Loading...
HomeMy WebLinkAboutNCC232251_Site Plan or Location Map_20230801 _ � � � i / / 401 I o �_ \ I / ,a,°' CONSTRUCTION SCHEDULE \� I ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY as4x NCGS 113A-54.1°IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR n I. Obtain all necessary permits and plan approvals.Erasion and Sediment Control COMPLETED AS AN EXCEL SPREADSHEET. (MSC)permit and a Certificate of Coverage(COC)must be obtained before any land disrobing activities AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED 4 0 '"'� > occur.A copy of the E&SC permit,the COC and a hard copy of the plan must be kept on site,preferably in a \ I I EROSION AND Nf�szt t E permits box,and accessible dining inspection. \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A iry^s g 4 e 2. Install gravel construction entrances first,then silt fences,reinforced silt fence outlets and wattles. \ ` \ \ NEAT 048.0131 STATES THAT'...DOCUMENTATION SHALL BE ACCOMPLISHED BY • 3. Finish clearing and grubbing any necessary areas on the lots as they are stoned. \ I \ INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE o 'Mg" �° d. Begin lot grading and excavation activities / APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, / 1 5. Resin or continue with house construction activities. \\\ \ \ DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, _el �1e 6. Finish all rough grading and M1ouse corewctiov. \ / e .,at,. ], install arivewa s,walks and - II\ (/\ I PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION 0.es ve' y of lot a tios. \ \ \ CONTROL PLAN." S ,��Q�, ryj' 4 SR-Iz51 9.8. Pinal grassing,mn fine ulching and stabilizing of lot)In most cases this will involve Me installation of sod on the lot. / \ \ \ �`fi The silt fence will remain m place until the lot is sodded or grassing is stabilized and rakes hold. /� "�.o n 10. The contractor shall conduct self-inspections of the erosion and sedimentation control measures and complete \ \ \ \ \ \ A o PP me following combined self-inspection r aerie on DEM R webaae \ \ \ \ `` SODDING w� "Fp ¢ https://files.nc.gootnedeq/EnergW/c20Minetiog-Faad%20Larid%n20Resources/StomeloeoMPDES%20 °� CS2 1.h General%20Permits)DEMLRLSW-Monitoring-Forms-Rev-August-8-2019pdf.Twelve months of complete / / \ Q insp«non forms shall be kept on site and available for inspection at all times.It is recommended a copy be \ \ .4. a2 2,0 kept m ap b (CS 113A54.1()15A NCAC 04E1.0131 NCGOIP III Sections A dB) wO u. Self-inspectionsr a sedimentation 1 baperformed 1 every seven / / \ (� \ \ \ \ \ �� g ° G� calends days d within_t h f ry be h 1 h,Any needed p Shall be // 1 \ 1 \ \ \ M�G���� R made immediately to designed.AII ESC shall be J"specified in I \ YR Np the co details h plan.A gauge b installed h project fmonitoring. / anosnno TRMM Na Psces. A 12, Inspeclio d final acceptan letter,When thep j - pl h p shall act DEMLR to SITE o o close out the E&SC Plan.After DEMLR informs the perm,ttee of the project close out,via inspection report, ee..� 2ryn �e y Ng ¢��S0 y"� q . M 5,--vry9 the permitted shall visit"deq.nc RovMCO01"to submit an electronic Notice of termination(c-NOT).A S100 \ \ a e 4'P `+. ,� w£ LET,,,,,, 0`�tit ;o animal general permit fee will be charged until the e-NOT has been filled our. / \ \ 1 \ ATeean..Ecnv. TO JotK000 "¢ \ \ \\ / / \-, ` \ \ • 40 \ ill Q 4° y 2 Nc oe� h \ / 3w2 \ �G uui TER WELL ESTABLISH.-Iry 2-3 z. su sa tzza Nb °! �e,xoW ww�?b \ \ \ -/ / / 1\ OPEN \ \ Vilif II \G \ \ ' AS SCOH AS THE SOO IS WITH masaL N?AAPPEARANCE OFAGOOD SOD neat as WEE..SFr THEmowea �a-2at , m°° s 0U - ASPACE II ) d I I P VICINITY MAP ° �a 17 ) II�of'II��Od���W'J'� aa ,, N.T.S. ' ( I i I I I 'M L�4 15 ( DATE: PAGE: -� I I v i CI ��'51� I »a .n �- 0015 .� /505 FENCE \ 1 I 1 \ \F Nr �/ I + _ b' I T / i' IIIIIIII IIIIIIII IIIIIIII;1 ( 18 \ I I I I t 'l • I I / / / II DATE PAGE n DPaFSLTF / 12 4 I // 19 aEAT „EwAsrEos NE 131 / / .. 14 // / SWIRE FENCE TEEL 10� I I I I / F 20 r '� �- HARDWARE CLOTH FRONT VIHw 'Nell./ \ I I I/ LotBlan / 1f ti G ,� R �. Id act' % % FILTER OF MgWANED STONE :', FILTER FABRIC. I CAND HARDWARE LOTH IN TRENCH \ \ I I I / / / / R Notts R ll t -I Hous Hous r- 110us� �'Hous Hous 4HOUS:q ,I / I I I/ 6 PRMN.::0$ I aFLTER FAaRcNOTES: rvro soLDGRourvD / / I --■ --I`-- ( / / I / :� n->-,ink-I-I -T mil' �JON GROUND u.:I 1 Hardware cloth antl gravel should overlay Ne s It fence at least 12 I = / 21I EOP r+r y+>-T rs-�>-T T Tn " r r>- ��g�gg'?I 2.Inches. w esDale should placed fence I 22 LEGEND Notes: ....:..:s•o....u.:::•i I P tic ^O ( Joni Lot Plan 1.If needed,Tree Protection fencing should be Installed along the buffer zone,wetland \\\`\ and based on ram conditions. m / _ ,-_-- S - °e„ 23 URy MAINTENANCE N - \\ Cie \\\\ I Lot Plan' N boundary and/or around protected trees,providing a adios of at least 1.25 feet for each el{ yyrT; inch of trunk diameter. °F 1.Per NCG-01,Inspect outlet at lest once a week and after each l inch or 2 / I 1 [ O I 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on aCavwlRE FENCE AND sOFUPPER EDGEFlow DIREcno Conti tlhave dferentlantled,ifncessiltlefo each lmentatmhave IntlHARDWARE CLOTH FILTER FABRCN TRENCH greater ranfall event Complete any required reparsmmetlately �, aillj "2 Freshen stone when sediment accumulation exceeds 6lnches e / I �o-T� schemer Gtl'agram antl fain atllustetl.(necessary for placement at low po its.loots era 3 Keep mesh free of debris to prayde adequate flow Q / I R -- \\�� / aFencesous an indoor SltWADDLE/S DLT sosEcnoa VIEw 4 Remove sediment when half of stone outlets covered Z -- A pe5 e i ne stone as needed to fiat rate de wa[erI g I / I / ® 3 Install required Slit Fe within10 feet of property II t ensure there Is no condo with Ks SILT FENCE OUTLET \NC Envir•�I Ieilrul.xyey / I / I / CONSTRUCTION ENTRANCE septic system.It is the responsibility of the builder t re the mtallabon Of Sediment SILTFENCE OUTLET 8 I I 2 / 45 control measures doe r p nth septic systemand repair area(s) -- I / east one Construct E[ r to r-t b - tall tl per lot _ / / / / I .Waste bhs and other areas dedicated f ghg bu Id rig meter al waste shall be at 6 / '1iI`-+e 1 leasthefeetawayfromst°nnin neInlets d 'ageditchesunless k can be shown that / other alternative exists If th s separat of be ach evetl these areas must be Ycoma ned beh nd S It Fence/ 1 / elan / I \II I6.Inletstlownsireamoftl slurbances shoultl beprotectetl streets shoultlbeswept when DATE PAGE: • 43setl merit fromtheconstruction ad v ty s presentsiit • • / art a S- S / R I Iprow dart on atddR anal sheets Erosuontand sad metntnconirol Beta laaretnotdrewnutreOs areNO �I �l an n / I Loeldn2 I I 1ErrECT�v�s'„Iy_-_- scale TYPICAL LOT LAYOUT WITH ROADSIDE DITCHES -� eclr fin..'I. stakes 6. tz .'I L 'elf'II - IIM /' 1DATE: PAGE: and a minimum of 10feet nd he be of a s6cT oN secT oN "`yOtraere lend silt a, ufe PC tena'.Ldoew;;Sl,nwa� ) til lit I^""� mel%g g aedt »define s with a 2 i I II �.1, ill ii! 4. Oak or retarder..hardwood n°°ff GROUND STABILIZATION / I II I I a sockreaMe.Stakes should maximum interval of 4 feet'rapmcod at a SITE AREA STABILIZATIONof 0 feet if the silt sock,rettle is Mixed in a 4 I ( I �Oa EXCEPTIONS ����• " DESCRIPTION TIME FRAME I I I 1 mI I D��G / �, � , UNTRENC Wood Mulch or Com st Tre'rre'undinti Min. .n. ToI 2 he ght of log a I PERIMETER DIKES, 7 DAYS NONE ISOMETRICINSTALLATIONroEw SWALES,DITCHES ,.. / I I 1 I QJ irtr ipar "/Owe ..,,...,°.w.m..r�...rn.on.r.x...wa..,..,,,, socrewaftle to bold it in place during runoff eve.. &SLOPES i 1 1 -0 1 1 1 1 1 1 1 1 MAINTENANCE: HIGH QUALITY 7 DAYS NONE /�1 1 1 11 1 1 1 :VW- 1 1 1111 COMPOST BOOK lain.now RATES I. Inspect silt saldwattle at least weekly and after WATER ZONES I •'., .. •111IIIIII I� Mul.or a P (HOW) 1 1 1 obese z 1 . for uno-endn.a mreared omen pom.r..n rm�"*s(aoo:m) Iso:m)(iao:m) c'0j z min ama moor nil o rage rArd SLOPES STEEPER 7 DAYS IF SLOPES ARE \ I I: win. 1 II a�i:. Sheet F way I t ,;,n.,n s e r re. �o 5i tvaP a THAN 3:1 10'OR LESS IN 1 \ / .-_Twie .r'y' ;rya' fill sin sock "m,tn cap c;aa gee, ire rid 1r° IFe IF I I `ll -4- s" /L LENGTH AND ARE ii wpt le ('05 rn) (398 rn) ' rn> magea mdged NOT STEEPER I s' m'ThrReac ough Rote e'%a Ellin Irma zmia s in 4' n - - THAN 2:1, 14 d the area above.e MOM') yreyre) Minim) rums nnAre m h».emit.»a»nmb»d. DAYS ARE V construction: m t e. ALLOWED I ari\ \ I \ 1.Clear the entrance antl exit area of all vegetation,roots,antl other objectionable 1.Per NCG-01 Inspect at least once a week antl after each 1 Inch or SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION SLOPES 3:1 OR 14 DAYS 7 DAYS FORmaterial andpropenygraaek. grouteraalnlalllmakeanyregntretlrepalrelmmeaiatey. \ \ I 2.Place the gravel to the sped.made and dimensions shown on the plans,and 2.Maintain the gravel pad in a condition to prevent mud or sediment FLATTER SLOPES GREATER smooth it fromleavingthe consimetlonsite.This may require periodic THAN 50 N \ Providedrelnaget°tartywater t°a sediment trap of other sukable outlet. toptlressingwith2inchstone.LENGTHI \ 4.Use geotextile fabrics in oMer to improve stability of the foundation in locations 3.Immatliately remove all objectionable materials spilletl.washetl or ALL OTHER AREAS 14 DAYS NONE(E%CEPTsubject to seepage or high water table. tracked onto public roadways. 110r1 WITH SLOPES FOR PERIMETERS \ N. CONSTRUCTION ENTRANCE/EXIT FLATTER THAN 4:1 AND HQW ZONES) \ \ DATE: Wre Fence Filter Fabric PAGE: \ areal Ppst sues.smnaem strengm rebrcvntn vdre mice SMv.Fare atrergu mencwanout wire mice wire Fence Wire B°dckf'ontrench \ Pact Steel Post thoroughly General Erosion Control Notes n -�mw 1.Only the ores shown shall be disturbed. ` . � PAGE 1 of 2 PlasticP9 ' , , z Alll d'smroed areas snou be grassed and \ TOTAL DISTURBED ACREAGE: 2.79 ACRES ad as soon as possible and mD'ntGned �/ \ aMin. i Pemanent gayer s established. _ _ \ LOT EROSION CONTROL PLAN j \ l LOTS 3, 5, 20, 22 & 23 . tag »n� d - _ - -� 1 �_\ \ \ I JONES CREEK ConsWcton: Filter Fabric \ \ _� \ \ \ \ I / I2..Esurethan.Sianrobthe`se^men ceosE coo synthetic filter CROSS aE°n°"VIEW MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTIONI MEADOWS may impound volumes of water_ lure of the structure) (Higher mn�a S.Construct the»eery fare. meant Trice onl la at u'Iwort p»0a.trt of the het minimum avoid When he neixttpost, FOR ree strength naarttom of twl»nch.fastened»wreytorcemenoenaaorma the un Eaend General-All measures will be inspected and corrections made after runoff producing falls,or at least once per week minimum.The builder will insure that the construction activities on anyparticular lot do not adverse) affect anyof the installed erosion control measures.If lot construction dictates,measures will be a.support as wppangth Wm..Madre<h.Fastned wremy reinforcement unt tensile .55then oftec on maupsm. 1pro grain Padversely side of the fen. at a palni�ediarey relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. AVID RESIDENTIAL LLC M1asuPO rtfenceaa�u»E,space poets a maximum of a feet apart SO innate should be driven 2.SM1pum a ate er.r,[or a oogireere fence fee,,,,tear,4500550se. Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all securelyse;"OI� wIreafaops a.,d°»notlagulreawlremeshsupport...6eecr<I, objectionable materials spilled,washed,Dr tracked onto public roadways. UPPER LITTLE RIVER TOWNSHIP HARNETT COUNTY e.toms,theniterrabric directly to posts.wlreorg»n<rrplles should h. minimum of 50 pound tens. ,yeasevamar«thenetrainandreaceoressureon Slit Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure SCALE:1R=1 JUNE 2023 I.Excavate m y rrceeswade and inches e e proposed fine ormeposm aria s fence,.» arena"°'d undarmicro the ferxe oaring that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. O�r ups. me uenmreproa reI 4i mRernoveSodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE .Place12 tomes off..along the bottom and side N the trend". and bins theaea m grade land stabllslzeln rthe contributing 100 0 50 100 200 400 B.Backfire.trench with soil paced over me filter fabric and compact Thorough compaction mina badmu is 4 drainage area has been properly MOIRa and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. critical to silt 10.ors not aaacngnce per�cm rformance. s. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be = MI° repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. sec Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) ANC-Envirptmentol.jpeo SILT FENCE sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. t inch = 100 ft. JReinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:6/20/2023 10:52 AM LAST PLOTTED:6/20/2023 3:2g PM PLOTTED so Dennis Gilbert FILENAME:G\CURRENT JOBS\Aare RESIDENTIAL LLC\23-2855-08 JONES CREEK MEA00WS-EC\PLANS\JONES CREEK EC-LOTS 3.5.20.22 Et 23.000