Loading...
HomeMy WebLinkAboutNCS000349_Compliance Evaluation Inspection_20070918 Compliance Inspection Report Permit:NCS000349 Effective: 05/01/02 Expiration: 04/30/07 Owner: North Carolina Renewable Power-Lumberton LLC SOC: Effective: Expiration: Facility: North Carolina Renewable Power Lumberton, L County: Robeson 1866 Hestertown Rd Region: Fayetteville Lumberton NC 28358 Contact Person:William J Huggins Title: ORC Phone: 910-887-6206 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 0 9/1 812 0 0 7 Entry Time 11:15AM Exit Time: 12:30PM Primary Inspector:Trent Allen Phone: 910-433-3300 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: 5tormwater Discharge, Individual Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCS000349 Owner-Facility;North Carolina Renewable Power-Lumberton LLC Inspection Date: 09/18/2007 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: The site has several different outfalls that discharge into a single ditch and the samples are taken at the last outfall so a representative sample will be taken. All qualitative monitoring and analytical monitoring was conducted as required by the permit. There was a completed and updated stormwater pollution prevention plan in place. Page 2 of 3 Permit: NCS000349 Owner-Facility:North Carolina Renewable Power-Lumberton LLC Inspection Date: 09/18/2007 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ #Does the Plan include a General Location (USGS)map? 0 ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? N ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? N ❑ ❑ ❑ #Does the Plan include a BMP summary? 0 ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ #Does the facility provide and document Employee Training? E ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? E ❑ ❑ ❑ #Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ #Does the Plan include a Stormwater Facility inspection Program? E ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Qutfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ #Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ #if the facility has representative outfall status, is it properly documented by the Division? 0 ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3