Loading...
HomeMy WebLinkAboutSW4130801_Inspection_20130813Compliance Inspection Report Permit: SW4130801 Effective:08113113 Project: Dollar General - Snow Camp Owner: Glandon Forest Equity LLC County: Alamance Region: Winston-Salem Expiration: 08112/21 Adress: W Greensboro Chapel Hill Rd CitylStatelZip: Snow Camp NC 27349 Contact Person: George T Barnes Title: Directions to Project: Approx 450 ft west of the intersection of snow camp rd and w greensboro chapel hill rd. Type of Project: State Stormwater - General Permit Drain Areas: On -Site Re prosentative(s): Related Permits: Inspection Date: 04/26/2017 Entry Time: 01:OOPM Primary Inspector: Glen White Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: M State Stormwater (See attachment summary) !;l Phone: 919-459-2600 Exit Time: 01:30PM Phone: 336-776-9800 Inspection Type: Compliance Evaluation page: 1 Permit: SW4130801 Owner - Project: Glendon Forest Equity LLC Inspection Data: 04126/2017 Inspection Type Compliance Evaluation Reason for Vlstt: Routine Fite Review Yes No NA NE Is the permit active? ■ ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ® ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ® ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? M ❑ ❑ ❑ Comment: Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ® ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ® ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ® ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures Constructed as per the approved plans? ❑ ❑ ❑ ❑ Are the inlets located per the approved plans? ❑ ❑ ❑ ❑ Are the outlet structures located per the approved plans? ❑ ❑ ❑ ❑ Comment: tOneration and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ® ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ DWQ upon request? Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ❑ ❑ ❑ Comment: Other WQ Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? ® ❑ ❑ ❑ Comment: page: 2