Loading...
HomeMy WebLinkAboutSW6230705_Design Calculations_20230831 (20) 4D Site Solutions, Inc. DESIGN REQUIREMENTS: A. Pass the storm event SCM 14 Pre-Development Runoff-100-yr Drainage Area,(DA)= 15.11 acres Intensity,(I)= 7.57 inches/hr Composite Runoff Coefficient,(C)=> 0.30 Maximum Release Rate,(Qloo)=> 34.31 cfs SCM 14 Post-Development Runoff-100-yr Drainage Area,(DA)= 15.11 acres Intensity,(I)= 9.52 inches/hr Composite Runoff Coefficient,(C)=> 0.61 Peak Release Rate,(Qloo)=> 87.75 cfs Detention Pond Stage-Storage Function Contour Contour Incr. Accum. Stage Elev. Area Storage Storage(S) (Z) (ft) (sf) (cf) (cf) (ft) ln(S) ln(Z) Z est 303.0 13,784 - - - 303.5 15,259 7,261 7,261 0.50 8.89 -0.69 0.58 304.5 16,772 16,016 23,276 1.50 10.06 0.41 1.54 305.5 18,343 17,558 40,834 2.50 10.62 0.92 2.48 306.5 19,974 19,159 59,992 3.50 11.00 1.25 3.43 307.5 21,665 20,820 80,812 4.50 11.30 1.50 4.41 308.5 23,416 22,541 103,352 5.50 11.55 1.70 5.42 309.5 25,225 24,321 127,673 6.50 11.76 1.87 6.48 310.5 27,094 26,160 153,832 7.50 11.94 2.01 7.59 311.5 29,024 28,059 181,891 8.50 12.11 2.14 8.74 Regression Output: b= 1.19 (X Variable Coeff) Ks= 13,932 (e'"thte"ept) Stage-Storage Equation is of the form:S=(Ks)(Z)b printed: 7/7/2023 1:17 PM Page 1 of 3 4D Site Solutions, Inc. Primary Spillway Barrel Number of Barrels= 1 Dia.of Barrel= 24 inches Area of Barrel,(Ab)= 3.14 sf Pipe Length,(L)= 80 feet Friction Coeff.,(Kp)= 0.01058 Inv.of Barrel= 303.00 feet Riser Elev.of Riser Crest= 308.30 feet Rectangular Length Weir= 36 inches Width Weir= 48 inches Total Weir Length= 14.00 feet Area of Riser= 12.00 sq.ft. Orifice in Riser Dia.of Orifice= 2.80 inches Number of Orifices= 1 Area of Orifice,(Ab)= 0.04 sf Orifice Coefficient(CO= 0.60 Inv.of Orifice= 303.00 feet Length of weir 1.80 feet Top of weir= 304.75 feet Weir Coefficient(Cw)= 3.00 Emergency Spillway Width of Spillway(Approx.)= 25 feet Weir Coefficient= 3.3 Crest Elevation= 309.50 feet Summary of Results Maximum Release Rate,(Qloo)= 34.31 cfs Release Rate,(Q1oo)= 66.77 cfs Normal Water Surface Elev.= 303.00 feet Water Surface Elev.@ Outlet(Q100)= 308.89 feet printed: 7/7/2023 1.17 PM Page 2 of 3 4D Site Solutions, Inc. Inflow Hydrograph-100-yr Peak Inflow,(Qp)_> 87.75 cfs Time to Peak Calculation: CN= 72 P= 7.91 in. S= 3.89 in. Q*= 4.62 in. (depth of runoff) Vo1= 253,160 cf (vol.of runoff) Time to Peak,(Tp)=> 34.6 minutes (SCS TR-55) printed: 7/7/2023 1:17 PM Page 3 of 3