Loading...
HomeMy WebLinkAboutSW6230702_Plansheet - 1 Cover Sheet_20240116 CONSTRUCTION DRAWINGS FOR: THE HOMES AT REEDY BRANCH R ID NTIA D V OPM NT 7 71 NC 27 W HIGHWAY 5 HARNETT COUNTY NORTH CAROLINA HARNETT REGIONAL WATER (HRW) REQUIRED NOTES: 1. APPROVAL OF THIS PLAN DOES NOT GUARANTEE WATER CAPACITY. CURRENT/FUTURE CAPACITY MAY NOT BE AVAILABLE. THIS 3 DEVELOPMENT MAY REQUIRE ADDITIONAL IMPROVEMENTS TO THE EXISTING WATER SYSTEM TO MEET FUTURE WATER DEMANDS PRIOR PROPERTY OWNER / PROJECT DEVELOPER O� TO A APPROVAL PRELIMINARY PLAT, CONSTRUCTION PLAN AND/OR FINAL PLAT NC 27 HWY 2. THE HOA WILL BE RESPONSIBLE FOR THE MAINTENANCE OF THE HARRINGTON PROPERTIES OF NC MAIL KIOSK, OPEN SPACES, AND ALL LANDSCAPE BUFFERING AND ti DRAINAGE EASEMENTS. PROJECT CONTACT: BRANDON HARRINGTON 2659 SAN LEE DRIVE 0ti �� ��s�Q SANFORD, NC 27330 y�<< LEGEND OF ABBREVIATIONS PHONE: 919-770-5969 BC BACK OF CURB N/F NOW OR FORMERLY CB CATCH BASIN PC POINT OF CURVATURE EMAIL: BRANDON@HARRINGTONPROPERTIESOFNC.COM CO CLEAN OUT P.D.E. PERMANENT DRAINAGE EASEMENT CPP CORRUGATED PLASTIC PIPE PT POINT OF TANGENCY G CMP CORRUGATED METAL PIPE PP POWER POLE C&G CURB&GUTTER PVC POLYVINYL CHLORIDE PIPE S DI DROP INLET PVI POINT OF VERTICAL INTERSECTION SHEET INDEX �4 O� DIP DUCTILE IRON PIPE RCP REINFORCED CONCRETE PIPE S�� �� EB ELECTRICAL BOX RRX RAILROAD CROSSING ( 10 SHEETS TOTAL FOR SW SUBMITTAL) SITE 2 ECM EXISTING CONCRETE MONUMENT R/W RIGHT OF WAY EG EDGE OF GRAVEL SS OR SAN SANITARY SEWER ciy(�gF�F� O EIP EXISTING IRON PIN SSMH SANITARY SEWER MANHOLE 1 COVER SHEET sR Ro EL ELEVATION T.C.E. TEMPORARY CONSTRUCTION EASEMENT I234 O EP EDGE OF PAVEMENT TF TRANSFORMER �a EPK EXISTING PKNAIL 2 OVERALL PROPERTY AND LOT LAYOUT TMH TELECOMMUNICATION MANHOLE �[ EV ELECTRICAL VAULT TP TELEPHONE PEDESTAL 3 OVERALL CONSTRUCTION PLAN Z7 FH FIRE HYDRANT TS TOP SIDEWALK FO FIBER OPTIC TSP TRAFFIC SIGNAL POLE CLARK R_OAD FOM FIBER OPTIC MARKER TW TOP OF WALL 4 PLAN / PROFILE SR 1_ FOB FIBER OPTIC BOX UC UNDERGROUND COMMUNICATIONS GUY GUY WIRE VB VALVE BOX SMITH FARMS DRIVE: STA 100+00 TO STA 114+00 HP HIGH POINT VC VERTICAL CURVE INV INVERT WCR WHEELCHAIR RAMP 5 PLAN / PROFILE IPS IRON PIN SET WM WATER METER re) JB JUNCTION BOX(STORM) WV WATER VALVE SMITH FARMS DRIVE: STA 114+00 TO STA 126+00 K RATE OF VERTICAL CURVATURE YI YARD INLET LP LIGHT POLE 6 PLAN / PROFILE o REEDY BRANCH LANE: STA 200+00 TO STA 211+50 7 NC 27 HWY WIDENING LEGEND OF SYMBOLS AND LINES 8 WALKING TRAIL / MAIL KIOSK AND PARKING LOCATION MAP o [� ClA TEMPORARY CI7nCTnnl r`nnITl7nl PROPERTY CORNER � RIGHT OF WAY N ./ UTILITY POLE PROPERTY LINE (ADJACENT) > ' �� SCALE: 1 IN = 1,000 FT = LIGHT POLE � STREAM/CREEK (INITIAL PI 'ASE OF CONSTRUCTION) TELEPHONE PEDESTAL T❑ CENTER LINE p GATE VALVE LIMITS OF DISTURBANCE ri 0-1 OA TEMPORARY EROSION CONTRO D ROUGH GRADING� A i N REDUCER Q UNDERGROUND ELECTRIC LINE UE Z WATER METER ❑wM OVERHEAD ELECTRIC LINE ' OHE (DURING CONSTRUCTION) FIRE HYDRANT SANITARY SEWER(GRAVITY) SAN SEWER MANHOLE Q SANITARY SEWER(FORCEMAIN) FM p ! !-! !ATEMPORARY EROSION CONTROL AND ROUGH GRADING- SEWER CLEANOUT • STORM DRAIN PIPE STORM CATCH BASIN (COMBO) ® WATER LINE W(FINAL PHASE OF CONSTRUCT!ON) = STORM CATCH BASIN (OPEN THRT) 0 GAS LINE GAS 12 NOTES FOR TEMPORARY EROSION CONTROL AND LJCIII II CC STORM JUNCTION BOX/MH COMMUNICATIONS LINE T Q MAY 1 '" C S 2023 HANDICAP � FIBER OPTIC LINE FO 13 TYPICAL SECTIONS AND CONSTRUCTION DETAILS , SPOT ELEVATION 1000..00 FENCE LINE W SIGN So TREE LINE 14 NCDOT STQNnQRn -D A\A/INC;S ALIGNMENT CHANGE O DRAINAGE FLOW PVI Qo CURB AND GUTTER ZO 15 i G HRW CTANDIARI DRAWINGS AND NOTE DELTA 0 CURB AND GUTTER(SPILL) � z 17 -i 4 CONSTRUCTION DETAILS NOTE: CONCRETE PAVEMENT EXISTING FEATURES ARE SHOWN SHADED. Q 2 19 DRAINAGE AREA MAP - STORM DRAINAGE J THOMAs ENGINEERING , INC * ROCK LINER N UN-SUITABLE SOILS FOR SEPTIC U W O CIVIL_ ENGINEERING & PLANNING CALL BEFORE YOU DIG U O p N ®® 143 Charlotte Avenue, Suite 104 �I� I Sanford, North Carolina 27330 N�+ � AGENCY REVIEW ONLY V (919) 777-6010 phone www.jthomasengineering.com license no. C-3389 project no. 22-004 U ai