Loading...
HomeMy WebLinkAboutSW6231105_Soils/Geotechnical Report_20231114 .•-. _..- Ili- i ___;.1 r , -v -------,,--. _ , .. ,FL _,.1 kE 1 " 1 J - - :.� r -41 _ 4_,,A6..„.,...t.e.,:. . Ai k .!c9 ice: - 3,; 4f r : ECS Southeast, LLP Revised Geotechnical Engineering Report LHA Caton Road 590 Caton Road Lumberton, North Carolina ECS Project No. 33:5995-R1 July 7, 2023 ECS SOUTHEAST, LLP "Setting the Standard for Service" Geotechnical • Construction Materials • Environmental • Facilities July 7, 2023 Mr. Bob Egan The Wooten Company 120 N Boylan Ave Raleigh, NC 27603 ECS Project No. 33:5995-R1 Reference: Revised Geotechnical Engineering Report LHA Caton Road 590 Caton Road Lumberton, Robeson County, North Carolina Dear Mr. Egan: ECS Southeast, LLP (ECS) has completed the subsurface exploration, laboratory testing, and geotechnical engineering analyses for the above-referenced project. Our services were performed in general accordance with our agreed to scope of work. This revised report presents our understanding of the geotechnical aspects of the project along with the results of the field exploration and laboratory testing conducted, and our design and construction recommendations. This revised report is being issues to correct the elevations of the borings per the request of Mr.Justin Bright with The Wooten Company. It has been our pleasure to be of service to The Wooten Company during the design phase of this project. We would appreciate the opportunity to remain involved during the continuation of the design phase, and we would like to provide our services during construction phase operations as well to verify subsurface conditions assumed for this report.Should you have any questions concerning the information contained in this report, or if we can be of further assistance to you, please contact us. Respectfully submitted, ECS Southeast, LLP Caitlin M. Cerza Winslow Goins, P.E. Staff Project Manager Principal,Engineer CCerza@ecslimited.com V1j ►ns@ecslirni,ted.com • f//o �, u,\\\\\\ 6151 Raeford Road, Suite A, Fayetteville, NC 28304 • T: 910-401-3288 • www.ecslimited.com ECS Capitol Services,PLLC • ECS Florida,LLC • ECS Mid-Atlantic,LLC • ECS Midwest,LLC • ECS Southeast,LLP • ECS Southwest,LLP NC Engineering No.F-1078•NC Geology No.C-553•SC Engineering No.3239 LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page i TABLE OF CONTENTS EXECUTIVE SUMMARY 1 1.0 INTRODUCTION 2 2.0 PROJECT INFORMATION 2 2.1 Site Information 2 2.2 Proposed Construction 3 3.0 FIELD EXPLORATION AND LABORATORY TESTING 4 3.1 Field Exploration 4 3.2 Laboratory Testing 4 3.3 Subsurface Characterization 4 3.4 Groundwater Observations 5 4.0 DESIGN RECOMMENDATIONS 5 4.1 Foundations 5 4.2 Slabs On Grade 6 4.3 Seismic Design Considerations 7 4.4 Pavements 7 5.0 SITE CONSTRUCTION RECOMMENDATIONS 9 5.1 Subgrade Preparation 9 5.1.1 Stripping and Grubbing 9 5.1.2 Proofrolling 9 5.2 Earthwork Operations 10 5.2.1 Excavation Considerations 10 5.2.2 Structural Fill 10 5.3 Foundation and Slab Observations 11 5.4 Pavements 12 6.0 CLOSING 13 APPENDICES Appendix A—Drawings& Reports • Site Location Diagram • Boring Location Diagram • Subsurface Cross Sections Appendix B—Field Operations • Reference Notes for Boring Logs • Subsurface Exploration Procedure: Standard Penetration Test (SPT) • Boring Logs B-01 through B-12 Appendix C—Laboratory Testing • Laboratory Test Results Summary LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 1 EXECUTIVE SUMMARY This executive summary is intended as a very brief overview of the primary geotechnical conditions that are expected to affect design and construction. Information gleaned from the executive summary should not be utilized in lieu of reading the entire geotechnical report. • Structural loading for the proposed construction was not available at the time this report was prepared. However, based on the assumed framing and anticipated construction material type, we estimate maximum column and wall loads will likely be less than 100 kips and 3 kips per linear foot, respectively for the apartment buildings. We estimate maximum column and wall loads will likely be less than 50 kips and 2 kips per linear foot, respectively for the community center building. • Provided the subgrades are prepared as recommended in this report, the planned building may be supported by conventional shallow foundations consisting of column or strip footings bearing on compacted structural fill and natural soils sized using a net allowable soil bearing pressure of 2,500 psf. • Based on the N-values measured in the borings,a Seismic Site Class D is recommended for seismic design of the proposed structures. Geophysical testing to measure shear wave velocities of the subsurface materials could be performed for this project to potentially improve the site class. • ECS should be retained to review the design documents for conformance with our recommendations. • ECS should be retained for construction materials testing and special inspections to facilitate proper implementation of our recommendations. LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 2 1.0 INTRODUCTION The purpose of this study was to provide geotechnical information for the design of roadways, foundations, floor slabs, and stormwater control measure (SCM) areas for the proposed housing development. The project will likely include the development of five multi-family residential areas and their associated community center and pavements. The recommendations developed for this report are based on project information supplied by Russell Pearlman and Justin Bright with The Wooten Company. Our services were provided in accordance with our Proposal No. 33:5176-GP dated April 13, 2022, as authorized by Bob Egan with The Wooten Company on April 29, 2022, which includes our Terms and Conditions of Service. This report contains the procedures and results of our subsurface exploration and laboratory testing programs, review of existing site conditions, engineering analyses, and recommendations for the design and construction of the project. The report includes the following items. • Observations from our site reconnaissance including current site conditions. • Brief review of the published geologic conditions. • Description of the field exploration and laboratory tests performed. • Characterization of the subsurface conditions. • Recommended allowable soil bearing pressure for conventional shallow foundations. • Recommendations for slab-on-grade design and construction. • Recommendations for seismic site classification. • Recommendations for design and construction of the pavements. • Evaluation of the on-site soil characteristics encountered at the testing locations, including reuse of on-site soil as engineered fill, compaction requirements and structural fill material guidelines. • Site and boring location diagrams. • Logs of the soil borings and results of the laboratory testing. 2.0 PROJECT INFORMATION 2.1 SITE INFORMATION The subject site is located east of 590 Caton Road in Lumberton, North Carolina. The property is further identified by the Robeson County Online GIS Database as Parcel Identification Number (PIN) 938201325479. The location of the site is shown on Figure 2.1.1 and indicated on the Site Location Diagram in Appendix A. The property currently consists of undeveloped agricultural land on the southern portion of the property and woods on the northern portion of the property.There is overhead electric running along the southern boundary of the property along Caton Road. Based on the Robeson County GIS database, the existing ground surface is relatively flat with approximate elevations of 139 to 142 feet, NAVD88. LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 3 r Air A ,., .... -_- _ __.- -,,,, '.. ..,) . ....„ . .. ,•,- •. . r....._...• .. . ... , :-.. • , : _ .... „.‘, - , .., -\ . ....,-,. ,, - „Tot- ., , -,... • • , , , , )... .! . _. s ..... . , , . ... ...• ```l\ 1 C. % It `r ... . . . .. . tik,.., ,,,,, ,1„.. , -,,,,,,,, ,=? ,,,, , • • , . 4,„*„, ,,,, , z-N i :yy. ncsx T ., A .x 44,lik, * . 4 • , is • ti — ', w i t r'1 �.!'- ' �k_ �► c —1 _ Gar _ r r� 1 1iit Vl O.AG +ykk r__ i E 11 ^i.._i ly - I - I l` erg c \` .. t. Figure 2.1.1. Site Location 2.2 PROPOSED CONSTRUCTION The project involves construction of five multi-family residential buildings and a community center building with their associated pavements, playground, and stormwater control measure area. Detailed information about the proposed buildings have not been provided, we assume the residential buildings will likely be a two-story, wood-framed structure with masonry load bearing walls and a slab-on-grade ground floor. We assume the community center building will likely be a single-story, wood-framed structure with masonry load bearing walls, and a slab-on-grade ground floor. We assume the maximum unfactored foundation loads for the residential buildings will likely be 100 kips for the maximum column load, 3 kips per foot for the maximum wall loads, and a maximum ground floor slab load of 150 pounds per foot(psf). We assume the maximum unfactored foundation loads for the community center building will likely be 50 kips for the maximum column load, 2 kips per foot for the maximum wall loads, and a maximum ground floor slab load of 150 pounds per foot (psf). LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 4 The structural engineer should verify these assumptions and notify ECS if the actual unfactored foundation design loads exceed or are significantly less than these assumed values. Design grades have not been provided to us. Based on the existing site grades and our experience with similar projects, we assume that cut and fill depths will likely be less than 1 foot for general site grading. Deeper cuts are anticipated for the proposed stormwater control measure area. Detailed design traffic loading is not available at this time. We assume design traffic loads will likely be limited to cars and light trucks in light-duty areas (less than 20,000 ESALs in 20 years), in addition to occasional delivery,garbage, and recycling trucks in heavy-duty areas(less than 50,000 ESALs in 20 years). 3.0 FIELD EXPLORATION AND LABORATORY TESTING 3.1 FIELD EXPLORATION Our exploration procedures are explained in greater detail in Appendix B including the insert titled Subsurface Exploration Procedures. Our scope of work included drilling 12 borings. Our borings were located with a handheld GPS unit and their approximate locations are shown on the Boring Location Diagram in Appendix A. 3.2 LABORATORY TESTING Each sample was visually classified on the basis of texture and plasticity in accordance with ASTM D2488 Standard Practice for Description and Identification of Soils (Visual-Manual Procedures). The laboratory testing consisted of selected tests performed on samples obtained during our field exploration operations. Classification and index property tests were performed on representative soil samples in accordance with ASTM D2487 Standard Practice for Classification for Engineering Purposes (Unified Soil Classification System (USCS)). Classification and index property tests performed included two natural moisture content tests,two percent passing sieve number 200 (wash sieve)tests, and two Atterberg limits tests. After identification and classification, the samples were grouped in the major zones noted on the boring logs in Appendix B. The group symbols for each soil type are indicated in parentheses along with the soil descriptions. The stratification lines between strata on the logs are approximate; in situ, the transitions may be gradual. 3.3 SUBSURFACE CHARACTERIZATION The site is located within the Coastal Plain physiographic province. The Coastal Plain is typically characterized by marine,alluvial, and aeolian sediments that were deposited during periods of fluctuating sea levels and moving shorelines. Basal formations are typical of those laid down in a shallow sloping sea bottom;dense sand,consolidated clay, limestone,chalk,marl,claystone,and sandstone.Overburden soils include marine interbedded gravel, sand, silt, and clay. Many of the clays have been preconsolidated by desiccation from frequent rising and lowering of the sea level and groundwater table.Alluvial gravel,sand, silt, and clay are typically present near rivers and creeks. The following sections provide additional information about the soil and rock strata encountered during our subsurface exploration. LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 5 Surficial Material: The borings encountered approximately 1 inch of topsoil across the site. Residuum: The natural soils encountered below the existing topsoil generally consisted of Clayey SAND (SC), Clean SAND (SP), Silty SAND (SM), and SAND with clay(SP-SC), in addition to interbedded CLAY(CL, CH).The SPT N-values within the sands ranged from 4 to 50+ bpf, indicating a relative density of very loose to very dense. The SPT N-values within the silts and clays ranged from 2 to 26 bpf, indicating a consistency varying from soft to very stiff. Please note that the ground surface elevations shown on the boring logs were not surveyed by a licensed surveyor. These elevations were interpolated using topographic information obtained from Robeson County GIS database.They should be considered approximate and accurate to +/-several feet. 3.4 GROUNDWATER OBSERVATIONS Water levels were measured in our borings as noted on the boring logs in Appendix B. Groundwater depths measured at the time of drilling ranged from 5.5 to 17 feet below the ground surface. Borings B- 10 and B-12 did not encounter groundwater seepage during our exploration at the depths explored. Variations in the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, construction activities, and other factors. 4.0 DESIGN RECOMMENDATIONS 4.1 FOUNDATIONS Provided subgrades and structural fills are prepared as recommended in this report, the proposed structures can be supported by shallow foundations including column footings and continuous wall footings. We recommend the foundation design use the following parameters: Design Parameter Column Footing Wall Footing Net Allowable Bearing Pressure(1) 2,500 psf 2,500 psf Acceptable Bearing Soil Material Stable Natural Soil or Compacted Structural Fill Minimum Width 24 inches 18 inches Minimum Footing Embedment Depth (below slab or finished grade)(2) 18 inches 18 inches Estimated Total Settlement(3) Less than 1 inch Less than 1 inch Estimated Differential Settlement(4) Less than 1/22inch Less than 1/2inch over between columns 50 feet Notes: (1) Net allowable bearing pressure is the applied pressure in excess of the surrounding overburden soils above the base of the foundation. (2) For bearing considerations and frost penetration requirements. (3) Based on assumed structural loads.If final loads are different,ECS must be contacted to update foundation recommendations and settlement calculations. (4) Based on maximum column/wall loads and variability in borings.Differential settlement can be re-evaluated once the foundation plans are more complete. LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 6 4.2 SLABS ON GRADE Assuming the finished floor elevation is around the current site elevations, it appears that the slabs for the structure will likely bear on the near-surface sandy soils and/or new compacted structural fill. These materials can support a slab-on-grade; however, there may be areas of soft or yielding soils that should be removed and replaced with compacted structural fill in accordance with the recommendations included in this report. We assume that the ground floor slabs-on-grade will likely be at or above finish exterior grades around the entire building footprints. For this case, the 2018 North Carolina Building Code does not require damproofing or waterproofing of the slab. However, depending on floor coverings and building use, a capillary break layer and vapor retarder should be installed to prevent excessive moisture from coming in contact with the concrete floor slab from the soils below. The following graphic depicts our soil-supported slab recommendations: - - - - Vapor Retarder or Vapor Concrete Slab Barrier OOoO 0c0 oO o 0 00 O o 00 0 0 0 0 °0 0 00 0 0 0 o O 0 0 0 0 0 0 0 0 Base Course 0 0 v Firm,Stable, Compacted Soil Subgrade 4.2.1 Floor Slab Section 1. Base Course Layer Thickness: 4 inches,minimum 2. Base Course Layer Material:A compactable granular fill that will remain unyielding and support construction traffic.At least 10%to 30%of the material should pass a No.100 sieve with a maximum aggregate size of%inch.Satisfactory materials are GRAVEL(ABC,GW,GW-SM),SAND(SP-SM,SW- SM),and SILTY SAND(SM)with less than 30%fines. 3. Base Course Layer Material should be compacted to at least 98%maximum dry density per ASTM D698. 4. Undisturbed natural subgrade should proofroll as firm and unyielding.Upper 1 foot of structural fill subgrade should be compacted to at least 98%maximum dry density per ASTM D698 5. Vapor Barrier or Vapor Retarder—Refer to ACI 302.1R-04 Guide for Concrete Floor and Slab Construction and ASTM E 1643 Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular Fill under Concrete Slabs for recommendations on this issue. Additionally,any environmental vapor intrusions considerations should be taken into account by the vapor barrier/vapor retarder material selection and design. Subgrade Modulus: Provided a base course break layer is implemented in the slab section,the slabs may be designed using a modulus of subgrade reaction of 150 psi/in.This value is applicable for design of slabs subject to point loads and should be reduced based on loaded area for uniform sustained distributed loads. LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 7 Slab Isolation: Soil-supported slabs should be isolated from the foundations and foundation-supported elements of the structure so that differential movement between the foundations and slab will not induce excessive shear and bending stresses in the floor slab. Where the structural configuration does not allow the use of a free-floating slab such as in a drop-down footing/monolithic slab configuration, the slab should be designed with suitable reinforcement and load transfer devices to preclude overstressing of the slab. 4.3 SEISMIC DESIGN CONSIDERATIONS Seismic Site Classification:The 2018 North Carolina Building Code (2015 International Building Code with North Carolina Amendments) requires that a Site Class be assigned for the seismic design of new structures based on the upper 100 feet of a soil profile. At least two methods are utilized in classifying sites, namely the shear wave velocity (vs) method and the Standard Penetration Resistance (N-value) method.The N-value method was used for this project. SEISMIC SITE CLASSIFICATION Site Shear Wave Velocity, N value Class Soil Profile Name Vs(ft./s) (bpf) A Hard Rock Vs>5,000 N/A B Rock 2,500<Vs<_5,000 N/A C Very dense soil and soft rock 1,200<Vs<_2,500 >50 D Stiff Soil Profile 600 5 Vs<_ 1,200 15 to 50 E Soft Soil Profile Vs<600 <15 Based upon our interpretation of the subsurface conditions, the appropriate Seismic Site Classification is "D" as shown in the preceding table. The Site Class definition should not be confused with the Seismic Design Category designation which the Structural Engineer typically assesses. Our experience indicates that evaluation of seismic site class in North Carolina using N-values can be overly conservative. If it is evaluated that significant advantage could be gained with an improved Site Class, additional site testing could be performed to measure actual shear wave velocities at the site. ECS can provide a proposal for these services upon request. 4.4 PAVEMENTS Design Traffic Loading: Detailed traffic loading information for the project is not available at this time. We have assumed a design traffic loading of up to 20,000 ESALs in 20 years for light duty pavements and up to 50,000 ESALs in 20 years,for heavy duty pavements. Subgrade Characteristics: Based on the results of our borings, it appears that the soils that will likely be exposed as pavement subgrades consist mainly of Clayey SAND(SC).California Bearing Ratio (CBR)testing was not performed as part of this study. For section thickness design purposes, we estimate a CBR value of 8 based on local experience. The pavement design assumes subgrades consist of unyielding materials evaluated by ECS and placed and compacted to at least 98 percent of the maximum dry density as evaluated by the standard Proctor test (ASTM D 698) in accordance with the project specifications. LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 8 Minimum Material Thicknesses: Pavements for the project are expected to consist of light duty parking areas and heavy-duty pavements in truck traffic areas.We recommend the following minimum pavement sections for the project. PROPOSED PAVEMENT SECTIONS MATERIAL FLEXIBLE PAVEMENT RIGID Light Duty Heavy Duty PAVEMENT Portland Cement Concrete (f'c=4,000 psi, air-entrained) 6 inches Asphalt Surface Course(S9.5B) 2 inches 2 inches - Aggregate Base Course(ABC) 6 inches 8 inches 4 inches In general, heavy-duty sections are areas that will likely be subjected to trucks, buses, or other similar vehicles including main drive lanes of the development. Light duty sections are appropriate for vehicular traffic and parking areas. ECS should be allowed to review these recommendations and make appropriate revisions based upon the formulation of the final traffic design criteria for the project. It is important to note that the design sections do not account for construction traffic loading. It should also be noted that these design recommendations may not satisfy the North Carolina Department of Transportation traffic guidelines. Any roadways constructed for public use and to be dedicated to the State for repair and maintenance must be designed in accordance with the State requirements. Concrete Pavements: Large, front loading garbage trucks frequently impose concentrated front wheel loads on pavements during loading of trash dumpsters. This type of loading typically results in rutting of bituminous pavements and ultimately pavement failures and costly repairs. Therefore, we suggest that the pavements in trash pickup areas utilize the aforementioned Portland Cement Concrete (PCC) pavement section. It may be prudent to use rigid pavement sections in areas planned for heavy truck traffic. The Portland cement concrete pavement section should consist of air-entrained Portland cement concrete having a minimum 28-day compressive strength of 4,000 psi.The rigid pavement section should be provided with construction joints and saw-cut control joints at appropriate intervals per Portland Cement Association (PCA) requirements. The construction joints should be reinforced with dowels to transfer loads across the joints. Wire mesh should be included to control shrinkage cracking of the concrete. We used a Load Transfer Coefficient,J,of 4.2 to evaluate the recommended concrete pavement thickness given in the preceding table. The concrete pavement section thickness is for plain jointed concrete pavement with reinforcement dowels only at construction joints. LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 9 Drainage: An important consideration with the design and construction of pavements is surface and subsurface drainage. Where standing water develops, either on the pavement surface or within the aggregate base course layer, softening of the subgrades and other problems related to the deterioration of the pavement can be expected. This is particularly important at the site due to the moisture sensitive near-surface soils. Furthermore, good drainage should help reduce the possibility of the subgrade materials becoming saturated during the normal service period of the pavement. 5.0 SITE CONSTRUCTION RECOMMENDATIONS 5.1 SUBGRADE PREPARATION 5.1.1 Stripping and Grubbing The subgrade preparation should consist of stripping vegetation, rootmat, topsoil, existing fill, and any soft or unsuitable materials from the 10-foot expanded building and 5-foot expanded pavement limits, and 5 feet beyond the toe of structural fills. The borings encountered approximately 1 inch of topsoil. Deeper topsoil or organic laden soils may be present in wet, low-lying, and poorly drained areas. In wooded areas,the root balls may extend as deep as about 2 feet and will likely require additional localized stripping to completely remove the organics. ECS should be retained to document that topsoil and unsuitable surficial materials have been removed prior to the placement of structural fill or construction of structures. 5.1.2 Proofrolling Prior to fill placement or other construction on subgrades, the subgrades should be evaluated by an ECS field technician. The exposed subgrade should be thoroughly proofrolled with construction equipment having a minimum axle load of 10 tons [e.g.,fully loaded tandem-axle dump truck]. Proofrolling should be traversed in two perpendicular directions with overlapping passes of the vehicle under the observation of an ECS technician.This procedure is intended to assist in identifying any localized yielding materials. Where proofrolling identifies areas that are yielding or "pumping" subgrade, those areas should be repaired prior to the placement of any subsequent structural fill or other construction materials. Methods of stabilization include undercutting,moisture conditioning,or chemical stabilization.The situation should be discussed with ECS to evaluate the appropriate procedure. Test pits may be excavated to explore the shallow subsurface materials to help in evaluating the cause of the observed unstable materials, and to assist in the evaluation of appropriate remedial actions to stabilize the subgrade. Undercut excavations should be backfilled with properly placed and compacted structural fill. Use of geotextiles and select granular fill may be recommended by ECS during construction to reduce the required undercut depths and/or aid in stabilization of subgrades. LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 10 5.2 EARTHWORK OPERATIONS 5.2.1 Excavation Considerations Excavation Safety: Excavations and slopes should be made and maintained in accordance with OSHA excavation safety standards. The contractor is solely responsible for designing and constructing stable, temporary excavations and slopes and should shore, slope, or bench the sides of the excavations and slopes as required to maintain stability of both the excavation sides and bottom. The contractor's responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. ECS is providing this information solely as a service to our client. ECS is not assuming responsibility for construction site safety or the contractor's activities; such responsibility is not being implied and should not be inferred. Construction Dewatering: Based on the borings, our experience with groundwater fluctuations on comparable sites, and assumed design grades, most of the temporary excavations are unlikely to encounter groundwater. However, some of the stormwater and utility excavations may encounter groundwater. The contractor should be prepared to remove any precipitation or groundwater that may seep into temporary construction excavations using open pumping. Open pumping utilizes submersible sump pumps in pits or trenches dug below the bottom of the excavation and backfilled with No. 57 stone. 5.2.2 Structural Fill Prior to placement of structural fill, representative bulk samples (about 50 pounds) of on-site and/or off- site borrow should be submitted to ECS for laboratory testing,which will typically include Atterberg limits, natural moisture content, grain-size distribution, and moisture-density relationships (i.e., Proctors) for compaction. Import materials should be evaluated prior to being hauled to the site to evaluate if they meet project specifications. Alternatively, Proctor data from other accredited laboratories can be submitted if the test results are within the last 90 days. Structural Fill Materials: Materials for use as structural fill should consist of inorganic soils with the following engineering properties and compaction requirements. STRUCTURAL FILL INDEX PROPERTIES Subject Property Building and Pavement Areas LL<40, PI<20 Max. Particle Size 3 inches Max. Organic Content 2%by dry weight LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 11 STRUCTURAL FILL COMPACTION REQUIREMENTS Subject Requirement Compaction Standard Standard Proctor,ASTM D698 Required Compaction 98%of Max. Dry Density within top 12 inches,and 95%elsewhere Moisture Content -3 to+3%points of the soil's optimum value Loose Thickness 8 inches prior to compaction On-Site Borrow Materials: The on-site soils meeting the classifications for recommended structural fill, plus meeting the restrictions on organic content and debris, may be reused as structural fill.We anticipate that most soils encountered in the borings within the anticipated excavation depths can be used as compacted structural fill. On-site soils used as structural fill will likely require careful moisture control to achieve compaction and stability. Depending on weather conditions at the time of construction, moisture conditioning of the on-site soils may be difficult. As such,the potential need for importing drier materials should be considered in project planning. Fill Placement: Fill materials should not be placed on frozen soils, on frost-heaved soils, and/or on excessively wet soils. Borrow fill materials should not contain frozen materials at the time of placement, and frozen or frost-heaved soils should be removed prior to placement of structural fill or other fill soils and aggregates. Excessively wet soils or aggregates should be scarified, aerated, and moisture conditioned. 5.3 FOUNDATION AND SLAB OBSERVATIONS Protection of Foundation Excavations: Exposure to the environment may weaken the soils at the footing bearing level if the foundation excavations remain open for too long a time. Therefore, foundation concrete should be placed the same day that excavations are made. If the bearing soils are softened by surface water intrusion or exposure,the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete. If the excavation must remain open overnight, or if rainfall becomes imminent while the bearing soils are exposed, a 1 to 3-inch thick "mud mat" of "lean" concrete should be placed on the bearing soils before the placement of reinforcing steel. Footing Subgrade Observations: Most of the soils at the foundation bearing elevation are anticipated to be suitable for support of the proposed structure. It is important to have ECS observe the foundation subgrade prior to placing foundation concrete,to confirm the bearing soils are what was anticipated. Slab Subgrade Observation: A representative of ECS should be called to observe exposed subgrades within the expanded building limits prior to structural fill placement to confirm that adequate subgrade preparation has been achieved. Proofrolling using a drum roller or loaded dump truck should be performed in their presence at that time. Once subgrades have been evaluated to be firm and unyielding, structural fill can be placed. LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 12 If there will likely be a considerable time lag between the site grading work and final grading of concrete slab areas prior to the placement of the design floor slab section materials,a representative of ECS should be called to observe the condition of the prepared soil subgrade. Prior to final floor slab section construction, the soil subgrade may require scarification, moisture conditioning, and re-compaction to restore stable conditions. 5.4 PAVEMENTS Subgrade Evaluation:The soil subgrade should be smooth-rolled and proofrolled prior to ABC placement. Areas that pump, rut, or are otherwise yielding should be re-compacted or undercut and replaced. The amount of undercutting will likely be dependent on design grades and weather conditions at the time of construction. Aggregate Base Course: The ABC should conform with the gradation, liquid limit, plasticity index, resistance to abrasion, and soundness per Section 1005 of the 2012 NCDOT Standard Specifications for Roads and Structures. The ABC should be placed and be compacted in accordance with Section 520 of the 2012 NCDOT Standard Specifications for Roads and Structures.The ABC should be placed in a single lift. It should be spread after end-dumping on previously placed ABC to prevent rutting and degradation of the relatively clean sand subgrade soils by rubber-tired dump trucks. The ABC should be compacted to at least 98 percent of its modified Proctor maximum dry unit weight per ASTM D1557 or AASHTO T180 (as modified by NCDOT), provided nuclear density testing is performed. Otherwise, at least 100 percent compaction is recommended. To document that the specified degree of compaction is being obtained, field compaction testing should be performed in each ABC lift by the geotechnical engineer's representative. We recommend that compaction tests be performed at a minimum frequency of one test per 5,000 square feet per lift in pavement areas. The early placement of the ABC will likely minimize the deterioration of the prepared soil subgrades. However,some loss of graded aggregate due to rutting and surface contamination may occur prior to final asphalt or concrete paving. Some infilling and re-grading of the aggregate base course may be required. The ABC should be smooth-rolled and proofrolled prior to asphalt or concrete pavement placement.Areas that pump, rut, or are otherwise yielding should be wetted or dried as needed and re-compacted. Alternatively,yielding areas could be undercut and replaced. Minimum Material Lift Thickness: The minimum lift thickness for asphalt surface course mix S9.5B is 1.0 inch and the maximum lift thickness for S9.5B is 1.5 inches. For sections with more than 1.5 inches of S9.5B surface asphalt, it should be placed in two lifts. Asphalt pavement S9.5B should be compacted to least 90.0 percent of the material's specific gravity Gmm. Asphalt Quality Control/Quality Assurance: We recommend that the asphalt contractor perform quality control procedures and testing per the project specifications to establish the required roller pattern(s). Quality assurance testing should be provided by ECS and should consist of coring the placed asphalt pavement to check thickness and compaction. LHA Caton Road July 7,2023 ECS Project No.33:5995-R1 Page 13 6.0 CLOSING ECS has prepared this report to guide the geotechnical-related design and construction aspects of the project. We performed these services in accordance with the standard of care expected of professionals in the industry performing similar services on projects of like size and complexity at this time in the region. No other representation expressed or implied, and no warranty or guarantee is included or intended in this report. The description of the proposed project is based on information provided to ECS by The Wooten Company. If any of this information is inaccurate or changes, either because of our interpretation of the documents provided or site or design changes that may occur later, ECS should be contacted so we can review our recommendations and provide additional or alternate recommendations that reflect the proposed construction. We recommend that ECS review the project plans and specifications so we can confirm that those plans/specifications are in accordance with the recommendations of this geotechnical report. Field observations, and quality assurance testing during earthwork and foundation installation are an extension of, and integral to, the geotechnical design. We recommend that ECS be retained to apply our expertise throughout the geotechnical phases of construction, and to provide consultation and recommendation should issues arise. ECS is not responsible for the conclusions, opinions, or recommendations of others based on the data in this report. APPENDIX A— Diagrams & Reports Site Location Diagram Boring Location Diagram Subsurface Cross Sections ..• :" s;�s ributors j.,�; I.i.IN ps r ^ :• �'� ...A... �L'�'�. N v4�T,�I ..w .tLC 4 tiLZ ? . .w S •y` A ' $ �,\+ .lam ��"� — r@ ♦ \ y � 1 tp- 111141( I • * (C i wit ��"ii ti am. . ....-y -. Is% .Pinecieet. ,,y w •\Country Club , ountryClubt .l,. -tf.11,1'1'r . , . t‘it s, r..,„,.. A • '• s a?,^ �\ t �o' why rf •y 4 a \� SPc ilk*.14 _ A - - I.&pi. CV Z - +�;� 1..5.e.4 d A l R - y _t r . ....NI 1 ...' , .,_._1 ,,, • S...."....17 Stein Perk ,. 1.- tc, , _ t ., o' - r .`��.:\ km '-' 0 ' 1,500. 3,000 .'atie ,wa` 0 a+.1• .„ - Feet SITE LOCATION DIAGRAM ENER /U GEG LHA CATON ROAD SCALE AS NOTED PROJECT NO. 33:5995 590 CATON ROAD, LUMBERTON, NORTH CAROLINA SHEET 1 OF 2 THE WOOTEN COMPANY DATE 6/6/2022 Service Layer Credits: Esri, HERE, Garmin,(c)OpenStreetMap contributors N tJi W E h� 4' k 1 B-04 • a, •, .• , INQj. cel B-02. r t �,-�'�`,F,j'.\+1 , a ram}� Q B-01 L N B-10 B-08 ) (-2 SITE INFORMATIC HOUSING AUTHORITY C Legend THE CITY OF LLM BERTC - • PIN 93&2O1325479 W.CANTON ROAD Approximate Boring Locations D.B.1077,PG.BR B-09 0 TO 200 • Approximate Cross-Section Locations Feet BORING LOCATION DIAGRAM EN7UGEGER LHA CATON ROAD SCALE AS NOTED Fli • PROJECT NO. 33:5995 590 CATON ROAD, LUMBERTON, NORTH CAROLINA FIGURE 2 OF 2 THE WOOTEN COMPANY DATE 6/13/2022 t C'1 O O 142 142 :i:/: Topsoil Topsoil 140 ;:i. , SP 140 138 1-1-.°. : SC a 138 12 i-i• 12 f:t136 : 136 4 :/:/: SC 134 1 /•/`/ 12 1F:1:/: 134 !,7t-i; r /. _CL 132 1•5 f 34 132 / /I 130 .f/i 130 SP 128 - 128 17 SP 39 126 126 124 - 124 122 - 5 iddd CH 5 �91a CH 122 /� EOB @ 20 120 ICI/ 120 t JT 4 118 SP 118 24 116 EOB @ 25 116 114 - 114 112 112 Legend 110 110 Key 108 108 Topsoil 106 106 104 104 SP 102 102 SC 100 100 98 98 /' ` i CL i f96 96 r CH sa sa 92 92 O O N co N O• N • Notes: Plastic Limit Water Content Liquid Limit Q WL(First Encountered) - Fill - X • A GENERALIZED SUBSURFACE SOIL PROFILE A-A' 1-EOB:END OF BORING AR:AUGER REFUSAL SR:SAMPLER REFUSAL. [FINES CONTENT°O/a] IWL(Completion) - Possible Fill 2-THE NUMBER BELOW THE STRIPS IS THE DISTANCE ALONG THE BASELINE. 3-SEE INDIVIDUAL BORING LOG AND GEOTECHNICAL INFORMATION. E . LHA Caton Road D1886)DARD PENETRATION TEST RESISTANCE(LEFT OF BORING)IN BLOWS PER FOOT(ASTM BOTTOM OF CASING WL(Estimated Seasonal Probable Fill High Water) The Wooten Company CEI LOSS OF 590 Caton Road,Lumberton,North Carolina 28360 WL(Stabilized) - Rock CIRCULATION Project NO: 33:5995 IDdYe: 07/07/2023 10 O t'V O 141 r -1:13m 141 m m * * : Topsoil 139 : Topsoil 'f:[:!: Topsoil 7 Sp 139 13 SP-SC 5 /:f.:•f•: 137 {:.{'% r• 137 - i.i: l:I: 14 135 - 13 /:•:• ; 1-2 i:i:i• ; 'F:I:. Sc 135 'l:•/y: SC :/:/::.!' = 3D /:f,:f„ 133 a:. 7 1-c. .l:/:!• 133 • 17.1; 131 .•`.•` 29- 131 22 1/ 37 SP 129 /,��; ---Ci eoe@.io 129 //f • 127 .%.;; - • 127 %:,f,::f: 35 / 125 32 /::!•t. SC - 125 -l:A: 123 -a 123 121 ,••'.,7 f CL 26 . • 121 2 SP 119 'EOB @ 20 119 117 117 26 115 115 113 - 113 Legend 111 15 111 Key 109 109 Topsoil 107 107 7 105 1'! 105 SP : 3C_ 103 l::.. 103 SC liii 101 18 ft 101 SP-SC 99 - 7 99 �� CH ' ` ` • CL 97 11. , 97 % % 24 f i ss �',a,a ss s: 7 +•: CH 93 fC3C3i- 93 i r f.7 is i CH 91 213 9/./, 91 EOB @50 O LO)Lr) U, [.._ O O N ti N. • M • Notes: Plastic Limit Water Content Liquid Limit Q WL(First Encountered) - Fill X • A GENERALIZED SUBSURFACE SOIL PROFILE B-B' 1-EOB:END OF BORING AR:AUGER REFUSAL SR:SAMPLER REFUSAL. [FINES CONTENT°O/a] IWL(Completion) - Possible Fill 2-THE NUMBER BELOW THE STRIPS IS THE DISTANCE ALONG THE BASELINE. 3-SEE INDIVIDUAL BORING LOG AND GEOTECHNICAL INFORMATION. E . LHA Caton Road D1586).DARD PENETRATION TEST RESISTANCE(LEFT OF BORING)IN BLOWS PER FOOT(ASTM BOTTOM OF CASING WL(Estimated Seasonal Probable Fill High Water) The Wooten Company CEI LOSS OF 590 Caton Road,Lumberton,North Carolina 28360 WL(Stabilized) - Rock CIRCULATIONMIIIII Project NO: 33:5995 IDdYe: 07/07/2023 rn I- C 140 m m 140 Topsoil :!:!:1: Topsoil 138 12 SP 7 f: :f 138 136 f:F:F• 136 •F:1:!: 9 10 0:•F, 134 - 134 :F:1:!: f:-' f;f:F: SC 132 4 SC 28_ :r:1:!, 132 f: :: 130 Q 1b ; f� 2T {•1:!' 130 fIN: ' •r:1:fi 128 l=f:F• 128 t r'1•! 126 { jjj, 126 29 15 ri / j 124 jj CL r!! 124 • jjj• 122 -SP-SCs� t 122 120 23 • SP 120 EOB @ 20 118 118 116 • SP 116 25 114 EOB@ 25 114 112 - 112 110 110 Legend 108 108 Key 106 106 Topsoil 104 - 104 102 102 SP 100 loo SC 98 98 96 96 SP-SC 94 94 92 92 90 90 OO O N N CO co Notes: Plastic Limit Water Content Liquid Limit Q WL(First Encountered) - Fill - X • A GENERALIZED SUBSURFACE SOIL PROFILE C-C' 1-EOB:END OF BORING AR:AUGER REFUSAL SR:SAMPLER REFUSAL. [FINES CONTENT°O/a] IWL(Completion) - Possible Fill 2-THE NUMBER BELOW THE STRIPS IS THE DISTANCE ALONG THE BASELINE. 3-SEE INDIVIDUAL BORING LOG AND GEOTECHNICAL INFORMATION. PE . LHA Caton Road D1586).DARD PENETRATION TEST RESISTANCE(LEFT OF BORING)IN BLOWS PER FOOT(ASTM BOTTOM OF CASING WL(Estimated Seasonal Probable Fill High Water) The Wooten Company LOSS OF 590 Caton Road,Lumberton,North Carolina 28360 WL(Stabilized) - Rock CIRCULATIONMIIIII Project NO: 33:5995 IDdYe: 07/07/2023 APPENDIX B — Field Operations Reference Notes for Boring Logs Subsurface Exploration Procedure: Standard Penetration Test (SPT) Boring Logs B-01 through B-12 TS REFERENCE NOTES FOR BORING LOGS MATERIAL12 I DRILLING SAMPLING SYMBOLS&ABBREVIATIONS SS Split Spoon Sampler PM Pressuremeter Test ASPHALT ST Shelby Tube Sampler RD Rock Bit Drilling WS Wash Sample RC Rock Core, NX,BX,AX CONCRETE BS Bulk Sample of Cuttings REC Rock Sample Recovery% (' o PA Power Auger(no sample) RQD Rock Quality Designation% ;o;Pe; GRAVEL HSA Hollow Stem Auger TOPSOIL PARTICLE SIZE IDENTIFICATION VOID DESIGNATION PARTICLE SIZES Boulders 12 inches(300 mm)or larger I BRICK Cobbles 3 inches to 12 inches(75 mm to 300 mm) 0 o Gravel: Coarse 3/4 inch to 3 inches(19 mm to 75 mm) p oo o` AGGREGATE BASE COURSE Fine 4.75 mm to 19 mm(No.4 sieve to inch) i Sand: Coarse It � 2.00 mm to 4.75 mm(No. 10 to No.4 sieve) GW WELL-GRADED GRAVEL Medium 0.425 mm to 2.00 mm(No.40 to No. 10 sieve) w + gravel-sand mixtures,little or no fines Q�o '� ("Fines") <0.074 mm(smaller than a No.Fine 0.074 mm to 0.425 mm(No.200 to No.40 sieve) 0 GP POORLY-GRADED GRAVEL Silt&Clay200 sieve) I 0 c gravel-sand mixtures,little or no fines � a C � GM SILTY GRAVEL o 0 „„ gravel-sand-silt mixtures COHESIVE SILTS&CLAYS COARSE FINE P 1,A RELATIVE GRAINED GRAINED GC CLAYEY GRAVEL UNCONFINED ems (%)8 , AMOUNT gravel-sand-clay mixtures COMPRESSIVE SPT5 CONSISTENCY ■ o SW WELL-GRADED SAND STRENGTH• ,OP4 (BPF) (COHESIVE)• Trace <5 <5 o • x gravelly sand,little or no fines <0.25 <2 Very Soft SP POORLY-GRADED SAND 0.25-<0.50 2-4 Soft With 10-20 10-25 : : . gravelly sand,little or no fines 0.50-<1.00 5-8 Firm Adjective 25-45 30-45 1 .• SM SILTY SAND 1.00-<2.00 9-15 Stiff (ex:"Silty") • sand-silt mixtures 2.00-<4.00 16-30 Very Stiff SC CLAYEY SAND 4.00-8.00 31 -50 Hard :• : X sand-clay mixtures >8.00 >50 Very Hard WATER LEVELS6 ML SILT non-plastic to medium plasticity GRAVELS,SANDS&NON-COHESIVE SILTS V WL(First Encountered) MH ELASTIC SILT high plasticity SPT6 DENSITY V WL(Completion) rI/' i CL LEAN CLAY <5 Very Loose J low to medium plasticity 5-10 Loose _v_ WL(Seasonal High Water) 11 -30 Medium Dense // /// CH highFAT plastiCLAYcity 31 -50 Dense I V WL(Stabilized) ///5 OL ORGANIC SILT or CLAY >50 Very Dense non-plastic to low plasticity 5 $ $ OH ORGANIC SILT or CLAY high plasticity FILL AND ROCK a r PT PEAT - .. r, .L highly organic soils FILL POSSIBLE FILL PROBABLE FILL ROCK 'Classifications and symbols per ASTM D 2488-17(Visual-Manual Procedure)unless noted otherwise. 2To be consistent with general practice,"POORLY GRADED"has been removed from GP,GP-GM,GP-GC,SP,SP-SM,SP-SC soil types on the boring logs. 3Non-ASTM designations are included in soil descriptions and symbols along with ASTM symbol[Ex:(SM-FILL)]. 4Typically estimated via pocket penetrometer or Torvane shear test and expressed in tons per square foot(tsf). 6Standard Penetration Test(SPT)refers to the number of hammer blows(blow count)of a 140 lb.hammer falling 30 inches on a 2 inch OD split spoon sampler required to drive the sampler 12 inches(ASTM D 1586)."N-value"is another term for"blow count"and is expressed in blows per foot(bpf).SPT correlations per 7.4.2 Method B and need to be corrected if using an auto hammer. 6The water levels are those levels actually measured in the borehole at the times indicated by the symbol.The measurements are relatively reliable when augering,without adding fluids,in granular soils.In clay and cohesive silts,the determination of water levels may require several days for the water level to stabilize. In such cases,additional methods of measurement are generally employed. 'Minor deviation from ASTM D 2488-17 Note 14. $Percentages are estimated to the nearest 5%per ASTM D 2488-17. Reference Notes for Boring Logs(09-02-2021).doc ©2021 ECS Corporate Services,LLC.All Rights Reserved SUBSURFACE EXPLORATION PROCEDURE: STANDARD PENETRATION TEST (SPT) - ASTM D 1586 Split-Barrel Sampling The Standard Penetration Test (SPT) is the most frequently used subsurface exploration test performed worldwide. This test provides samples for identification purposes, as well as a measure of penetration resistance, or N-value. The SPT N-value (or blow counts), when corrected and correlated, can be used to approximate the engineering properties of soils for geotechnical design and engineering purposes. SPT Procedure: • Involves driving a 2-inch outer diameter split-barrel (split- spoon) sampler into the soil by dropping a 140-lb hammer a height of 30 inches at the desired test depth. • Recording the number of hammer blows required to drive the split-spoon sampler a distance of 18 to 24 inches (in 3 or r'- 4 increments of 6 inches each). �,.' li. If it. ..ate • The SPT N-value (blows per foot) is determined by summing — ;,� the blow counts for the 2nd and 3rd six-inch intervals. W V � • The boring is advanced* to the desired depths and additional tail /4; ~SPTs are performed. - 4 , • SPT tests are typically performed at 21/2-foot intervals within the upper 10 feet of the boring and 5-foot intervals thereafter. • Soil samples are obtained at each test depth for visual classification and laboratory testing. • The drill rig is equipped with either an automatic hammer or ,�- v a rope and cathead driving assembly. The automatic hammer generally delivers more energy to the sampler than the 6�r. standard cathead assembly. • Although the differences in energy will vary, it is common to assume the automatic hammer delivers about 1.3 times the energy of the cathead assembly. • The uncorrected N-values recorded in the field are typically reported on the soil test boring logs. *Drilling methods may vary, but the predominant drilling methods used for SPT are the open hole fluid rotary (mud rotary) drilling and hollow-stem auger drilling. CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-01 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: FiSi LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION In 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321240.6 1979829.0 141 m Lu LU Z Z J LL Q LIQUID LIMIT I- F ; `� L. X PLASTIC LIMIT w p DESCRIPTION OF MATERIAL J Q N 0 STANDARD PENETRATION BLOWS/FT w 'Liw Q O 20 40 60 80 100 0 CALIBRATED PENETROMETER TSF O CL Q CL 8 Q > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 QN < CC > it RECOVERY •WATER CONTENT% An An > — RQD [FINES CONTENT]% — REC 10 20 30 40 50 \Topsoil Thickness[1.0011] / - • - (SC)CLAYEY FINE TO MEDIUM SAND, • 2-4-5 S 1 SS 18 18 brown, moist, loose to medium dense — (9) `° 466 S-2 SS 18 18 - (12) 0 z 5 - 136— 4 - (CL)SANDY LEAN CLAY,gray,tan, red, — _ S-3 SS 18 18 wet,very stiff _ 315) (15) '5 Ti4-8-10 S-4 SS 18 18 (18) 's 10 — 131— (SP) MEDIUM SAND,gray,tan, red, - wet, medium dense _ Ti Ti4-12-5 S-5 SS 18 18 - (17) ';; 15 126— (CH)SANDY FAT CLAY, pink,gray,wet, - firm - - Ti2-2-3 5-6 SS 18 18 - (5) ':0 20 121— (SP) MEDIUM SAND,orange,wet, - medium dense • Ti • Ti4-12-12 S 7 SS 18 18 - (24) 24 25 •END OF BORING AT 25 FT 116_ 30— 111— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL SZ WL(First Encountered) 5.50 BORING STARTED: May 312022 CAVE IN DEPTH: Y WL(Completion) BORING 7 WL(Seasonal High Water) COMPLETED: May 312022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: 2Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-02 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: FiSi LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION MD 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321324.6 1979944.3 140cc Lu LU Z Z J H Q LIQUID LIMIT I- F ; `� L. X PLASTIC LIMIT w p J Q N 0 STANDARD PENETRATION BLOWS/FT w 'Li DESCRIPTION OF MATERIAL w Q O 20 40 60 80 100 0 CALIBRATED PENETROMETER TSF O CL Q CL 8 Q > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 QN < CC > it RECOVERY •WATER CONTENT% An An > - RQD [FINES CONTENT]% — REC 10 20 30 40 50 \Topsoil Thickness[1.0011] / - : - (SC)CLAYEY FINE TO MEDIUM SAND, • 3-3-3 S 1 SS 18 18 brown,tan,gray, moist to wet, loose — (6) P. to medium dense • — 345 S-2 SS 18 18 - (9) ., 5 - 135— '= S-3 SS 18 18 - s(17) - (17) 'i 3-8-10 S-4 SS 18 18 _ (18) s 10 - 130— (SP) MEDIUM SAND,trace clay, pink, - gray,wet, loose to dense 10-14-19 - S-5 SS 18 18 - (33) • 3 15 125— 2-3-3 - S-6 SS 18 18 - (6) �6 20 END OF BORING AT 20 FT 120_ 25— 115- 30— 110— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL SZ WL(First Encountered) 6.00 BORING STARTED: May 312022 CAVE IN DEPTH: Y WL(Completion) BORING WL(Seasonal High Water) COMPLETED: 7May312022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: S'Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-03 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: FiSi LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION In 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321429.4 1979967.5 141cc Lu LU Z Z J LL Q LIQUID LIMIT I- F ; `� E. X PLASTIC LIMIT w p J Q N 0 STANDARD PENETRATION BLOWS/FT w 'Li DESCRIPTION OF MATERIAL w Q O 20 40 60 80 100 0 CALIBRATED PENETROMETER TSF O CL Q Cl_ Q > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 QN < CC > it RECOVERY •WATER CONTENT% An An > — RQD [FINES CONTENT]% — REC 10 20 30 40 50 Topsoil Thickness[1.0011] / - — (SP) FINE TO MEDIUM SAND,tan, 2-3-4 S 1 SS 18 18 moist, loose — (7) �' (SC)CLAYEY FINE TO MEDIUM SAND, • - _ S-2 SS 18 18 orange, brown,gray, moist to wet, = (12) (12) 0' 2 5 - medium dense • 136— S-3 SS 18 18 2-5-7iy 2) - (12) • (SP) FINE TO MEDIUM SAND,orange, S-4 SS 18 18 gray, pink,wet, dense - 7-14-20 (34) 4 10 — — 131— _ — 11-17-22 S-5 SS 18 18 - (39) '4 15 126— (CH) FAT CLAY,gray,wet,firm - 5-6 SS 18 18 1-2-3 - (S) s 20 END OF BORING AT 20 FT f 121_ 25— 116— 30— 111— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL SZ WL(First Encountered) 6.00 BORING STARTED: May 312022 CAVE IN DEPTH: Y WL(Completion) BORING WL(Seasonal High Water) COMPLETED: SC May312022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: S'Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-04 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: FiSi LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION MD 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321539.9 1980113.2 140 m Lo LU Z Z J LL Q LIQUID LIMIT I- F ; `� L. X PLASTIC LIMIT w p J Q N 0 STANDARD PENETRATION BLOWS/FT w 'Li DESCRIPTION OF MATERIAL w Q O 20 40 60 80 100 0 CALIBRATED PENETROMETER TSF O CL Q Cl_ Q > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 < N < CC > it RECOVERY •WATER CONTENT% An An > — RQD [FINES CONTENT]% — REC 10 20 30 40 50 Topsoil Thickness[1.0011] (SP) FINE SAND, brown, moist, loose 2-3-3 _ S-1 SS 18 18 — (6) •.• (SC)CLAYEY FINE TO MEDIUM SAND, _ S-2 SS 18 18 orange, moist,very loose _ 2-2-2 0 1 X 3 5 - 135— (SC)CLAYEY SAND,tan, red,gray,wet, — S-3 SS 18 18 medium dense - 3-4-7— (11) I. io-lo-io S-4 SS 18 18 - (20) A 10 — 130— (SP) MEDIUM SAND,tan,orange,wet, - dense to very dense _ _ 7-11-20 S-5 SS 18 18 - (31) °' 3 15 125— — S-6 SS 11 11 • — 16-50/5^ 20— END OF BORING AT 19.42 FT 120— (s0/s") sD/s^ 25— 115- 30— 110— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL SZ WL(First Encountered) 5.50 BORING STARTED: May 312022 CAVE IN DEPTH: Y WL(Completion) BORING SC WL(Seasonal High Water) COMPLETED: May 312022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: 2Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-05 1 of 2 PROJECT NAME: DRILLER/CONTRACTOR: FiSi LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION MD 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321369.2 1980132.9 140cc Lu LU Z Z J LL Q LIQUID LIMIT I- F ; E. X PLASTIC LIMIT w p J Q N 0 STANDARD PENETRATION BLOWS/FT w 'Li DESCRIPTION OF MATERIAL w Q O 20 40 60 80 100 0 CALIBRATED PENETROMETER TSF O CL Q Cl_ Q > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 < N < CC > it RECOVERY •WATER CONTENT% An An > - RQD [FINES CONTENT]% - REC 10 20 30 40 50 Topsoil Thickness[1.0011] / - (SP) FINE TO MEDIUM SAND,tan, - 3-3-4 _ S-1 SS 18 18 moist, loose — (7) (SC)CLAYEY FINE TO MEDIUM SAND, • - _ S-2 SS 18 18 red,tan,gray, moist to wet, medium = (14) (14) 5 - dense • 135— S-3 SS 18 18 Q - 3-11-19 — (30) 0 • (SP) FINE TO MEDIUM SAND,trace 5 S-4 SS 18 18 clay,tan,gray,orange, moist to wet, -— 9-(29)29) y 10 — — medium dense 130— — — 6-17-18 S-5 SS 18 18 - (35) 5 15 125— - S-6 SS 18 18 — 7-12-16 f - - Raig 20 — 120— • • 6-12-14 - S-7 SS 18 18 - (26) i 25 115— — — 4-6-9 S-8 SS 18 18 - (15) 30 110— CONTINUED ON NEXT PAGE THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL S7 WL(First Encountered) 6.50 BORING STARTED: May 312022 CAVE IN DEPTH: Y WL(Completion) BORING 7 WL(Seasonal High Water) COMPLETED: May 312022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: 2Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-05 2 of 2 PROJECT NAME: DRILLER/CONTRACTOR: FiSi LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION In 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321369.2 1980132.9 140 m Lo LU Z Z J LL Q LIQUID LIMIT L~i F ; `� L. X PLASTIC LIMIT w p J Q N 0 STANDARD PENETRATION BLOWS/FT w 'Li DESCRIPTION OF MATERIAL w Q O 20 40 60 80 100 0 CALIBRATED PENETROMETER TSF O CL Q [L Q > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 QN < CC > it RECOVERY •WATER CONTENT% An An > — RQD [FINES CONTENT]% - REC 10 20 30 40 50 (SP) FINE TO MEDIUM SAND,trace - clay,tan,gray,orange, moist to wet, medium dense S 9 SS 18 18 (SC)CLAYEY FINE TO MEDIUM SAND, - 2-3-4 * 35 light gray,wet, loose 105— 171 (CH) FAT CLAY,gray, moist,very stiff • • _ 3-7-11 S 10 SS 18 18 _ (1s) 0 s 40 100- • • - 5-12-12 _ S-11 55 18 18 (24) 11 4 45 95- (CH)SANDY FAT CLAY,gray, moist,very :;..r stiff 5-12 SS 18 18 ii' ' - 4-12-14 Cp t:! : - (26) 26 50 END OF BORING AT 50 FT 90 55— 85— 60— 80— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL S7 WL(First Encountered) 6.50 BORING STARTED: May 312022 CAVE IN DEPTH: Y WL(Completion) BORING 7 WL(Seasonal High Water) COMPLETED: May 312022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: 2Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-06 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: FiSi LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION In 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321368.0 1980291.4 140cc Lu LU Z Z J H Q LIQUID LIMIT I- F ; `� E. X PLASTIC LIMIT w p J Q N 0 STANDARD PENETRATION BLOWS/FT w 'Li DESCRIPTION OF MATERIAL w Q O 20 40 60 80 100 0 CALIBRATED PENETROMETER TSF O CL Q CL 8 Q > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 < N < CC > it RECOVERY •WATER CONTENT% An An > — RQD [FINES CONTENT]% — REC 10 20 30 40 50 Topsoil Thickness[1.0011] / - — (SP) FINE TO MEDIUM SAND,trace 2-3-4 S 1 SS 18 18 clay,tan,gray, red, moist, loose — (7) �' (SC)CLAYEY FINE TO MEDIUM SAND, • - _ S-2 SS 18 18 orange, brown, moist, loose _ 2-4-5 5 - • 135— (SP) FINE TO MEDIUM SAND,gray, = — S-3 SS 18 18 tan, red,wet, dense ( 2z 34) 4 (SC)CLAYEY MEDIUM SAND,gray, S-4 SS 18 18 orange,wet, dense _ 14-15-18 (33) 1,5 10 — — 130— (SP) MEDIUM SAND,tan,gray,orange, - wet, medium dense _ _ 5-15-15 S-5 SS 18 18 - (30) ee 0 15 125— _ _ 6-12-13 S-6 SS 18 18 - (25) is 20 END OF BORING AT 20 FT 120_ 25— 115- 30— 110— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL SZ WL(First Encountered) 6.00 BORING STARTED: May 312022 CAVE IN DEPTH: Y WL(Completion) BORING WL(Seasonal High Water) COMPLETED: 7May312022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: S'Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-07 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: FE LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION MD 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321196.3 1980211.0 139cc Lu LU Z Z J LL Q LIQUID LIMIT I- F ; `� E. X PLASTIC LIMIT w p J Q 0 STANDARD PENETRATION BLOWS/FT w 'Li DESCRIPTION OF MATERIAL w Q O 20 40 60 80 100 0 CALIBRATED PENETROMETER TSF O CL Q CL 0 I- > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 < N < CC it RECOVERY •WATER CONTENT% An VI > — RQD [FINES CONTENT]% - REC 10 20 30 40 50 \Topsoil Thickness[1.0011] / - • - (SC)CLAYEY FINE TO MEDIUM SAND, • 3-3-4 S 1 SS 18 18 tan,orange,gray, moist, loose to — (7) �' medium dense • — 4-4-6 S-2 SS 18 18 - (10) "F 5 - 134— 5-3 SS 18 18 - 4-18-10 (28) (28) °is 8-12-15 S-4 SS 18 18 _ (27) A 10 — 129— (CL)SANDY LEAN CLAY,gray, orange, red, moist,stiff 3-6-9 - S-5 SS 18 18 - (15) 5 15 124— Q — (SP) MEDIUM SAND,gray,orange, - wet, medium dense _ 9-11-12 - S-6 SS 18 18 - (23) :4 20 END OF BORING AT 20 FT 119_ 25— 114- 30— 109— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL SZ WL(First Encountered) 17.00 BORING STARTED: May 312022 CAVE IN DEPTH: Y WL(Completion) BORING WL(Seasonal High Water) COMPLETED: 7May312022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: S'Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-08 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: FIS LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION MD 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321176.3 1980139.7 139cc Lu LU Z Z J LL Q LIQUID LIMIT I- F ; `� E. X PLASTIC LIMIT w p J Q 0 STANDARD PENETRATION BLOWS/FT w 'LiDESCRIPTION OF MATERIAL 05 w Q O 20 40 60 80 100 0 CALIBRATED PENETROMETER TSF O CL Q Cl- Q > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 QN < CC it RECOVERY •WATER CONTENT% An VI > — RQD [FINES CONTENT]% - REC 10 20 30 40 50 Topsoil Thickness[1.0011] / - - (SP) FINE TO MEDIUM SAND,trace 3-5-5 S 1 SS 18 18 clay,gray, moist, loose - (10) 'o (SC)CLAYEY FINE TO MEDIUM SAND, • - 5-2 SS 18 18 tan, moist, medium dense 3- (14) 4 5 - 134- (SM)SILTY FINE TO MEDIUM SAND, - _ 5-3 SS 18 18 tan,gray, red, moist, medium dense _ 3(1 )1 (18) 1:. (SP) FINE TO MEDIUM SAND,trace S-4 SS 18 18 clay,gray,tan, moist, dense _ 12-20-27 (47) ,' 10 - - 129- 12-24-26 - S-5 SS 18 18 - (50) 'o 15 124- 4 - (SM)SILTY FINE SAND,gray,wet, - medium dense _ . - 2-6-8 - S-6 55 18 18 - (14) q 20 END OF BORING AT 20 FT 119_ 25- 114- 30- 109- THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL SZ WL(First Encountered) 17.00 BORING STARTED: May 312022 CAVE IN DEPTH: Y WL(Completion) BORING WL(Seasonal High Water) COMPLETED: 7May312022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: 2Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-09 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: FiSi LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION MD 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321019.5 1980055.1 139cc Lu LU Z Z J LL Q LIQUID LIMIT ifF ; `� l0 X PLASTIC LIMIT w p J Q N 0 STANDARD PENETRATION BLOWS/FT w 'Li DESCRIPTION OF MATERIAL w Q O 20 40 60 80 100 0 CALIBRATED PENETROMETER TSF O CL Q Cl- 0 I- > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 QN < CC > it RECOVERY •WATER CONTENT% An An > — RQD [FINES CONTENT]% — REC 10 20 30 40 50 \Topsoil Thickness[1.0011] (SP) FINE TO MEDIUM SAND,trace 6-6-6 SA. SS 18 18 clay,gray, moist, medium dense — (12) �z (SC)CLAYEY FINE TO MEDIUM SAND, _ S-2 SS 18 18 gray,tan, moist to wet,very loose to - 4-4-5 5 - medium dense 134— 2-2-2 16 _ S-3 SS 18 18 • (a) '� 1 14044ii _ 3-7-8 S-4 SS 18 18 - (15) 4 10 129— • (SP-SC) MEDIUM SAND WITH CLAY, - tan,gray,orange,wet, medium dense — — 9-13-16 S-5 SS 18 18 - (29) 01 9 15 124— • 9-13-7 - S-6 SS 18 18 • - (20) o 20 • 119- 31 (SP) FINE TO MEDIUM SAND,tan, • - _ orange,gray,wet, medium dense _ 9-11-14 - S-7 SS 18 18 - (25) 25 25 END OF BORING AT 25 FT 114_ 30— 109— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL SZ WL(First Encountered) 8.50 BORING STARTED: Jun 012022 CAVE IN DEPTH: Y WL(Completion) BORING WL(Seasonal High Water) COMPLETED: SC Jun012022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: S'Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-10 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: FiSi LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION MD 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321172.8 1979975.5 139 m LU Z Z J LL Q LIQUID LIMIT I- F ; `� E. X PLASTIC LIMIT w p J Q N 0 STANDARD PENETRATION BLOWS/FT w 'LiDESCRIPTION OF MATERIAL w Q O 20 40 60 80 100 0 CALIBRATED PENETROMETER TSF O CL Q CL 8 Q > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 QN < CC > it RECOVERY •WATER CONTENT% An An > - RQD [FINES CONTENT]% — — REC 10 20 30 40 50 \Topsoil Thickness[1.00"] (SP-SC) FINE TO MEDIUM SAND WITH 3-6-7 S 1 SS 18 18 CLAY, brown,gray, moist, medium — (13) 13 \ dense (SC)CLAYEY FINE TO MEDIUM SAND, _ 3-6-7 S 2 SS 18 18 brown,tan,gray, moist, medium - (13) 5 -_ dense 134= S-3 SS 18 18 3-5-6 — — 111)11) �i• (CL)SANDY LEAN CLAY, light gray,tan, S-4 SS 18 18 moist,very stiff — s-(22) (zz) 1112 10 - — 129— (SC)CLAYEY FINE TO MEDIUM SAND, - tan, red, moist, medium dense • _ 5-12-20 S-5 SS 18 18 - (32) 2 15 124— • • (CL)SANDY LEAN CLAY,dark gray, - moist, soft _ _ _ 1-1-1 5-6 SS 18 18 - (2) 2 20 •END OF BORING AT 20 FT • 119_ 25— 114- 30— 109— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL SZ WL(First Encountered) NE BORING STARTED: Jun 012022 CAVE IN DEPTH: Y WL(Completion) BORING 7 WL(Seasonal High Water) COMPLETED: Jun 012022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: 2Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-11 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: FiSi LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION MD 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321539.8 1980267.8 140 cc Lu LU Z Z J LL Q LIQUID LIMIT L~i F ; `� L0 X PLASTIC LIMIT w p J Q I 0 STANDARD PENETRATION BLOWS/FT w 'Li DESCRIPTION OF MATERIAL w Q O 20 40 60 80 100 0 CALIBRATED PENETROMETER TSF O CL Q [L Q > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 QN Q CC it RECOVERY •WATER CONTENT% vl Ln > — RQD [FINES CONTENT]% — REC 10 20 30 40 50 Topsoil Thickness[1.001I] / - - (SP) FINE TO MEDIUM SAND,tan, 2-2-3 S 1 SS 18 18 moist, loose — (5) �° (SC)CLAYEY FINE TO MEDIUM SAND, • - -5-6 _ S-2 SS 18 18 orange tan, red, moist to wet, _ (11) (11) °1 5 - medium dense • 135— S-3 SS 18 18 7-11-13 — (24) 'T. • (SM)SILTY FINE TO MEDIUM SAND, S-4 SS 18 18 tan,gray,wet, dense _ 11-20-20 (40) '0 10 — — 130— (SP) MEDIUM SAND,tan,gray,wet, - dense - - — 10-19-20 S-5 SS 18 18 - (39) 3Ci 9 15 END OF BORING AT 15 FT 125— 20— 120— 25— 115- 30— 110— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL SZ WL(First Encountered) 6.00 BORING STARTED: Jun 012022 CAVE IN DEPTH: Y WL(Completion) BORING WL(Seasonal High Water) COMPLETED: SC Jun012022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: S'Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG CLIENT: PROJECT NO.: BORING NO.: SHEET: The Wooten Company 33:5995 B-12 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: FiSi LHA Caton Road Mid Atlantic Drilling,Inc. SITE LOCATION: LOSS OF CIRCULATION MD 590 Caton Road,Lumberton,North Carolina 28360 NORTHING: EASTING: STATION: SURFACE ELEVATION: BOTTOM OF CASING ' 321286.6 1980070.9 139 cc Lu m LU Z Z J LL Q LIQUID LIMIT L~i F LU l0 X PLASTIC LIMIT w p J Q Ln 0 STANDARD PENETRATION BLOWS/FT LU 'Li DESCRIPTION OF MATERIAL w Q O 20 40 60 80 100 O CALIBRATED PENETROMETERTSF O CL Q CL 8 Q > m ROCK QUALITY DESIGNATION& 1 2 3 4 5 QN Q C > w RECOVERY •WATER CONTENT% UI An > — RQD [FINES CONTENT]% REC 10 20 30 40 50 \Topsoil Thickness[1.0011] / T (SC)CLAYEY FINE TO MEDIUM SAND, 2_2_3 _ S-1 SS 18 18 brown,orange,tan, loose to medium — (5) dense — • $ 2 SS 18 18 2-4-8 - (12) \\s) 5 - 134— _ 4-8-12 _ S-3 SS 18 18 — (20) (SP) FINE TO MEDIUM SAND, red, S 4 SS 18 18 brown,gray, moist, dense _ 12-17-20 (37) 37 10 END OF BORING AT10FT 129 _ 15— 124- 20— 119— 25— 114- 30— 109— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES.IN-SITU THE TRANSITION MAY BE GRADUAL S7 WL(First Encountered) NE BORING STARTED: Jun 012022 CAVE IN DEPTH: Y WL(Completion) BORING 7 WL(Seasonal High Water) COMPLETED: Jun 012022 HAMMER TYPE: Automatic EQUIPMENT: LOGGED BY: 2Z WL(Stabilized) ATVCME-45C CC6 DRILLING METHOD: Mud rotary GEOTECHNICAL BOREHOLE LOG APPENDIX C — Laboratory Testing Laboratory Test Results Summary Laboratory Testing Summary Atterberg Limits Moisture-Density CBR(%) Sample Depth AMC Soil **Percent — — #Organic Sample Location Number (feet) (%) Type Passing No. <Maximum <Optimum Content(%) LL PL PI 200 Sieve Density(pcf) Moisture(%) 0.1 in. 0.2 in. B-04 S-2 3.5-5 14.3 *SC 37 21 16 36.4 B-09 S-3 6-7.5 19.7 *SC 43 16 27 40.9 Notes: See test reports for test method,AASTM D2216-19,*ASTM D2488,**ASTM D1140-17,#ASTM D2974-20e1 <See test report for D4718 corrected values Definitions: MC:Moisture Content,Soil Type:USCS(Unified Soil Classification System),LL:Liquid Limit,PL:Plastic Limit, PI: Plasticity Index,CBR:California Bearing Ratio,OC:Organic Content Project: LHA Caton Road Project No.: 33:5995 Client: The Wooten Company Date Reported: Office/Lab Address Office Number/Fax Els- 6151 Raeford Road (910)401-3288 ECS Southeast LLP - Fayetteville Suite A Fayetteville, NC 28304 (910)323-0539 Tested by Checked by Approved by Date Received awiggs RRodriguez2 RRodriguez2