Loading...
HomeMy WebLinkAboutNCC232891_Site Plan or Location Map_20230926 / a 1 ) /I/ //////// 21 /' / I .I 2) ' ) I I I I 1`� / / (/(/ /M AE OgU�pD DO' NS 234/ i�,1,/ DATE: PAGE: 80 / // I 1 (LID 7. A' 5/ / I I I --- - �yin_ 2 p 1•0 EAS ik L 3;%8 I I , ' I I / M99DOgguEE AILI�Dpp i c ,,. / I f'/ / ISI / I \ R I R. l e e % 91 �i / - ../.^�, / / 691 I I I I 1231 / / 20 r \ I % ! R R lit HousE HOUSE HOUSE 4.1 SITE ,' , r - 4 2 a I. .I . _MGA• L_ � � l �_ A HaA. JAr L °�▪=EAST MEN' ROADWAY RO y , r s / 1 / J I I 73 1'/A 1/ 36 I / �a \ o '-CURB IrvLe�eo°ear cux5 Y Notes: / / _ _ f� V)� \ 1.If ncetletl,Trea Protection fencing should be installed along the buffer zone,wetland AT W.4k I v /- fi 37 /1 \/ / (c I Z boundary and/or around protected trees,providing a radius of al least 1.25 feet for each _ .;• . ��_ ( ( I I // / I m 205 W \ LFCErvD inch aftrunk tliameter. ,!� 1/ I \77" 0 \ 2.Install Sitt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on 4, 'G / \ 3 I O� \ DIRECTIONFLOW SILT FENCE schematiGdiagmm and field adjusted,if necessary,for placement at low points.If lots era _�`' - % / ! - / I I ' j I I \ contiguous antl have tlifferent land cornets or builtlars,each lot shoultl have intlividual silt ei. Nff /. / /_� / / \ Fences. 9 � / PELICAN PROPERPS'/ •• \ ® schematic/diagram required Sik Fence within lO tent of property line[o ensure there is no conflict with J HOLDING LlG"/j \ jl$1\ ENTRANCE septic system.II is the responsibility of the builder to ensure the installation of sediment DB$82 996. / / _ �rO�V \ \ \ case INLET � control measures does not impact the septic system and repair weals). 71 }_,,,,ifil.. /� 374 / IIaI `� 4.At least one Construction EnhancelExit is to be installetl per lot. 37JI 65 5.Waste bins and other areas tl drained for managing building matesal waste shall be at ® ��� �5.��� / �� � 1I \ least 50 feet away from sWrm drain inlets or tlrainage ditches unless it can be shown that 41 Ino other alternative exists.If this separation cannot be achievetl,,here areas must be m /_ -/ / /- r 1 IJ1\ I \ \ ` wntainetl behind Silt Fence. g / J JJJ II 6.Inlets downstream°f tliaturbances sM1oultl be protected',streets shoultl be swept when o " /✓y/// _ �. I 1 I ` I ----. 36,4- 207\ seaimentfrpm me construction activity is present. J2 my.(° i ! / / / 4b2 II I ..\Ne-EnvironmentoLjpeq 1.Details tar riot Fence,Silt Fence Outlets,Construction Entrances and other measures are pv6iNE / {{••,, _...-- it /.�(1f Y 1 I l I 1 ' \ \ provided on additional sheets.Erosion and sediment control details are not drawn to scale. • / / / �-� \ i-CTIv�D.te +- TYPICAL LOT LAYOUT WITH CURB AND GUTTER 0 O z re 4 �� \ w c I / / / s/\2 / • 63 DATE PAGE: >.. a-koAo cs sot 401- / S -- 4 8 \ \ -- �808 �� --401q \ 38 j • 0 i / \457 \ 1 \ 1 \ VICINITY MAP 36 - / FORCEDiii \ 3 �, / / o aLrLE9E �'�453 I 4z; I / i./ N.T.S. //// j, % /� `•♦109. I 1 c CONSTR.35" 361 / �p�a i# 2i w 384 (/_ EN I) �O l;;;41g;:::;;;;;;;;:t14eon. _I / �\ / / 390 \ 45• 452 ry .fl 4 7 )360 186 / I I QA� iF4:7::::!: rn /re • _c \'• ,/ ?;• V.CONS�TN UECTION / / - i-, - \o /~ \ SLTFORCE• _ q 1,p■psp.\' �II 3 388\ n� 460LET ��pi/45.140NCE 1 larglillifr ION 437/ / qr / N / / r� �r+r+rYp C I MI /" �• \ \$ 3$6 A I -E NFOER"CE\ � 21 \- TRITCSTION ` ....:'1� / / a� .., lj 2�CONSTRUCTIO 00 11q ATTLEV NA1/ / �' ;YAre`il'�r .s�. /F. \ \\ I ° ° V� .+a 382 �,.,,f,�\ \ g ...o Y /mom I li;iR "i!�!� �,1.*r DATE: PAGE =L AN OPE \ Iiiii CON9TRLIMI7CTroN� 4:4 \ F \14� U' / \ Sock/Wattle Silt Sock/W HOLDI $LLC \ I -� \a10� ELT 4' FENCE I ,.s/ ,,(/ N Conatructpn. Ma oleo Flow-� I S s•I t be s bstwnea for 08 PG 496 ` til: �"`+�_� W 4' j I �j�5� / 1.Clear the entrance and ex t area of all vegetal on,roots and other objectionable 1 Per NCG Ot nspect at st once a week antl after each 1 inch or Ares re oN ME �YY�UUm�-,- bB 1 PD 9 "' _yDa \ Ey 7 M meter alantlproperlygratleT. greaterra nfall makeany q- d p-s- d ly.-=rn an via - -\\\ 1` 39 o -uE ION �I I / 3 aII�,I. 1 Ji �- " /� / 35O� 2.PlacetM1egravelto thespecRc gratle antl tl mans Dori shown°n the plans antl 2 Ma ntanthe grovelpatl- d t top t tl edmerit Stakes 1z .n1lStk a - - - - �\__ '_gEINF� _ (/ r / / p_ smoothl from leaving the construct it Th- y reglire perodic .. ,,. to the desired lengOs such thet log;do not F , �It10Fe -J/a< I 1 nstd tie pe sect w WD6\ �3i° 'r'l. WArn g I / 3.Provide drainage to carry water to a sediment trap or other suitable outlet topdress rig with 2 inchstone. toe of ,, (In OUTLEr�O �w� - /O - 4.Use geotextle fabrics in order toimprove stabilty of the foundation n lowtons 3Immediately remove all objectionable materials spilled,washed or SECTION SECTION 'mini�ated OW . . . - - `r► nl 0 35 Op S�acP`� �- 'C dry ` cA IT / `, / O / subject to seepage or high water table hacked onto publ c roadways • x I Na ightty N t° \ zZ \\`�� ,;Yii �iOE / / il D / 1I pQ �° `° a'ti • klwatfie(al. 1 /�g�� / �� 9I I 3g6 I 1 422/ 9,,•i CONSTRUCTION ENTRANCE/EXIT W III 4. z thmraduMblee hardwood stbaam.ha • - - - - • • •j• ) /?o p y I .. \ 13 IS I ON-Iwtl°• ON/ / / / �_189 2 wlatl.Staof Ofeet if Me i lt sock/Wattle planed at //y,.?// . . -\ \ O, W TT E I /� / / �W ms co eat' G�C \P b" SIL F CE g G 1 M ISOMETRItrenchC �, // '- ° 1�'1 . I I 97 1 / •'1 I / Sec / q SODDING Wood INSTALLATION NST LLATI Cnm9 of g rid 4 M n. E. / f 1 / ' / '42 190 ' / y ZS plaCed In 84 uNTRENcro 1 2 net htof to 'concrete blocks shall be used aENTRENCHED INSTALLATION. socks/wattles are used on M / / \ �� � I / HEDEw u T ry ,.......,...m..•m„rea.,.a.«.,..,,,�..v..x. ,. °k,wmtl pee during"�"a aa�rn. / /MAINTENANCE: l // ) /, I r��II 1�1, 19 NI ^1398 I 1^ ( I i 4 k ii I 1 353 / �� ToraaaP STAGGERED at least ..,,1 inch or greater rainfall.RemoveMulch or ompen a.m COMPOST SOO,INITIAL ROW RATES Mm naccumulated sediment and any debris eeded tO allow wraeepuate row. °5 - WETLANrC�/Me silt / �// / 11� I II I II \ \ 191 ( FNMA ..MING PIECES . • • / / / / - / I ( I I 399 I I I jl L 1 41S \Ili \ • l CONSTRUCTION SCHEDULillanaE M Untrerchae Soda deed Dolan p,omets rim) (fop.m)(aso.mI(w rim) rim) 2. atte must De replayed if°gg or / I I )8,43 ` I \ \ I 1.Obtain all necessary permits and plan approvals.Erosion and Sediment COntml(E@SC)permit and a Certificate Of Coverage Sheet Flory ax team 22am a - - / / / WETLANDS "/i / / I I 4 I I \ 35\ (cop must be obtained before any land disturbing activities occur.A copy of the ENSCpermit,the C°C and a ha,copy of the OAWillSock/Mv,gm(op) 60o F 3°reel SOCkMattle may need to he replaced with a / I s Plan must be kept on site,preferably in a permits box,and accessible during inspevriwconaEm ATIC SOOED C ERMUwynAr attle ° MO ) (398) MOo mj - \ / / J / ,CEII1IIJI//N,`�� I I \ z.Irlatall grayer<onsaa<dan antran«s anti men sat lances,reinmT«d silt ran<e "m�rovg z; 6 tau p 4. Reinstall il damaged or iongeceed until.lie /0.'\ / / / (GCOrer110n},G1 \ 3.Fcoamm nisM1 claming antlets and ld&rvbbing any necessary aces ono melotsmthey ere started.7.ip "re'/n 1m/a2m/a gxilit / l I 1 A.res�l D5l eckalwenles she h(90 (141 (Im (zsl (A6 e t mere seta ere rid/m/m> /m/m> /m/m) /m/m) /m/m) meaamhefleepecmeetratad see. 7° /\ 1 I 1 1 \I` ,Mali 192 u / 4B 1 wag' d excavation activities SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION x2 Begin or continue with house construction activities. � - \,21 1 6.F rough grading d house construction. I�O' /% \ \ II \4�1 \ `_ 7 II dr'v walks d patios. I B Begin f grading fl /%� •\\\ \I \ \ \ \ I I I 0)O 9 Final 6 8mulching dstabilizing f 1 1 most cases this will involve me installation of sod on.lot.The silt fenvc w • DATE: PAGE: \� \ \ `- remain-n place -I M1 I sodded or rigrassing'stabilized end takes held Y /V /i' \s, \ \ 1� \� \ ` to me contractor snail conduct self-inspections p Iona of erosion bird sedimentation aortal measures and complete me rolmwrng u - 4MIN. SILT I 111j ,POND ACC -- N;`1,l`�1 \I °o�FR\ \'„YYY \ ID \ \ Isin OAg 193� combined self-inspection farm fowdon me DEMLR website 1kN,{I ,Ildll)). MOW MIEN•INE Sop is IIIII ---['-- j1 11, ( \ \ \ (0 \ hops://www.deq.noBov/about/divisi°naenergy'mineral-and-land-resources/stormwater/stormwater-pro,Nnpdes-c°nsunction-program. TELy SIL ,II, E`\ \ \ mESTABLISHED.m2-] - , \ \� , I I \ �� ` rwdve mantas ar<amplete inspection forms shall be kept an site ens available for inspectionnau times.uia recommended wTx rRa Got LAID. Aa,aasoos xaHaa_ aMowEn \ 1°0 copy be kept' perw b ef:GS.II 3A$01 tlwughGS.113A57 Sec' S NC AC 04A0101 gwugb ISA ',\ \ I 7\ \O NCACIME0504G IP 't NCG 010000 NPDES for ConslmcnonA' men use eon.wnTeawatt \ rt� \ fi Pp�l 11.1f-i p for d sedimentation control measures are to he performed 1 calendar days and x APPEARANCE OF GOOD SOD GROUNDSTABILIZATION \\ 4"" I 'tM1 2 h f cry t°rgr<sUrtnanlinch.Any needed reps Hall be madeimmediately measures as SITE AREA STABILIZATION - '\ eon MEE \ �- a ed. Itoject s BC hll be meinmmedmspecified in tM1e enswdion detarls on tars plan Anin gauge sM1ell be msmllMIEXCEPTIONS -QPEN$PACE , k4 I y4 V 194 12I at h on'df ite fl cglnten When the 1 tM1c M1allconmct DEMLRm clone out me EffiSCI IIi• DESCRIPTION TIME FRAME common Area \ ` � �� rtr prm p pe�mesa J ����I�1��lifl oil . naamarero THEWASHEDsr PERIMETER DIKES, 7 DAYS NONE Plan.Ayer DEMLR NrOm,a m<pmnih<e afineproj I ptttion TreOrt.me nn q�O "degnc.Bov/NCGOI to submit an electronic Notice of termination(e-NOT)A$100 annual general permit fee will be charged • HSTEEL ARDWARE FENCE POSTSWALES,DITCHES \ / p f ` \ I \\ \ \- until rhea NOT has bcentilled out. = re &SLOPESACE \WIRE FENCE ) `\ ye,aaymn.T ARE CLOT FRONT VIEW HIGH QUALITY 7 DAYS NONE tree �00 - -/ - - - 1 m \ 99�NU \ ` A SELF INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY .�, mmw.x. WATER ZONES • NCGS 113A-54.1•IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR BURY WIRE FENCE. \ \ I \ \5 COMPLETED AS AN EXCEL SPREADSHEET. �' - roynslrwmss FILTER (HOW) / - - - - - 44 \ \\ I \� AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED \ \ \ EROSION AND SLOPES STEEPER 7 DAYS IF SLOPES ARE - 1 \ \ \ I .I\ alla SEDIMENTATION CONTROL PLAN THAT U KEPT ON THE PROJECT SITE.RULE 15A General Erosion Control Notes WASHED STONE FILTER OF it57 STEEL FENCEy CLOTH IN TRENCH THAN 3:1 10'OR LESS IN \ \ \ I I - NCAC 048.0131 STATES THAT....DOCUMENTATION SHALL BE ACCOMPLISHED BY 9'FILTER FABRIC NOTES: yNTO solo GROUN AND HARDWARE LENGTH AND ARE - _ I \ \ \ I 4y2 \I • ` \ 1.Only the areas shown shall be disturbed. INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE 2.All disturbed° shall be d and 1.Hardware cloth and gravel should overlay the silt fence at least 12 NOT STEEPER '06 \ V�\ I \ 345 �/ APPROVED EROSION AND SEDIMENTATIONINSPECTIONREPORT CONTROL PLAN OR BY COMPLETING, grid rr ° GROUND inches. - - - - - - I - -,- ( \ v N \ DATING AND SIGNING AN THAT LISTS EACH MEASURE, mulched ass as over Possible d maintained THAN 2:1, 14 ♦ t 196\ until t c s established. 2.Stone outlets should be placed on law elevation areas of silt fence - \ /}� PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION pemanen and based on field conditions. DAYS ARE .8" 1 / - \ - ` \ \/ CONTROL PLAN.•\\\ MAINTENANCE. ALLOWED - - - - - - p - / \ \ eJRy of 1-Per NCG-01,inspect outlet at lest once a week and after each l inch or SLOPES 3:1 OR 14 DAYS 7 DAYS FOR \ I 40 / AT �\ HARDWARE CLOTH FILTER FABRIC IN TRENCH greater rainfall event.Complete any required repairs immediately. FLATTER SLOPES GREATER - 1 \ 1AR'�g,gn auarw FENCE AND 2_Freshen stone when sediment accumulation exceeds 6 inches. THAN 501 IN WETLA �\ \ / I\ _4`-'�A� T JEtt FE-RS9 Diu E\ 3.Keep mesh free of debris to provide adequate flow. LENGTH \ \\ op 1 / /.♦• / SECTION Dew 4.Remove sediment when half of stone outlet is covered. ono \/ , / \1 - 5.Replace stone as needed to facilitate de-watering. ALL OTHER AREAS 14 DAYS NONE(EXCEPT �+R \ ..\Nc-Envh .fillb.'.ey �a /.••.• TR OS -� _ °�"' WITH SLOPES FOR PERIMETERS a0\ (' o- q d I SILT FENCE OUTLET FLATTER THAN 4:1 AND HOW ZONES) \) 1 - - - - - •L/4, / 411 I DATE: were Fence Filter Fabric PAGE: -I 1 ,�/^ - I � \ s 5tr mtabriewimwiref PI I ( V � \ _ \ oerreNiaM1aewtNam tea ran wore Fence Wire Eockall trench S 41 I • ,- Mir - _� \\ and Compact Erit'P C PAGE F ',I/ //� ewer Pysf( sec Mm.den Steel Post - thoroughly / OPEN SPACE (. \ \ `\.I m/ r I / ,V I� 1 Of L - t wv I Common red \ ga\ - : \ / w _ - `� o�` TOTAL DISTURBED ACREAGE: 1.42 ACRES Pwre ties kKn: / \ / mG -- • \ \\ 1 _ )`\ \ _ .��� LOT EROSION CONTROL PLAN ? `Xt f . .. a�ln � /// � / ^ y - - -�- - _ LOTS 391, 393, 395, 450, 451 & 453 :Loth... MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION BEDFORD, PHASE 5 a4-wean me caneucum. Filter Fabric 1 General-All measures will be Inspected and Corrections made after runoff producing rainfalls,or at least once per week minimum. The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion Control measures. If lot construction dictates, etrengN orexua etreng111µaynNetic slterfabnca. CROSS SECTION VIEW measu s will be relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible. Silt fences and gravel construction entrances will be maintained as suggested In the erosion control manual. Sodding,seeding and mulching will be maintained to insure proper FOR 1.construathe sediment barrier of..n.rd 2.Ensure the gr..(HigherNnses ground stabilizing cover. nrM vdnme afwamr ainrfiyiemfeene Taff recnfNe Mmdnrelb0e Ne lmMthdthe banter w avoid joints...enjoin.are Gravel Construction Entrance-The gravel pad should re condition to prevent mud o sediment from leaving the construction site. This may require periodic topdressing with 2-inch stone. After each rainfall,inspect any structure used to trap sediment and clean it out a necessary. Immediately all objectionable materials spilled.washetl,or public roadways.Any sediment that build up against the fence should be removed end disposed of properly to insure that the sediment does not wesM1 back against the fence.Adequate storage voume should be provided for behind the fence at tall times.Take care LO not undermine Ne necessary,securely fasten the filter cloth only at a support post 4.Support.andard strength filter radio by wire mesh fastened withlto° u.Extepslope remove cleanout operations.the A&G RESIDENTIAL, LLC sidewire the fence mesh ppon to eaI Wiww plastic gip tie should have ee bofiom°Atha trench.Fasten ne wire mlnlmmin5o ou 'tensile strength.en rak on the Bmiss. Sill Fence-Sediment fences should be inspected s least o the and after each rainfall event. Any repairs should f made immediately. Damaged s.decomposed fabric should be replaced promptly Any sediment deposits that build up against the fence should be removed and disposed of properly to S.When a wire mesh suppon fenm is used,spate posts am room B peSupportsdwaMb driven e,reard�mva., maura that me removed sediment does not wash back o9anstine fence. Adequate storage volume should be provided far behind me fence of tan times. Take on to not Undermine the Tense daring cleanout operations. MCLAUCHLIN TOWNSHIP HOKE COUNTY securely into 6.Extra strength fiat S.Remove sediment deposits,.neceSS,te pro.°adequate filterfaMen Me MMOd posts.Wire u a shouts have a...um of and tensile Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured. The sod should be watered a necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod The sod should not be mowed to close,since this could inhibit adequate r�with spawvreas'czlp net q pound reduce Nnessureon < growth and stabilization of the root bed. The soda should be limed and fertilized a soil t commendations and t f Commendations when and if possible. SCALE: 1"=100' SEPTEMBER 2023 7.EE.et the trench appro.-m.r4rches side and B inches seep along the proposed fine of me pasts one reroavom unaermin rig me fence auarg m grow s per type re type o grass re possi GRAPHIC PHI n upslope from the hairier. 4.Remove lI fenCe.Take care n°g ea lenalsand unstsde sediment deposits Grassing and Mulching-Theo a to receive grassing and mulching should be properly fertilized and limed a necessary as o initial step in soil preparation. Once the grassing has been placed,the a should be maintained o ceded to insure that all areas are germinating properly. Any bare areas should be k"iR`yr 111� ��`y�� Ong the b0dam and sloe of the trend,. nil bring the ereeto grade anti stadllzeit after nie ce...rg repaired, and reseeded as soon as possible. If the time of year does not permit the establishment of an permanent grass.then a temporary grossing should be used until the growing season permits the use of a permanent grass. 100 0 50 100 2I ADO erNebiterfabrlyandco pact Thoroughempeevonatthebackbitla drainage areahaabeenproperlyatablitaed. re a o - - `� Wattles-Wattles shall be inspected after significant rainfall events.RH.or gullies up slope of the wattle and any undercutting is to be repaired Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height. ,O.Do mtB. lttalch filter a°brlc to existing trees. Removed sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water.Any sediment deposits that build up against the fence should be removed and disposed of properly to Insure that the removed sediment does not wash back against the fence.Adequate storage volume should be providedfor behind the fence at WII times.Take care to not undermine the fence during cleanout operations. ( IN FEET ) ..\NC-Enviry i iealul.jyey 1 inch = 100 ft. SILT FENCE Reinforced Silt Fence Outlet-Remove sediment deposits a necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone a necessary as it becomes clogged with sediment.Remove all L__tL-_- J C fencing materials and unstable sediment deposits and b ae area to grade and stabilize it after the contributing drainage area has been properly stabilized.Any sediment deposits that build up against the fence should be removed end disposed Of properly to insure Net the removed sediment does not wash back against the fence.Adequate storage MOORMAN,K ONEZER (90 TZEL,INC.1158ROADFOOT AVE.FAYETTEVILLE,N.C.28305 volume should be provided for behind Ne fence at tall times.Th.care to nil undermine Me fence during....Operation. PHONE(910)484-5191 FAX(910)484-0388 LICENSE#F-G106 LAST SAVED:0431/2023 11:52 AM MST PLOTTED:B/31/2023 12:24 PM PLOTTED BY.Dennis Gilbert FILENAME:0\CURRENT JOBS\A&G RESIDENTIAL LLC\23-2E55-12 BEDFORD-EC\PLANS\BEDFORD EC-CATS oar oa3.395.450.451&453.BOO