Loading...
HomeMy WebLinkAboutSW4230801_SNAP Tool_20231208 Project Information Complete this sheet if required by your reviewing authority. Contact them for any questions. Grey boxes/text are optional. SNAPv4.2.0 LOCATION Project Name(optional): ACC Public Safety Training Center Parcel ID(optional): Submission Date(optional): date Nutrient Management Watershed: Jordan Lake menu Local Jurisdiction/Reviewing Agency: Winston-Salem menu Subwatershed: Haw_River menu Project Latitude Coordinates(optional): N Phosphorus Delivery Zone: Jordan-030050 menu Project Longitude Coordinates(optional): W Nitrogen Delivery Zone: Jordan-030050 menu PROJECT DETAILS Development Land Use Type: Institutional menu Disturbed Area: 1,470,586 ft2 Part of Common Development Plan? no yin Project Activity: New Development menu Designated Downtown Area? no y/n Project Drains to SA Waters? no y/n Public Linear Road/Sidewalk Project? no y/n Pre-Project Land Use: fallow/open menu Project Owner Type: State non-NCDOT menu Project Description(optional): L STORM WATER DETAILS (Falls ONLY)Onsite Reduction%Req. % Project Uses LID/Runoff Volume Match? no y/n Existing BUA/Development Onsite? yes y/n Local Gov't nutrient req's same as State? yes y/n Local Gov't cutoff date for Existing BUA: 08/11/2009 date Project Drains to Regional SCM? no y/n Nitrogen Export Rate Target: 1.43 Ib/ac/yr Total Nitrogen Offset Credits Needed: Ib/yr Phosphorus Export Rate Target: 1.43 Ib/ac/yr Total Phosphorus Offset Credits Needed: lb/yr SNAP v4.2.0 Project Area and Offsite Land Cover Characteristics Precipitation Burlington Station: Copy & Paste VALUES ONLY for Best Results Click here to scroll down to error messages on this sheet. I I PROJECT AREA LAND COVERS TN EMC (mg/L) TP EMC (mg/L) Pre-Project Area (ft2) Post-Project Area (ft2) Change pre-to-post(ft2) Roof 1.18 0.11 0 32,013 32,013 Roadway 1.64 0.34 55,597 292,083 236,486 Parking/Driveway/Sidewalk 1.42 0.18 0 77,217 77,217 Protected Forest 0.97 0.03 2,196,478 2,196,478 0 Managed Pervious/Landscaping 2.48 1.07 1,687,041 1,307,177 -379,864 Offsite or Existing Roof 1.18 0.11 0 0 Offsite or Existing Roadway 1.64 0.34 0 0 Offsite or Existing Parking/Driveway/Sidem 1.42 0.18 0 0 Offsite Protected Forest 0.97 0.03 0 0 Offsite Managed Pervious 2.48 1.07 0 0 CUSTOM LAND COVER 1 -II 0 CUSTOM LAND COVER 2 0 CUSTOM LAND COVER 3 0 LAND TAKEN UP BY SCM 1.18 0.11 34,148 34,148 Total (Regulated & UnReg)Area 3,939,116.00 3,939,116.00 Project(Regulated)Area 3,939,116.00 3,939,116.00 , SCM Characteristics Stormwater Control Measure (SCM)Characteristics Click here to go to Click here to go to Click here to go back to the Copy Et Paste VALUES ONLY for SCM101's Land Cover Data Click here to review Errors Summary Data tos SNAP v4.2.0 Best Results - Catchment ID 1 1 1 2 2 2 SCM ID 101 Drai' 102 103 201 202 203 • Type of SCM We[Pond 1 Hydrologic soil group at SCM location C SCM Description ` Design Storm Size(inches/24hrs) 1.00 Percent of Full Size 100% r %Annual Effluent 72% 0% 0% 0% 0% 0% %Annual Overflow 16% 0% 0% 0% 0% 0% %Annual ET/Infiltrated 13% 0% 0% 0% 0% 0% Custom%Annual Effluent Custom%Annual Overflow Custom%Annual ET/Infiltrated SCM Effluent TP EMC(mg/L) 0 0.13 0.00 0.00 0.00 0.00 0.00 SCM Effluent TN EMC(mg/L) 0.86 0.00 0.00 0.00 0.00 0.00 Custom Effluent TP EMC Custom Effluent TN EMC SCM Land Cover TP EMC(mg/L) 0.11 0.00 0.00 0.00 0.00 0.00 III SCM Land Cover TN EMC(mg/L) 1.18 0.00 0.00 0.00 0.00 0.00 I. This SCM Drains to Numbered SCM 0 0 0 0 0 0 Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchment Routing SCM 101 SCM 102 SCM 103 SCM 201 SCM 202 SCM 203 Catchment 1 Catchment 2 Catchment 3 Catchment 4 Catchment 5 Catchment 6 IError Check-Missing SCM Area: Ir Error Check-Min/Max Size: LError Check-Hydrology: IError Check-Missing SCM Info: 1 Error Check-Drainage Data w/o SCM: I Error Checks-SCM Type: ■ SCM ID: 101 102 103 201 202 203 SCM Drainage Area Land Covers Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Directly to SCM 101(ft2) SCM 102(ft2) SCM 103(ft2) SCM 201(ft2) SCM 202(ft2) SCM 203(ft2) 1 Roof 32,012 Roadway 252,130 Parking/Driveway/Sidewalk 76,103 Protected Forest 0 Managed Pervious/Landscaping 530,786 Offsite or Existing Roof Offsite or Existing Roadway Offsite or Existing Parking/Driveway/Sidewalk Offsite Protected Forest Offsite Managed Pervious CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM 34,148 TOTAL AREA DRAINING TO SCM(ft): 925,179 0 0 0 0 0 CATCHMENT AREA(ft): 925,179 0 Nutrient Export Summary SNAP v4.2.0 Landcover Et SCM Data Review Errors/Advisories Errors/Advisories Avg Annual precip(in)= 44.68 SCM Area(ft')= 34,148 Total(Regulated+ Unregulated)Area(k�)= 3,939,116 SCM Treated Area(ft2)= 925,179 Project(Regulated) 2 3,939,116 Catchment Routing: No errors Area(ft)= Net BUA(Project Area Treating Runoff from 345,716 Net BUA indicates new development or expansion. n0 BUA only ft2)= Existing BUA or Offsite: Custom Landcovers are present: no Disturbed Area(fte)= 1,470,586 Total Nitrogen Export Target 120.31 I Total Phosphorus Export Target 129.31 Scaled to Project Area(Ib/yr): Scaled to Project Area(Ib/yr): Total Area Total Area Project Area Total Area Project Area Total Area Project Area Project Area Total Area Project Area Nutrient Export Summary (Onsite+ (Onsite Only) Post-Project Post-Project Post-Project Post-Project Post-Project Post-Project Post-Project Post-Project Offsite) before before SCM-Treated SCM-Treated Untreated Untreated Pre-Project Pre-Project Treatment Treatment after Treatment after Treatment Area Only Area Only Areas Areas - Area(All Landcover Types)(acres) 90.4297 90.4297 90.4297 90.4297 90.4297 _ 90.4297 21.2392 21.2392 69.1905 69.1905 Percent Built-Upon Area(BUA)(%) _ 1% 1% 10% 10% 10% 10% 39% 39% 1% 1% Built-Upon Area(BUA)(sqft) 55,597 55,597 401,313 401,313 401,313 401,313 360,245 I 360,245 41,068 41,068 Annual Runoff Volume(ft3/yr) 827,674 827,674 1,979,027 1,979,027 1,808,053 1,808,053 1,179,211 1,179,211 628,842 628,842 Annual Runoff%Change 139% 139% 118% 118%Total Runoff Change(cuft/yr) 1,151,353 1,151,353 980,379 980,379 Total Nitrogen EMC(mg/L) 1.63 ME= 1.53 1.53 1.14 1.14 0.99 0.99 1.42 1.42 Total Nitrogen Load Leaving Site(lb/yr) 84.19 MEM_ 189.16 189.16 128.42 I 128.42 72.64 72.64 55.77 55.77 Total Nitrogen Loading Rate(Ib/ac/yr) 0.93 WE= 2.09 2.09 1.42 1.42 3.42 3.42 0.81 0.81 Total Nitrogen%Change Pre-to-Post _ 125% 125% 53% 53% Total Nitrogen Change(Ib/yr)Pm-to-Post 104.98 104.98 44.23 44.23 Total Phosphorus EMC(mg/L) 0.45 0.45 0.32 , 0.32 0.21 0.21 0.16 0.16 0.31 0.31 Total Phosphorus Load Leaving Site(Ib/yr) 23.33 23.33 39.31 39.31 24.19 24.19 12.07 12.07 12.12 I 12.12 Total Phosphorus Loading Rate(Ib/ac/yr) 0.26 0.26 0.43 0.43 0.27 0.27 0.57 0.57 0.18 0.18 Total Phosphorus%Change Pm-to-Post 68% 68% =rIZ= 4% Total Phosphorus Change(Ib/yr)Pre-to-Post I 15.98 15.98 0.86 0.86 SCM/Catchment Summary SCM ID and Type Volume TN Reduction TP Reduction TN Out TP Out Falls Lake ONLY:Onsite Reduction Compliance Check Reduction(%) (%) (%) (lbs/ac/yr) (lbs/ac/yr) Catchment 1 12.66% I 45.54% 55.60% 3.42 0.57 II Nitrogen II Phosphorus 101:Wet Pond 12.66% 45.54% 55.60% 3.42 0.57 Onsite%Reduction Requirement 102:NA _ 0.00% 0.00% _ 0.00% 0.00 _ 0.00 Export Target Scaled to Area(Ib/yr) 129.31 129.31 103:NA 0.00% 0.00% 0.00% 0.00 _ 0.00 _ Export Load Post-Project Before Treatment 189.16 39.31 Catchment 2 0.00% 0.00% _ 0.00% 0.00 _ 0.00 Total Reduction Need(lb/yr) 201:NA 0.00% 0.00% _ 0.00% 0.00 _ 0.00 Onsite Reduction Need(Ib/yr) 202:NA 0.00% 0.00% _ 0.00% 0.00 _ 0.00 Onsite Export Target(lb/yr) 203:NA 0.00% 0.00% 0.00% 0.00 0.00 Project Area Post-Project After Treatment _ 128.42 24.19 Catchment 3 0.00% 0.00% 0.00% 0.00 _ 0.00 301:NA 0.00% 0.00% _ 0.00% 0.00 _ 0.00 302:NA 0.00% 0.00% _ 0.00% 0.00 _ 0.00 _ 303:NA 0.00% 0.00% 0.00% 0.00 0.00 _ Catchment 0.00% 0.00% 0.00% _ 0.00 0.00 401:NA 0.00% 0.00% 0.00% _ 0.00 0.00 402:NA 0.00% 0.00% 0.00% _ 0.00 0.00 403:NA __ 0.00% 0.00% 0.00% 0.00 0.00 _ Catchment 5 0.00% 0.00% 0.00% 0.00 0.00 501:NA 0.00% 0.00% 0.00% 0.00 0.00 502:NA 0.00% 0.00% 0.00% 0.00 0.00 503:NA 0.00% 0.00% 0.00% 0.00 0.00 _ Catchment 6 0.00% 0.00% _ 0.00% 0.00 _ 0.00 _ 601:NA 0.00% 0.00% _ 0.00% 0.00 _ 0.00 602:NA 0.00% 0.00% _ 0.00% 0.00 _ 0.00 _ 603:NA 0.00% 0.00% 0.00% 0.00 0.00 1 Nutrient Management Strategy Watershed - Nutrient Offset Credit Reporting Form SNAP v4.2.0 Please complete and submit the following information to the local government permitting your development project to characterize it and assess the need to purchase nutrient offset credits. Contact and rule implementation information can be found online at: http://deq.nc.gov/about/divisions/water-resources/planning/nonpoint-source-management/nutrient-offset-information PROJECT INFORMATION Applicant Name:1 Project Name: ACC Public Safety Training Center Project Address: Date: (mm/dd/yyyy) Development Land Use Type: Institutional County: Project Activity Type: New Development Project Area(sqft): 3,939,116 Project Latitude: 0.000000 Post-Project Built-Upon Area%: 10.19% I Project Longitude: 0.000000 WATERSHED INFORMATION Nutrient Management Watershed: Jordan Lake N Target Export Rate(Ib/ac/yr): 1.43 Subwatershed: Haw_River P Target Export Rate(Ib/ac/yr): 1.43 Nitrogen Delivery Zone: Jordan-030050 Nitrogen Delivery Factor: 64% Phosphorus Delivery Zone: Jordan-030050 Phosphorus Delivery Factor: 62% PERMANENT NUTRIENT OFFSET REQUEST Post-Project Nitrogen Calculations -Projects with No Offsite or Built-Upon Area (A) (B) (C) (D) (F) (G) (Where Applicable) TN Export TN Remaining TN Permanent Additional I Total TN TN Untreated TN Treated TN Delivery Offsets Permanent Load(Ib/yr) Target Load Load(lb/yr) Reduction Factor(%) Required Local Gov't Offsets to (Ib/yr) Need(Ib/yr) (Ib/yr) Offsets(Ib/yr) Buy(Ib/yr) 189.2 129.3 128.4 0.0 I 64.0% 0.0 0.0 Post-Project Phosphorus Calculations -Projects with No Offsite or Built-Upon Area (A) (B) (C) (D) (F) (G) (Where Applicable) TP Export TP Remaining TP Permanent Additional Total TP TP Untreated TP Treated TP Delivery Offsets Permanent Load(Ib/yr) Target Load Load(Ib/yr) Reduction Factor(%) Required Local Gov't Offsets to (Ib/yr) Need(Ib/yr) (Ib/yr) Offsets(Ib/yr) Buy(Ib/yr) 39.3 129.3 24.2 0.0 62.0% 0.0 0.0 LOCAL GOVERNMENT AUTHORIZATION Local Government Name:I Staff Name: Phone: Staff Email: Date: Local Government Authorizing Signature: