Loading...
HomeMy WebLinkAboutSW6230805_Supplement-EZ Form_20230831 SUPPLEMENT-EZ COVER PAGE L FORMS LOADED PROJECT INFORMATION 1 Project Name Turnberry South Phase 1 2 Protect Area(ac) 18.926 3 Coastal Wetland Area(ac) - 4 Surface Water Area(ac) 0.122 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 _ 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 1 13 Wet Pond 1 14 Stormwater Wetland _ _ 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof r 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 _23 StormFilter 0 24 Sllva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo.PE 28 Organization: Bowman North Carolina.Ltd. 29 Street address: 4006 Barrett Drive.Suite 104 30 City.State.Zip: Raleigh,NC 27609 31 Phone number(s): _ 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer \\\\�A C A'Rfi0 1// • '/ cc OFESSIp�;.,q • SEAL — Signature of Designer 051571 • • • 0;••F GIN E rtk li"tn r PA 7/7/q3 /77/oil''Haig"' Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs _ 2 3 Does this project have low density areas? _ No 4 If so,number of low density drainage areas _ 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM - _ Wet Pond BioRetention _ 5 Total drainage area(sq ft) 819110 sf _ 403800 328663 6 Onsite drainage area(sq ft) 819110 sf _ 403800 328663 7 Offsite drainage area(sq ft) 8 Total BUA in project(sq ft) 328769 sf 208172 sf 120597 sf New BUA on subdivided lots(subject to 9 permitting)(sq ft) 216000 sf 120000 sf 96000 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 112769 sf 88172 sf 24597 sf 11 Offsite BUA(sq ft) 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) -Sidewalk(sq ft) 22515 sf 17159 sf 5356 sf -Roof(sq ft) -Roadway(sq ft) 90254 sf 71013 sf 19241 sf -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 40.14% 51.6% 36.7% 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) 18748 cf 40198 cf 21 Calculation method for design volume Simple Method I Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): There is 5,307 sf(0.122 ac)of surface water area.The bioretention pond has been designed for an area of 616,411 sf with an impervious area of 266,449sf.This future phase includes an additional 287,748 sf.of drainage area with an additional impervious area of 145,848 sf. WET POND 1 l Drainage area number 1 I 2 Minimum required treatment volume(Cu ft) 17295 cf 'GENERAL MDC FROM 02H.1050 31 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4'Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other Yes engineered side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth(bottom of sediment 220.00 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 221.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 226.50 23 Elevation of the permanent pool(fmsl) 227.00 24 Elevation of the top of the vegetated shelf(fmsl) 227.50 25 Elevation of the temporary pool(fmsl) 228.30 26 Surface area of the main permanent pool(square feet) 9275 sf 27 Volume of the main permanent pool(cubic feet) 37556 cf 28 Average depth of the main pool(feet) 4.45 ft 29 Average depth equation used Equation 3 30 If using equation 3,main pool perimeter(feet) 492.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 32 Volume of the forebay(cubic feet) 6998 cf 33 Is this 15-20%of the volume in the main pool? Yes 34 Clean-out depth for forebay(inches) 12 in 35 Design volume of SCM(cu ft) 18748 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 2.00 in 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 2.47 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance(inches) 42 in 44 Depth of forebay at exit(inches) 36 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) 6:1 48 Does the orifice drawdown from below the top surface of the Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes yr,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about 55 the wet pond(s): Wet Pond 1 1:02 PM 7/13/2023 BIORETENTION CELL 1 Drainage area number 2 2 Minimum required treatment volume(cu ft) 10414 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 _ Does the SCM have retaining walls,gabion walls or other 6 engineered side slopes? No Are the inlets,outlets,and receiving stream protected from erosion 7 (10-year storm)? Yes Is there an overflow or bypass for inflow volume in excess of the 8 design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes _ 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes _ 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes BIORETENTION CELL MDC FROM 02H.1052 18 SHWT elevation(fmsl) 205.00 19 Bottom of the bioretention cell(fmsl) 220.00 _ 20 Ponding depth of the design storm(inches) 12 in _ 21 Surface area of the bioretention cell(square feet) 38995 sf 22 Design volume of SCM(cu ft) 40198 cf _ 23 Is the bioretention cell used for peak attenuation? Yes 24 Depth of peak attenuation over planting surface(in) 20.16 in 25 Height of peak attenuation outlet above the planting surface(in) 20.16 in 26 Infiltration rate of the in situ soil(inch/hour) 2 in/hr 27 Diameter of the underdrain pipes(if applicable) 4 in 28 Does the design include Internal Water Storage(IWS)? Yes 29 if so,elevation of the top of the IWS(fmsl) 218.5 _ 30 Elevation of the planting surface(fmsl) 220.00 _ 31 What type of vegetation will be planted? (grass,trees/shrubs, other)? Grass 32 Media depth(inches) 30 in 33 Percentage of medium to coarse washed sand by volume 75-85% 34 Percentage of fines(silt and clay)by volume 8-15% 35 Percentage of organic matter by volume 5-10% 36 Type of organic material Pine Bark Fines 37 Phosphorus Index(P-Index)of media(unitless) 30 _ 38 Will compaction be avoided during construction? Yes _ 39 Will cell be maintained to a one inch/hour standard? Yes 40 Depth of mulch,if applicable(inches) 41 Type of mulch,if applicable 42 How many clean out pipes are being installed? 39 43 Type of pretreatment that will be used: Rip-Rap ADDITIONAL INFORMATION 44 Please use this space to provide any additional information about the bioretention cell(s): Bioretention 1 1:02 PM 7/13/2023