Loading...
HomeMy WebLinkAboutSW6120802_401 Certification Application_20120822Permit No. 51V (� 1 ZD F CV - NCDENR The Project Name Contact Person Phone Number Date Drainage Area Number Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr Post -development 1-yr, 24-h Pre/Post 1-yr, 24-hr peak flo Storage Volume: Non -SA L Minimum design volume req Design volume provided Storage Volume: SA Wate 1,5' runoff volume Pre -development 1-yr, 24-hr Post -development 1-yr, 24-h Minimum required volume Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Dmwdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area (to be provided by DWQ) Qp h r�R Or CG STORMWATER MANAGEMENT PERMIT APPLICATION DORM 401 CERTIFICATION APPLICATION FORM p T INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. Items Checklist (Part Ill) most be printed, titled out and submitted along with all of the required information. So}angles' Michael O'Rourke 704-527-3440 Post -Developed Area #1 45,239.00 q2 35,409.00 ft2 78.27 % 1.00 in 3.02 in 0.13 inmr ischarge 0.12 0sec discharge 3.90 ffJlsec control 3,78 Wisec atered 7,088,00 fe 21 %� o r FUG fe OK for non -SA waters unoff volume runoff volume NIA fl' 0.00 W 0.00 ft3 NIA ff3 NIA ft 3 OK NoB 1.26 inlhr 158.65 fmsl 0% hv. 5,00 days OK ?,vS 3.00 A OK ,E �� ( oA/ 161.00 fm51 OK}��tS 6,605.00 (f2 164.00 fmsl 120.00 It 40.00 #t , r 4,510,00 ft2 Form SW401-Infiltration Bann-Rev,5 1 Mpr2011 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be pru'lWed by DWQp Additional Information Maximum runoff to each inlet to the basin? 0.82 ac-in OK Length of vegetative filter for overflow N/A ft OK Distance to structure 80.00 tt OK Distance from surface waters >50 ft OK Distance from water supply well(s) >100 €t OK Separation from impervious soil layer 4.00 ft Ott Naturally occuring soil above shwt 4.33 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Forebay off-line bypass & ve etaled filter strip waived - infiltrate 2.5 x WQv @ 0.5K Glrtf�z Form SW401-Infiltration Basin-Rev.5 11Apr2011 Parts t. & U. Design Summary, Page 2 of 2 (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. r 5 AJ0 1. Plans (1" - 54' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Saf- :%fEM C(6.0 r �•� - Basin dimensions, Pretreatment system, High flow bypass system, - Maintenance access, Proposed drainage easement and public right of way (ROW). Overflow device, and Boundaries of drainage easement. C3.0 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: C4.0 Bypass structure, Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, -Vegetated filter, and swe tAAm a 0w Skear C4•0 - Pretreatment device. C3'b 3. Section view of the infiltration basfn (1' = 20' or larger) showing: C.5.1 -Pretreatment and treatment areas, and SEA t*W-113VE ON SRiE�r Gq'd - Inlet and outlet structures. 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. C14• O 6. A construction sequence that shows how the infiltration basin will be protected from sediment until the entire drainage area is stabilized. ArjoEr,> 7. The supporting calcu}ations. M8. A copy of the signed and notarized operation and maintenance (00) agreement. 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part III. Required Items Checklist. Page 1 of 1