Loading...
HomeMy WebLinkAboutSW8080208_Current Permit_20230623 ROY COOPER. ;5 �� Governor ELIZABETH S.BISER Secretary i """ ,#' DOUGLAS R.ANSEL NORTH CAROLINA InteriaiDirector Environmental Quality Tune 23,7.023 Carteret Crossing,LLC,managed by Cedar Creek Crossing East,LLC,managed by Attn: H.David Swain,Manager 1131 B Military Cutoff Road Wilmington,NC 28405 Subject: Permit Renewal Post-Construction Stormwater Management Permit No. SW8 080208 Wachovia at Carteret Crossing Shopping Center Carteret County Dear Mr. Swain: Effective August 1,2013 the Post-Construction Stormwater Management Program has been transferred from the Division of Water Quality("DWQ")to the Division of Energy,Mineral and Land Resources("DEMLR"). All previous references to DWQ will remain in older permits issued prior to August 1,2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. The Division of Energy,Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on June 22,2023. The Division is hereby notifying you that permit SW8080208 has been renewed,updated,and re-issued on June 23,2023,as attached. As requested, a copy of the current operation and maintenance agreement is also enclosed. Please be aware that the renewal and re-issuance of this stermwater permit does not imply that the site is currently in compliance. This permit shall be effective until December 31,2029,which includes all available extensions,and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements;it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts,requirements,or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAR within thirty(30)days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714,or via telephone at 919-431-3000,or visit their website at www.NCOAH.com.Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit,please contact Ashley Smith in the Wilmington Regional Office,at(910)796-7215 or ashleym.smith@deq.nc.gov. Si//nc'erely, & L 9U' X,Douglas R. Ansel,Interim Director Division of Energy,Mineral and Land Resources North Carolina Department of Environmental Quality l Division of Energy,Mineral and Land Resources NORTH Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington,North Carolina 28405 tea\ , rfciiii 910:796.7215 State Stormwater Permit No. SW8 080208 Page 2 of 2 Enclosures: Attachment C—Permitting History copy of the Renewal Application Documents Copy of the current operation and maintenance agreement DES/ams: 111Stormwater\Permits&Projects12008\080208 HD12023 06 permit 080208 cc: Wilmington Regional Office Stormwater File ,„„ ....-- North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources tlrilmington Regional Office 1127 Cardinal Drive.Extension I Wilmington,North,Carolina 28405 cAaouta D ' aprbssme eator 910.796.7215 Post-Construction Stormwater Management Permit No. SW8 080208 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST-CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Carteret Crossing, LLC Wachovia at Carteret Crossing Shopping Center 301 W.B. McLean Drive, Cape Carteret, Carteret County FOR THE construction, operation and maintenance of an underground infiltration trench in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until December 31, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 2 of this permit. The stormwater control has been designed to handle the runoff from 24,917 square feet of impervious area. 3. The tract will be limited to the amount of built-upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built-upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 5 Post-Construction Stormwater Management Permit No. SW8 080208 6. The following design criteria have been provided in the infiltration trench and must be maintained at design condition: a. Drainage Area, acres: 0.59 Onsite, ft2: 25,550 Offsite, ft2: None b. Total Impervious Surfaces, ft2: 24,917 c. Design Storm, inches: 1.5 d. Trench Dimensions, L x W x H, ft: 101 x 25 x 2.33 e. Storm Chambers# &volume, CF: 97 @ 31 cf f. Bottom Elevation, FMSL: 38.2 g. Bypass Weir Elevation, FMSL: 40.53 h. Permitted Storage Volume, ft3: 3,000 i. Type of Soil: Sand j. Expected Infiltration Rate, in/hr: 2.3 k. Seasonal High Water Table, FMSL: 36.2 Time to Draw Down, hours: 6.12 m. Receiving Stream/River Basin: Deer Creek/White Oak n. Stream Index Number: SA;ORW o. Classification of Water Body: "20-36-1" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, filter media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 2 of 5 Post-Construction Stormwater Management Permit No. SW8 080208 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 10. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on-site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; Page 3 of 5 Post-Construction Stormwater Management Permit No. SW8 080208 iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, v. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Page 4 of 5 Post-Construction Stormwater Management Permit No. SW8 080208 Permit renewed, updated and reissued this the 23rd day of June 2023. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION CAtak.-3L . Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 080208 Page 5 of 5 Attachment C-Permitting History Wachovia at Carteret Crossing Shopping Center Permit No.5W8 080208 1 BfivLS T; Paled Adios Desc ipEce s f s Ch=ges Modified hen Sim ist Viddeo High Density Project-construction,operation and maintenance of an underground 2/21/2008 Original 1.0 infiltration trench in compliance with the provisions of 15A NCAC 2H.1000.The C1-C7 Approval stormwater control has been designed to handle the runoff from 24,917 square feet of impervious area. 6/23/2023 Renewal 2.0 Expiration Date:December 21,2029 Page 1 of 1 • Permit Number: ,_./.4>82, crD.v?O 3 (to be provided by DWQ) Drainage Area Number: Infiltration Trench Inspection and Maintenance Agreement I will keep a maintenance record on this BMP. This pis maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected,repaired or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public,and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the infiltration trench will be carefully managed to reduce the sediment load to the sand filter. — The water level in the monitoring wells will be recorded once a month and after every storm event greater than 1.0 inches(or 1.5 inches if in a Coastal County). The infiltration trench will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The grass filter strip or Areas of bare soil and/or Regrade the soil if necessary to other pretreatment area erosive gullies have formed. remove the gully,and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment has accumulated to Search for the source of the a depth of greater than six sediment and remedy the problem if inches. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. The flow diversion The structure is dogged. Unclog the conveyance and dispose structure(if applicable) of any sediment off-site. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. Form SW401-Infiltration Trench I&M-Rev.2 Page 1 of 3 BMP element: Potential problem: How I will remediate the problem: The trench Water is ponding on the Remove the accumulated sediment surface for more than 24 from the infiltration system and hours after a storm. dispose in a location that will not impact a stream or the BMP. The depth in the trench is Remove the accumulated sediment reduced to 75%of the original from the infiltration system and design depth. dispose in a location that will not impact a stream or the BMP. Grass or other plants are Remove the plants,preferably by growing on the surface of the hand. If pesticide is used,wipe it on trench. the plants rather than spraying. The observation well(s) The water table is within one Contact the DWQ Stormwater Unit foot of the bottom of the immediately at 919-733-5083. system for a period of three consecutive months. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipe. The emergency overflow Erosion or other signs of The emergency overflow berm will berm damage have occurred at the be repaired or replaced if beyond outlet. jpair. _ The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Infiltration Trench I&M-Rev.2 Page 2 of 3 Permit Number: Sig)lo o (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Wachovia at Carteret Crossing Shopping Center BMP drainage area number: 1 Print name:Donald H. Fallis Titie:Agent for Carteret Crossing LLC Address:1111 Military Cutoff Road, Sutie 251,Wilmington, NC 28405 Phone:910-256 0 • 1 c i) nn . Signature: , t _ J`'' Date: 2. + 1*• Ot Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, -1 t;r A r at f2s C'kct.t\rk Q r-, , a Notary Public for the State of rL C' 4 k C.G,r-c(%;AA , County of . L"Cc, isian 0 is E. , do hereby certify that -pc;n� d c. i( i 5personally appeared before me this L i) day of I C�r esA -/ , -ei e9e , and acknowledge the due execution of the forgoing infiltration trench maintenance requirements. Witness my hand and official seal, /d`1 ixL 4 la. /C „SlidI t J CI"L. L— tea, Hq+�e��� L .47 �GTA/�yyOy:S. z 41 V.,m P►%«..� SEAL My commission expires /t/Z Z/p Form SW401-Infiltration Trench I&M-Rev.2 Page 3 of 3 DEMLR USE ONLY Date Fee Paid Permit Number is as hB070 1 605= Su)8 O so d S NC DEQ Division of Energy,Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance dance with 15A N CAC ail i 045(3),the currentpermit holder shall reneW their high density permit ISO.days prior to Its.expiration. Renewedpermits are valid for a period of 8 years per Session Law 2011'-398(SS 781). Section 60.1c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number SW8 080208 2.. Project name: Wachovia at Carteret Crossing Shopping Center 3. Project street address. 301 WB McLean Drive City: Cape Carteret County: Carteret ZIP : 28,584 4. What,if any,changes have been made to the project as permitted? None if the project has changed from the origmai approved plans,please complete SWU-iO1 for a Major Modification or Minor.Moa ation Application form available at'htta;l daq.nc..goviaboutidivisionsienergv- mineral-land-resourcesienergv-mineral-land-r aiesistormweter-pro mipost-constr actin. B. PERMITTEE INFORMATION If changes to the pe nittee or project name have been mark please complete either the Permit Update foam or the Permit Transfer form available at n asJ'deo.nc.gov boutgbvi is energy-mineras-lancl- resc:urcesienergy-minerai-land-rulesistorma±er-orograrr ipost-construititirl. State Stormwater Permits do not automatically transfer with the sale of the properfy. 1. Current Permit Holder's Company Name/Organization. Carteret Crossing LLC 2. Signing°fficiars Name: H.David Swain 3. Signing Official's Title: Manager 4. Mining Address. 1131-B Military Cutoff Road City. Wilmington State: NC . ZIP: 28405 5. Street Address: 1131-B Military CutoffRoad City: Wilmington State: NC ZIP 28405 6. Phone: 910)256-2211 Email:mary©swainassiociates&com JUN 2.22023 BY:ieeet -0' GC Stormwater Permit Renewal Form Page 1 of 3 May 11,2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters)or DEMLR Central Office(Urbanizing Areas Ph 2, USMP,Non-Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to Indicate that the required Information is provided in the application package' X 1. A permit application processing fee of$505.00 payable to NCDEQ. X 2. One original signed hard copy and one electronic copy of this completed form, The signing official named on this application to represent the current permittee must meet one of the following a. Corporation-a principle executive officer of at least the level of vice-president; b. Limited Liability Company(LLC)-a manager or company official as those terms are defined in G.S.57D"North Carolina Limited Liability Company Act,' c. Public Entity-a principal executive officer,ranking official,or other duly authorized employee;. d. Partnership or limited partnership-the general partner, e. Sole proprietor;or f. Letter of authorization signed by one of the signatories noted in a-a above authorizing the signature of another entity. ra 3. One hard copy and one electroniccopy of recorded documents required by the original permit that have not yet been received by DEMLR,including:deed restrictions,protective covenants,. condominium/planned community declaration and easement& if the project has been built,include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built,include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. X 4. O&M Agreements,.Please select one. ❑ I have a copy of the current recorded O&M Agreement for all SCMs,and I will continue to keep this on file with the permit or I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be seat to me. I agree to keep this on file with the permit. X 5. Desi er Certifications,Please select one: El A copy of the certification(s)confirming that the project was built in accordance with the approved plans have been previously provided to the.Division;or ❑ A copy of the certification(s)confirming that the project was built in accordance with the approved plans are enclosed;or The project has not yet been built. pia 6. [IF APPLICABLE]If the project has been built,one original hard copy and one electronic copy of a signed,sealed,and dated letter from a licensed professional stating that the SCMs have been inspected,.and that they have been built and maintained in accordance with the permit. x 7. [IF APPLICABLE]When the permittee is a corporation or a limited liability corporation(LLC)- Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,or other official documentation,which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H, 1043(3)(b). httosPo v ..sosnc.00vio tine se:vicesisearc:-'b', ;ills/ Bcsiness Registratirrc Stormwater Permit Renewal Application Form Page 2 of 3 May 11,2018 ;uRMIrrAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters)or DEMLR Central Office(Urbanizing Areas Ph 2, USMP, Non-Coastal HQW/ORV1). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: X 1. A permit application processing fee of$505.00 payable to NCDEQ. X 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation—a principle executive officer of at least the level of vice-president; b. Limited Liability Company(LLC)—a manager or company official as those terms are defined in G.S. 57D"North Carolina Limited Liability Company Act;" c. Public Entity—a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership—the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a—e above authorizing the signature of another entity. rja 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including:deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. X 4. O&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or Z I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. X 5. Designer Certifications, Please select one: Z A copy of the certification(s)confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s)confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. n/a 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. x 7. [IF APPLICABLE]When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation,which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos:/lwww.sosnc.gov/online services/search/by title/ Business Registration JUN 16 2023 JUN 2 2 2023 BY: BY: Stormwater Permit Renewal;4pp v3;4r Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION wI, H- ►a ,� Siti ark_ , the person legally responsible for the permit, certify that I have a copy of the Permit an. O: ,' A •reeme on site(or I will obtain a copy and it will be kept on site),that I am responsible for the pe 'err :nce o -- m. intenance procedures, and the site has been and will be maintained according to the O&M A. --men a d rp'roved plans. I agree to notify DEMLR of any problems with the SCMs or built-upon area an• to I- b• it t - pr•p=r forms to modify or transfer the permit prior to any changes to the project, SCMs, or ow er• i'. All n'•r at •n proided on this permit renewal application is,to the best of my knowledge, correct a • , • ete. '� ''""ccam� 1.2 "1 ,Aa' Signature: � Date: V J �v<. ,G NOTARIZATION: / f I, MA ry W NCI r , a Notary Public for the State of V 1 • CA rs Li nit. ` , County of Itti i Rain wee , do hereby certify that % . vow( d SvvA( A personally appeared before me this the !1i day of hire/ , 20 23 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, unneaftwoiss\ (Notary Seal) ( ;;r; z;;;; \ Notary Signature: MA PU@�IC 2 My commission expires Ain( 6. - '�� ?�o 9,y0 t,FR CCJa bPIE ....... ..........., ........... JUN 2 2 2023 fjECEIVEflBy JUN 16 2023 _� BY: Stc-mate-aern-lt Rs^ewa Application Form ?age 3 of 3 May 11,2018 Permit No.—�4r.43".4�D t (to be provided by DVVQ). �� pA 0-6 NCD NR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM ,fa`o `M-ri„!4:00+ This form must be filled out,printed and submitted. The Required Items Checklist(Part III)must be printed,filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Wachovia at Carteret Crosssing Shopping Center Contact person Donald H.Fallis,Agent for Carteret Crossing,LLC Phone number 910-256-2211 Date 18-Feb-08 Drainage area number 1 IL DESIGN INFORMATION Site Characteristics Drainage area 25,550.00 ft2 Impervious area 24,917.00 ft2 Percent impervious 97.5% Design rainfall depth 1.5 in Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? N (Y or N) 1-yr,24-hr runoff depth in 1-yr,24-hr intensity in/hr Pre-development 1-yr,24-hr peak flow ft3/sec Post-development 1-yr,24-hr peak flow ft3/sec Pre/Post 1-yr,24-hr peak flow control ft3/sec Storage Volume:Non-SR Waters Minimum volume required 2,963 ft3 Volume provided 3,000 ft3 OK for non-SR waters Storage Volume:SR Waters 1-yr,24-hr rainfall depth in Pre-development 1-yr,24-hr runoff ft3 Post-development 1-yr,24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Soils Report Summary Soil type Sand Infiltration rate 2.30 in/hr SHWT elevation . 36.20 fmsl Trench Design Parameters Drawdown time 0.26 days Perforated pipe diameter 16"Tall Domes in Perforated pipe length 101 ft Stone type(If used) #4 Stone void ratio 40% Stone is free of fines? Y (Y or N) Trench Elevations Bottom elevation 38.20 fmsl . Storage/overflow elevation 40.53 fmsl Top elevation 40.53 fmsl Form SW401-Infiltration Trench-Rev.1 Parts I.&II.Design Summary,Page 1 of 2 Permit No. 5&a $ (to be provided by DWQ) Trench Dimensions Length(long dimension) 101 ft Width(short dimension) 25 ft Height(depth) 4 ft OK Additional Information Total runoff volume captured by french 0.82 sc-in OK Length of vegetative filter for overflow 50 ft OK Number of observation wells 1 OK Distance to structure 38 ft OK Distance from surface waters 1600 ft OK Distance from water supply well(s) >100 ft OK Separation from impervious soil layer >2 ft OK Naturally occuring soil above SHWT >2 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided Y Form SW401-Infiltration Trench-Rev.1 Parts I.&II.Design Summary,Page 2 of 2 Permit No. 5W 6f-4er-° oSr' (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent,the agent may initial below. If a requirement has not been met,attach justification. Pagel Plan Initials Sheet No. r_J 1. Plans(1'-50'or larger)of the entire site showing: -Design at ultimate build-out, L"Z -Off-site drainage(if applicable), Delineated drainage basins(indude Rational C coefficient per basin), CA- G -Trench dimensions, Ly -Pretreatment system, -High flow bypass system, Nfm' R+t�� -Maintenance access, -Recorded drainage easement and public right of way(ROW), SIRE. A air* FUSLIC C.4 -Overflow device,and Np,-Boundaries of drainage easement. 2.Partial plan(1'=30'or laraerl and details for the infiltration trench showing: ri -Bypass struchke, CS -Maintenance access, e-3;-C S -Basin bottom dimensions, cc -Basin cross-section with benchmark for sediment deanout, G`? -Flow distribution detail for inflow, eta 4- C , --Vegetated filter,and -Pretreatment device. t A!r 3.Section view(lithe infiltration basin(1"=20'or larger)showing: -Pretreatment and treatment areas,and Gy -Inlet and outlet structures. -F__. 4. A table of elevations,areas,incremental volumes&accumulated volumes to verify the volume provided. MC-S PAGE_ 2-' Neilir f NC. 114 5.A soils report that is based upon an actual field investigation,soil borings,and infiltration tests. The pAcjcPifik, results of the soils report must be verified in the field by DWQ,by completing&submitting the soils 1LL investigation request form. County soil maps are not an acceptable source of soils information. W . JA1 Or OkaWr. 6.An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. MTV L-r7 7.A construction sequence that shows how the infiltration basin will be protected from sediment until the 04. f.3 entire drainage area is stabilized. M_T ?M a 8. The supporting calculations. tom. p) ilcA- I:w E. 9.A copy of the signed and notarized inspection and maintenance(I&M)agreement •TIt N A' 10. A copy of the deed restriction. Form SW401-In iltratlon Trench-Rev.1 Part III.Requirii Items Checklist,Page 1 of 1 State Stormwater Management Systems Permit No. SW8 080208 Wachovia at Carteret Crossing Shopping Center Stormwater Permit No. SW8 080208 �� Carteret County ' �. DEL, 1 Designer's Certification I, Oark , as a duly registered W .ice in the State of North Carolina, having been authorized to observe (periodically/weekly/ full time) the construction of the project, N lei , Cre)% S in)0 (Project) for Ca.r4 2 - CAro nv5, (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature AAAA-169----:r4-- wow Registration Number Mc- Z 4- I g , CAe. ' ►�: Date 17cc. I► / loos fpfr ,— . AL \\tir2410 7� G4 44 �' �. 'I, Zoog Page6of7 State Stormwater Management Systems 11,7FD Permit No. SW8 080208 Certification Requirements: DEC 1 1 2008 BY:_ .!'I-4 1. The drainage area to the system contains approximately the permitted acreage. WA 2. The drainage area to the system contains no more than the permitted amount of built-upon area. M+ 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. MA-Pc 5. The bypass structure elevations are per the approved plan. Is1VPr 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the outlet/bypass structure. 'I-4 8. All slopes are grassed with permanent vegetation. tc 9. Vegetated slopes are no steeper than 3:1. µ+A- 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. rk 11. The permitted amounts of surface area and/or volume have been provided. M+k- 12. All required design depths are provided. ,n+A- 13. All required parts of the system are provided. mik 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Carteret County Building Inspections Page 7 of 7