Loading...
HomeMy WebLinkAboutSW6231109_Construction Sequence_20231127 No. E22007101 Page 1 of 2 Duke Energy Progress (DEP) Barker Laydown Yard Site Preparation Scope of Work 11/06/2023 Mow the site and install gravel per Approved Erosion Control Plan to include: 1. Duke Energy Progress (DEP)will obtain and pay for the following permits: 1. Cumberland County Special Use Permit 2. Cumberland County Site Plan 3. NCDEQ Erosion and Sediment Control 4. NCDEQ low-density Stormwater Permit 5. NCDOT Driveway Permit 2. No work may start on the site until all the required permits have been obtained. 3. Furnish and install the "Temporary Construction Entrance." 4. Install the silt fence. Clear/mow only enough area to install the silt fence. 5. Clear only the area at and around all "Sediment and Erosion Control Devices" (Silt Fence Outlets, etc.). 6. Install the "Sediment and Erosion Control Devices". 7. Install Temporary Seeding. 8. Mow the site. 9. Install and compact ABC stone on top of the existing grade and ensure positive drainage across the site. 10. Install Permanent Seeding. 11. "Sediment and Erosion Control Devices" shall be maintained through completion of the project. The contractor shall make any repairs as necessary to the Sediment and Erosion Control Devices"throughout the duration of his contract for the project. The contractor shall keep all sediment on site. 12. The contractor shall keep Braxton Road free of soil, stone, and debris from the construction site. It shall be the responsibility of the contractor to remove any soil, stone, and debris deposited onto the roadway by sweeping, washing or by other methods. Page 1 of 2 No. E22007101 Page 2 of 2 13. The contractor shall inspect all "Sediment and Erosion Control Devices" at least once weekly. The contractor shall also inspect all the "Sediment and Erosion Control Devices" after each rainfall of 1 inch or more within 24 hours after the rain has stopped. A rain gauge shall be installed at the project site to facilitate rainfall monitoring. In North Carolina, at each inspection of the "Sediment and Erosion Control Devices", the contractor is required to complete the "Stormwater Inspections for General Permit NCG010000-Land Disturbing Activities form and post it in the permit box located on site. 14. The contractor, in North Carolina, shall conduct self inspections for erosion and sedimentation control and complete the self-inspection report for land disturbing activity form as required by NCGS 113A-54.1 after each phase of the approved erosion and sedimentation control plan is implemented. This form shall be maintained on-site to be available at all times. Page 2 of 2