Loading...
HomeMy WebLinkAboutNCC231911_MODIFICATION Supporting Doc (PHASE 2)_20231222 City of Asheville ALT H E C I TY O F Development Services Department Site Engineering Division ASH EVILLE Box 7148 Asheville, NC 28802 Phone:828-259-5670 www.ashevillenc.gov LETTER OF APPROVAL Date: 12/20/2023 D. R. Horton Debra E Green 80 Peachtree Rd. Suite 200 Asheville, NC 28803 RE: Project Name: Aberdeen Place Phase II, Lots TH-50, TH -52, TH-54, TH-60, TH-61, TH-62, TH-63, TH-64, TH-65, TH-70, TH-71, TH-72, TH-73, TH-74, TH-75, TH-80, TH-81, TH-82, TH-83, TH-84, & TH-85 Address: 1 Cain Hollow Way Permit Number: 21-08500PZ City: Asheville County: Buncombe Date Received: 08-23-2017 River Basin: French Broad PIN: 9627-07-9162, -9154, -9136, -9129, -0224, -9212, -0206, -8294, -9299, -8287, -9382, -8370, -9364, -8352, -9357, -8345, -9440, -8337, -9422, -8410, -9415 Acres Approved: 1.07ac Plan Type: Residential River Classification: C Dear Ms. Debra Green, The Development Services Department Site Engineering Division has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. This plan shall expire one (1) year from the date of approval, as required by the City of Asheville Unified Development Ordinance Section 7-12-2(c)(2)f. This approval shall become null and void if you have not made progress on the site within six months after the date of approval. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI)form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form must be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Brooklyn Broussard at brooklyn.broussard@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. 1 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Title 15A NCAC 4B.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city ordinances or rules may also apply to this land disturbing activity. THis approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Sincerely, Ric Ledford, CFM Senior Plans Reviewer City of Asheville Public Works Dept. 2