Loading...
HomeMy WebLinkAboutSW6231112_Design Calculations (Riprap)_20240117 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 10-23-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Brayden Preserve Subdivision 1997 REVISION / / LOCATION BY RECORD / / Harnett County, North Carolina Caleb Kernan OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 1 OUT Qio/Qfull = 0.70 Pipe Dia= 30 in V/Vfull = 1.08 Q10= 20.64 cfs V= 6.5 fps Qfull = 29.32 cfs Vfull = 5.97 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in III �•�•�•�•�•� Riprap Class = B ••••••••••• L Apron Thickness = 18 in �•������•S Apron Length 15.0 ft �•�•�•�•••••�• Apron Width @ Outlet = 7.5 ft •• •• ••• Apron Width @ End = 17.5 ft Length Storm Outlet Structure FES No.= PIPE 2 OUT Q1o/Qfull = 0.20 Pipe Dia= 24 in V/Vfull = 0.78 Q10= 9.11 cfs V= 11.2 fps Qfull = 44.92 cfs Vfull = 14.28 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in Riprap Class = 1 s Apron Thickness = 22.5 in 3 Apron Length 16.0 ft Apron Width @ Outlet = 6 ft Apron Width @ End = 18.0 ft Length 1997-Storm drainage.xlsx LATEST REVISION: 1/17/2024 5:21 PM PAGE 1 OF 6 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 10-23-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Brayden Preserve Subdivision 1997 REVISION / / LOCATION BY RECORD / / Harnett County, North Carolina Caleb Kernan OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 3 OUT Q1o/Qfull = 0.64 Pipe Dia= 30 in V/Vfull = 1.06 Q10= 19.90 cfs V= 6.6 fps Qfull = 30.92 cfs Vfull = 6.29 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length 15.0 ft Apron Width @ Outlet = 7.5 ft Apron Width @ End = 17.5 ft L Length 1 Storm Outlet Structure I FES No.= PIPE 4 OUT Q1o/Qfull = 0.87 Pipe Dia= 30 in V/Vfull = 1.12 Q10= 27.01 cfs V= 7.1 fps Qfull = 31.15 cfs Vfull = 6.34 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in •�•�•�•�•�•�•� Riprap Class = 1 Apron Thickness = 22.5 in IIIIIII';IIII1J _Apron Length 20.0 ft Apron Width @ Outlet = 7.5 ft Apron Width @ End = 22.5 ft Length 1997-Storm drainage.xlsx LATEST REVISION: 1/17/2024 5:21 PM PAGE 2 OF 6 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 10-23-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Brayden Preserve Subdivision 1997 REVISION / / LOCATION BY RECORD / / Harnett County, North Carolina Caleb Kernan OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 5 OUT Q1o/Qfull = 0.12 Pipe Dia= 18 in V/Vfull = 0.67 Q10= 2.42 cfs V= 7.5 fps Qfull = 19.77 cfs Vfull = 11.17 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length 9.0 ft Apron Width @ Outlet = 4.5 ft Apron Width @ End = 10.5 ft L Length 1 Storm Outlet Structure FES No.= PIPE 6 OUT Q1o/Qfull = 0.63 Pipe Dia= 30 in V/Vfull = 1.06 Q10= 19.73 cfs V= 6.7 fps Qfull = 31.15 cfs Vfull = 6.34 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length 15.0 ft Apron Width @ Outlet = 7.5 ft Apron Width @ End = 17.5 ft Length 1997-Storm drainage.xlsx LATEST REVISION: 1/17/2024 5:21 PM PAGE 3 OF 6 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 10-23-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Brayden Preserve Subdivision 1997 REVISION / X / LOCATION BY RECORD / X / Harnett County, North Carolina Caleb Kernan OTHER / X / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 7 OUT Q1o/Qfull = 0.77 Pipe Dia= 36 in V/Vfull = 1.10 Qio= 39.50 cfs V= 8.0 fps Qfull = 51.46 cfs Vfull = 7.27 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in Riprap Class = 1 s Apron Thickness = 22.5 in 3 Apron Length = 24.0 ft Apron Width @ Outlet = 9 ft Apron Width @ End = 27.0 ft L Length 1 Storm Outlet Structure FES No.= PIPE 8 OUT Q1o/Qfull = 1.07 Pipe Dia= 18 in V/Vfull = 1.13 Q10= 7.98 cfs V= 4.8 fps Qfull = 7.43 cfs Vfull = 4.20 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length = 9.0 ft Apron Width @ Outlet = 4.5 ft Apron Width @ End = 10.5 ft Length 1997-Storm drainage.xlsx LATEST REVISION: 1/17/2024 5:21 PM PAGE 4 OF 6 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 10-23-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Brayden Preserve Subdivision 1997 REVISION / X / LOCATION BY RECORD / X / Harnett County, North Carolina Caleb Kernan OTHER / X / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 9 OUT Q1o/Qfull = 0.71 Pipe Dia= 24 in V/Vfull = 1.08 Q10= 12.17 cfs V= 5.9 fps Qfull = 17.05 cfs Vfull = 5.42 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length 12.0 ft Apron Width @ Outlet = 6 ft Apron Width @ End = 14.0 ft L Length Storm Outlet Structure FES No.= TSB 6 OUT Q1o/Qfull = 0.91 Pipe Dia= 24 in V/Vfull = 1.13 Q10= 22.00 cfs V= 8.7 fps Qfull = 24.12 cfs Vfull = 7.67 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in Riprap Class = 1 s Apron Thickness = 22.5 in 3 Apron Length 16.0 ft Apron Width @ Outlet = 6 ft Apron Width @ End = 18.0 ft Length 1997-Storm drainage.xlsx LATEST REVISION: 1/17/2024 5:21 PM PAGE 5 OF 6 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 10-23-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Brayden Preserve Subdivision 1997 REVISION / X / LOCATION BY RECORD / X / Harnett County, North Carolina Caleb Kernan OTHER / X / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 10 OUT Q1o/Qfull = 0.10 Pipe Dia= 18 in V/Vfull = 0.67 Qio= 1.08 cfs V= 4.0 fps Qfull = 10.50 cfs Vfull = 5.94 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in Apron Length = 9.0 ft Apron Width @ Outlet = 4.5 ft Apron Width @ End = 10.5 ft Length 1997-Storm drainage.xlsx LATEST REVISION: 1/17/2024 5:21 PM PAGE 6 OF 6