Loading...
HomeMy WebLinkAboutNCG021013_Inspection Report_20230823 Compliance Inspection Report Permit:NCG021013 Effective: Expiration: Owner: American Materials Company LLC SOC: Effective: Expiration: Facility: Brown Sand Mine County: Pitt NC Highway 33 Region: Washington Greenville NC 27834 Contact Person:Tony Harris Title: Phone: 910-799-1411 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 08/24/2023 Entry Time 09:OOAM Exit Time: 12:30PM Primary Inspector:Varun Prakash Phone: 252-948-3963 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Technical Assistance Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG021013 Owner-Facility:American Materials Company LLC Inspection Date: 08/24/2023 Inspection Type:Technical Assistance Reason for Visit: Routine Inspection Summary: Inspection of Brown sand mine was conducted on 08/24/2023 (9 am to 12:30 pm). Met with on-site person (Franklin Clark, Frankie.Clark@americanmaterialsco.com, P: 910-379-5427) and explained to him the NCG02 permit requirements that were missing in the NOI (notice of intent) received.Tony Harris, Operations Manager(P:910-990-7928, tony.harris@americanmaterialsco.com) couldn't make it to the site on that day. Dewatering of this mine will be discharge into Faith lake Inc. routed through a vegetative buffer from a proposed discharge point as indicated in the site map. Following is the list of things that need to be submitted to NC-DEMLR for NCG02 permit issuance: 1. SWPPP(STORMWATER POLLUTION AND PREVENTION PLAN)was missing on the site and in the NCG02 NOI application. 2. SCM (Stormwater Control Measure) clean out measures 3. Secondary Containment Plan was missing 4. Spill Prevention and Response Procedures was missing 5. Narrative Description of Stormwater BMPs was missing. 6. Employee Training, for facility personnel responsible for operations that have the potential to contaminate stormwater runoff, was missing. Though some of the constituent parts of SWPPP were available in the application or on site(e.g. site plan, mining permit, a Pumping Operation and Monitoring (POM) Plan, Mine Safety and Health Administration (MSHA)documentation, etc. were available). Refer to Part B of NCG02 permit requirements for constituent parts of a SWPPP at this link: https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg020000-general-permit-20 10630-dem I r-sw/down load In addition, following was observed on the Brown sand mine site: 1. Silt-fencing was missing on the outer side of the birm-wall. 2. Secondary containment(interior lining)of the diesel tank on the site (picture attached)to be confirmed. Dyke wall around diesel storage not present. If interior lining is missing, dykewall needs to constructed for the volume capacity of the diesel stored plus sufficient freeboard to contain the 25-year, 24-hour storm event around the diesel tank. It is recommended that the responsible part should review the overall NCG02 permit requirements as it applies to this site. Issuance of permit shall be reviewed after completion of above tasks. Page 2 of 3 Permit: NCG021013 Owner-Facility:American Materials Company LLC Inspection Date: 08/24/2023 Inspection Type:Technical Assistance Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: This is a new project. This mine hasn't done dewatering/SW discharge yet. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ ❑ 0 ❑ Comment: This mine hasn't done dewatering/SW discharge yet Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ 0 ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: This mine hasn't done dewatering/SW discharge vet Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ 0 ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ 0 ❑ Comment: This mine hasn't done dewatering/SW discharge yet Page 3 of 3 Diesel storage tank on site - secondary containment to be confirmed .v F , I — r t a Y r. IM ".* Vv:. -,'�.-, /'.�t _-'+ .ti.-bMt�k,n��tirve::a,+,.�.✓-,3�"�-"�' f�a9� �`�c, �;�t.. .� ?Ii 4tr3 °?ffi � .r��fNi }F;:.r, v A ,g.aJ°,', - .✓�' r '�r f` 1+y' e'ef - , M.�i �1 Off st..J' F�ti�� +'���``0 ��;+ �a�:8e'�"�rc•r. � �l �i'r`rr 4�a d; �:' -d saw ° `t ! n ��_ `,• � ?�' '_ - a � 5., r Silt - fence missng around the berm wall loom e _ st �fiYF .�'WW 'a" aNO I 1r , 6", hR� c <*