Loading...
HomeMy WebLinkAboutSW4090301_Admin Review_20090513Application Completeness Review First Submittal ❑ Re -submittal Date Received: 3 0eve topmentlProject Name: _ /le_D0A1kL1>`s ' Receiving stream name _ B+4 CK -s <--re K Date Reviewed: By I r classification: C, For post -construction requirements, a program will be deemed compiiant,for the areas where it is implementing any of the following programs: WS-I, WS-I1, WS-III, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. Projects that require a 4011404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): Latitude and Longitude: 3 4 ' If 2 "'A✓ qo 2-1 �H V Jurisdiction Project Address: f .K ../ '[, r 4B Engineer name and firm: _5-r1,"44�e�orsSos_ _]? .i�f� "CgTM__< ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets El"High Density ❑ Other ❑ 401/404 impacts to surface waters, wetlands, and buffers (add language to cover letter and/or addinfo letter) U' BUA r1 3• Z 9 29, tam Check for $505.00 included Original signature (not photocopy) on application o�egal signature (Corporation-VP/higher, Partnership -General Partnerlhigher, LLC-memberlmanager, Agent). Check spelling, capitalization, punctuation, http://www.secretary.state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. ❑ For subdivided projects, a signed and notarized deed restriction statement a' -Sealed, signed & dated calculations V Correct supplement an 0$ provided for each BMP on site (check all that were provided & number of each) ra'Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet © Off -Site ❑ NCDOT Linear Road Er"' -Two sets of sealed, signed & dated layout & finish grading plans with appropriate details 91" Narrative Description of stormwater management provided Soils report provided Nor Ham✓ wAAe-P' xlyi'" l' � e V, �`�`�`�'�`'�'�'�� ? Wetlands delineated or a note on the plans that'none exist on site and/or adjacent property a^ Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; M,' Dimensions & slopes provided , 63` Drainage areas delineated ITervious and impervious reported for each ❑ Areas of high density Inspection and maintenance agreements provided ❑ Application complete 113"Application Incomplete Returned: (Date) Comments M=Eb SI r kvT PsT/M'f-' rAb May 14, 2008Revision — LEFT ✓M4(L 't— EMr91L- SL 2006-246 Section 9 Post Construction. Requirements for Non -Coastal Counties Low-density'projects 'tr' : -7 ti:•: t. ❑ No more than two dwelling units per acre or 24% built -upon area; ❑ Vegetated conveyances to the maximum extent practicable; ' ❑ Built -upon areas at least 30 feet landward of perennial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures. High density projects ❑ Control and treat runoff from the first one -inch of rain. ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours; ❑ Discharge the storage volume at a rate equal to or less than the predevelopment discharge rate for the one-year, 24=hour'storm: = '. ❑ Achieve 85% average annual removal of total suspended solids. ; •-1 ~ .. ❑ For BMPs that require a`iep'arat16n:frbm:the seasonal high-water table'(SHWT); the' -separation shall include at least 12 inches of naturally occurring soil above the SHWT. ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c); ❑ All built -upon areas are at least 30 feet landward of perennial and intermittent surface waters;' ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures - ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices Post -Construction Runoff Controls for T&E Species Goose Creek, Six Mile Creek and Waxhaw Creek Watersheds Buffers ❑ 200' undisturbed buffers on perennial streams ❑ 100' undisturbed buffers on intermittent streams Low -density projects ❑ All built upon area shall be limited to 10 percent. - ❑ Use of vegetated conveyances to the maximum extent practicable; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures High -density projects • The stormwater control measures must control and treat the difference between the pre -development and post -development conditions for the 1-year-24-hour storm. ----- - -- ---- ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours, ❑ Aal structural stormwater treatment systems must be designed to achieve 85% average annual removal of total suspended solids; . . . . ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All •. Projects requirements listed'in'-15A NCACt2H"A008(c):.-.Y'. "r J ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures. ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices High Density Projects that require a 401/404 within an NSW ❑ 85% TSS " ❑ 30% TN May 14, 2008 Revision