Loading...
HomeMy WebLinkAboutSW3230601_BUA Allocations_20230626 Denver Fitness Facility N. NC 16 Business, Denver, NC Lincoln County Project Area and Density Calculation RE: NCDEQ Stormwater Application Line Item #8 (Project Percent Impervious Area Project Density without Existing Development = [New BUA] divided by [Total Project Area] x 100 Given Data: Existing On-Site Impervious N/A Proposed On-Site Building 26,829 S.F. Proposed On-Site Parking 60,095 S.F. Proposed On-Site Sidewalks 6,065 S.F. Proposed On-Site Other 10,222 S.F. Existing Off-Site Impervious 15,328 S.F. Total Project Area (3.568 AC.) 155,422 S.F. 1. Determine Poject Density: PD = (New BUA)/(Project Area)x 100 _ (118,539)/(155,422)x 100 = 76.3% BUA Project Density*** ' Per NCDEQ Staff, this number includes existing off-site impervious above which includes impervious area from other parcels not owned by project developer. The subject parcel BUA Project Density is 66.4%which includes impervious areas On-Site and improvements within NCDOT R/W only.