HomeMy WebLinkAboutSW8961204_HISTORICAL FILE_20220906STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 %J 1 0 4
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
[91 HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2022 o9 oko
YYYYMMDD
Burd, Tina 1
From: Burd, Tina J
Sent: Monday, August IS, 2022 10:54 AM
To: Barraco CIV Talia M
Subject: SW8 961204 - USMCB Lot 201
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 10, 2022. The project has
been assigned to Ashley Smith and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
D Q��
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Website: http://deg.nc.goy/about/divisions/energy-mineral-land-resources/stormwater
Based on the current guidance to minimize the spread of COVID-rq, the Department of Environmental Quality has adjusted operations to
protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these
staffing changes, all DEQoffice locations ate limiting public access to appointments only. Please check with the appropriate staff befine
visiting our offices, as we may be able to handle your requests by phone or entail. We appreciate your patience as we continue to serve the
public during this challenging time.
Non -Transfer Application Completeness Review Checklist
Project Name: U5 C_3 L—T 2-x7
Project County/Location: O03a�ovJ /wV C.U3
Permit Action: New New Permit #r:
❑Not located in the ETJ of the following delegated
and functioning programs:
Date Delivered to WIRO: / /C) % )lj Z
RIMS Received/Accepted Date: /D p
Date Given to Admin: ��$yy /A -2-.;-
BIMIS Acknowledged Date': ploga-
NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach
Bruns: Leland / Navassa (?) / Oak Island
Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City
Major Mod / Minor Mod &Will ❑Existing Permit #:
❑----
Applicant & Permittee are the same?3 Expiration Date°:
Permit Type: D / / LD Overall / HD &LD Combo
General Permit / Offsite / Exempt + Redevelopment
Development Type: Commercial/ Residentia ther
Subdivided?: Subdivision or
ci WOE q!'ol Z��
(o ZD 20 ZZ
❑Offsite to SWB:
Ells Offsite Lot approved in Master Permit?a
Rule(s): u2017 Coastal u2008 Coastal IA1995 Coastal
❑Phase II El Universal ❑1988 Coastal
Permittee Type & Documents Needed:
Property Owner(s) =Purchaser Lessee =HOA Developer 4
Viable? Viable? =Viable? QVlable? Viable?
Deed =Purchase Agmt =Lease =Election Minutes
Paperwork -
®Application ' \
❑Fee: ❑$505 (within 6mo) Check#(s): Lzf Q_j�;D ❑No Fee
❑Su pplement' (1 new form or for older forms: 1 original per SCM)
❑ O&M '
❑Soils Report (Infil or PP)
❑Calculations (signed/sealed)
❑Deed Restrictions, if subdivided'
❑Project Narrative
❑USGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N
❑Plans (2 Sets)
NOTES:
'Enter BUS Acknowledged Date on this Sheet
2For New Projects -Enter New Permit # on Supplements & Deed Restriction Templates.
3 If permittee is different, STOP. Needs to be transferred first.
°If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first.
5If Lot not approved in master permit, STOP. Master permit needs mod.
EMAILED ENGINEER DATE:
REVIEWER NAME:r..�(_
T
Comments:
G:WQ\\\Reference Libra ry\Procedures\Checklists\Com pleteness Review Checklist 20210908