HomeMy WebLinkAboutSW1221002_Response To Comments_20231208 Gresham
` Smith
December 7, 2023
Mr. Jim Farkas
NCDEQ
512 North Salisbury Street
Raleigh, NC 27699-1612
Subject: Asheville Regional Airport Terminal Modernization and Expansion
Asheville, NC
Gresham Smith Project Number: 43483.02
Dear Mr. Farkas:
The following are Gresham Smith responses to your comments from your email dated November 21,
2023 regarding Asheville Regional Airport Terminal Modernization and Expansion.
1. Comment: Please provide the SHWT Elevation.
Please use the borings provided as part of the 7/11/2022 geotechnical report as these
borings were taken within the footprint of the proposed SCM and report the depth to
the SHWT (not just the depth to encountered water as this fluctuates over time
whereas SHWT is more constant and what the MDC requires).
The two borings from the 7/11/2022 geotechnical report indicate the depth from the
existing ground surface to the SHWT so in order to determine the elevation of the
SHWT,the elevation of the existing ground surface for these two borings needs to be
provided.
Please provide these two existing ground surface elevations and update the
Supplement-EZ Form (and any other submittal items) needed to reflect this SHWT
elevation.
222 Second Avenue South GreshamSmith.com
Suite 1400
Genuine Ingenuity Nashville,TN 37201
615.770.8100
Jim Farkas
State Stormwater Engineer
DEMLR Post-Construction Stormwater Program
December 7,2023
Response: The 7/11/2022 geotechnical report indicates minimum depths for the SHWT at
borings Ksat-1 and Ksat-2. At the time of the borings, the existing surface elevation
at Ksat-1 was 2119.00 and 2119.38 at Ksat-2.
From the geotechnical report, the SHWT is noted as a minimum of 36" from the
surface elevation at Ksat-1, which correlates to a maximum SHWT elevation of
2116.00. Additionally, the SHWT is noted as a minimum of 34" from the surface
elevation at Ksat-2,which correlates to a maximum SHWT elevation of 2116.58.
The existing ground elevation at the boring locations, prior to the South Apron
Expansion Project in May 2020, was 2103.87 at Ksat-1 and 2112.61 at Ksat-2. These
are based on the existing survey file used for the design of project SW1190702 by
Parrish and Partners.
Therefore, due to fill being placed during the May 2020 project SW1190702, it is
assumed to be extremely unlikely the SHWT reaches above the existing ground
elevation prior to fill being placed.As a conservative assumption,the SHWT has been
listed as 2112.61. Please see the boring elevations exhibit included with this
resubmittal for boring locations and elevations for the two topographical surveys,
dated September 2019 and September 2020.
2. Comment: Please provide a sealed hard copy of the calculations (This item is required per 15A
NCAC 02H .1042(2)(f)).The provided hard copy of the calculations were signed, but
not sealed. You can just provide a signed &sealed hard copy of the cover page and we
can slipsheet it into the full hard copy of the calculations that we currently have.
Response: A signed and sealed cover page of the drainage report has been included with this
resubmittal.
3. Comment: The percent BUA for the dry pond does not appear to be calculated correctly. Unlike
with the project area,the drainage area of an SCM cannot exclude existing BUA from
the density calculation (per 15A NCAC 02H .1003(3)(b)). Please make the following
changes:
o Application, Section IV, 10, Drainage Area Column 1:
■ Proposed Impervious Area - Change the provided value (33,842
sf) to 215,541 sf to account for the existing BUA within the DA.
■ Percent Impervious Area - Change the provided value (54.50%)
to 88.41% to account for the existing BUA within the DA.
■ Existing BUA - Change the provided value ("-" sf) to 181,699 sf
to account for the existing BUA within the DA.
■ Total - Change the provided value (33,842 sf) to 215,541 sf to
account for the existing BUA within the DA.
Page 12
Jim Farkas
State Stormwater Engineer
DEMLR Post-Construction Stormwater Program
December 7,2023
o Supplement-EZ Form, Drainage Area Page, Dry Detention Pond
Column:
■ Line 18 - Change the provided value (55%) to 88% to account
for the existing BUA within the DA.
Response: Application, Section IV, 10, Drainage Area Column 1 has been updated to list 215,541
sf for proposed impervious area, 88.41% for percent impervious area, 181,699 sf for
existing BUA, and 215,541 sf for total impervious area.
Supplement-EZ Form, Drainage Area Page, Dry Detention Pond Column has been
updated to list 88% for percent impervious area.
4. Comment: Supplement-EZ Form, Dry Pond Page, Line 29 - This cell automatically rounds to the
nearest whole inch (2") whereas the proposed orifice diameter is 1.9". Please either
manually correct this cell of the spreadsheet (to show 1.9") or specify in the Additional
Information (Line 37) that the actual drawdown orifice diameter is 1.9".
Response: Supplement-EZ Form, Dry Pond Page, Line 29 has been updated to show the
accurate orifice diameter of 1.9".
5. Comment: Please provide the following:
- 1x hard copy & ix electronic copy of the existing ground surface elevation for
the two borings from the 7/11/2022 geotechnical report (to determine the
SHWT elevation).
- 1x hard copy & ix electronic copy of the revised pages of the Supplement-EZ
Form.
- 1x hard copy & 1x electronic copy of the revised pages of the Application.
- 1x hard copy & 1x electronic copy of the revised pages of the calculations
(signed &sealed).
- 1x hard copy (2x hard copies for plans) & ix electronic copy of anything else
needed to address these comments.
Response: The above information has been included with this resubmittal.
6. Comment: Hard copies should be mailed to me at the following address:
For FedEx/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640M
Raleigh, NC 27604
For USPS:
Jim Farkas
1612 Mail Service Center
Page 13
Jim Farkas
State Stormwater Engineer
DEMLR Post-Construction Stormwater Program
December 7,2023
Raleigh, NC 27699-1612
Hand Delivery:
Please reach out to me prior to hand delivering a submission to make sure that
I (or someone else in my group) will be able to receive the submission. Do not
leave the package in the foyer with the security guard.
NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay
the review process and the submission package may be lost while being sent
from the Regional Office to me in the Central Office.
Electronic copies should be uploaded at the following location:
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
Response: Acknowledged.
If you have any questions, please do not hesitate to call me at 615-770-8155.
Sincerely,
Nathan Hudgens, P.E.
Gresham Smith
Page 14