Loading...
HomeMy WebLinkAboutSW8961204_HISTORICAL FILE_20220906STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 %J 1 0 4 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS [91 HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2022 o9 oko YYYYMMDD Burd, Tina 1 From: Burd, Tina J Sent: Monday, August IS, 2022 10:54 AM To: Barraco CIV Talia M Subject: SW8 961204 - USMCB Lot 201 The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 10, 2022. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 D Q�� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Website: http://deg.nc.goy/about/divisions/energy-mineral-land-resources/stormwater Based on the current guidance to minimize the spread of COVID-rq, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQoffice locations ate limiting public access to appointments only. Please check with the appropriate staff befine visiting our offices, as we may be able to handle your requests by phone or entail. We appreciate your patience as we continue to serve the public during this challenging time. Non -Transfer Application Completeness Review Checklist Project Name: U5 C_3 L—T 2-x7 Project County/Location: O03a�ovJ /wV C.U3 Permit Action: New New Permit #r: ❑Not located in the ETJ of the following delegated and functioning programs: Date Delivered to WIRO: / /C) % )lj Z RIMS Received/Accepted Date: /D p Date Given to Admin: ��$yy /A -2-.;- BIMIS Acknowledged Date': ploga- NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach Bruns: Leland / Navassa (?) / Oak Island Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City Major Mod / Minor Mod &Will ❑Existing Permit #: ❑---- Applicant & Permittee are the same?3 Expiration Date°: Permit Type: D / / LD Overall / HD &LD Combo General Permit / Offsite / Exempt + Redevelopment Development Type: Commercial/ Residentia ther Subdivided?: Subdivision or ci WOE q!'ol Z�� (o ZD 20 ZZ ❑Offsite to SWB: Ells Offsite Lot approved in Master Permit?a Rule(s): u2017 Coastal u2008 Coastal IA1995 Coastal ❑Phase II El Universal ❑1988 Coastal Permittee Type & Documents Needed: Property Owner(s) =Purchaser Lessee =HOA Developer 4 Viable? Viable? =Viable? QVlable? Viable? Deed =Purchase Agmt =Lease =Election Minutes Paperwork - ®Application ' \ ❑Fee: ❑$505 (within 6mo) Check#(s): Lzf Q_j�;D ❑No Fee ❑Su pplement' (1 new form or for older forms: 1 original per SCM) ❑ O&M ' ❑Soils Report (Infil or PP) ❑Calculations (signed/sealed) ❑Deed Restrictions, if subdivided' ❑Project Narrative ❑USGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N ❑Plans (2 Sets) NOTES: 'Enter BUS Acknowledged Date on this Sheet 2For New Projects -Enter New Permit # on Supplements & Deed Restriction Templates. 3 If permittee is different, STOP. Needs to be transferred first. °If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first. 5If Lot not approved in master permit, STOP. Master permit needs mod. EMAILED ENGINEER DATE: REVIEWER NAME:r..�(_ T Comments: G:WQ\\\Reference Libra ry\Procedures\Checklists\Com pleteness Review Checklist 20210908