Loading...
HomeMy WebLinkAboutSWA000227_Construction Sequence_20230919 Construction Sequence — Waxhaw VFD 1. If funds are available in Spring 2025,the Future Training Area and Future Outbuilding will be constructed utilizing a storage shed and a set of storage containers. 2. An Alternate Third Bay will be constructed no sooner than 2043.