIOR TO USE. (k �': `.,_ '.t •`.� FLORIDA:866.769.1266 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU I \\ '?... OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. '-��;�:^�;''A:;•- �,.`�,-.:':'--r V— �;�.^'cj`c^_`:;.�,�\ 10. WETLAND MATTING SHALL BE COMPOSITE AND/OR HEAVY DUTY TIMBERP'CRANE"MATS. NO LATTICEei 4°41.. •---r•-•s-• _� OR TWO-PLY MATTING SHALL BE USED IN JURISDICTIONAL WETLANDS AND/OR STREAMS. � •�' CONTACTS cn 11. NO OIUFUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 125 FEET OF WETLANDS OR - �° OWNER: ENGINEER:BRIAN LAFRANCHI RESPONSIBLE FOR MAINTENANCE: W SURFACE WATER WITHOUT CONTAINMENT. •.� .�'s-,.' DUKE ENERGY CAROLINAS,LLC COMPANY NAME:DEWBERRY ENGINEERS INC. NAME:NEAL CARY CC 12. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. '�^•- ^^- ;) 526 SOUTH TRYON ST. ADDRESS 1:9300 HARRIS CORNERS PARKWAY PH: (704)-575-3424 13. ANY DAMAGE TO THE TOWN'S PARKING LOT AND GREEN WAY TRAIL SHALL BE REPAIRED OR CHARLOTTE,NC 28202 ADDRESS 2:SUITE 220 FAX: (704)-382-6542 RESTORED TO EQUAL OR BETTER CONDITION. PH:(704)382-0071 PH:704631-5206 EMAIL:Neal.Cary@Duke-Energy.com 14. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE VICINITY MAP FAX:(704)382-6542 EMAIL:blafranchi@dewberry.com Shane.Estridge@duke-energy.com O DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. SCALE: 1:1 OO a 15. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND (n COVER SHALL BE USED FOR STABILIZATION. V LI) 3 ISSUE FOR NCDEO PERMITTING PERMITTING W21027501 LLE SE BML 115E2023 0 2 ISSUE FOR NCDEO PERMITTING PERMITTING W21027501 LLE SE BML 09/18/023 co CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL" (811) 1 ISSUE FOR PERMITTING PERMITTING W21027501 LLE SE BML 0703/2023 V OR (1-800-632-4949) AT LEAST 48 HOURS PRIOR TO REV DESCRIPTION ISSUE TYPE DPN OFT CHK ENG DATE 'Cr BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING REVISION HISTORY UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL SEAL, rely DRAWING are ❑ PRELIMINARY TITLE UTILITIES THAT PROVIDED THEIR OWN LOCATOR SERVICES ® 1r r1q BILL OF MATERIAL IS ❑ AS BUILT t -4 SH OARp�.� CONFIDENTIAL COVER SHEET INDEPENDENT OR "NORTH CAROLINA ONE CALL". REPORT ANY YT Dewberry �.. iEBSi'f�'' AND MAY NOT BE DISCREPANCIES TO THE ENGINEER IMMEDIATELY. tiaw P 1.z LOANED,REPRODUCED DUKE -`2W Dewberry Engineers Inc. [o",Ea�� _ OR COPIED,EITHER 9300 RABBIS CORNERS PKWY raT'°� `°°"T'°" UNION EMC DEL STATION SUITE 220 gym: 40018 WHOLLY OR IN FART, Company: MC811.dR 61 sg, i? OR MADE PUBLIC'IN ENERGY. CHARLOTTE,NC 09.9 9 y•. 01N ff,: ANY MANNER WITHOUT PHONE: 704.509.9918 ''ti'r R'=O`� Phone: CITY: CHARLOTTE COUNTY: MECKLENBURG STATE: NC FAX: 704.509.9937 I2A4 L,F,', THE WRITTEN SHEET SIZE: REGION: STATION NUMBER: !DRAWING NUMBER: REV: NCBELS# F-0929 11/8/2023,1F1e1ra, CONSENT wwA.Newberry.com OF DUNE ENERGY Date: ARCH D NC-SC 2091 44965054SDV01 0 CORPORATION FILENAME:SDV TEIERSHEET.DWG