HomeMy WebLinkAboutSW6230103_Stormwater Narrative_20231020 STORMWATER MANAGEMENT AND TEMPORARY EROSION CONTROL for CARTER FARMS SUBDIVISION PHASE I Submittal to: NCDEQ PUBLIC WATER SUPPLY SECTION HOKE COUNTY, NORTH CAROLINA Submittal date: May 18, 2022 Owner/ Developer: Rheibeck Investments, LLC. 3727 Legion Road Hope Mills, NC 28348 Contact: Geoff Becker Phone: (910) 426-7575 Prepared by: Averette Engineering Co., P.A. CIVIL ENGINEERING Lddro LAND SURVEYING — 119 F. — PJJ_1e Ro-c f PLANNING ,t``j_ I;acford, FJL; 2E4376 P-ione,�B16) 458—�656 Fix:,, -3' 4D—-181 Es:ablishcc eb:v,•Nm�.ave�et�e enc.com TABLE OF CONTENTS SECTION PAGE I. EXISTING CONDITIONS A. PROPERTY ....................................................................................................1 B. WATERSHED .................................................................................................2 C. JURISDICTIONAL WATERS.................................................................................2 D. FEMA FLOOPLAIN... ....................................................................................2 E. SOILS............................................................................................................2 II. AGENCY STORMWATER REQUIREMENTS A. Hoke County.............................................................................................2 B. NCDEQ .........................................................................................................3 III. PROPOSED IMPROVEMENTS A. PROJECT DESCRIPTION.....................................................................................3 B. LAND DISTURBANCE AND EROSION CONTROL.......................................3 C. IMPERVIOUS SURFACE ...................................................................................3 D. DRAINAGE AND STORMWATER MANAGEMENT.......................................4 APPENDICES A. Computations Minor System Grass Conveyance Swales Erosion Control B. Maps Inlet Drainage Area Erosion Control Drainage Area C. Soil Survey Map D. FEMA FIRM Map E. USGS MAP F. STORMWATER FORMS SUPPLEMENT-EZ OPERATION &MAINTENANCE AGREEMENT BMP SUPPLEMENT FORMS I. EXISTING CONDITIONS A. PROPERTY The proposed project site is 28.11 AC project consisting of PIN#'s 7947-30-00-1348, 794730001062, 794730001316, 794730001294, 794730001295, 794730001293 respectively in Hoke County. The property is currently undeveloped farm land with no impervious surfaces. The property has a cell phone tower that is to be decommissioned as part of phase 2. The following is a summary of the adjacent properties: To the north, commercial chicken farm(zoning RA-20) To the south, single family (zoning RA-20) To the west, undeveloped (zoning RA-20) To the east, single family (zoning RA-20) See Figure 1 below for an aerial view of the property for the proposed Carter Farm Subdivision project (Site). Figure ]:Aerial view of pre-developed site �s 3 Za Stormwater Impact Analysis-Carter Farms Subdivision Page 1 1 4 B. WATERSHED The site is located in the Mill Creek Watershed and Cape Fear River Basin. The NCDEQ Stream Index for Mill Creek is 18-31-20 and Stream Classification for Mill Creek is `B'. C. JURISDICTIONAL WATERS There are no jurisdictional streams located on the site. There are no impacts proposed with this project to jurisdictional streams or wetlands. D. FEMA FLOODPLAIN There are FEMA mapped floodplains located on the site per FIRM Panel 3710947300J, effective date Oct. 17, 2006. See Appendix D for FEMA FIRM maps. No floodplains will be impacted by the development of the site E. SOILS Refer to Appendix C for the NRCS map showing anticipated on-site soils. II. AGENCY STORMWATER REQUIREMENTS A. Hoke County Section 3.7 `Storm Drainage Not in Public Streets" of the Hoke County Subdivision Ordinance details the requirements for managing stormwater from new construction sites. Section 3.3 `Streets" of the Hoke County Subdivision Ordinance details the requirements for managing stormwater from new construction sites per NCDOT requirements. Stormwater Impact Analysis-Carter Farms Subdivision Page 2 1 4 B. NCDEQ Hoke County is a `tipped' county and new projects located within the county must meet NCDEQ Post Construction Stormwater Phase 2 regulations. Site requirements for stormwater control are different if the proposed development is `high density' (greater than 24%impervious) or `low density' (less than 24%impervious). III. PROPOSED IMPROVEMENTS A. PROJECT DESCRIPTION The proposed project will create fifteen (15) single family lots (min 20,000 sf) in phase 1. The proposed project will add additional roads the Hoke County road system. The design follows the Preliminary Plat that was recently approved by Hoke County. As part of this project, public water will be extended to serve the new lots. B. LAND DISTURBANCE AND EROSION CONTROL The proposed disturbed area for the proposed project is 9.5 AC +/-. A NCDEQ Land Disturbance (Erosion Control) Permit will be obtained prior to beginningwork. C. IMPERVIOUS SURFACE The proposed total amount of impervious surfaces for this project is 7.68 AC. Phase 1 contains 2.39 ac of the total project impervious. This includes pavement and curb & gutters in the public R/W and driveways and rooftops on each lot. The resulting percent impervious (or built-upon) of 22.2% of the total project area. Phase 1 will result in a percent impervious of 13.0% of the total project area. A maximum amount of 4,738 SF of impervious area is allocated to each lot. Thus, this development is classified as `low density' under NCDEQ Phase II regulations. Stormwater Impact Analysis-Carter Farms Subdivision Page 3 1 4 D. DRAINAGE AND STORMWATER MANAGEMENT i. Roadway Drainage-Minor System The proposed roadway will have curb and gutter. Catch basins in the gutter line will provide the roadway drainage. Catch basins were spaced based on gutter spread not exceeding one-half lane width during a 4 in/hr storm (NCDOT guidelines). The minor pipe system is sized based on 10-year storm flow and cross-pipes are sized based on 25-year storm flow not exceeding the hydraulic capacity of each pipe segment (as open channel flow, that is, non- pressure flow). ii. Grass Conveyance Swales As stated in Section III. C. above, proposed impervious is less than 24% and, therefore is classified as `Low Density' per NCDEQ regulations. Per NCDEQ guidance, Curb outlet swales are proposed to receive runoff collected by the catch basins in the road system to control the runoff before being discharged from the site. The curb outlet swale has a longitudinal slope of 0.0%that discharge through a swale level spreader to the north. There is one proposed curb outlet swale (PC#1), that accounts for the runoff for swales #2 &3 (PC#2, PC#3).The proposed curb outlet swale has a length greater than 100 LF per post stormwater rules. A routing analysis of the swales was performed to account for infiltration of the soils and the available volume in the swales since the bottom elevation of the swale PC#1 is below the outlet elevation. The lower bottom elevation provides retention of the 25- yr storm which reduces the outflow through the level spreader by 15.2 CFS. The post development flow into swale PC#1 is 33.94 cfs (18.4 ac, I=calc. TC, c=0.35). The pre-development flow is 13.80 cfs (6.8 ac, I=calc. TC, c=0.30). The retention within the swale reduces the post-development flow to 14.54 CFS as compared to pre-development flow at 13.80 CFS (1.34 CFS increase). In addition to the flow reduction the level spreader reduces the outlet velocity to 1.18 ft/s. iii. Methodology and computations Refer to Appendix A for storm drainage and stormwater management computations. Hydrologic computations were based on the Rational Method for storm drainage and SCS method for stormwater management. Rainfall intensity was determined based on data of the closest rainfall gauge listed on the NOAA website. Drainage areas were delineated based on a combination of field and LIDAR topography. A time of concentration of 5 min is used for all calculations unless the overall flow length exceeds 1000 ft. Stormwater Impact Analysis-Carter Farms Subdivision Page 4 1 4 APPENDIX A Computations Minor System Grass Conveyance Swales Erosion Control Minor System Upstream Inlet Inlet Rainfall Pipe Capacity Gutter Gutter Gutter Drainage Area Pipe Diameter Total Pipe Flow Total System Pipe Slope Pipe Invert Pipe Invert Elevation(Top) Inlet Elevation Flow(Total Flow(Total Inlet ID Inlet ID Runoff (acres) Intensity*(in/h) (in) Pipe Material Pipe Length(ft) (Full Flow) (ft'/s)(1) Flow(ft'/s) (ft/ft) (Upstream)(ft) (Downstream)(ft) Inlet ID (ft)(3) (Invert)(ft) Inlet Type 4 iNhr Intercepted) Bypassed) Coeficient (5) (ft'/s) (ft'/s)(2) (ft'/s) (ft'/s) FES 104 CB 103 0.35 3.20 5.99 18 Class II I RCP 20.00 19.70 6.71 6.71 0.0300 199.63 199.03 FES 104 202.00 199.63 NCDOT 840.19 - - CB 103 CB 102 0.70 0.25 7.97 24 Class III RCP 24.00 17.32 1.39 8.10 0.0050 197.63 197.51 CB 103 202.53 197.63 NCDOT 840.03 0.82 0.47 CB 102 JB 101 0.70 0.20 7.97 24 Class III RCP 14.50 17.32 1.12 922 0.0050 197.51 197.41 CB 102 202.53 197.51 NCDOT 840.03 0.66 0.38 DI 101(6) FES 100 - - - 24 Class I II RCP 85.00 17.32 - 922 0.0050 197.42 197.00 DI 101(6) 202.40 197.42 NCDOT 840.19 - - - CB 206 CB 205 0.35 0.50 7.97 15 Class I II RCP 166.00 6.99 1.39 1.39 0.0102 206.36 204.66 CB 206 204.81 206.36 NCDOT 840.03 0.70 0.54 0.16 CB 205 CB 203 0.35 0.70 7.97 15 Class III RCP 348.00 6.99 1.95 3.35 0.0097 204.66 201.30 CB 205 204.81 204.66 NCDOT 840.03 1.14 0.81 0.33 FES 204 CB 203 0.35 2.10 8.89 15 Class III RCP 2000. 12.12 6.53 6.53 0.0300 201.94 201.34 FES 204 204.81 201.94 NCDOT 840.03 2.94 1.41 0.65 CB 203 CB 202 0.70 0.19 7.97 24 Class III RCP 24.00 21.91 1.06 10.94 0.0083 200.34 200.14 CB 203 204.81 200.34 NCDOT 840.03 0.86 0.48 0.12 CB 202 JB 201 0.70 0.40 7.97 24 Class III RCP 14.50 2035. 2.23 13.17 0.0069 200.14 200.04 CB 202 204.81 200.14 NCDOT 840.03 1.12 0.46 0.10 DI 201(6) FES 200 - - - 24 Class III RCP 85.00 2079. - 13.17 0.0072 200.04 199.43 DI 201(6) 205.01 200.04 NCDOT 840.19 - - - Notes 1 Storm System Sizing based on 10-yr Storm 2 Gutter Spread Calculations based on Storm Intensity of 4 inthr 3 CB(Catch Basin)Top Elevation is BOC 4 Gutter Spread Width is measured from Edge of Pavement 5 Storm System Sizing based on 25-yr Storm-for cross pipe drainage 6 Inlet is for secondary collection-No intial flow captured. Culvert Report Hydraflow Express Extension for AutoCADO Civil 3D0 2009 by Autodesk, Inc. Wednesday,Sep 21 2022 FES 104 Invert Elev Dn (ft) = 199.03 Calculations Pipe Length (ft) = 20.00 Qmin (cfs) = 6.71 Slope (%) = 3.00 Qmax (cfs) = 6.71 Invert Elev Up (ft) = 199.63 Tailwater Elev (ft) = Normal Rise (in) = 18.0 Shape = Cir Highlighted Span (in) = 18.0 Qtotal (cfs) = 6.71 No. Barrels = 1 Qpipe (cfs) = 6.71 n-Value = 0.012 Qovertop (cfs) = 0.00 Inlet Edge = Projecting Veloc Dn (ft/s) = 8.35 Coeff. K,M,c,Y k = 0.0045, 2, 0.0317, 0.69, 0.5 Veloc Up (ft/s) = 5.32 HGL Dn (ft) = 199.73 Embankment HGL Up (ft) = 200.64 Top Elevation (ft) = 202.50 Hw Elev (ft) = 201.14 Top Width (ft) = 18.00 Hw/D (ft) = 1.01 Crest Width (ft) = 10.00 Flow Regime = Inlet Control Elev(ft) FES 104 Hw Depth(ft) 203.00 3.37 202.00 2.37 201.00 net control 1.37 200.00 0.37 199.00 -0.63 198.00 L -1.63 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Cir Culvert HGL Embank Reach(ft) Culvert Report Hydraflow Express Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. Wednesday,Sep 21 2022 FES 204 Invert Elev Dn (ft) = 201 .34 Calculations Pipe Length (ft) = 20.00 Q m i n (cfs) = 6.53 Slope (%) = 3.00 Qmax (cfs) = 6.53 Invert Elev Up (ft) = 201 .94 Tailwater Elev (ft) = Normal Rise (in) = 18.0 Shape = Cir Highlighted Span (in) = 18.0 Qtotal (cfs) = 6.53 No. Barrels = 1 Qpipe (cfs) = 6.53 n-Value = 0.012 Qovertop (cfs) = 0.00 Inlet Edge = Projecting Veloc Dn (ft/s) = 8.29 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.5 Veloc Up (ft/s) = 5.26 HGL Dn (ft) = 202.03 Embankment HGL Up (ft) = 202.93 Top Elevation (ft) = 204.84 Hw Elev (ft) = 203.42 Top Width (ft) = 18.00 Hw/D (ft) = 0.99 Crest Width (ft) = 10.00 Flow Regime = Inlet Control Elev(ft) FES 204 Hw Depth(ft) 205.00 3.06 204.00 2.06 Inlet control 203.00 1.06 202.00 0.06 201.00 -0.94 200.00 -1.94 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Cir Culvert HGL Embank Reach(ft) Grass Conveyance Swales Permanent Channel# 1 =>DA# PD 1 Calculate Flow-Rational Method 25-VrStorm Qzs=CIA C= 0.35 1= 5.92 in/hr CALCTc Qzs= 38.12 A= 18.40 ac Channel Slope-- 0.00 Channel Depth— 2.50 Channel Bottom Width= 4.00 Side Slopes= 3.00 Veloci 2.25 Soil Type sandy loam Slopes=0-10% Channel Lining Shear Calculation T=yds y= 62.4 Ibs dwae T= 0.112321bs/ft2 s= ft/ft Temporary=NAG S75BN Permanent=Fescue(1.0 Ibs/ft Permanent Channel# 2 =>DA# Calculate Flow-Rational Method 25-VrStorm Qzs=CIA C= 0.30 1= 8.89 in/hr Q25= 6.40 A= 2.40 ac Channel Slope= 1.60 Channel Depth= 2.50 Channel Bottom Width= 4.00 Side Slopes— 3.00 Veloci = 3.62 Soil Type @ sandy loam Slopes=0-10% Channel Lining Shear Calculation T=yds y= 62.4 Ibs d—te 0.35 ft T= 0.4368 Ibs/ft2 s= 0.016 ft/ft Temporary=NAG S75BN Permanent=Fescue(1.0 Ibs/ft2) Permanent Channel# 3 => DA# 204 Calculate Flow- Rational Method 25-Yr Storm Q25= CIA C= 0.35 1= 8.89 in/hr CA LC Tc Q25= 6.53 A= 2.10 ac Channel Slope= 1.00 Channel Depth= 1.00 Channel Bottom Width= 0.00 Side Slopes= 3.00 Velocity= 3.49 Soil Type @ sandy loam Slopes= 0-10% Channel Lining Shear Calculation T=yds y= 62.4lbs dwater 0.79 ft T= 0.24648 Ibs/ftZ s= 0.01 ft/ft Temporary= NAG S75BN Permanent= Fescue (1.0 Ibs/ft2) Channel Report Hydraflow Express Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. Thursday,Jul 20 2023 PC #1 Trapezoidal Highlighted Bottom Width (ft) = 4.00 Depth (ft) = 1.80 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 38.12 Total Depth (ft) = 2.50 Area (sqft) = 16.92 Invert Elev (ft) = 100.00 Velocity (ft/s) = 2.25 Slope (%) = 0.10 Wetted Perim (ft) = 15.38 N-Value = 0.022 Crit Depth, Yc (ft) = 1 .08 Top Width (ft) = 14.80 Calculations EGL (ft) = 1 .88 Compute by: Known Q Known Q (cfs) = 38.12 Elev (ft) Section Depth (ft) 103.00 3.00 102.50 2.50 102.00 N71 2.00 101.50 1.50 101.00 1.00 100.50 0.50 100.00 0.00 99.50 -0.50 0 2 4 6 8 10 12 14 16 18 20 22 24 Reach (ft) Channel Report Hydraflow Express Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. Thursday,Jul 20 2023 PC #2 Trapezoidal Highlighted Bottom Width (ft) = 4.00 Depth (ft) = 0.35 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 6.400 Total Depth (ft) = 2.50 Area (sqft) = 1.77 Invert Elev (ft) = 100.00 Velocity (ft/s) = 3.62 Slope (%) = 1.60 Wetted Perim (ft) = 6.21 N-Value = 0.022 Crit Depth, Yc (ft) = 0.39 Top Width (ft) = 6.10 Calculations EGL (ft) = 0.55 Compute by: Known Q Known Q (cfs) = 6.40 Elev (ft) Section Depth (ft) 103.00 3.00 102.50 2.50 102.00 2.00 101.50 1.50 101.00 1.00 100.50 0 0.50 100.00 0.00 99.50 -0.50 0 2 4 6 8 10 12 14 16 18 20 22 24 Reach (ft) Channel Report Hydraflow Express Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. Thursday,Jul 20 2023 PC #3 Triangular Highlighted Side Slopes (z:1) = 3.00, 3.00 Depth (ft) = 0.79 Total Depth (ft) = 1.00 Q (cfs) = 6.530 Area (sqft) = 1.87 Invert Elev (ft) = 100.00 Velocity (ft/s) = 3.49 Slope (%) = 1.00 Wetted Perim (ft) = 5.00 N-Value = 0.022 Crit Depth, Yc (ft) = 0.79 Top Width (ft) = 4.74 Calculations EGL (ft) = 0.98 Compute by: Known Q Known Q (cfs) = 6.53 Elev (ft) Section Depth (ft) 102.00 2.00 101.50 1.50 101.00 1.00 Is 7 100.50 0.50 100.00 0.00 99.50 -0.50 0 1 2 3 4 5 6 7 8 Reach (ft) U.S. Department of Agriculture FL-ENG-21 B Natural Resources Conservation Service 06/04 TR 55 Worksheet 3: Time of Concentration (Tc) or Travel Time (Tt) Project: Carter Farms Subdivison Designed By: MTB Date: Location: Hoke County, NC Checked By: MDA Date: Check one: y/ Present Developed Check one: V T, Tt through subarea DA#104 NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to T, only) Segment ID 1 1. Surface description (Table 3-1) ................................................ GRASS 2. Manning's roughness coeff., n (Table 3-1) .............................. 0.04 3. Flow length, L (total L < 100 ft) .............................................. ft 100 4. Two-year 24-hour rainfall, P2.................................................. in 0.1 5. Land slope, s ....................................................................... ft/ft 0.050 6. Tt =0.007 (nL)0.8 Compute Tt.......................... hr 0.18 + = 0.18 P2 0.5 S0.4 Shallow Concetrated Flow Segment ID 2 7. Surface description (paved or unpaved) ................................... UNPAVED 8. Flow length, L ......................................................................... ft 557 9. Watercourse slope, s ........................................................... ft/ft 0.013 10. Average velocity, V(Figure 3-1) .......................................... ft/s 1.9 11. Tt = L Compute Tt ......................... hr 0.08 + 3600 V Channel Flow Segment ID 12. Cross sectional flow area, a ............................................... ft2 0.0 13. Wetted perimeter, PW ......................................................... ft 0.0 14. Hydraulic radius, r= a Compute r .................................. ft PW 15. Channel Slope, s ............................................................ ft/ft 0.000 16. Manning's Roughness Coeff., n ............................................ 0.00 17. V= 1.49 r2/3 s'/2 Compute V ...................... ft/s 0.0 n 18. Flow length, L ...................................................................... ft 0 19. Tt = L Compute Tt.................................... hr + _ 3600 V 20. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19 ................................................................. hr 0.26 0.26= 15.6 mins Chapter 3 Time of Concentration and Travel Time Technical Release 55 Urban Hydrology for Small Watersheds Figure 3-1 Average velocities for estimating travel time for shallow-concentrated flow .50 .20 .10 i2 d a. a h .06 m 0 a M .04 �-I a 02 .01 .005 1 2 4 6 10 20 1.9 Average velocity(ftlsec) 3-2 (210-V1-TR-55,Second Ed.,dune 1986) LEVEL SPREADER# 1 Calculate Flow- Rational Method 0.75 in/hr Design Storm Q= CIA C= 0.40 1= 0.75 in/hr per MDC Q= 3.00 A= 10.00 ac Required Level Spreader L= 10 feet/1 cfs Required Level Spreader L= 30.00 ft Proposed Spreader L= 55.00 ft Flow Depth 0.00 Flow discharged via inflitration in swale 10-Yr Storm Q10= Outflow Treatment swale Q10= 0.74 cfs Flow Depth= 0.03 cfs Proposed Stone Spreader Dims Spreader L= 55 ft Apron Width= 6 ft Stone D= 12 in Stone Dia= Class A e POI#01 Pre Developmemt SCM01 SCM 1 DA 01P SCM #01 Subcat Reach on Link Routing Diagram for PC01 Prepared by Toshiba, Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Carter Farm Subdivision PC01 Type/1 24-hr 10-Year Rainfall=5.52" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment Pre POI #01: P0I#01 Pre Developmemt Runoff = 2.96 cfs @ 12.02 hrs, Volume= 0.489 af, Depth= 0.32" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.52" Area (ac) CN Description 0.000 39 Woods 18.400 39 Grass 0.000 90 Pavement 0.000 90 Sidewalk 0.080 90 Buidling 18.480 39 Weighted Average 18.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment Pre POI #01: P0I#01 Pre Developmemt Hydrograph ■Runoff 2.96cfs - - - - - - - - - - - - - - - - - - - - - - 3 Type III 24-hr 10-Yuar Rainfall'=5.52 RUnioffArdcl,18.480 Ac 2 tAnQ Qrl�•T•Y�0r� -� w Runoff Qel'lpth=0.8�11 '--'�--'�--'�-- 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type/1 24-hr 10-Year Rainfall=5.52" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment SCM01: SCM 01 DA Runoff = 16.66 cfs @ 11.99 hrs, Volume= 1.035 af, Depth= 0.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.52" Area (ac) CN Description 2.390 90 Impervious 16.010 39 Pervious 18.400 46 Weighted Average 18.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment SCM01: SCM 01 DA Hydrograph + t t t ■Runoff 18 --I- 16.66 cfs -�-J-A-1-1-+-+-L-L-L- ----------J-J- -1-1-1-1-L- -L- -- 17 -------- ----'--'- -+-+-+-+-+- ---------------'--'- ------- - -fir- 16 _ I_ + + + + r _ _i 15 ------'--' --'--'-------------------------71J�i�� 14 I I I I I I I 12 -r---I--I --- - - -+-+-+-r-r-r-+-r-� r Off OM I' II--II--II--II--I -----1-1-+-+-+-r-r-r-r-r---I--I--I--I-7-r-,-7-7-7-}+-r-r-r-r-I-- 10 0 9 -+-+-+-+-+-+-+-+-+-+-+-+-+-++-+-+-+-+-+-+-+ -��* �, LL 8 +-+-+--- I�TJ� �111-- 7 -------- ----- - -+-+-+-+-+- - - ---------- - - - - - -+-CN - 6 L-----'-- --'-J-J-L-1-+-+-+-L-r-L-L-L--------J-J-L- -1-1-1-r-L-L-L-I- 5 4 3 2 -------- ---- - - - - - - ------------------ - - - - - - ------- 1 I I I I I I I I I I I I I I I I I I I I I I I I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type/1 24-hr 10-Year Rainfall=5.52" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Page 4 Summary for Pond 01 P: SCM #01 Inflow Area = 18.400 ac, 0.00% Impervious, Inflow Depth = 0.67" for 10-Year event Inflow = 16.66 cfs @ 11.99 hrs, Volume= 1.035 of Outflow = 1.43 cfs @ 13.95 hrs, Volume= 1.034 af, Atten= 91%, Lag= 117.5 min Primary = 0.47 cfs @ 13.95 hrs, Volume= 0.894 of Secondary = 0.96 cfs @ 13.95 hrs, Volume= 0.140 of Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Starting Elev= 197.00' Surf.Area= 3,765 sf Storage= 2,259 cf Peak Elev= 199.03' @ 13.95 hrs Surf.Area= 15,748 sf Storage= 21,549 cf (19,290 cf above start) Plug-Flow detention time= 591.6 min calculated for 0.983 of(95% of inflow) Center-of-Mass det. time= 530.0 min ( 1,451.4 - 921.4 ) Volume Invert Avail.Storage Storage Description #1 194.00' 21,549 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) 194.00 3,765 0.0 0 0 195.00 3,765 20.0 753 753 196.00 3,765 20.0 753 1,506 197.00 3,765 20.0 753 2,259 198.00 9,533 100.0 6,649 8,908 199.00 15,748 100.0 12,641 21,549 Device Routing Invert Outlet Devices #1 Primary 197.00' 1.500 in/hr Exfiltration over Surface area above 197.00' Conductivity to Groundwater Elevation = 190.00' Excluded Surface area = 3,765 sf #2 Secondary 199.00' 55.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.47 cfs @ 13.95 hrs HW=199.03' (Free Discharge) L1=Exfiltration ( Controls 0.47 cfs) Secondary OutFlow Max=0.74 cfs @ 13.95 hrs HW=199.03' (Free Discharge) L2=Broad-Crested Rectangular Weir(Weir Controls 0.74 cfs @ 0.44 fps) Carter Farm Subdivision PC01 Type/1 24-hr 10-Year Rainfall=5.52" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Page 5 Pond 01 P: SCM #01 Hydrograph 16.66 CfS - ■Inflow -r-r--r-r-rr-+-r--r-r--r-+-r--r-r--r-r-r--r-r- ■outflow ------ --------------------- �� ��{{" /�A r- ■Primary h1fl "= 10.4004 ■Secondary 18 17 16 � � "'�J 14 -I-+-F -T- --+-T--T-r- T-+-T-I- -r--7-+- -I- -r-I- -T- -I- -r13 12 11 1-1-L -L-'--'-+-L_I_1-L_I_J-1-L_I_ - - w i 10 ---Y-r -r-I--I-Y-r-I-r-r-I-r-+-r-I-r-r--r-+-I---r-r-I-r-r----�-r- 3 9 lO 8 --I-+_T -T-�--+-T--+-T- -T-T--,-r-I-�-T-�-I-,-r----T-�---_r_ 7 --i-i-i -i-i-i-i-i--i-i-i-i-i-i-- - ---i-i-i-- - ---i-i-i--i-i- ------------------------------------------------ 5 -+ - ++ -+-+-1-+-+--+-+-++-+-+-++-+-++-+-+-++-+-+--+-+- 1.43 cfs 3 2 0.96 cfs 1 0 2 4 6 8 1012 14 1618 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type 11 24-hr 25-Year Rainfall=6.67" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment Pre POI #01: P0I#01 Pre Developmemt Runoff = 13.80 cfs @ 12.00 hrs, Volume= 1.007 af, Depth= 0.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.67" Area (ac) CN Description 0.000 39 Woods 18.400 39 Grass 0.000 90 Pavement 0.000 90 Sidewalk 0.080 90 Buidling 18.480 39 Weighted Average 18.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment Pre POI #01: P0I#01 Pre Developmemt Hydrograph r-r-i--i--i--i--i--i-y-y-t-t-+-t-r-r-r-r-r-r-i--i--i-y-y-y-�-rt-rt-t-r-r-r-r-r 15 1 ■Runoff 13.80cfs - - - - - - - - - - - - - - - - - - 14 r-r---i--i -----y-y-t-t-+-t-r-r-r-r-r-r------y-y-y T 13 ------ ---- 12 - 25-Yearl Rain 11=6.IV/ "-- r-r-i--i--i --i--i-y-y-t-t-+-t-r-r-r-r-r-r-i--i--i-y-y-y-�-rt-rt-t-r-r-r-r-r- 10 npff OM 9 Iu Hoff Deph= fi5 0 7 T -------- -----------------------------------------Jd: 5.0-tnin 6 -------- ----- - - - - - - - - - ---------- - - - - - - -��� - 5 -----i- - -r-r-r-i-i---------------i-i-i-i- - -i-i-i 4 3 2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type 11 24-hr 25-Year Rainfall=6.67" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment SCM01: SCM 01 DA Runoff = 33.74 cfs @ 11.98 hrs, Volume= 1.783 af, Depth= 1.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.67" Area (ac) CN Description 2.390 90 Impervious 16.010 39 Pervious 18.400 46 Weighted Average 18.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment SCM01: SCM 01 DA Hydrograph ------------------------------------------ ■Runoff 36 --- 33.74 I'1-I'1--I', -pI', - 34 1 IT R"�OZ4-hr- ----r-r-r-T-r-r-r-r-r-r-i-i------r-r-r-r 32 r-----i--i Y p c7 ai 28 r-r---i--i -----t-t-t-t-r-r-r-r-r-r-r-r ---t - r r- 26 FZwrio'ff /ark& 19.400 dG r-r---i-- - ----t-t-t-t-r-r-r-r-r-r-r-I- i---i-.p--r-y-y-u4r rt-rtpp-t-r�r-r-r-r- 24 ff V101 y 2220 -------- -----+-+-+-+-+-+-+-+-+-+----------+-+-+-+-+-+-+-+-+-+-+��- p���^�{c 18 --'--'--'-- ----'-J- -1-L- -L-L-L-L-L----------J-J- - _1TC JO- 1n-- ML T 16 ------'-- --'--'- - -i-1-i-L-L-L- -+-------'--'- - - -1-1-1-i-L-r- -+-'-- 14 j------'-- ------'- -'-'-'-'-'-'---------------'--'-'-'- 12 10 8 6 4 2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type 11 24-hr 25-Year Rainfall=6.67" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Page 8 Summary for Pond 01 P: SCM #01 Inflow Area = 18.400 ac, 0.00% Impervious, Inflow Depth = 1.16" for 25-Year event Inflow = 33.74 cfs @ 11.98 hrs, Volume= 1.783 of Outflow = 15.52 cfs @ 12.10 hrs, Volume= 1.783 af, Atten= 54%, Lag= 7.3 min Primary = 0.48 cfs @ 12.10 hrs, Volume= 0.914 of Secondary = 15.03 cfs @ 12.10 hrs, Volume= 0.869 of Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Starting Elev= 197.00' Surf.Area= 3,765 sf Storage= 2,259 cf Peak Elev= 199.23' @ 12.11 hrs Surf.Area= 15,748 sf Storage= 21,549 cf (19,290 cf above start) Plug-Flow detention time= 345.0 min calculated for 1.730 of(97% of inflow) Center-of-Mass det. time= 316.1 min ( 1,213.0 - 896.8 ) Volume Invert Avail.Storage Storage Description #1 194.00' 21,549 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) 194.00 3,765 0.0 0 0 195.00 3,765 20.0 753 753 196.00 3,765 20.0 753 1,506 197.00 3,765 20.0 753 2,259 198.00 9,533 100.0 6,649 8,908 199.00 15,748 100.0 12,641 21,549 Device Routing Invert Outlet Devices #1 Primary 197.00' 1.500 in/hr Exfiltration over Surface area above 197.00' Conductivity to Groundwater Elevation = 190.00' Excluded Surface area = 3,765 sf #2 Secondary 199.00' 55.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.48 cfs @ 12.10 hrs HW=199.23' (Free Discharge) L1=Exfiltration ( Controls 0.48 cfs) Secondary OutFlow Max=14.54 cfs @ 12.10 hrs HW=199.22' (Free Discharge) L2=Broad-Crested Rectangular Weir(Weir Controls 14.54 cfs @ 1.18 fps) Carter Farm Subdivision PC01 Type 1124-hr 25-Year Rainfall=6.67" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Page 9 Pond 01 P: SCM #01 Hydrograph 33.74 CfS - - - ■inflow - - -- - -- - - -- - -- - ---- - -- - ---- - - ■Outflow ■Primary 11i1V W /�1�i�� Iiv��l7V ��ii ■Secondary ---+-r -r----+-r--T-r--r-T-r--r-r--r-T----r-r--r-T----�-r- 36 �, 34 __� _� _ P'e' ev-1 -23 - 32 �p = 30 "'.7 e 28 26 --i-r-r -r-r-i-r-r-i-r-r-rr-+-r-i-r-r-i-r-+-r-i-r-r-i-r-r-r-i-r-r- 24 i 1 w 22 15.52 Cfs '�J- - -- - -��--�-�- zo 3 1$ 0 16 15103 CfS -r-r--r-r--r-r-rr-+-r--r-r--r-+-r--r-r--r-r-r--r-r- 14 -r-i -r- 12 - ---- - -- - -- - - -- - -- - ---- - -- - ---- - - 10 8 6 4 2 0 2 4 6 8 1012 14 1618 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type/1 24-hr 100-Year Rainfall=8.60" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment Pre POI #01: POI#01 Pre Developmemt Runoff = 40.53 cfs @ 11.98 hrs, Volume= 2.184 af, Depth= 1.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=8.60" Area (ac) CN Description 0.000 39 Woods 18.400 39 Grass 0.000 90 Pavement 0.000 90 Sidewalk 0.080 90 Buidling 18.480 39 Weighted Average 18.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment Pre POI #01: POI#01 Pre Developmemt Hydrograph -7 7 7 -1--1--1--1-+-+-t-+-+-+-r-r-r-r-r-r-1--1--1-+-+-+-+-+-+-+-r-r-r-r-r- 44 --i 42 ■Runoff 40.53 cfs -'- '- - - - - - - - - ----------�'-�'- - - - - - - - - -�'-- I I Tye �4-6-r - 40 -------- ----- - -+-+- -r-r-r- - ---------- - - - 1 1 1 1 1 I I I I I I I I I I I I I I I I I I I I I 38 r-r-1--1--1 --1--1-t-r-t-t-t-r-r-r-r-r-r-rA-/--/1--I�-/r-ry-rprwrt-1-t-r-rp-rc-nr-I-- 36 34 ------'--' ----'-L- -L-L-L-L-L-L-L-r-'--'--'p-----L-L-L-1y�-,1�-1A-10-Lw-r-/fir-r-'-- 32 ------i-- ----1-+-+-+-+-+-+-+-+-+-+---1-i� � i��i`iQ�1ET. F�it �-- 30 m1 1 nI �I� I7-- AI -----r-r-T-T-r-r-r-r_r_r-I - rlr� -ff ��f�4�'�rY��'.i_84 28 ------'-- ----'--'- - - - - - - -�-'--' of - w26 ------�-- -----r- - - - -r-r-r- - --------p-r- - - -'- - -r-r-�- -1-- 2 24 r-1--r-1-- --1--1-r-T-T-T-r-r-r-r-r-r-r-r-1--1- 1 t#ii FF 1"r 3 22 -- --(1��---^�T--- ym-�-G-- l0 20 i I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 18 --1--1--1-- --1--1-+-+-+-+-+-+-+-r-r-+-1--1--1--1--1-+-+-+-+-+-+-+- r- 16 ------�1-- --- - - -T-T-r-r-r-r-r-�r-��-��------ - - - -7-7-T- � - 14 ------'-- ------'- -'-'-'-'-'-'-'-----------'--'-'-'-'- -'-'-'-'-'---'-- 12 --1--1--i-- --i--1- - - - - -r-r-r- - -------i--1- - - - - - - -r-r- - -i-- 10 --1--1--1-- -----T-r-T-T-r-r-r-r-r-r----------T-r-r- -r-T-T-r-r-r-r-I-- 6 -------- ----L- -L-L-L-L-L-L- - ----------L- - -L-L-L-L-L-L- - --- 4 r-r-1--1-- --+-+-+-+-+-+-r-r-r-r-r-r-1--1--1-+-+-+-+-+-+-+-r-r-r-r-r- 2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type/1 24-hr 100-Year Rainfall=8.60" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment SCM01: SCM 01 DA Runoff = 68.81 cfs @ 11.97 hrs, Volume= 3.331 af, Depth= 2.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=8.60" Area (ac) CN Description 2.390 90 Impervious 16.010 39 Pervious 18.400 46 Weighted Average 18.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment SCM01: SCM 01 DA Hydrograph - --------------,-r-+-+-r-r-r-r-r-r-r-I--I--I--I-r-r-r- -r-T-+-r-r-r-r-I-- 75 ■Runoff -I-r- - - -----,-,-1+--1r--Lr--Lr--Lr--Lr--Lr--1r-r-r-------------T- I-1-1I -L-L- -L 70 68.8 1 L P-p- - - =� - 65 60 -' -' -' -' -''f0�f-Year Rain�f 11=8.60'�- 55 ----Ruhoff Arn&�1&400 jAc-- -- 50 I N�® � +-+-+-i-- -+-+-+-+-+-+-+-+-+-r-+-+-+ npff •T•Y w 45 w ---- 40 Runoff Depth=Z'�' =- LL 35 30 +-+-+ -- -+-+-+-+-+-+-+-+-+-+-+-+-+-++-+-+-+-+-+-+-+-+-+-CN=40- 20 15 10 tttt 0 L H....6....I....I....I....I....I....1. 1....I.... I....I....I....I....I....I....I....I....I........2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type/1 24-hr 100-Year Rainfall=8.60" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Page 12 Summary for Pond 01 P: SCM #01 Inflow Area = 18.400 ac, 0.00% Impervious, Inflow Depth = 2.17" for 100-Year event Inflow = 68.81 cfs @ 11.97 hrs, Volume= 3.331 of Outflow = 81.44 cfs @ 11.99 hrs, Volume= 3.331 af, Atten= 0%, Lag= 1.3 min Primary = 0.50 cfs @ 11.99 hrs, Volume= 0.921 of Secondary = 80.94 cfs @ 11.99 hrs, Volume= 2.410 of Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Starting Elev= 197.00' Surf.Area= 3,765 sf Storage= 2,259 cf Peak Elev= 199.67' @ 11.99 hrs Surf.Area= 15,748 sf Storage= 21,549 cf (19,290 cf above start) Plug-Flow detention time= 184.6 min calculated for 3.279 of(98% of inflow) Center-of-Mass det. time= 170.3 min ( 1,043.4 - 873.2 ) Volume Invert Avail.Storage Storage Description #1 194.00' 21,549 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) 194.00 3,765 0.0 0 0 195.00 3,765 20.0 753 753 196.00 3,765 20.0 753 1,506 197.00 3,765 20.0 753 2,259 198.00 9,533 100.0 6,649 8,908 199.00 15,748 100.0 12,641 21,549 Device Routing Invert Outlet Devices #1 Primary 197.00' 1.500 in/hr Exfiltration over Surface area above 197.00' Conductivity to Groundwater Elevation = 190.00' Excluded Surface area = 3,765 sf #2 Secondary 199.00' 55.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.50 cfs @ 11.99 hrs HW=199.63' (Free Discharge) L1=Exfiltration ( Controls 0.50 cfs) Secondary OutFlow Max=74.67 cfs @ 11.99 hrs HW=199.63' (Free Discharge) L2=Broad-crested Rectangular Weir(Weir Controls 74.67 cfs @ 2.15 fps) Carter Farm Subdivision PC01 Type/1 24-hr 100-Year Rainfall=8.60" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 ©2017 HydroCAD Software Solutions LLC Page 13 Pond 01 P: SCM #01 Hydrograph --1-1-L-1-1-1-1--1-1-L-1-1-L-1-J-1-L-i-�-�-�-J-+-�--�-�-L-1-J-1-1--1-1-L- -+-+-++-+-+-++-+-++-+-+-++-+-++-+-+-++-+-++-+-+-++-+-++-+-+- ■Inflow +--+-+-+--+-+--+-+-+--+-+--+-+-+--+-+--+-+-+--+-+- ■outflow � � - �p� /�� � ■Primary 90 r-r--7-r-I- -r-r�-T-r-�� �rJYY i�W�����Eh �it��Fir- ■Secondary 85 80.94 cfs cfs T- -T-T T-T- -T- -+ - ,T- 80 - ---------------------------PekT;F� v-� �.� - 75L 70 - 65 60 55 u 50 3 45 LL 40 -1-1--1-i-L--1-L--J-1-L-'- -L--J-1-'--'- -L-'- -i----1-L- 35 30 -1-1--1-i-L-'-1-L-'-J-L-L-'-�-L-'-J-L-'--'-�-L-'-J-i-'--'-�-L- 25 20 15 10 S 5 0 2 4 6 8 1012 14 1618 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Erosion Control Sediment Basin# 1 Calculate Flow- Rational Method 10-Yr Storm 25-Yr Storm Q10=CIA C= 0.30 Q25 = CIA C= 0.30 1= 7.98 1= 8.89 Q10= 30.88 A= 12.90 Q25 = 34.40 A= 12.90 2-Yr Storm Q2= CIA C= 0.30 1= 6.18 Q2 = 23.92 A= 12.90 Calculate Required Surface Area SA=Q10 x 435 sf/cfs Q10= 30.88 SA= 13433.93 ft2 Side Slopes= 3.00 :1 Pond Depth= 4.00 ft Basin Dims (Per SA) Top= 79.00 x 213.00 = 16827 ft2 Weir= 67.00 x 201.00 = 13467 ft2 Bottom = 43.00 x 177.00 = 7611 ft2 Volume Required VR=Ax1800 cf/ac A= 12.90 ac VR= 23220.00 ft3 Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 16827.00 sf Bottom= 7611.00 sf VP= 48876.00 ft3 D= 4.00 ft Skimmer Sizing Calculate Dewater Time Qd=V/Td V= 23220.00 ft 3 Td= 5 3-5 days typ Qd= 4644.00 cf/day Calculate Orifice Diameter D=sgrt((Qd/(2310sgrt(h))) Qd= 4644.00 h= 0.33 D= 1.87 Use 4 " Skimmer w/ 1.87 " Orifice Principle Spillway Sizing L=Q2/(cH1.5) L= ? ft H= 1.50 ft c= 3.10 L= 4.20 ft Riser Sizing C=pi X D C= 4.20 ft pi= 3.14 D= 16.05 i n D= ? ft Material= CMP Use 24.00 "CMP Riser Barrel Sizing Q2= CA X sgrt(2gh) C= 0.60 A= ? sf A= 2.12 Q2= 23.92 cfs h= 5.50 ft A=pi X r2 g= 32.20 ft/s A= 19.71 in Material= CMP Use 18.00 "CMP Barrel Size Riser/Barrel Base Calculate Bouyance Force on Riser Cross-sectional area A=(pi x r2)x 2 r= 1.00 A= 6.28 sf Riser Volume V=A x L A= 6.28 L= 4.00 V= 25.12 Bouyance Force FB=qV q= 62.40lbs V= 25.12 ft3 FB= 1567.49lbs/cf Concrete Base Sizing (Concrete = 120 Ibs/cf)-(weight of water= 62.4 Ibs/cf) =57.6 Ibs/cf x 1.1 SAFETY FACTOR Base Volume 29.93 cf Base Dims= 5.47 ft x 5.47 ft x 1.00 ft Weir Sizing Per AutoCa d Hyd raflow Software L= 10.00 ft D= 2.00 ft dwater 1.00 ft Q25= 34.40 cfs Velocity= 3.37 ft/s Weir Lining Shear Calculation T=yds y= 62.4 Ibs dwater 1 ft T= 0.624 Ibs/ft2 s= 0.01 ft/ft Required Liner= Class A Rip Rap Proposed Liner= Class A Rip Rap Temporary Diversion/Berm# 1 =>DA# EC401 Calculate Flow-Rational Method 25-Yr Storm Q25=CIA C= 0.40 I*= 5.92 in/hr *IntensityperTc Q25= 23.68 A= 10.00 ac Channel Slope= 0.20 Channel Depth= 2.50 Bottom Width= 4.00 Side Slopes= 3.00 Velocity-- 3.42 Soil Type @ Loamy Sand Slopes=0-10% Channel Linin¢ Shear Calculation T=yds y= 62.4lbs cl_,= 1.3 ft T= 0.4056 Ibs/ft2 s= 0.005 ft/ft Temporary= NAG S75BN Permanent= NAG S75BN Temporary Diversion/Berm# 2 =>DA# EC402 Calculate Flow-Rational Method 25-Yr Storm Q25=CIA C= 0.40 I*= 6.38in/hr *Intensity per Tc Q25= 4.59 A= 1.80 ac Channel Slope= 0.00 Channel Depth= 2.00 Bottom Width= 4.00 Side Slopes= 3.00 Velocity-- 1.40 Soil Type @ Loamy Sand Slopes=0-10% Channel Linin¢ Shear Calculation T=yds y= 62.4lbs cl—te,= 1.05 ft T= 0.3276 Ibs/ft2 s= 0.005 ft/ft Temporary= NAG S75BN Permanent= NAG S75BN Barrel Outlet Protection#1 New York Method 8.06.5 Manual Diameter of Barrel = 18.00 " La= 8 ft Velocity= 5.5 ft/s W= 6 ft Zone= 1 Stone Diameter= Class a Stone d= 12 in Outlet Protection#100 New York Method 8.06.5 Manual Q= 16.74 cfs La= 16 FT Pipe Diameter 24 in W= 6 FT Velocity= 17.3 ft/s d= 24 IN Zone= 3 Stone Diameter= Class I Outlet Protection#200 New York Method 8.06.5 Manual Q= 5.3 cfs La= 6 FT Pipe Diameter 15 in W= 4.5 FT Velocity= 4.9 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A APPENDIX B Drainage Area Maps i � 1 \ � \ I � 210 � � � 1 I DA PDyI \ , I (ALL OTHER ORAINXG�AREAS INCLUDED) 18.4 AC r/— \ i --- J DA CBd202 0.4 AC r/— POd2 o 2. , 2.2 AC+�— I / / _ DA C81206 DA CBd201 0.6 AC+ 0.2 AC r/- -—— _ 0.7 AC r/— DA CBd203 ---- 0.2 AC+/— -- _ DA CBg103 / DA FESd204 / 0.25 AC+/— --._----- 2.111 AC+/— / �pW N.ANDERS DA DI®104 O / (PRlygTE) 5` ;WW----3-2 AC+/---- Averette Engineering Co.,P.A. sEA� -IN eY: REVISIONS SCALE MCK Na. DESCRIPTION DATE CARTER FARMS SUBDIVISION-PHASE 1 CHECKED BY: L Sv EEenvc 71.2Add E. C. D. AVERETTE CARTER ROAD 1" = 100' LAND SURVEYING 712 E.Lake Ritlge ROOtl PLANN/RG Raef.,d,NC 28376 PROJECT d: HOKE COUNTY,NORTH CAROLINA PN<ne:(910)488-5656 2020-11 SHEET NO.: Fax:(910)488-0181 — NAN License:C-0146 CPRTERFPRMS D&D DA2 DATE: DRAINAGE AREA MAP-INLET/PERMANENT CHANNELS Established 1970 Web:www.averette—eng—T 1, 5/18/2022 \ 210 DA 138#1 1 \ 7--- DA EC/401ID.D AC / Averette Engineering Co.,P.A. ckL' Dom+�' REVISIONS MTB ND. DESCRIPTION DATE CHECKED Bf: CARTER FARMS SUBDIVISION L 'v En envc 71.2Add E. C. D. AVERETTE CARTER ROAD 1'- 100 LAND SURVEYING 712 E.Lake Ritlge ROotl PLANK/NG Raef.,d,NC 28376 PROJECT/: HOKE COUNTY,NORTH CAROLINA PNane:(910)488-5656 2020-11 SHEET NO.: Fax:(910)488-0181 License:C-0146 CMfERFORMS DJ D DATE- DRAINAGE AREA MAP-EC DA1 Established 1970 Web:www.overette—eng.c2T 1, 5/18/2022 APPENDIX C Soil Survey Map Soil Map—Hoke County, North Carolina in v 674700 674800 674900 675000 675100 675200 675300 675400 675500 675600 34o 56'16"N I 34o 56'16"N 14 NJ oA JT BaD GdB N Soil Map may not he valiel at this scale. OV 340 55'54"N -'I N 340 55'54"N 674700 67. 67. 67. 675100 675. 675300 67. 67. 675600 Map Scale:1:4,640 if printed on A landscape(11"x 8.5")sheet. a N Meters 0 50 100 200 300 Feet 0 200 400 800 1200 Map projection:Web Mercator Conermordinates:WGS84 Edge tics:UTM Zone 17N WGS84 usoA Natural Resources Web Soil Survey 7/21/2021 Conservation Service National Cooperative Soil Survey Page 1 of 3 Soil Map—Hoke County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest(A01) Spoil Area The soil surveys that comprise your AOI were mapped at 0 Area of Interest(AOI) Stony Spot 1:24,000. p� Y Soils Very Stony Spot Warning:Soil Map may not be valid at this scale. 0 Soil Map Unit Polygons Wet spot Enlargement of maps beyond the scale of mapping can cause ,P Soil Map Unit Lines misunderstanding of the detail of mapping and accuracy of soil Other line placement.The maps do not show the small areas of Soil Map Unit Points Special Line Features contrasting soils that could have been shown at a more detailed M� Special Point Features scale. Blowout Water Features Streams and Canals Please rely on the bar scale on each map sheet for map Borrow Pit measurements. Transportation Clay Spot _ Rails Source of Map: Natural Resources Conservation Service Closed Depression Web Soil Survey URL: .,o Interstate Highways Coordinate System: Web Mercator(EPSG:3857) Gravel Pit US Routes Maps from the Web Soil Survey are based on the Web Mercator Gravelly Spot Major Roads projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the 0 Landfill Local Roads Albers equal-area conic projection,should be used if more A. Lava Flow Background accurate calculations of distance or area are required. Marsh or swamp Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s)listed below. Mine or Quarry Soil Survey Area: Hoke County, North Carolina Miscellaneous water Survey Area Data: Version 17,Jun 4,2020 Perennial Water Soil map units are labeled(as space allows)for map scales Rock Outcrop 1:50,000 or larger. Saline Spot Date(s)aerial images were photographed: Jun 15,2015—Dec 4, 2017 Sandy Spot ° The orthophoto or other base map on which the soil lines were Severely Eroded Spot compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor Sinkhole shifting of map unit boundaries may be evident. Slide or Slip o Sodic Spot usoA Natural Resources Web Soil Survey 7/21/2021 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map—Hoke County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BaD Blaney loamy sand,8 to 15 14.4 13.1% percent slopes CaB Candor sand, 1 to 8 percent 0.6 0.6% slopes GdB Gilead loamy sand,2 to 8 2.6 2.4% percent slopes GoA Goldsboro loamy sand,0 to 2 8.4 7.6% percent slopes, Southern Coastal Plain JT Johnston loam 10.2 9.3% LaB Lakeland sand, 1 to 8 percent 9.8 8.9% slopes NoA Norfolk loamy sand,0 to 2 20.0 18.2% percent slopes WaB Wagram loamy sand,0 to 6 43.8 39.9% percent slopes Totals for Area of Interest 109.7 100.0% USDA Natural Resources Web Soil Survey 7/21/2021 Conservation Service National Cooperative Soil Survey Page 3 of 3 APPENDIX D FEMA Firm Map �;- _.` --a � �' Fes• a`�, ure � ?�� ��r I I COO' • D lI2EAS, j. .L� ■y�'R J- �' �• �''' 4 ;N�+�* Creek J e m 34°56'30"N 4i, a o� F p - 1 S •� � � SITE r `` a i���A u 1 �� ► 4 h s �r r.�► a � 34°5601N a 1 79°5'30"W 79°5'0"W 79°4'30^W 1980000 FEET APPENDIX E USGS MAP \- - �- z - \ \ � SITE { / ) �\ ) / Q � - � � APPENDIX F STORMWATER FORMS SUPPLEMENT-EZ OPERATION & MAINTENANCE AGGREEMENT BMP SUPPLEMENT FORMS Permit Number: (to be provided by DWQ) flF wAr�R `=' r NCDENR p STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out,printed and submitted. The Required Items Checklist(Part III)must also be filled out,printed and submitted along with all of the required information. I. PROJECT INFORMATION Project name Carter Farms Subdivision-Phase 1 Contact name Averette Engineering Co.,P.A. Phone number (910)488-5656 Date May 18,2022 Drainage area number PD 1 II. DESIGN INFORMATION Site Characteristics Drainage area 801,504.00 ftz Impervious area 104,108.00 ftZ Percent impervious 13.0%% Design rainfall depth 3.04 inch Peak Flow Calculations 10-yr storm runoff depth 5.44 in 10-yr storm intensity 5.38 in/hr Post-development 10-yr storm peak flow 34.60 ft/sec Velocity Velocity Maximum non-erosive velocity(peak 10-year storm) 5.00 ft/sec Soil characteristics(enter'Y'below) Sand/silt(easily erodible) X Clay mix(erosion resistant) Grass Type(enter'Y'below) Bermuda x Tall fescue Bah iag rass Kentucky bluegrass Grass-legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: Y (Y or N) Maximum velocity 3.60 OK Side slopes 3.00 :1 Insufficient side slopes.Max is 5:1. Swale length 858.00 ft OK Option 2: Swale Seeking Pollutant Credit("For-Credit"Swale): (Y or N) Maximum velocity for 10-yr storm ft/sec Side slopes :1 Swale length ft Form SW401-Grassed Swale-Rev.4 Parts I and 11.Project Design Summary,Page 1 of 2 Permit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an'Y'in the appropriate cell below: Trapezoidal Parabolic V-shaped X Width of the bottom of the Swale ft Width of the top of the Swale ft Additional Information Is the Swale sized for all runoff from ultimate build-out? Y(Y or N) OK Is the BMP located in a proposed drainage easement with a Y(Y or N) OK recorded access easement to a public Right of Way(ROW)? What is the distance from the bottom of the Swale to the SHWT? 12.00 ft OK What is the ground level elevation? 201.00 fmsl What is the elevation of the bottom of the Swale? 197.00 fmsl What is the SHWT elevation? 185.00 fmsl What is the longitudinal slope of the Swale? 0.10 % OK What is the depth of freeboard? 0.67 ft OK Form SW401-Grassed Swale-Rev.4 Parts I and 11.Project Design Summary,Page 2 of 2 Permit No: (to be assigned by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent,the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. MA C5 1. Plans(1"=50'or larger)of the entire site showing: -Design at ultimate build-out, -Off-site drainage(if applicable), -Delineated drainage basins(include Rational C coefficient per basin), -Swale dimensions(width, length,depth), -Maintenance access, -Proposed drainage easement and public right of way(ROW), -Grass species,and -Boundaries of drainage easement. MA C7 2. Plan details(1"=50'or larger)for the grassed swale showing: -Swale dimensions(width, length,depth), -Maintenance access, -Proposed drainage easement and public right of way(ROW), -Design at ultimate build-out, -Grass species, -Off-site drainage(if applicable),and -Boundaries of drainage easement. MA C16 3. Section view of the grassed swale(1"=20'or larger)showing: -Side slopes, -Longitudinal slope, -Freeboard -Swale dimensions,and -SHWT level(s) MA 4. Supporting calculations(including maximum velocity calculations for applicable storms) MA 5. A copy of the signed and notarized operation and maintenance(0&M)agreement. MA 6. A copy of the deed restrictions(if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1