Loading...
HomeMy WebLinkAboutSW1230602_Supplement-EZ Form_20230929 SUPPLEMENT-EZ COVER PAGE LOAD SUPPLEMENT FORMS PROJECT INFORMATION ' - 1 Project Name Legacy Soccer Complex 2 Project Area(ac) 54.64 3 Coastal Wetland Area(ac) _ 0 4 Surface Water Area(ac) 0.86 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No !COMPLIANCE WITH 02H.1003(4) ` I 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 LOAD SUPPLEMENT FORMS DESIGNER CERTIFICATION 27 Name and Title: Jason Gaston,PLLC 28 Organization: Valor Engineering 29 Street address: 215 Boone Heights Drive#107 30 City,State,Zip: Boone,NC 28607 31 Phone number(s): 828-386-1866 32 Email: jason@dbdplanning.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer ,,P�H CAq� \ss 0•ofESS/p�'9. 4 ; Jason Gaston EAL - Signature of Designer 03523 'v'9S0ti•GAs1p�`: :, ,,,,, ,,,o 05/15/2023 Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wet Pond 5 Total drainage area (sq ft) 1436719.15 1357391.68 6 Onsite drainage area (sq ft) 1380078.63 1357391.68 7 Offsite drainage area (sq ft) 22686.95 0 8 Total BUA in project (sq ft) 400487 sf 400487 sf New BUA on subdivided lots (subject to 9 permitting) (sq ft) sf sf New BUA not on subdivided lots (subject to 10 permitting) (sf) 400487 sf 400487 sf 11 Offsite BUA (sq ft) sf sf 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) 143200 sf 143200 sf - Sidewalk (sq ft) 67344 sf 67344 sf - Roof(sq ft) 28915 sf 28915 sf - Roadway (sq ft) 39740 sf 39740 sf - Future (sq ft) sf sf - Other, please specify in the comment box below (sq ft) 121288 sf 121288 sf !New infiltrating permeable pavement on 13 subdivided lots (sq ft) sf sf New infiltrating permeable pavement not on 14 subdivided lots (sq ft) sf sf Existing BUA that will remain (not subject to 15 permitting) (sq ft) sf sf 16 Existing BUA that is already permitted (sq ft) sf sf 17 Existing BUA that will be removed (sq ft) sf sf 18 Percent BUA 28% 30% 19 Design storm (inches) 1.0 in 1.0 in 20 Design volume of SCM (cu ft) 35692 cf 35692 cf 21 Calculation method for design volume _ Simple Simple ADDITIONAL INFORMATION _ Please use this space to provide any additional information about the 22 drainage area(s): _ "Other impervious" is comprised of turf soccer fields which drain via an underdrain system to the wet pond. A diversion ditch/swale will be used on the western portion of the parcel to divert off-site runoff from the project site and is included on the site plans. This ditch is not considered an SCM per our cnnversation with Rrianna Holland OA/13/2023 WET POND I Drainage area number 1 2 Minimum required treatment volume (cu ft) 35692 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 Does the SCM have retaining walls, gabion walls or other 6 No engineered side slopes? 7 Are the inlets, outlets, and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with N/A General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H .1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment 1015.50 removal) (fmsl) 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 1016.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 1017.00 23 Elevation of the permanent pool (fmsl) 1020.00 24 Elevation of the top of the vegetated shelf(fmsl) 1020.00 25 Elevation of the temporary pool (fmsl) 1021.50 26 Surface area of the main permanent pool (square feet) 28078 27 Volume of the main permanent pool (cubic feet) 87518 cf 28 Average depth of the main pool (feet) 3.10 ft 29 Average depth equation used Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf(feet) 32 Volume of the forebay (cubic feet) 14860 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean-out depth for forebay (inches) 6 in 35 Design volume of SCM (cu ft) 424045 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) 3 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 3.19 41 Are the inlet(s) and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? _ _ Yes 43 Depth of forebay at entrance (inches) 36 in 44 Depth of forebay at exit (inches) 24 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) 3:1 48 Does the orifice drawdown from below the top surface of the No permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes yr, 24-hr storm? 50 Are fountains proposed? (If Y, please provide documentation that No MDC(9) is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Bermuda sodded lawn 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about 55 the wet pond(s): Wet Pond 2 9:17 AM 9/29/2023