Loading...
HomeMy WebLinkAboutSWA000220_Construction Sequence_20230815 • • 5410 Trinity Road P 919.866.4951 TIMMONS GROUP Suite 102 F 919.859.5663 YOUR VISION ACHIEVED THROUGH OURS. Raleigh, NC 27607 www.timmons.com MEMORANDUM TO: Jim Farkas FROM: Dexter Howell DATE: 3/31/2023 RE: Stancil Farms Construction Sequence Dear Jim, Stancil Farms will be built in two phases consisting of 99 residential lots within phase 1 and 84 residential lot within phase 2. Subdivision roads will be owned and maintained by NCDOT and are 20' normally crowned roads with ditches, stormwater will drain through pipes and swales to follow the natural drainage pattern. Watermains are public and will be owned and maintained by Harnett Regional Water. Each lot will have an individual septic system. Respectfully, Dexter Howell CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES