Loading...
HomeMy WebLinkAboutSWG040162_Plan Sheet_20240126 r SF - / ` ��' EDwARDS RD — SF / I \ 0-0 / D O � \ � �?\ PATRICK LEE SMITH AND '"r I X� Ix WIFE, JAMIE P. SMITH ��' - CYNTHIA THOMAS GREENE p BOOK 6509, PAGE 138 .� NO DEED FOR THIS PARCEL IN �O I Q / PIN: 01024009A LCOT SEE RECORDED PLAN IN 4� SITE �� CABINET B, FILE 28B co PIN : 01024010 / `� / ^• KEY MAP ^�� LIDAR TOPO / SCALE: 1" = 1000' 1 —n / Y i FIELD DELINEATED WETLANDS, SURVEYED TOPO ®,;, SEE NOTE 8 BELOW ONE / PIPE INV 463.50 1 > I PROPOSED PERMANENT CULVERT (CULVERT 1). / / APPROVED PER NCDOT PIPE INV 464.30 PERMIT#D103-090-22-00046 � SF PROPOSED FENCE WITH METAL SLATS, TYP. 4 /.' 66 I0, ri i� / i I TEMPORARY SEDIMENT TRAP APPROVED AS PART OF NCDEQ JAMES SIDNEY HINSON RECORDED PERMANENT I I PERMIT STANL-2023-017. KAREN CHRISTINE HINSON ACCESS EASEMENT I BOOK 466, PAGE 305 7,158 S.F. (0.164 AC.) I I I DEED BK. 8369, PG. 631 PIN: 01027005 468 c�' 465 46 4 7 I 468 CA x 468.90 N n "n SF _ SF - � 1 .^ I 0 - 200 400 EX. GAS FACILITY J: SCALE: 1"—200' SCALE IN FEET TO REMAIN PARCEL PLAN / C G G G GCA - _ 470— GENERAL NOTES PERMIT SUMMARY (FOR OVERALL PROJECT) _ > - - W � \ 1. NCDEQ E&S PERMIT- STANL-2023-017; APPROVED 4/18/2023 ' w M o _ "' GAS COMPANY: 2. NCDOT DRIVEWAY PERMIT- D103-090-22-00046; APPROVED 10/19/2022 / ^ a PIEDMONT NATURAL GAS 3. UNION CO FLOODPLAIN - FP22004; APPROVED 11/10/2022 �` 60 CONTACT: AARON WELDON 4. NWP 12 (ACOE 404) - SAW-2022-01922; APPROVED 9/15/2022 4720 PIEDMONT ROW DRIVE 5. NCDEQ 401 PERMIT- CERT WQC005317; APPROVED 11/8/2022 / CHARLOTTE, NC 28210 / 704-731-4753 47 A AARON.WELDON@DUKE-ENERGY.COM DESIGN CONSULTANT: c� �471 KLEINFELDER CONTACT: MICHELLE KEYS 3200 GATEWAY CENTRE BOULEVARD, SUITE 100 MORRISVILLE, NC 27560 - T 864-650-5694 i f MKEYS@KLEINFELDER.COM RECORDED UTILITY PROPOSED FENCE, TYP. I STATION SITE EASEMENT SITE OWNER: • ` -'• 57,775 S.F. (1.326 AC.) I > � DEED BK. 8369, PG. 631 JAMES AND KAREN HINSON 16396 TYSON ROAD ALBEMARLE, NC 28001 - 1 1. THE OVERALL SITE ACREAGE IS 56.53 ACRES. �� I 2. THE PROPOSED REGULATOR STATION IS 1.33 ACRES. 10 .._ �" j 3. THE SITE ZONING IS RA-40. 4. SETBACKS (RA-40): FRONT = 40' REQUIRED; 58' PROVIDED SIDE = 15' REQUIRED; 97' PROVIDED ( 5. LIMIT OF DISTURBANCE (OVERALL PROJECT) = 224.5 AC. I \ i LIMIT OF DISTURBANCE (THIS SITE) = 3.11 AC. 474 \ I 47 .00 6. PROPOSED FENCING IS IN COMPLIANCE WITH THE F1 SCREENING \ \ J REQUIREMENTS (CHAIN LINK WITH METAL SLATS). \ I 472.45 '\ 194.59 I 7. ANY WELLS AND/OR ON-SITE WASTEWATER DISPOSAL SYSTEMS DISCOVERED DURING THE SITE DEVELOPMENT PROCESS WILL BE ABANDONED IN ACCORDANCE I \ WITH APPLICABLE NORTH CAROLINA LAWS AND RULES. \ 8. WETLANDS SHOWN ON THESE PLANS WERE DELINEATED BY KLEINFELDER IN A FIELD SURVEY IN OCTOBER, 2020. \ TRACT NO. 1100 JAMES SIDNEY HINSON \ KAREN CHRISTINE HINSON BOOK 466, PAGE 305 PIN: 01027005 iE w LINE 129 LAUNCHER 0 30 60 o SCALE: 1"= 30' SCALE IN FEET PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET 137 DWG SCALE 1" - 40' HORIZ. 0 07/21/2023 ISSUED FOR CONSTRUCTION JL EUD RAP AREA CODE 5340 DATE SIGNATURE/INITIALS P N G LINE 477 TRANSMISSION REGIONAL E ACCOUNT NUMBER 492158 ENGINEER DWG DATE 07/21/2023 STATION ID - PROJECT NUMBER 0232243 DATE SIGNATURE INITIALS MGR TECH �� DUKE Piedmont REGULATOR STATION DRAWING NUMBER REC& STD 4 ENERGY, Natural Gas DRAWING BY JL PNG-C-477-0001144 O CHECKER EUD DATE SIGNATURE/INITIALS PRINCIPAL COPYRIGHT 2018 UNION & STAN LY COUNTY, NORTH CARO L I NA CORP. OFFICE 4720 PIEDMONT ROW DRIVE SIGNATURE ENGINEER CHARLOTTE, INC 28210 Indian Trail Resource Center,North Carolina RC STATION/METER/LINE NUMBER YEAR REVISION U