Loading...
HomeMy WebLinkAboutSW3230501_Recorded Document_20230616ROY COOPER. ATZ2 Gavernor FEB ELIZABE'm S. BISER Secretary BRIAN WRENN LR�-ector NORTH CAROUNA Environmental Quality February 21, 2022 1,ETTER OF APPROVAL William Dale Smith Jr. Post Office Box 319 Midland, North Carolina218107 RE: Project Name: Smith Industrial Subdivision Project ID: CABAR-2022-051 County: Cabarrus City: Midland Location: Old Camden Road River Basin- Yadkin -Pee -Dee Stream Classification: Other Acres Approved: 2.12 Submitted By: CEST Date Received by LQS: January 26, 2022 Plan `type: New This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no [and - disturbing activity has been undertaken, as is required by Title 15A NCA.0 413 .0129, As of April 1, 2019, all new construction. activities are required. to complete and submit an electronic Notice of Intent 'eNOl) form requesting a Certificate of Coverage (COC) under the NCGO 10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you m usT obtain the COC prior to commencement of any land disturbing activity. The eNOl form may be accessed. at deq.ne.gov/NCCx01. Please direct questions about the eNO1 form to the Storrnwater Program staff in the Raleigh central office, If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC, 'Title 15ANCAC 4B .0118(a) arid. theNCGO I permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the (.-.'OC, once it is received. 3. Records of inspections made (luring the previous 30 days. North Carolina Department of Environmental Quality Dwis, ion of Energy, Minera I and and Resources Mooresville Regicnia) Office 610 Fast Center Avenue, Suite 301 1 Mooresvi Ile, North Carolin a 28115 704 663- 1699 .7M*5 Letter of Approval William Dale Smith Jr. February 21, 2022 Page 2 of 2 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section KSL/cys Enclosures: Certificate of Approval cc: CESI Attention: Mick Buysse Post Office Box 268 Concord, North Carolina 28026-0268