Loading...
HomeMy WebLinkAboutNCG140512_Inspection Report_20230803 Compliance Inspection Report Permit:NCG140512 Effective: 11/21/22 Expiration: 06/30/27 Owner: Lane Construction Company SOC: Effective: Expiration: Facility: LaneBlythe Batch Plant County: Wake 9317 Old Stage Rd Region: Raleigh Garner NC 27529 Contact Person:Marcus Curran Title: Phone:413-772-9678 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 08/03/2023 Entry Time 09:OOAM Exit Time: 10:OOAM Primary Inspector:Thaddeus W Valentine Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140512 Owner-Facility:Lane Construction Company Inspection Date: 08/03/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: I spoke with Marcus Curran (Blythe)and Donald Pearson (Summit) about the basins and outfalls shown on the site map and looked at the bain and outfalls on the site. The following Changes and clarifications were made concerning the facility basins and outfalls. Basin #1-Drains directly to the onsite pond and will remain Basin #2- Not constructed and will not be constructed (This area also drains directly to the onsite pond) Outfall #1 outlets directly to the onsite pond Outfall #2 outlets directly to the onsite pond Outfall #3 is located across the Interstate from the batch plant and discharges runoff from from the onsite pond and multiple other areas off site. The onsite pond will be the one and only sample outlet for the permitted batch plant site as the pond captures all runoff from the site. If any water is taken from the pond, it will be used to water down onsite stockpiles only. If water is needed from the onsite pond to water any part of the overall project not related to the batch plant, the pond must be sampled for ph, TSS & non polar oil and grease and found to be below the bench mark limits before water is used. Page 2 of 3 Permit: NCG140512 Owner-Facility:Lane Construction Company Inspection Date: 08/03/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: The facility has all the required information, that/just need to put it togther in one binder. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ 0 ❑ ❑ Comment: Will begin at next rain event Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Samples will be taken at next rain event Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ 0 ❑ ❑ Comment: I reviewed the outfall as shown on the map and found that outfall outfall #3 was not on the site, but across the interstate. That outfall will be removed as a sample point. Basin 10.4 will not be installed, therefore there is no sample point there. Basin 10.1 will remain but discharges into onsite pond. All areas of the site discharge into onsite pond Page 3 of 3