Loading...
HomeMy WebLinkAboutSWA000214_Construction Sequence_20230705 wi4oyiu m 14 ENGINEERING June 14, 2023 Jim Farkas North Carolina Department of Environmental Quality 512 N. Salisbury Street, Office 640E Raleigh,NC 27604 NAPA Auto & MSUC Construction Sequence: No future development is planned for this project beyond the scope outlined in the provided construction documents. \ • ♦ • • • 11 ilk*lill 1 • IP '• • II • II1111 • r • •• • Vr ♦ • • • • • � .• • . • • • ` . fi Engineering&Land Planning 209 Highway 544,Conway,SC 29526 Phone(843)347-5851